HomeMy WebLinkAboutResolution - 2013-R0244 - CO To Contract - Utility Contractors Of America Inc.- NW Lubbock Drainage - 08/08/2013Resolution No. 2013—RO244
August 8, 2013
Item No. 5.7
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock is hereby authorized and directed to
execute for and on behalf of the City of Lubbock, Change Order No. 1 to that certain
Contract No. 10284 by and between the City of Lubbock and Utility Contractors of
America, Inc. for Northwest Lubbock Drainage Improvements - Phase 1, and related
documents. Said Change Order No. 1 is attached hereto and incorporated in this
resolution as if fully set forth herein and shall be included in the minutes of the City
Council.
Passed by the City Council on August 8. 2013
GL ROBERTSON, MAYOR
ATTEST:
3K7kt- 0... . - -
Reb ca. Garza, City Secretar�')
APPROVED AS TO CONTENT:
R. Keith Smith, P.E., Chief Operating Officer
APPROVED AS TO FORM:
Chad Weaver, Assistant City Attorney
vw:ccdocs,. RES.ChgOrd# I Contract -Utility Contractors
July 24, 2013
City of Lubbock
Purchasing and Contract Management
Change Order
Contract No: 10284 Contractor: Utility Contractors of America, Inc.
Change Order No.1 Contract Title: Northwest Lubbock Drainage Improvements - Phase 1
BID/RFP No. 12 -10284 -MA Project Number: 92174
1."Change Order" means a written order to a Contractor executed by the Owner in accordance with the contract authorizing an
addition to, deletion from, or adjustment or revision of the requirements of the contract documents, or an adjustment to the
compensation payable to Contractor, or to the time for performance of the contract and completion of the Project, or a
combination thereof, which does not alter the nature of the thing to be constructed and is an integral part of the project objective.
Adjustments to "Estimated Quantities" to a line item in a Unit Price contract do not require a Change Order. All work that alters
the nature of the thipE to be constructed or that is not an int�ge ral= of the project g�jective must be let out for public bid.
Description of change (alteration, deviation, addition, or deletion) caused by conditions encountered during construction
not covered by the specifications and drawings of the project (attach additional pages if necessary):
At the City's request, an additional 2562 LF of trunk line pipe is being added to the construction work in
order to better coordinate construction efforts with a water line project and ongoing TXDOT construction.
Also, additional curb and gutter and water line replacements are necessary as part of the construction.
This change order amends the contract length from 755 calendar days to 955 calendar days.
2. Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs, including material
quantities, material costs, taxes, insurance, employee benefits, other related costs, profit and overhead. Where certain unit prices
are contained in the initial contract, no deviations are allowed in computing negotiated change order costs.
ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM.
ITEM DESCRIPTION AMOUNT
A. ORIGINAL CONTRACT VALUE: $ 30,899,371
B. AMOUNT OF THIS CHANGE ORDER: Council approval required f over S25,000 $ 5,080,518
COST CENTER: 6511 ACCOUNT: 92174 9243 30000
C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A): 16.4
D. AMOUNT OF PREVIOUS CHANGE ORDERS: $ 0
E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): $ 5,080,518
F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 25% increase 16.4
or decrease
G. NEW CONTRACT AMOUNT (A+E): $ 35,979,889
3. It is mutually agreed that the above dollar amount and the time extension, as applicable, as set forth in this Change Order constitutes
full compensation to the Contractor for all costs, expenses and damages to the Contractor, whether direct, consequential or otherwise,
in anyway incident to, or arising out of or resulting directly or indirectly; from the work performed or modified by the Contractor
under this Change Order.
This Ch!inge Omer_ _ is n tLvvalid withoastthe following signatures (okase sign in order and return 3 originals with Contract Cover Sheet to
Purchating and Contract Mang ement De arim n ;
t(1) O TRACTOR liates (2) PROJECT ARCHITECT/ENGINEER Date
roved Conte t: � App ed a Form:
Zq 13
SENTATIVEDate (4 pate(3) OWNER'S REP )
as,q- P�-� 'waNY 114WI3
(5) CAPrrA1L PROJECTS MANAGER Date (6) PURL SING AKWONTRACT MANAGER Date
anover 525,000 require a Contract Cover Sheet and the jollowin ignatures.
CITY OF LUBBOCK E -
8 8 13 8/8/13
(7) MAYOR Date (8) CIT SECRETARY Date
Council Date: August 8. 2013 Agenda Item 0: 5.7 Resolution ll: 2013—R0244
PUR-45 (Rev 12r2012)
Proposal
From: Utility Contractors of America Inc. Project: 988COlA
5901 63rd St. Suite D Description: Northwest Lubbock Drainage
ty@ucatexas.com Improvements - Change Order -
Lubbock, TX 79424 Erskine to Approximately
Phone: (806) 792-1314 Quaker Storm Sewer
Fax: (806) 687-0826 Bid Date:
ITEM / DESCRIPTION
BID QTY
U/M
UNIT BID
AMOUNT
01A
2,562.000
LF
2.00
$5,124.00
SWPPP, including NOI and NOT
02A
2,562.000
LF
6.00
$15,372.00
Traffic Control
03A
43.000
LF
1,760.00
$75,680.00
10'x 10' RC Box, Open Cut Installation
04A
1.000
EA
50,000.00
$50,000.00
10'x 10' to 8'x 7' RC Box Transition, Length
6'
05A
2,513.000
LF
1,725.00
$4,334,925.00
8'x 7' RC Box, Open Cut Installation
06A
2,562.000
LF
0.50
$1,281.00
Trench Groundwater Dewatering
07A
2,562.000
LF
73.00
$187,026.00
Trench Safety System
08A
1.000
EA
15,850.00
$15,850.00
Storm Sewer Manhole, With Riser Branch
Tees
09A
1.000
EA
13,500.00
$13,500.00
Storm Sewer Manhole, No Riser Branch Tees
10A
50.000
LF
228.00
$11,400.00
Crossing Water Line, Remove & Replace, 12"
dia.
11A
1.000
EA
11,500.00
$11,500.00
Parallel Utility Adjustment
12A
180.000
LF
3.00
$540.00
Remove Concrete Curb and Gutter
7/22/2013 Utility Contractors of America Inc.
Proposal
ITEM / DESCRIPTION
BID QTY
U/M
UNIT BID
AMOUNT
13A
180.000
LF
18.00
$3,240.00
Concrete Curb and Gutter
14A
24,970.000
SY
4.00
$99,880.00
Vegetation Restoration by Seeding
15A
1.000
Is
38,000.00
$38,000.00
Moblization
16A
3,960.000
LF
40.00
$158,400.00
R/R 14" SCRC w/14" DR -18 C-905
17A
3.000
EA
2,500.00
$7,500.00
12" x 6" TS,TV & Box
18A
2.000
EA
3,000.00
$6,000.00
12" x 8" TS,TV, & Box
19A
1.000
EA
3,300.00
$3,300.00
12 -inch Gate Valve
20A
2.000
EA
7,500.00
$15,000.00
14 -inch Gate Valve
21A
2.000
EA
1,500.00
$3,000.00
Remove existing 14" valve vaults
22A
2.000
EA
12,000.00
$24,000.00
8 X 8' Vault for 14" valve (no Bottom)
TOTAL BID: $5,080,518.00
Digitally signed by Ty Lane
T Laneemail=ty@ucatexas.com, DN: cn=Ty Lane, o=UCA Inc.,
You=President,
c=US
Signature: Date: 2013.07.22 19:08:19 -05'00'
Ty Lane