HomeMy WebLinkAboutResolution - 2014-R0096 - Contract - Teinert Commercial Building Services - Roof Repairs - 03/13/2014RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for
and on behalf of the City of Lubbock, Contract No. 11795 for roof repairs for the City of
Lubbock Wood Shop, by and between the City of Lubbock and Teinert Commercial Building
Services, and related documents. Said Contract is attached hereto and incorporated in this
resolution as if fully set forth herein and shall be included in the minutes of the City Council.
Passed by the City Council on
March 13, 2014
ROBERTSON, MAYOR
ATTEST:
U�" -,5-1<-
Rebe ca Garza, City Secret
APPROVED AS TO CONTENT:
Y 1 ,,—
Mark Ye wood, Rssistant City Manager
Chief Information Officer
APPROVED AS TO FORM:
Chad Weaver, Assistant City Attorney
vw:ccdocs.' RES.Contract-Teinert
February 27, 2014
Contract No. 14-11795-JOC
Work Order Signature Document
NJPA EZIQC Contract No.: TX04-112012-TCB
FINew Work Order F-1 Modify and Existing Work Order
Work Order Number: 017769.00 Work Order Date: 01/27/2014
Work Order Title: Roof Repairs City of Lubbock Wood Shop
Owner Name: City of Lubbock Contractor Name: Teinert Commercial Building Services
Contact: Wesley Everett Contact: Chad Henthorn
Phone: (806) 775-2665 Phone: (806) 744-2801
Work to be Performed
Work to be performed as per the Final Detailed Scope of Work Attached and as per the terms and conditions of NJPA
EZIQC
Brief Work Order Description:
Roof Repairs City of Lubbock Wood Shop
Work Order Number
017769.00
CITY OF LUBBOCK
Glen ert n, ayor
Attest:
Rebecca ,a a, City Secretary
Location
Roof Repair City of Lubbock
Wood Shop
APPROVED AS CONTENT:
arYearwo ,Chief formation Office
Assista t City Manager
Amount of Contract
$82,000.86
Chad Henthorn, Teinert Commercial Building
Services
Owner's Representative
Wesley Everett, Director of Facilities
APP V D AS O FORM:
Assistant City Attorney
Work Order Signature Document
THE GORDIAN GROUP
NJPA EZIQC Contract No.: TX04-112012-TCB
FINew Work Order ❑ Modify an Existing Work Order
Work Order Number.: 017769.00 Work Order Date:
Work Order Title: Roof Repairs, City of Lubbock Wood Shop
Owner Name: City of Lubbock Contractor Name: Teinert Commercial Building Services
Contact: Rodney Unrein Contact: Chad Henthorn
Phone: 806 775-2207 Phone: (806) 744-2801
Work to be Performed
Work to be performed as per the Final Detailed Scope of Work Attached and as per the terms and conditions of NJPA
EZIQC Contract No TX04-112012-TCB.
Brief Work Order Description:
Time of Performance Estimated Start Date:
Estimated Completion Date:
Liquidated Damages Will apply: Will nota I :
Work Order Firm Fixed Price: $82,000.86
Owner Purchase Order Number:
Approvals
Owner
` Date
a�� 2 -N-11V
Contractor Date
Work Order Signature Document Page 1 of 1
EZIQC - Southwest V2712014
Detailed Scope of Work
To: Chad Henthorn
Teinert Construction
4009 Clovis Road
Lubbock, TX 78414
(806) 744-2801
Date Printed: January 27, 2014
Work Order Number: 017769.00
Work Order Title: Roof Repairs, City of Lubbock Wood Shop
Brief Scope:
THE Q-GORDI; GROUP
From: Rodney Unrein
City of Lubbock
1625 13th Street, Room 204
Lubbock, TX 79457
806 775-2207
7 Preliminary FIRevised ❑X Final
The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the items
set forth below shall be considered part of this scope of work.
Work shall include removal of existing roof membrane and insulation down to substrate. Remove and replace any damaged
or deteriorated metal decking according to the unit price as specified. Mechanically fasten specified 1.5" specified
insulation board per ASCE 7 criteria, adhere specified tapered insulation board and W substrate board as specified. Fully
adhere specified SBS modified base sheet, and fully adhering one ply of Thermoplastic Elvaloy® sheet. Install new
miscellaneous carpentry to parapet wall as specified to provide wall flashings and new metal coping cap as specified.
Raise all mechanical equipment and service lines to eight -inch (8") minimum height above finished roof surface. Provide a
twenty (20) year NDL manufacturer's warranty with no exclusion for up to two-inch (2") diameter hail events, and a two (2)
year contractor's warranty. Work shall also include all HVAC and electrical, piping disconnect and reconnection.
Installation shall be as per NRCA, SMACNA, ANSUSPRI, specifications, details and manufacturer's guidelines.
Contractor
Date
Owner Date
Scope of Work Page 1 of 1
EZIQC - Southwest 112712014
Contractor's Price Proposal - Summary
Date: January 27, 2014
Re: IQC Master Contract #: TX04-112012-TCB
Work Order* 017769.00
Owner PO #:
Title: Roof Repairs, City of Lubbock Wood Shop
Contractor: Teinert Commercial Building Services
Proposal Value: $82,000.86
01 - General Requirements $3,466.80
02 - Site Work $102.69
05 - Metals $5,868.63
07 - Thermal & Moisture Protection $72,411.61
08 - Openings $151.13
Proposal Total $82,000.86
Thisl total represents the correct total for the proposal. Any discrepancy between line totals,
sub -totals and the proposal total is due to rounding.
Contractor's Price Proposal - Summary Page 1 of 1
EZIQC - Southwest 1/27/2014
Contractor's Price Proposal - Detail
Date: January 27, 2014
Re: IQC Master Contract #: TX04-112012-TCB
Work Order* 017769.00
Owner PO #:
Title: Roof Repairs, City of Lubbock Wood Shop
Contractor: Teinert Commercial Building Services
Proposal Value: $82,000.86
Sect. Item Mod.
UOM
Description
Line Total
Labor Equip. Material (Excludes)
4 05 31
00
00 0018
01 - General Requirements
$867.54
1 01 22 23 00 0887
DAY
5,000 LB Telescopic Boom, Hi -Reach, Rough Terrain Construction Forklift With
Factor
$2,697.13
Full -Time Operator
X
Installation 1,300.00 x 0.51 x
1.3085 -
867.54
Quantity Unit Price Factor
Total
Installation
3.00 x 687.08 x 1.3085 -
2,697.13
2 01 74 19 00 0015
EA
40 CY Dumpster (5 Ton) "Construction Debris"Includes delivery of dumpster,
MOD For >500 To 1500, Add
$769.67
$221.14
rental cost, pick-up cost, hauling, and disposal fee. Non -hazardous material.
Quantity Unit Price
Factor
Quantity Unit Price Factor
Total
Installation 100 x 588.21 x 1.3085 =
769.67
1.3085
Subtotal for 01 - General Requirements
6 05 31
$3,466.80
02 - Site Work
3 02 41 19 13 0347 VLF Concrete Block, Soft Old Mortar, Toothing Masonry Cutouts $102.69
Quantity Unit Price Factor Total
Installation 24.00 x 3.27 x 1.3085 - 102.69
Subtotal for 02 - Site Work $102.69
05 - Metals
4 05 31
00
00 0018
SF 1-1/2" Deep, 22 Gauge Open Ribbed Galvanized Steel Deck
$867.54
Quantity Unit Price
Factor
Total
X
Installation 1,300.00 x 0.51 x
1.3085 -
867.54
Demo for existing deck
5 05 31
00
00 0018 0175
MOD For >500 To 1500, Add
$221.14
Quantity Unit Price
Factor
Total
Installation 1,300.00 x 0.13 x
1.3085
221.14
6 05 31
00
00 0020
SF 1-1/2" Deep, 18 Gauge Open Ribbed Galvanized Steel Deck
$4,473.76
Quantity Unit Price
Factor
Total
Installation 1,300.00 x 2.63 x
1.3085 -
4,473.78
7 05 31
00
00 0020 0175
MOD For >500 To 1500, Add
$306.19
Quantity Unit Price
Factor
Total
Installation 1,300.00 x 0.18 x
1.3085 -
306.19
Subtotal for 05 - Metals
$5,868.63
07 - Thermal & Moisture Protection
8 07 13 13 00 0005 CSF 4 Ply, 15# Asphalt Saturated Organic Felt Sheet Waterproofing, Hot -Mopped $1,821.96
Quantity Unit Price Factor Total
Installation 0.00 x 163.60 x 1.3085 - 0.00
Demolition 40.00 x 34.81 x 1.3085 = 1,821.96
Contractor's Price Proposal - Detail Page 1 of 3
EZ/QC - Southwest 1/27/2014
Contractor's Price Proposal - Detail Continues..
Work Order Number: 017769.00
Work Order Title: Roof Repairs, City of Lubbock Wood Shop
07 - Thermal & Moisture Protection
9
07 13 13 00 0011
CSF 1/2" Asphalt Coated Protective Board
$12,740.08
Quantity Unit Price
Factor
Total
Installation 40.00 x 243.41 x
1.3085
12,740.08
This is actually a wood fiber protection board. Price book doesn't have specified product.
This is the next
closest available product.
10
07 22 16 00 0014
SF 1" Thick, R2.78, Perlite, Roof Board Insulation
$824.36
Quantity Unit Price
Factor
Total
Installation 0.00 x 1.14 x
1.3085
0.00
Demolition 4,500.00 x 0.14 x
1.3085 =
824.36
11
07 22 16 00 0047
SF 1-1/2" Thick, R10.87, Polyisocyanurate, Roof Board Insulation
$6,948.14
Quantity Unit Price
Factor
Total
Installation 4,500.00 x 1.18 x
1.3085 -
6,948.14
12
07 22 16 00 0083
SF 1/4" Tapered Polyisocyanurate Board
$19,607.87
Quantity Unit Price
Factor
Total
Installation 4,500.00 x 3.33 x
1.3085 -
19,607.87
13
07 51 13 00 0214
SQ Flexbase® 80 Fiberglass Reinforced SBS -Modified Base Sheet
Used As Base
$9,671.45
Ply With Biflex Cap, 80 Mil
Quantity Unit Price
Factor
Total
Installation 45.00 x 164.25 x
1.3085 -
9,671.45
14
07 54 19 00 0009
SQ 80 Mil, Single Ply RPVC Roofing Membrane, Fully Adheredlncludes adhesive.
$12,205.16
Quantity Unit Price
Factor
Total
Installation 45.00 x 207.28 x
1.3085 -
12,205.16
15
07 54 19 00 0009 0112
MOD For >10 To 25, Add
$1,072.25
Quantity Unit Price
Factor
Total
Installation 45.00 x 18.21 x
1.3085
1,072.25
16
07 54 19 00 0009 0114
MOD For 20 Year Warranty, Add
$353.30
Quantity Unit Price
Factor
Total
Installation 45.00 x 6.00 x
1.3085 -
353.30
17
07 54 19 00 0009 0125
MOD For Integral Polyester Fleece -Backing, Add
$1,678.15
Quantity Unit Price
Factor
Total
Installation 45.00 x 28.50 x
1.3085 -
1,878.15
18
07 62 00 00 0051
SF 24 Gauge, Galvanized Steel Flashing
$3,406.35
Quantity Unit Price
Factor
Total
Installation 325.00 x 6.76 x
1.3085
2,874.77
Demolition 325.00 x 1.25 x
1.3085 =
531.58
19
07 62 00 00 0051
SF 24 Gauge, Galvanized Steel Flashing
$110.57
Quantity Unit Price
Factor
Total
Installation 12.50 x 6,76 x
1.3085 -
110.57
Counter Flash for mech units
20
07 63 00 00 0008
SF 24 Gauge Galvanized Sheet Metal, Filled Pitch Pockets
$126.77
Quantity Unit Price
Factor
Total
Installation 2.00 x 48.44 x
1.3085 -
126.77
These are evaloy clad. Evaloy is not in price book.
21
07 71 23 00 0195
LF 4" x 5", 26 Gauge, Rectangular Galvanized Steel Downspout
$691.67
Quantity Unit Price
Factor
Total
Installation 60.00 x 7,88 x
1.3085 -
618.66
Demolition 60.00 x 0.93 x
1.3085
73.01
Contractor's Price Proposal - Detail
Page 2 of 3
EZ/QC - Southwest
1/27/2014
Contractor's Price Proposal - Detail Continues..
Work Order Number: 017769.00
Work Order Title: Roof Repairs, City of Lubbock Wood Shop
07 - Thermal & Moisture Protection
22 07 71 23 00 0197 EA Galvanized Steel Leader/Conductor Head $755.48
Quantity Unit Price Factor Total
Installation 4.00 x 138.16 x 1.3085 723.13
Demolition 4.00 x 6.18 x 1.3085 32.35
This will be 24 gauge as specified.
23 07 71 23 00 0198
EA Thru-Wall Galvanized Steel Scupper Outlet
$398.05
Quantity Unit Price
Factor
Total
Installation 4.00 x 70.49 x
1.3085 =
368.94
Demolition 4.00 x 5.56 x
1.3085 =
29.10
This will be 24 gauge as specified.
$72,411.61
Subtotal for 07 - Thermal & Moisture
Protection
08 - Openings
24 08 71 16 00 2300
EA 36" Long, 3/8" Flexible Conduit, Stainless Steel Armored Power Transfer Door
$151.13
Loop
Quantity Unit Price
Factor
Total
Installation 2.00 x 49.23 x
1.3085
128.83
Demolition 2.00 x 8.52 x
1.3085 =
22.30
Reroute conduit for HVAC units
$151.13
Subtotal for 08 - Openings
Proposal Total $82,000.86
This total represents the correct total for the proposal. Any discrepancy between line totals,
sub -totals and the proposal total is due to rounding.
Contractor's Price Proposal - Detail Page 3 of 3
EZIQC - Southwest 1/27/2014