Loading...
HomeMy WebLinkAboutResolution - 2013-R0022 - Agreement - Armko Industries Inc.- Services For Roof Replacement - 01/10/2013Resolution No. 2013-R0022 January 10, 2013 Item No. 5.12 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock, an Agreement for Architectural/Engineering services for the roof replacement at the Lubbock Memorial Civic Center, by and between the City of Lubbock and Arntico Industries, Inc., and related documents. Said Agreement is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on January 10, 2013 pr ATTEST: Reb cca Garza, City Secretat7 APPROVED AS TO M Scott Snider, Assistant City Manager Community Services APPROVED ORM: 1 Chad Weaver, Assistant City Attorney m:ccdocs/RES.Agnnt-Armko Industries, Inc. December 2, 2012 Resolution No. 2013-R0022 CONTRACT 11130 AGREEMENT BETWEEN THE CITY OF LUBBOCK AND ARMKO INDUSTRIES, INC. STATE OF TEXAS § COUNTY OF LUBBOCK § This Agreement entered into this 10th day of January, 2013, by and between the CITY of Lubbock ("City") and "ARMKO INDUSTRIES, INC", 7302 82nd Street, Suite 14, Lubbock, TX, 79424. (The Engineer). WHEREAS, City is in need of Architectural and Engineering Services for the Roof Replacement at the Lubbock Memorial Civic Center, 1501 Mac Davis Lane, Lubbock, Texas. WHEREAS, ARMKO INDUSTRIES, INC. has the experience and skill required the Services described above; and WHEREAS, City desires to contract with ARMKO INDUSTRIES, INC. to perform said services; NOW THEREFORE, it is agreed between the parties that: I. SCOPE OF WORK. A. Responsibilities: ARMKO INDUSTRIES, INC. agrees to provide all Architectural and Engineering Services at above said location, and described in Exhibit A which is attached hereto and incorporated herein as if fully set forth. B. City Responsibilities: City agrees to pay a not to exceed amount of $132,000 inclusive of all related fees and expenses to ARMKO INDUSTRIES, INC. for the project cost of performing above described Exhibit A. II. TIME OF PERFORMANCE ARMKO INDUSTRIES, INC will begin work promptly after this agreement is signed and complete the project within three hundred fifty five (355) calendar days of receipt of Notice to Proceed, unless otherwise agreed between the parties. III. GENERAL CONDITIONS A. General Compliance ARMKO INDUSTRIES, INC. agrees to comply with all applicable federal, state, and local laws pertaining to architectural and engineering services. B. Certificate of Insurance Lubbock Memorial Civic Center Roof Project — Armko Industries, Inc. Page 1 ARMKO INDUSTRIES, INC. shall obtain and maintain in full force and effect during the term of this Agreement, commercial general liability, professional liability and automobile liability coverage with insurance carriers permitted to do business in the state of Texas. The insurance companies must carry a Best's Rating of A -VII or better. The policies will be written on an occurrence basis, subject to the following minimum limits of liability: Commercial General Liability: $1,000,000 General Aggregate Products-Comp/Op AGG Personal & Adv. Injury Contractual Liability Professional Liability Automobile Liability: $ 1,000,000 Combined Single Limit for any auto: $ 500,000 Per Occurrence The City shall be named as an additional insured with respect to the Automobile Liability and Commercial General Liability on a primary and non-contributory bases and shall be granted a waiver of subrogration under those policies. Engineer shall provide a Certificate of Insurance to the City as evidence of coverage. The Certificate shall provide 30 days notice of cancellation. A copy of the additional insured endorsement and waiver of subrogration attached to the policy will be included in the Certificate. Copies of all endorsements are required. C. Hold Harmless ARMKO INDUSTRIES, INC. hereby assumes full responsibility for the risk of bodily injury, death or property damages resulting from its performance of this Agreement and releases for itself, its employees and agents, the City of Lubbock, its officers, agents, employees or representatives from any and all injury, loss, liability, damage or costs relating to any claim arising from performance of this Agreement. ARMKO INDUSTRIES, INC. shall hold harmless, defend and indemnify the City from any and all claims, actions, suits, charges and judgments whatsoever that arise out of ARMKO INDUSTRIES, INC. performance or nonperformance of this Agreement. D. Governing Law This Agreement shall for all purposes be construed and enforced under and in accordance with the laws of the State of Texas. E. Non -Arbitration The City reserves the right to exercise any right or remedy available to it by law, contract, equity, or otherwise, including without limitation, the right to seek any and all forms of relief in a court of competent jurisdiction. Further, the City shall not be subject to any arbitration process prior to exercising its unrestricted right to seek judicial remedy. The remedies set forth herein are cumulative and not exclusive, and may be exercised concurrently. To the extent of any conflict between this provision and another provision in, or related to, this document, this provision shall control. Lubbock Memorial Civic Center Roof Project — Armko Industries, Inc. Page 2 F. The City Right to Audit At any time during the term of the contract, or thereafter, the City, or a duly authorized audit representative of the City or the State of Texas, at its expense and at reasonable times, reserves the right to audit Contractor's records and books relevant to all services provided to the City under this Contract. In the event such an audit by the City reveals any errors or overpayments by the City, Contractor shall refund the City the full amount of such overpayments within thirty (30) days of such audit findings, or the City, at its option, reserves the right to deduct such amounts owing the City from any payments due Contractor. G. Amendments City or ARMKO INDUSTRIES, INC. may amend this Agreement at any time provided that such amendments make specific reference to this Agreement and are executed in writing and signed by both parties. H. Entire Agreement This Agreement constitutes the entire agreement between the parties with respect to the subject matter. IN WITNESS HEREOF, the parties have executed this Agreement as of this 10th day of January ,2013. CITY OF LUBBOCK ARMKO INDUSTRIES, INC. GLE'RODFRTSON, MAYOR Brad Draper, RRO, PCI Vice President ATTEST: Re •eca Garza, City Secreta Lubbock Memorial Civic Center Roof Project — Annko Industries, Inc. Page 3 APPROVED AS TO CONTE Scott Snider, Assistant City Manager APPROVED/AS TO FORM: Chad Weaver, Assistant City Attorney Lubbock Memorial Civic Center Roof Project— Armko Industries, Inc. Page 4 December 3, 2012 Mr, Freddy Chavez Director of Facilities Lubbock Memorial Civic Center 1501 Mac Davis Lane Lubbock, Texas 79401 RE: Roof Replacement Project Lubbock Memorial Civic Center Mr. Chavez, EXHIBIT A d Z Cd LU AWKO 7302 W St. Suite 14 Lubbock, TX 79424 806.833.6953 / FAX 806.833.8539 x .armko.com Texas Registered Engineering Firm N490 It is the desire of the City of Lubbock to engage the services of Annko to perform roof consulting services specifically requested by the City of Lubbock. The services to be provided may relate to some or all of the following: analysis of existing roof components; Instrumented moisture survey; roof programs; analysis of the construction documents including review of the exterior elevations, wall sections, parapets, unusual transitions, roof components, door / window details, plan details; specifications; help in establishing budget forecast; bidding or negotiation backup; major phase or full -lime quality assurance observations; final observations and progress payment requests; and/or other work agreed to by the parties. Armko shall perform any or all of the afore -described services for the City of Lubbock as an independent consultant and not as an employee. SCHEDULEA Building Envelope Analysis A. Interior and exterior visual examination of roof -related sheet metal, parapets, copings, flashings, roof mat, deck system, and penetrations and/or projections through the roof system. B. Cross-section analysis of core samples of the roof membrane. C. Analysis of insulation and topside of deck system at core areas. D. Moisture meter readings of insulation and/or membrane as required. E. Bitumen chemical analysis if applicable. F. Establish roof priorities if applicable. Building Envelope Analysis Report (written and oral presentation) A. Existing Conditions B. Recommendations C. Budget Cost Estimate D. Existing Condition Photographs E. Roof Plan Total for Schedule A: $ 1,500.00 PROPOSAL FOR PROFESSIONAL SERVICES Page 2 of 4 SCHEDULE B SCHEMATIC DESIGN - PHASE 1 —15% A. Perform building evaluation and establishment of the Scope of Work. B. Identify areas of concern for the new work as well as the existing conditions. C. Establish tie-in options and weather tightness of the existing facility during demolition. D. Provide preliminary drawings and or sketches. DESIGN DEVELOPMENT - PHASE 2 — 20% A. Development of preliminary drawings, including the following: 1. Roof Plans 2. Roof details 3. Unusual and difficult transitions between walls and roof elements B. Define major waterproofing elements C. Define the roofing and waterproofing specifications CONSTRUCTION DOCUMENT - PHASE 3 — 30% A. Preparation of the construction documents, including the following: 1. Specifications and establishment of the Scope of Work 2. Compile and print Bid Package and General Conditions 3. Roof Plans 4. Roof Details 5. Unusual and difficult transitions between walls and roof elements 6. Waterproofing details B. Provide review of architectural drawings for flashing and moisture conflicts including the following: 1. Wall Sections 2. Exterior Elevations 3. Parapet Details 4. Plans Details 5. Door and Window Details C. Finalize the project specifications for the roofing and waterproofing sections of the project manual. BIDDING - PHASE 4 — 5% A. Assist in notification to the construction community. B. Assist at pre -proposal and/or proposal conference. C. Cooperative evaluation and selection of successful bidder. CONSTRUCTION - PHASE 5 — 30% A. Perform submittal review. B Assist at and/or conduct pre -construction and pre -installation meetings. C. On-site observations of work (two hours per week maximum). D. Monthly progress payment request review. E. Final observations and progress payment request review. F. Maintain photo manifest of work in place. G. Provide daily observation reports of each visit to Owner. Total for Schedule B: 6% of Roofing and Waterproofing contract awarded to successful contractor or professional fees not to exceed $ 132,000.00 PROPOSAL FOR PROFESSIONAL SERVICES Page 3 of 4 QUALITY ASSURANCE INSPECTOR A. Additional visits over and above the two (2) hour on site weekly visit as described in Schedule C, shall be $65.00 hour. B. Full-time Quality Assurance Inspector shall be $65.00 per hour, plus reimbursable expenses, based on one eight hour work day. REIMBURSABLE EXPENSES Upon submission of invoices and support documentation, City of Lubbock shall reimburse Armko for the following expenses: A. Special reproductions as required. TERMS Phases 1-4 for Schedule B will be invoiced at the completion of Phase 4 for 70% of total billable amount. Balance due of 30% of total billable amount for Schedule B will be invoiced in monthly increments until completion of project. Armko shall receive payment within ten (10) days after receipt of invoice by City of Lubbock according to the aforementioned schedule of fees. Armko's provision of its services hereunder shall be within its discretion, as shall the hours and days to be worked. LIMITATION OF LIABILITYIWARRANTIES With respect to the service to be performed by Armko, pursuant to the terms of this agreement, Armko shall not be liable or responsible for, and it shall be saved and held harmless by City of Lubbock from and against any and all claims and damages of every kind, for injury to or death of any person or persons and for any damage to or loss of property, arising out of or attributed directly or indirectly to the performance of this contract. City of Lubbock agrees that Armko shall provide only the services set out herein and that Armko makes no warranties, express or Implied, with respect to the products it may recommend to their fitness for a particular purpose. City of Lubbock agrees to look solely to the warranties made by the contractor and/or manufacturer of said products, including, without limitation, consequential damages arising out of the use of said product. ENTIRE AGREEMENT This agreement supersedes any and all other agreements, either oral or in writing, between the parties hereto with respect to the services to be rendered to the City of Lubbock by Armko and contains all of the covenants and agreements between the parties with respect to such transaction in any matter whatsoever. PROPOSAL FOR PROFESSIONAL SERVICES Page 4 of 4 CHOICE OF LAWNENUE This agreement shall be governed by and construed in accordance with the laws of the State of Texas and is performable in Lubbock County, Texas. CANCELLATION Either party hereto may cancel this agreement in writing upon thirty (30) days written notice. The contract shall thereafter terminate 30 days after the postmark date of said notice. Nothing contained herein shall relieve either party from performing hereunder during said 30 day period. Payment for all services performed prior to the termination date shall be due within five days after said termination date, unless earlier payment is required under any other provision of this agreement. Respectfully, a o(„ 3A414—t Brad Draper, RRO, RCI Vice President