HomeMy WebLinkAboutResolution - 2014-R0342 - CO To Contract - Allen Butler Construction Inc.- Street Paving Improvements - 10/09/2014RESOLUTION
(WHEREAS, the City of Lubbock and Allen Butler Construction, Inc. ("Contractor"), entered into
Contract No. 11647 ("Contract"), Resolution No. 2014-84029, related to 34`h Street Paving
Improvements (the "Project"), per Bid # ITB 14 -11647 -TF,
WHEREAS, pursuant to Change Order No. 1, the City and Contractor increased the amount of
the Contract by One Hundred. Fifty One Thousand Ninety Seven and 551100 Dollars
($151,097.55), said amount being, approximately 2.7% of the original Contract value;
WHEREAS, the City and Contractor now desire to enter into Change Order No. 2, as prescribed
below.
NOW THEREFORE. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
LUBBOCK:
THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for
and on behalf of the City of Lubbock, Change Order No. 2 to that certain Contract No. 11647,
Resolution No. 2014-84029, by and between the City of Lubbock and Allen Butler Construction.
[tic., for 34`x' Street Paving Improvements, per Bid # ITB 14 -11647 -TF, and related documents.
Said Change Order No. 2 is attached hereto and incorporated in this Resolution as it' Billy set
forth herein and sliall be included in the minutes of the City Council.
Passed by the City Council on oct(b 9. 2
GL TSON, MAYOR
/#9�
:ATTEST;
`ebe ca. Garza, City Secreta
APPROVED AS TO CONTENT:
d 0-
R. Keith Smith, P.E.. Director of Public Works
AS TO FORM:
K. Casner, Natural Resources and Utility Attorney
)rd#2-Contract-11647-Allen Butler
2014
PARKHILL SMITH & COOPER 4222 85th Street
Lubbock, Texas 79423
an 806.473.2200
CHANGE DATE OF ISSUANCE: September 11, 2014
ORDER PROJECT: 34th Street Paving Improvements — Quaker Ave to Indiana Ave
OWNER: City of Lubbock
NO. 2 CONTRACTOR: Allen Butler Construction
ENGINEER'S PROJECT NO.: 01.2692.12
The Contract Documents are modified as follows upon execution of this Chanae Order:
Description:
Additional work, outside of the original contract, is to be completed to replace two severely dilapidated sewer
manholes, and to eliminate a third one, that were discovered upon removing the existing concrete pavement in the
Quaker/34th ST Intersection. A portion of the sewer line will also be replaced. The work will require additional
traffic control measures, temporary pumping of effluent from upstream manholes to downstream of the working
area, and other measures to complete the work within a single weekend. No additional days will be allocated
through this chance order.
Attachments (list documents supporting change):
Change request from Allen Butler
CHANGE IN CONTRACT PRICE:
Original Contract Price:
$_5,453,267.08
Increase from previously approved
Change Orders No. 1 to No. 1 :
$ 337.699.55
Contract Price prior to this Change
Order:
$ 5,790.966.63
Increase of this Change Order.
CHANGE IN CONTRACT TIMES:
Original Contract Times: ® Working days ❑ Calendar days
Substantial completion (days or date): 345
Ready for final payment (days or date):
[IASFeasel [Decrease] from previously approved Change Orders
No. 1 to No. 1:
Substantial completion (days): 0
Ready for final payment (days):
Contract Times prior to this Change Order: NIA
Substantial completion (days or date): 345
Ready for final payment (days or date):
[Increase] [Decrease] of this Change Order. NIA
Substantial completion (days or date): 345
$_93.301.00 Ready for final payment (days or date):
%Tatal%Projects1201212692.121CONSTRUCTiON PHASE1Change Ordem%CO 212692.12 Change Order No 2.docm
Abilene Amarillo EI Paso Las Cruces Lubbock Midland team-psc.com
Change Order No. 2 Page 2 September 11, 2014
Contract Price incorporating this
Change Order:
$_5.884.267.63
RECOMMENDED:
By:
Enginee�Aut zed Signature)
Date: 9/S�/y
Approved by Funding Agency ('d applicable):
Contract Times with all approved Change Orders:
Substantial completion (days or date): 345
Ready for final payment (days or date):
ACCEPTED:
By:
Owner odzed Signature)
Date:
By: ZIZL U / D44 Lf/
Contractor AuthorizedSignature)
Date:
Date:
i
ALLEN BUTLER CONSTRUCTION, INC.
24 S. LAKESHORE DRIVE
RANSOM CANYON. TX 79388
(888)746-7498
FAX (808)748.7877
CHANGE REQUEST DATE: 08/21/14
PROJECT: 34th Street JOB #: 14-105
TO: Kyle Jackson
PSC
DESCRIPTION OF CHANGE:
34th & Quaker - Bypass Pumping & Manhole Rehab
REM DESCRIPTION
QUANTITY UNITS
UNIT
PRICE
NET AMOUNT
1 Mobilization
1 LS
$2,000.00
$2,000.00
2 Traffic Control
1 LS
$3600.00
$3,600.00
3 Bypass Pumping
1 Each 3 days
$35,000.00
$35.000.00
4 Demo & Replace MIH
2 Each
$10,000.00
$20.000.00
5 Demo Existina WH
1 Each
$1 000.00
$1 000.00
Remove & Replace
Existing 24° Clay tie with
6 24" PVC
60 Each
$200.00
$12,000:00
7 CSB
30 CY
$100.00
4000.00
Site Supervlsicn, security,
alclean-up & demo haul -off
1 LS
$8,234.00
$8,234.00
9110% Mark-up UCA INV
1 Each
$7.650.00
$7,650.00
10 Bondi
1w
1 $917.001
$917.00
UNIT COST $93,301.00
93,301.00
TheOriginal Contract Sum was...................................................................
Net Change by Previously Authorized Request and Changes ............................
The Contract Sum Prior to This Change Order was ......................................... -
TheContract Sum will be Increased............................................................. $93,301.00
ACCEPTED:
ALLEN BUTLER CONSTRUCTION, INC.
BY: BY:
DATE: DATE:
PLEASE SIGN AND RETURN ONE COPY
Contract No: 11647
City of Lubbock
Purchasing and Contract Management
Change Order
Contractor: Alen Butler Construction, Inc.
Change Order No. 2 Contract
BIDfRFP No, ITB 14 -11647 -TF
34th Street Paving Improvements
Project Number: 92217
"Change Order" means a written order to a Contractor executed by the Owner in accordance with the contract authorizing an
addition to, deletion from, or adjustment or revision of the requirements of the contract documents, or an adjustment to the
compensation payable to Contractor, or to the time for performance of the contract and completion of the Projc" or a
combination thereof, which does not alter the nature of the thing to be constructed and is an integral part ofthe project objective.
Adjustments to "Estimated Quantities" to a line item in a Unit Price contract do not require a Change Order. All work !hot alters
the nWgre gfthe thing to be constructed or that is notnut not.irilml nart ofthe proiect otifectivu must be Igt out for pqlic bid.
Description of change (alteration, devintion, addition, or deletion) caused by conditions encountered during construction
not covered by the specifications and drawings of the project {unach additional pages ljnecessary):
Work included In Change Order No. 2, by the Contractor, has been requested by the City of Lubbock Public Works
Department. This work includes the removal of three deteriorated Sewer Manholes and the installation of two new
ones. The old manholes were leaking causing the surrounding soils to lose the ability to support the roadway. The
operation requires pumping the sewage around the section of sewer line that will be under construction.
Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs, including material
quantities, material costs, taxes, insurance, employoc benefits, other related costs, profit and overhead. Where certain unit prices
aro contained in the initial contract, no deviations are allowed in computing negotiated change order costs.
IT1011';GED COSTS MUST 8T FULLY D0C1IM ENTEI) AND ATTACI IED TO THIS F010.
I'I'EM DESCRIPTION AM101JNJ'
A. ORIGINAL CON'IRiACT VALUE: $ 5,453,287.08
B. AMOUNT OF TI IIS CHANGE ORDER: (rood appm ml ra7urred 1f ouer $25,000 $ 03,301.00
COST CENTER: 92217 ACCOUNT: 0240 1.71
C. PERCENT OF CONTRACT VALUE TI [IS CHANGE ORDER (BfA): %
D. AMOUNT OF PREVIOUS CIIANGE ORDERS: 151,097.55
E, TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): S 244,300.55
F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (EJA): 13% 4.48 %
oe derreme
G. NEW CONMRACT AMOUNT (A+ -E): $ 5,697,665.55
It is mutually agreed that the above dollar amount and the time extension, as applieaabie, as set forth in this Change Order constitutes
full compensation to the Contractor for a costs, expenses and damages to the Contractor, whether direct, consequential or otherwise,
in anyway incident to, or arising out of or resulting directly or indirectly; from the Work perlbmxd or modified by the Contractor
under this Clutnge Order. /
(1) CONTRACTOif
Approved Cir
(3) OWNER'SSEAITATNVE Date
C1161-) _ ___ jq f
(5) CAP PROIIiC"IS MANAOER Dace
f,
(z)
9111114
Date
Approved as to Form•
1t J
(4 C ATTG Y to
(G) PIJRCi[AS1IdG CONTRACT MANAGER Date
Ch a duet f 25,4417 require a Conti t aver Sheet ¢nr! the fniinxving s atures;
CITY OF Lt1B 1'TE -
(7)MAYOR Batu (8 761 ECRErAKY Dntc
C uu�sc'I nate: 125/2014 Agenda Item it; Resolution M
VUR -45 (1e4v IM012)