Loading...
HomeMy WebLinkAboutResolution - 2014-R0075 - Contract - Minnix Commercial Partners Ltd.- HVAC And Office - 02/27/2014RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the act of the City Manager in executing, on behalf of the City of Lubbock, Contract No. 11743 to repair storm damage to roof, overhead doors and HVAC and interior office of the Meter Shop, by and between the City of Lubbock and Minnix Commercial Partners, Ltd, and all related documents is hereby ratified in full. Said Contract is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council Passed by the City Council on February 27, 2014 G C. ROBERTSON, MAYOR ATTEST: Reb tca Garza, City Secretary APPROVED AS TO CONTENT: �� 4---A Mark earwo d, Assistant City Manager Chief Information Officer APPROVED AS TO FORM: Chad Weaver, Assistant City Attorney vw:ccdocs/RES.Acknowledge & Ratify-Minnix Contract February 4, 2014 Contract No. 14-11743-JOC Work Order Signature Document BUYBOARD EQIQC Contract No.: 2012 Area J - MCP New Work Order Modify and Existing Work Order Work Order Number: 016423.00 Work Order Date: 08/27/2013 Work Order Title: Storm Damage repairs to roof, overhead doors, HVAC system and interior office of the Meter Shop Owner Name: City of Lubbock Contractor Name: Minnix Commercial Partners, LTD Contact: Wesley Everett Contact: Keenan Davis Phone: (806) 775-2275 Phone: (806) 798-7335 Work to be Performed Work to be performed as per the Final Detailed Scope of Work Attached and as per the terms and conditions of BuyBoard EZIQC Contract No. 2012 Area J — MCP. Brief Work Order Description: Storm Damage repairs to roof, overhead doors, HVAC system and interior office of the Meter Shop Work Order Number Location Amount of Contract 016423.00 Storm Damage repairs to roof, $115,170.75 overhead doors, HVAC system and interior office of the Meter Shop This job order contract ratifies the purchase of and encumbers fu�MAQOOount of $115,170.75 awarded to Minnix Commercial Partners, LTD., on February 27, 2014. The following is incorporated into and made part of this job order contract by reference: JOC 14-11743 Resolution No. CITY OF LUBBOCK Keenan Davis, Project Manager Minnix Commercial Partners, LTD Attest -D Owner's 4epreseV / n tive Rebecca G rza, City Secreta Wesley Everett, Director of Facilities APPROVED AS CONTENT: APPA0i" AS�TO'FORM: Mark Yei_rwood, Chief Information Office Assistant City Attorney Assistant City Manager Work Order Signature Document BUYBOARD EZIQC Contract No.: 2012 Area J - MCP New Work Order ❑ Modify an Existing Work Order Work Order Number: 016423.00 Work Order Date: Work Order Title: Meter Shop- Storm Repairs 06/05/13 Owner Name: City of Lubbock Contractor Name: Minnix Commercial Partners, LTD Contact: Wes Everett Contact: Keenan Davis Phone: 806-775-2275 Phone: (806) 798-7335 Work to be Performed Work to be performed as per the Final Detailed Scope of Work Attached and as per the terms and conditions of BuyBoard EZIQC Contract No 2012 Area J - MCP. Brief Work Order Description: Meter Shop- Storm Repairs 5/13/13. Time of Performance See Schedule Section of the Detailed Scope of Work Liquidated Damages Will apply: Will not apply: Work Order Firm Fixed Price: $115,170.75 Owner Purchase Order Number: Approvals Owner Date Contractor Date Work Order Signature Document Page 1 of 1 EZIQC - Buy Board 8/26/2013 Board` Cooperative Purchasing Detailed Scope of Work To: Keenan Davis From: Wes Everett Minnix Commercial Partners, LTD City of Lubbock PO Box 64895 1625 13th St Lubbock, TX 79464 Lubbock, TX 79401 (806) 798-7335 806-775-2275 Date Printed: August 26, 2013 Work Order Number: 016423.00 Work Order Title: Meter Shop- Storm Repairs 06/05/13 Brief Scope: Meter Shop- Storm Repairs 5/13/13. 2'j1QC' THE GORDIAN GROUP Preliminary FIRevised ❑X Final The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the items set forth below shall be considered part of this scope of work. Emergency Repairs for Water Meter Shop. Remove existing damaged rooftop packaged unit. Remove existing roofing and haul off. Install new roofing as specified by Brad Draper. Replace 2 damaged overhead doors, repaired openings, and replaced trim. Repair electrical damages to plugs and lights from water. Replace carpeting and base in office from water damages. Remove existing ceiling pads and replaced with new. Replace insulation above ceiling. Paint room and door. Contractor Date Owner Date Repair damaged ceiling grid. Scope of Work Page 1 of 1 EZ/QC - Buy Board 8/26/2013 Contractor's Price Proposal CSI - Summary Date: August 26, 2013 Re: IQC Master Contract #: Work Order #: Owner PO #: Title: Contractor: Proposal Value: 2012 Area J - MCP 016423.00 Meter Shop- Storm Repairs 06/05/13 Minnix Commercial Partners, LTD $115,170.75 01 - General Requirements $18,535.67 02 - Site Work $93.70 05 - Metals $7,590.85 06 - Wood, Plastic, and Composites $6,935.70 07 - Thermal & Moisture Protection $64,959.58 08 - Openings $4,160.13 09 - Finishes $3,135.21 23 - Heating, Ventilating, And Air -Conditioning (HVAC) $7,888.76 26 - Electrical $1,871.15 Proposal Total $115,170.75 The Percentage of NPP on this Proposal: 18.34% Contractor's Price Proposal - Summary Page 1 of 1 EZIQC - Buy Board 8/26/2013 Contractor's Price Proposal CSI - Detail Date: August 26, 2013 Re: IQC Master Contract #: 2012 Area J - MCP Work Order* 016423.00 Owner PO #: Title: Meter Shop- Storm Repairs 06/05/13 Contractor: Minnix Commercial Partners, LTD Proposal Value: $115,170.75 Sect. Item Modifer UOM Description Line Total Labor Equip. Material (Excluded if marked with an X) 01 - General Requirements 1 01 22 20 00 0006 HR CarpenterTasks in the CTC include appropriate costs to cover labor. These $1,960.00 tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC. Quantity Unit Price Factor Total Installation 48.00 x 33.47 x 1.2200 1,960.00 Clean up and secure site and painting 2 01 22 20 00 0055 HR Maintenance Electrician, With Truck And ToolsThis task will be used $896.26 specifically for maintenance service calls. Quantity Unit Price Factor Total Installation 12.00 x 61.22 x 1.2200 896.26 Repairs to lights due to roofing/water damage. Traced out conduit for damaged plugs/lighting circuits and repaired. 3 01 22 20 00 0060 HR Maintenance Roofer Worker With Truck And ToolsThis task will be used $4,321.73 specifically for maintenance service calls. Quantity Unit Price Factor Total Installation 60.00 x 59.04 x 1.2200 4,321.73 4 01 22 23 00 0889 MO 6,000 LB Telescopic Boom, Hi -Reach, Rough Terrain Construction Forklift $9,811.06 With Full -Time Operator Quantity Unit Price Factor Total Installation 1.00 x 8,041.85 x 1.2200 9,811.06 5 01 52 19 00 0005 MO ADA Portable Toilets, Chemical $192.13 Quantity Unit Price Factor Total Installation 1.50 x 104.99 x 1.2200 192.13 6 01 74 19 00 0014 EA 30 CY Dumpster (4 Ton) "Construction Debris"Includes delivery of dumpster, $1,354.49 rental cost, pick-up cost, hauling, and disposal fee. Non -hazardous material. Quantity Unit Price Factor Total Installation 3.00 x 370.08 x 1.2200 1,354.49 Subtotal for 01 - General Requirements $18,535.67 02 - Site Work 7 02 90 50 00 0096 SF Tear Out Batt Insulation $93.70 Quantity Unit Price Factor Total Installation 320.00 x 0.24 x 1.2200 93.70 Subtotal for 02 - Site Work $93.70 05 - Metals 8 05 05 23 00 0140 EA 1/2" Diameter x 5-1/2" Long Wedge Anchor Expansion Bolt $2,726.70 Quantity Unit Price Factor Total Installation 300.00 x 7.45 x 1.2200 2,726.70 9 05 05 23 00 0140 0035 For Galvanized, Add $289.14 Quantity Unit Price Factor Total Installation 300.00 x 0.79 x 1.2200 289.14 Contractor's Price Proposal - Detail Page 1 of 5 EZIQC - Buy Board 8/26/2013 Contractor's Price Proposal - Detail Continues.. Work Order Number: 016423.00 Work Order Title: Meter Shop- Storm Repairs 06/05/13 Sect. Item Modifer UOM Description Line Total Labor Equip. Material (Excluded if marked with an X) 05 - Metals 10 05 05 23 00 0140 0039 For > 100, Deduct -$457.50 Quantity Unit Price Factor Total Installation 300.00 x -1.25 x 1.2200 -457.50 11 05 31 00 00 0035 SF 1-1/2" Deep, 22/18 Gauge Cellular Galvanized Steel Deck $4,872.38 Quantity Unit Price Factor Total Installation 625.00 x 6.39 x 1.2200 4,872.38 12 05 31 00 00 0035 0165 For> 500 To 1500, Add $160.13 Quantity Unit Price Factor Total Installation 625.00 x 0.21 x 1.2200 160.13 Subtotal for 05 - Metals $7,590.85 06 - Wood, Plastic, and Composites 13 06 11 16 00 0155 LF 2" x 6" Wood Blocking To Concrete $6,935.70 Quantity Unit Price Factor Total Installation 1,500.00 x 2.74 x 1.2200 5,014.20 Demolition 1,500.00 x 1.05 x 1.2200 = 1,921.50 Subtotal for 06 - Wood, Plastic, and Composites $6,935.70 07 - Thermal & Moisture Protection 14 07000 0004 SQ GAF Everguard Fleeced Backed TPO $21,122.38 Quantity Unit Price Factor Total ' Installation x x 41.00 515.18 = 1.0000 21,122.38 15 07 21 16 00 0012 SF 3-1/2" Thick, Unfaced, R-13 Fiberglass Flexible Insulation $242.05 Quantity Unit Price Factor Total Installation 320.00 x 0.62 x 1.2200 242.05 16 07 22 16 00 0047 SF 1-1/2" Thick, R10.87, Polyisocyanurate, Roof Board Insulation $6,402.56 Quantity Unit Price Factor Total Installation 4,100.00 x 1.14 x 1.2200 5,702.28 Demolition 4,100.00 x 0.14 x 1.2200 = 700.28 17 07 22 16 00 0056 SF 1/2" Thick, R0.5, Gypsum -Fiber, Roof Board Insulation (USG Securock $6,852.74 Gypsum) Quantity Unit Price Factor Total Installation 4,100.00 x 1.21 x 1.2200 6,052.42 Demolition 4,100.00 x 0.16 x 1.2200 = 800.32 18 07 22 16 00 0068 SF 1/2" Tapered Polyisocyanurate Board $17,156.86 Quantity Unit Price Factor Total Installation 4,100.00 x 3.43 x 1.2200 17,156.86 19 07 22 16 00 0068 0024 SF For Setting In Hot Asphalt, Add $1,800.72 Quantity Unit Price Factor Total Installation 4,100.00 x 0.36 x 1.2200 1,800.72 20 07 51 13 00 0065 SQ Cap Sheet Surfaced, Built Up Roofing System Demolitionlncludes protective $3,194.28 surfacing. Quantity Unit Price Factor Total Installation 41.00 x 63.86 x 1.2200 3,194.28 Contractor's Price Proposal - Detail Page 2 of 5 EZIQC - Buy Board 8/26/2013 Contractor's Price Proposal - Detail Continues.. Work Order Number: 016423.00 Work Order Title: Meter Shop- Storm Repairs 06/05/13 Sect. Item Modifer UOM Description Line Total Labor Equip. Material (Excluded if marked with an X) 07 - Thermal & Moisture Protection 21 07 52 16 12 0004 SQ 80 Mil, SBS Modified Bitumen Base Sheet, Hot-Mopped $2,876.15 Quantity Unit Price Factor Total Installation= 41.00 x 57.50 x 1.2200 2,876.15 22 07 54 23 00 0009 EA Up To 3" Pipe Diameter, Prefabricated TPO Pipe Cone/Bootlncludes attaching $33.18 the boot to the membrane, caulking around the pipe and installing a draw band. Quantity Unit Price Factor Total Installation 1.00 x 25.19 x 1.2200 30.73 Demolition 1.00 x 2.01 x 1.2200 = 2.45 23 07 54 23 00 0011 EA 6" Diameter, Prefabricated TPO Penetration Pocketlncludes attaching the $68.30 pocket to the membrane, sealing around the penetration and filling the pocket with pourable sealer. Quantity Unit Price Factor Total Installation 1.00 x 53.50 x 1.2200 65.27 Demolition 1.00 x 2.48 x 1.2200 = 3.03 24 07 59 00 00 0002 LF Roofing Membrane Termination Barincludes fasteners and caulking. $273.77 Quantity Unit Price Factor Total Installation 120.00 x 1.52 x 1.2200 222.53 Demolition 120.00 x 0.35 x 1.2200 = 51.24 25 07 62 00 00 0053 SF 24 Gauge, Galvanized Steel Flashing $1,856.72 Quantity Unit Price Factor Total Installation 190.00 x 6.76 x 1.2200 1,566.97 Demolition 190.00 x 1.25 x 1.2200 = 289.75 26 07 62 00 00 0060 LF 8" Girth, 24 Gauge Galvanized Steel Fascia Panels $3,079.87 Quantity Unit Price Factor Total Installation 322.00 x 6.87 x 1.2200 = 2,698.81 Demolition 322.00 x 0.97 x 1.2200 = 381.05 Subtotal for 07 - Thermal & Moisture Protection $64,959.58 08 - Openings 27 08 36 13 00 0025 EA 12'x 12', Non-Insulated, 24 Gauge Galvanized Steel Sectional Door, Manual $4,160.13 Lift Quantity Unit Price Factor Total Installation 2.00 x 1,432.16 x 1.2200 3,494.47 Demolition 2.00 x 272.81 x 1.2200 = 665.66 Subtotal for 08 - Openings $4,160.13 09 - Finishes 28 09 51 13 00 0018 SF 2' x 2'x 3/4" Mineral Fiber Acoustical Ceiling Panels $671.49 Quantity Unit Price Factor Total Installation 320.00 x 1.52 x 1.2200 593.41 Demolition 320.00 x 0.20 x 1.2200 = 78.08 29 09 51 13 00 0018 0093 For > 200 To 500, Add $39.04 Quantity Unit Price Factor Total Installation 320.00 x 0.10 x 1.2200 39.04 Contractor's Price Proposal - Detail Page 3 of 5 EZ/QC - Buy Board 8/26/2013 Contractor's Price Proposal - Detail Continues.. Work Order Number: 016423.00 Work Order Title: Meter Shop- Storm Repairs 06/05/13 Sect. Item Modifer UOM Description Line Total Labor Equip. Material (Excluded if marked with an X) 09 - Finishes 30 09 65 13 13 0002 LF 4" High 1/8" Vinyl Plastic Base, All Colors $351.36 Quantity Unit Price Factor Total Installation= 144.00 x 1.69 x 1.2200 296.90 Demolition 144.00 x 0.31 x 1.2200 = 54.46 31 09 65 13 33 0002 SF Latex Self Leveling Underlay, 1/8" Thick $171.78 Quantity Unit Price Factor Total Installation= 320.00 x 0.44 x 1.2200 171.78 32 09 65 13 33 0005 SF Remove Glue From Concrete FloorFor removal of glue from VCT or carpet $121.02 placement. Not to be used in conjunction with demolition tasks associated with floor tile installation. Quantity Unit Price Factor Total Installation 320.00 x 0.31 x 1.2200 = 121.02 33 09 68 13 00 0019 SY 24 Ounce, Patterned, Nylon Carpet Tile $1,537.64 Quantity Unit Price Factor Total Installation 36.00 x 35.01 x 1.2200 = 1,537.64 34 09 68 16 00 0034 SY 24 Ounce, Medium Traffic, Patterned, Nylon Broadloom Carpet $242,88 Quantity Unit Price Factor Total Installation 0.00 x 21.53 x 1.2200 = 0.00 Demolition 36.00 x 5.53 x 1.2200 = 242.88 Subtotal for 09 - Finishes $3,135.21 23 - Heating, Ventilating, And Air-Conditioning (HVAC) 35 23 74 13 00 0005 EA 5 Ton Cooling, Electric Heat Self Contained Package Rooftop UnitElectric load $7,345.75 approximately 1/2 the cooling capacity. Quantity Unit Price Factor Total Installation 1.00 x 5,761.31 x 1.2200 7,028.80 Demolition 1.00 x 259.80 x 1.2200 = 316.96 36 23 74 13 00 0005 0252 For Equipment Base Roof Curbs, Add $543.01 Quantity Unit Price Factor Total Installation 1.00 x 445.09 x 1.2200 543.01 Subtotal for 23 - Heating, Ventilating, And Air-Conditioning (HVAC) $7,888.76 26 - Electrical 37 26 05 19 16 0013 MLF #10 AWG Cable - Type THHN-THWN, 600 V Copper, Single Solid, Placed In $106.71 Conduit Quantity Unit Price Factor Total Installation 0.20 x 437.35 x 1.2200 106.71 38 26 05 19 16 0122 MLF #6 AWG Cable - Type THHN-THWN, Underground Feeder And Branch Circuit $576.91 Quantity Unit Price Factor Total Installation 0.50 x 945.75 x 1.2200 576.91 39 26 05 33 13 0291 LF 3/4" EMT Conduit, Mounted Exposed On Flat Wall $123.22 Quantity Unit Price Factor Total Installation 50.00 x 2.02 x 1.2200 123.22 40 26 05 33 13 0313 EA 3/4" EMT Set Screw Coupling $5.12 Quantity Unit Price Factor Total Installation= 2.00 x 2.10 x 1.2200 5.12 Contractor's Price Proposal - Detail Page 4 of 5 EZIQC - Buy Board 8/26/2013 Contractor's Price Proposal - Detail Continues.. Work Order Number: 016423.00 Work Order Title: Meter Shop- Storm Repairs 06/05/13 Proposal Total $115,170.75 This total represents the correct total for the proposal. Any discrepancy between line totals, sub -totals and the proposal total is due to rounding. The Percentage of NPP on this Proposal: 18.34% Contractor's Price Proposal - Detail Page 5 of 5 EZIQC - Buy Board 8/26/2013 Sect. Item Modifer UOM Description Line Total Labor Equip. Material (Excluded if marked with an X) 26 - Electrical 41 26 05 33 13 0324 EA 3/4" EMT Compression Coupling $12.30 Quantity Unit Price Factor Total Installation 4.00 x 2.52 x 1.2200 12.30 42 26 05 33 13 1691 LF 3/4" Liquid Tight Flex Conduit $23.42 Quantity Unit Price Factor Total Installation 10.00 x 1.92 x 1.2200 23.42 43 26 05 33 13 1702 EA 3/4" Straight Liquid Tight Connector $11.15 Quantity Unit Price Factor Total Installation 2.00 x 4.57 x 1.2200 11.15 44 26 05 33 16 0222 EA 4" Square Box x 2-1/8" Depth, With Cover, Concealed Outlet Boxes .$37.06 Quantity Unit Price Factor Total Installation 2.00 x 15.19 x 1.2200 37.06 45 26 24 19 00 0711 EA Fused Disconnect Type, Size 1 Space Complete With Bus And Hardware $164.98 Quantity Unit Price Factor Total Installation 1.00 x 135.23 x 1.2200 164.98 46 26 25 00 00 0053 EA 60 Amp Bus Duct Circuit Breaker 277/480 V, 3 Phase, 4 Wire Plug-in Circuit $810.28 Breaker Quantity Unit Price Factor Total Installation 1.00 x 664.16 x 1.2200 810.28 Subtotal for 26 - Electrical $1,871.15 Proposal Total $115,170.75 This total represents the correct total for the proposal. Any discrepancy between line totals, sub -totals and the proposal total is due to rounding. The Percentage of NPP on this Proposal: 18.34% Contractor's Price Proposal - Detail Page 5 of 5 EZIQC - Buy Board 8/26/2013 Signature of Director of Facilities Management Date City departments must obtain approval from the Director of Information Technology when specifications include the configuration of any computer systems, computer hardware, computer software, or computer peripherals. Si nature of Director of Information Technology Date APPROVAL Signature Date (Expenditures under $25,000 - Dept Head; over $25,000 - Director) Prevailing Wage Rates: Contractor must comply with the requirements of all applicable laws and regulations and the current Davis- Bacon Wage Rates and any such revisions thereto. TOTAL: Fixed Price Work (Job Order Sum): $ 115,170.75 A total of $ is appropriated with $ available in project/account number 1611.8302.12166 (Budget Title ) for this purpose. (Daoidw, dA&O U4,4— Signature of Senior Budget Anal Ist Signature of Budget Director The City reserves the right to exer'Cid any right or remedy available to it by law, contract, equity, or otherwise, including without limitation, the right to seek any and all forms of relief in a court of competent jurisdiction. Further, the City shall not be subject to any arbitration process prior to exercising its unrestricted right to seek judicial remedy. The remedies set forth herein are cumulative and not exclusive, and may be exercised concurrently. To the extent of any conflict between this provision and another provision in, or related to, this document, this provision shall control. CITOF UBBOCK, T XAS (OWNER) CONTRACTOR B BY , Marta Alva Di ect o urchasing and Contract Signature Management Keenan Davis or Nick Hammond Printed Name APPROVED AS TO CONTE Project Manager Title Owner's ReprWehlativu Minnix Commerical Partners LTD Company PRI E CATION: P.O. Box 64895 Address Facilities Manage n OC Administrator Lubbock, TX 79464 City, State, Zip Code PUR-I2-JOC (Revised 07/2012) I" REQUEST FOR JOB ORDER CONTRACT 1 TO: David Gamboa, Senior Buyer Job Order Contract No: / e i Requesting Department: _Facilities Job Order Date: _8/27/2013 Cost Center No: 1611 Contact Person/Phone: _Rodney Unrein 2207 Notice to Proceed Date: Expected Completion Date: Emergency Storm Damage, Meter Shop JOB ORDER CONTRACTING: When requesting the minor construction, repair, rehabilitation, or alteration of a facility, the requesting department must complete and submit this form to the Purchasing Department, along with a complete and accurate description of the work being requested and the location thereof. Official notification of a Job Order and Notice to Proceed can only be made by the Purchasing Department. Notice of Award by any other department or agency of the City may be premature and inaccurate. FROM THE DATE OF THIS REQUEST UNTIL OFFICIAL NOTIFICATION OF AWARD BY THE PURCHASING DEPARTMENT, ANY AND ALL INQUIRIES MUST BE REFERRED TO THE PURCHASING DEPARTMENT. SUMMARY AND STATEMENT OF WORK: / Storm Damage, repairs to roof, overhead doors, HVAC system and interior office. NOTE: Complete this section for projects that involve minor construction, repair, rehabilitation, or alteration of a facility (projects that require insurance). PROJECT NUMBER: _016423.00 NUMBER OF DAYS FOR COMPLETION OF WORK Working or Calendar LIQUIDATED DAMAGES: If the performance period of a Job Order exceeds 30 days, partial payment is authorized, based on a percentage of completion minus a 5% retainage of total sum of JO. Liquidated damages may be assessed if project extends beyond JO agreed completion date. OWNER'S REPRESENTATIVE: TITLE: INSURANCE/BOND REQUIREMENTS: as stipulated in IQC Master Contract No. with the JO Contractor. Additional requirements as follows: 1MP0 ANT: Ci departure must obtain a royal for proper insurance requirements ro/!hf Risk anagement Coordinator for al! projects that involve he cons c n,r ir,maintena e,o enovation of a structure, road, highway, o othrove ent or addition of real property (public works) prior to b ' i n f form to the epartment. Per E ibit A nature of R k a agement Coordinator Date [Asbestos may be present in the buildin , but no suspected materials will be disturbed during the proposed work. El—Asbestos may be present in the building, but sampling has shown that none of the materials that will be disturbed contain asbestos. El—The work area contains asbestos materials that must be addressed before continuing the proposed work. The Contractor must contact the Asbestos Coordinator prior to performing any work. See attachment for details. EI—The work proposed is exterior to the building; therefore, it is the responsibility of the Contractor to follow all state, local, and federal regulations regarding worker safety and waste disposal. Signaturesbestos Coordinator Date PUR- I2-JOC (Revised 07/2012) JOC CONTRACT: EXHIBIT A City of Lubbock, TX Purchasing & Contract Management II —INSURANCE COVERAGE REQUIRED SECTION A. Prior to the approval of this contract by the City, the Contractor shall furnish a completed Insurance Certificate to the City, which shall be completed by an agent authorized to bind the named underwriter(s) to the coverages, limits, and termination provisions shown thereon, and which shall furnish and contain all required information referenced or indicated thereon. THE CITY SHALL HAVE NO DUTY TO PAY OR PERFORM UNDER THIS CONTRACT UNTIL SUCH CERTIFICATE SHALL HAVE BEEN DELIVERED TO THE CITY. SECTION B. The City reserves the right to review the insurance requirements of this section during the effective period of the contract and to require adjustment of insurance coverages and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decisions, or the claims history of the industry as well as the Contractor. SECTION C. Subject to the Contractor's right to maintain reasonable deductibles in such amounts as are approved by the City, the Contractor shall obtain and maintain in full force and effect for the duration of this contract, and any extension hereof, at Contractor's sole expense, insurance coverage written by companies approved by the State of Texas and acceptable to the City, in the following type(s) and amount(s): TYPE OF INSURANCE GENERAL LIABILITY ® Commercial General Liability ❑ Claims Made ® Occurrence ® XCU ® To Include Products Of Complete Operation Endorsements ❑ Pollution AUTOMOTIVE LIABILITY ® Any Auto ❑ Scheduled Autos ❑ All Owned Autos ❑ Hired Autos COMBINED SINGLE LIMIT General Aggregate $1,000,000 Products-Comp/Op AGG x Personal & Adv. Injury x Contractual Liability _ Fire Damage (Any one Fire) Med Exp (Any one Person) General Aggregate _ ❑ Non -Owned Autos Aggregate $1,000,000 (EXCESS LIABILITY ❑ Umbrella Form GARAGE LIABILITY El Any Auto ® BUILDER'S RISK ❑ INSTALLATION FLOATER ❑ CARGO ® WORKERS COMPENSATION Each Occurrence Aggregate Auto Only - Each Accident Other than Auto Only: Each Accident Aggregate _ ❑ 100% of the Total Contract Price ❑ 100% of the Total Material Costs OCCUPATIONAL MEDICAL AND DISABILITY ® EMPLOYERS' LIABILITY $500,000 OTHER: COPIES OF ENDOSEMENTS ARE REQUIRED ® City of Lubbock named as additional insured on Auto/General Liability on a primary and non-contributory basis. ® Waiver of subrogation in favor of the City of Lubbock on all coverages, PUR-I2-JOC (Revised 07/2012) IMPORTANT: POLICY ENDORSEMENTS The Contractor will provide copies of the policies without expense, to the City and all endorsements thereto and may make any reasonable request for deletion, revision, or modification of particular policy terms, conditions, limitations, or exclusions (except where policy provisions are established by law or regulation binding upon either of the parties hereto or the underwriter of any of such policies). Upon such request by the City, the Contractor shall exercise reasonable efforts to accomplish such changes in policy coverages, and shall pay the cost thereof. Any costs will be paid by the Contractor. REQUIRED PROVISIONS The Contractor agrees that with respect to the above required insurance, all insurance contracts and certificate(s) of insurance will contain and state, in writing, on the certificate or its attachment, the following required provisions: a. Name the City of Lubbock and its officers, employees, and elected representatives as additional insureds, (as the interest of each insured may appear) as to all applicable coverage; b. Provide for 30 days notice to the City for cancellation, nonrenewal, or material change; c. Provide for notice to the City at the address shown below by registered mail; d. The Contractor agrees to waive subrogation against the City of Lubbock, its officers, employees, and elected representatives for injuries, including death, property damage, or any other loss to the extent same may be covered by the proceeds of insurance; e. Provide that all provisions of this contract concerning liability, duty, and standard of care together with the indemnification provision, shall be underwritten by contractual liability coverage sufficient to include such obligations within applicable policies. f. All copies of the Certificates of Insurance shall reference the Project name or contract number for which the insurance is beine supplied. NOTICES The Contractor shall notify the City in the event of any change in coverage and shall give such notices not less than 30 days prior the change, which notice must be accompanied by a replacement CERTIFICATE OF INSURANCE. All notices shall be given to the City at the following address: Marta Alvarez, Director of Purchasing & Contract Management City of Lubbock 1625 13`h Street, Room 204 Lubbock, Texas 79401 SECTION D. Approval, disapproval, or failure to act by the City regarding any insurance supplied by the Contractor shall not relieve the Contractor of full responsibility or liability for damages and accidents as set forth in the contract documents. Neither shall the bankruptcy, insolvency, or denial of liability by the insurance company exonerate the Contractor from liability. PUR-I2-JOC (Revised 07/2012)