HomeMy WebLinkAboutResolution - 2015-R0241 - Additional Scope Of Services, Contract- RS&H Inc - Engineering Services At LPSIA - 08/13/2015Resolution No. 2015-RO241 August 8, 2015 Item No. 6.4 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock, an additional scope of services pursuant to Professional Services Contract 12234 for professional engineering services at Lubbock Preston Smith International Airport, by and between the City of Lubbock and RS&H, Inc., and related documents. Said additional scope of services is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on August 13, 2015 GLffN-f. XOTSON, MAYOR ATTEST: P4 'eow C eb tcca Garza, City Secret APPROVED AS TO CONTENT: y CaYnpbell, Vxecutive Director of Aviation APPROVED AS TO FORM: RES. Prof Sery Contract-RS&H, Inc July 7, 2015 Resolution No. 2015-RO241 City of Lubbock Preston Smith International Airport Terminal Building Modifications PROJECT PROPOSAL / PRO ECT WORK SCOPE - CONCEPT & DESIGN PHASE ERVICES FOR VARIOUS PROJECTS CONTRACT #12234 AMENDMENT No. 2 Reynolds, Smith and Hills, Inc. 10748 Deerwood Park Boulevard South Jacksonville, Florida 32256-0597 904 256 2500 Fax 904 256 2501 FL Cert. Nos. AAC001886 EB0005620 LCC000210 City of Lubbock Preston Smith International Airport Terminal Building Modifications June 12, 2015 Concept & Design Phase Services for Various Projects Page 1 City of Lubbock Preston Smith International Airport Terminal Building Modifications PROJECT PROPOSAL / PROJECT WORK SCOPE - CONCEPT & DESIGN PHASE SERVICES FOR VARIOUS PROJECTS PROFESSIONAL SERVICES WORK PLAN The City of Lubbock (the Airport) has identified several systems within the passenger terminal building that are in need of upgrading or replacement. Also identified are certain programmatic issues dealing with passenger flow and use efficiency of terminal space. This Work Plan will discuss these needs and identify a strategy to address each either individually or as a part of a group. Individual projects will be described in detail and an approach for addressing each will be detailed. If an issue is dependent upon or is seen to have an effect on other issues, they will be addressed as one project. This Work Plan describes the scope of services by RS&H, Inc., the Architect/Engineer (A/E) for the design and construction phases of the renovation and improvements. This Work Plan includes a Project Schedule and a Project Proposal. The Project Schedule defines the durations of work that are the basis of the Work Plan and Project Proposal. The Project Proposal provides the basis of the estimate for the required compensation and defines the task efforts and deliverables required for the Project. UPGRADING OR REPLACEMENT PROJECT SCOPE DEFINITION — Detailed scope defined under A. Basic Services Task A.1.0 - Terminal Public Address (PA) system — Full Design Services The existing PA system is in need of replacement. The PA system for most part is from the original terminal construction and lacks some of the newer technology features available today. Under the scope of this project the PA system will be replaced with a new system which will include the new speakers, cabling and head end equipment. The system will be Internet Protocol (IP) network based to facilitate new installation and additional components in future. Ambient noise sensors will be provided to improve intelligibility based on the ambient noise. The sensors will adjust he speaker volume based on the ambient noise due to occupancy level of the space. A construction cost estimate will be provided at the 60% design submittal. Task A.2.0 - Access Control and CCTV Upgrades — Concept Design Services The scope of this work includes upgrade of CCTV video management system as well as improved integration of the access controls and CCTV system. RS&H recommends that a concept study phase for this work be the initial step. The concept phase will provide design concept for the security center and more details on the level of upgrades required to the access control and CCTV systems. Goal will be to limit the cost and investment. The concept study will serve to layout the system and obtain an accurate cost and propose an incremental phasing plan for implementation. City of Lubbock Preston Smith International Airport Terminal Building Modifications Concept & Design Phase Services for Various Projects Page 2 Task A.3.0 - Building Envelope Weather Tightness — Full Design Services The existing roof has been in place since 1993 and has developed several leaks over the years. The roof is a modified bitumen system with a built up, gravel covered membrane system in some areas. There are reported leaks in the wall systems as well and the airport has completed a report identifying some areas where water intrusion is occurring. RS&H will survey the roof membrane systems and flashing systems, review any As -built drawings available and provide recommendations to move forward with needed repairs and/or replacements. A review of the report pertaining to the wall system water infiltration will be part of this task and recommendations for repairs will be part of this scope. A site investigation will occur at the beginning of the task and a written report will be included in the 30% submittal. Task A.4.0 - Concept Design for Ticketing, Baggage Screening, Security Checkpoint (SSCP) and Revolving Doors — Concept Design Services RS&H will investigate landside enhancements including moving the SSCP and the revolving doors serving as exits from the airside to a different location ultimately better serving the airport and traveling public. At its present location the SSCP is squeezed between two building service rooms which would not be cost effective to relocate. There is sound reasoning to collocate the SSCP and airside/landside exits and at the same time provide a single exit lane using technology, video cameras and motion detectors. Another important consideration for this area is to accommodate the airport police (LEO) offices in a close proximity to the checkpoint. Currently the LEO offices are on the second level and therefore proposes challenges to the response time to the checkpoint area. The LEO offices will be considered with any proposed modifications to this area. The elimination of the revolving doors and the cost of the maintenance associated with these units will be a welcomed move for the Airport. If this proves feasible, RS&H will provide a concept for this action that can be accomplished in phases while these services continue at their present locations. The Ticketing queuing area is undersized and is presently used for TSA baggage screening as well as passenger check-in activities. Passengers from the east bag claim area must traverse through the Ticketing area in order to exit the building further adding to the congestion. Relocating the TSA bag screening operation to another location away from the public should be a priority. Ticketing, TSA bag screening and the adjacent Bag Claim areas should be included in the concept design with the SSCP and Exit lane. A concept construction cost estimate will be included. Task A.5.0 - Mechanical and Plumbing Systems — Concept Design Services Presently the HVAC systems are being repaired or replaced as needed. Recent work included fixes to the boiler systems and control system. An update to the HVAC assessment should be performed in order to set priorities for future repairs/replacement. A phasing plan for plumbing infrastructure replacement, mostly associated with the restrooms, should be considered as areas of the building core are being modified for landside enhancements. Funding Expectations — The Project's total cost is to be phased using the Airports entitlement funds available on an annual basis. Project Duration — The Project's schedule is defined in the accompanying Project Schedule. The actual schedule may vary significantly as the Project design progresses and the scope is further developed. Changes to the project schedule require changes in the A/E efforts and require increases to the compensation indicated in Project Proposal. City of Lubbock Preston Smith International Airport Terminal Building Modifications Concept & Design Phase Services for Various Projects Page 3 A. BASIC SERVICES Task A.1.0 Terminal Public Address (PA) System Design Task 1.1 Alternatives — Alternatives will be studied to evaluate accommodation of the various facility needs and functions and will be presented to the Airport for consideration. This task will result in concurrence with the Airport on the alternative, or combination of features of the alternatives, for further development. Task 1.2 PA System Design — The system design considerations for function including zoning will be defined and alternative approaches presented. Evaluations based on preferences and affordability will be made for the Airport's direction for further refinement during the subsequent design phases. Task 1.3 Estimating/Budgeting Documents — Project definition will be provided through drawings, narratives and selected outline specifications for cost evaluation. A construction cost estimate, including phasing will be provided at the design development phase. Task 1.4 Project Delivery - Design and final documentation of audio communication (paging) system including specifications will be delivered to the Airport for procurement under the City's procurement system. Task 1.5 Project Management and Discipline Coordination — Scheduling, resource allocation. monitoring, oversight, direction and control for all aspects of the team's efforts including assembly and coordination of all documentation. Task A.2.0 Access Control and CCTV Upgrades Task 2.1 Alternatives — Alternatives will be studied to evaluate accommodation of the various facility needs and functions. Concepts for access control and CCTV system design upgrades will be presented to the Airport for consideration. This task will result in concurrence with the Airport on the alternative, or combination of features of the alternatives, for further development. Task 2.2 Access Control and CCTV Systems Design - Evaluations based on preferences and affordability will be made for the Airport's direction for further refinement during the subsequent design phases. Task 2.3 Estimating/Budgeting Documents — Project definition will be provided through drawings, narratives and selected outline specifications for cost evaluation. Task 2.4 Project Delivery - Design and final documentation of the access control and CCTV system including specifications will be delivered to the Airport for procurement under the City's procurement system. Task 2.5 Cost Estimate Budget Development — An estimate of probable construction cost of the design development level documents to establish the relative value of project components, potential alternates for funding limitations and the conformance to the overall project budget. The probable construction cost is an estimate representing the judgment of the estimators who have no control over the cost of labor, materials or equipment, over the Contractor's methods of determining prices, or over competitive bidding, market or negotiating conditions. Accordingly the A/E cannot and does not warrant or represent that bids or negotiated prices will not vary from the budget, funding or from any estimate or evaluation by the A/E. Task 2.6 Project Management and Discipline Coordination — Scheduling, resource allocation. monitoring, oversight, direction and control for all aspects of the team's efforts including assembly and coordination of all documentation. Task A.3.0 Building Envelope Weather Tightness Performance of this Task will be based on the review of the report provided by the Airport and the verification of deficiencies identified within the report. This task will not provide another building envelope assessment but will implement recommendations noted in Airport provided report. City of Lubbock Preston Smith International Airport Terminal Building Modifications Concept & Design Phase Services for Various Projects Page 4 The documents will include Drawings and Specifications that establish, in detail sufficient for production of shop drawings and construction, the configuration and quality of the materials, components and systems required for the Project. Task 3.1 Site Investigation — RS&H will visit the site to survey and document the existing conditions of the roofing membrane and flashing, and sealants and flashings in the exterior wall systems. Task 3.2 Estimating/Budgeting Documents — Project definition will be provided through drawings, narratives and selected outline specifications for cost evaluation. A construction cost estimate will be provided at the design development phase. Task 3.3 Architectural Construction Documents — Design and documentation of architectural elements of the project such as roof replacement/repairs, exterior envelope repairs and related plans, sections and details. Task 3.4 Project Delivery - Final documentation of the project elements including specifications will be delivered to the Airport for procurement under the City's procurement system. Task 3.5 Probable Construction Cost Estimate — An estimate of probable construction cost of the nearly complete construction documents to identify, potential alternates for funding limitations and assess probable conformance to the overall project budget. The probable construction cost is an estimate representing the judgment of the estimators who have no control over the cost of labor, materials or equipment, over the Contractor's methods of determining prices, or over competitive bidding, market or negotiating conditions. Accordingly the A/E cannot and does not warrant or represent that bids or negotiated prices will not vary from the budget, funding or from any estimate or evaluation by the A/E. Task 3.6 Project Management and Discipline Coordination — Scheduling, resource allocation. monitoring, oversight, direction and control for all aspects of the team's efforts including assembly and coordination of all documentation. Task A.4.0 Concept Design for Ticketing, Baggage Screening, Security Checkpoint (SSCP) and Revolving Doors Performance of this Task will define the general design parameters of scope, scale and relationship of components of the Project. Documentation will include plans, sections, elevations and/or written descriptions. Specific task breakdowns are as follows: Task 4.1 Conditions Investigation Program — RS&H will visit the terminal to verify locations and conditions of systems that will be effected by the proposed concepts. Task 4.2 Alternative Configurations — Alternatives will be studied to evaluate accommodation of the various facility needs and building functions. Scaled study plans will illustrate the alternatives along with presentation of the features and the relative responsiveness to the goals and objectives of the facility. This task will result in concurrence with the Airport on the alternative, or combination of features of the alternatives, for further development. Task 4.3 Architectural Design — The aesthetic design considerations for function, massing and interior appearances will be defined and alternative approaches presented. Evaluations based on preferences and affordability will be made for the Airport's direction for further refinement during the Design Development phase. Task 4.4 Estimating/Budgeting Documents — Multi -discipline project definition will be provided through drawings, narratives and selected outline specifications for cost evaluation. Task 4.5 Cost Estimate Budget Development—An estimate of probable construction cost of the schematic level documents to establish the relative value of project components, potential alternates for funding limitations and the conformance to the overall project budget. The probable construction cost is an estimate representing City of Lubbock Preston Smith International Airport Terminal Building Modifications Concept & Design Phase Services for Various Projects Page 5 the judgment of the estimators who have no control over the cost of labor, materials or equipment, over the Contractor's methods of determining prices, or over competitive bidding, market or negotiating conditions. Accordingly the A/E cannot and does not warrant or represent that bids or negotiated prices will not vary from the budget, funding or from any estimate or evaluation by the A/E. Task 4.6 Code and Permitting Research — Preliminary determination of jurisdictional authority requirements for Building Code, Fire Protection and Life Safety. Impacts on project scope and strategies to accommodate requirements will be defined. Task 4.7 Project Management and Discipline Coordination — Scheduling, resource allocation, monitoring, oversight, direction and control for all aspects of the team's efforts including assembly and coordination of all documentation. Task A5.0 Mechanical and Plumbing Systems Task 5.1 Conditions Investigation Program — RS&H will visit the terminal to verify locations and conditions of systems that will be included in the proposed HVAC assessment report update and plumbing system replacement concept design. Task 5.2 HVAC Assessment Report Update - An update to the Airport's HVAC assessment report will be provided including a list of repair/replacement priorities for consideration. Task 5.3 Plumbing Infrastructure Replacement — RS&H will prepare a concept and conceptual cost estimate for the replacement of the supply and waste piping systems directly related to the restrooms. A plan will be developed indicating possible phasing as related to renovations in Task 4.0. City of Lubbock Preston Smith International Airport Terminal Building Modifications Concept & Design Phase Services for Various Projects Page 6 Project Duration and Fee — The Project's schedule will be identified upon NTP, as only certain tasks may be authorized. Changes to the project scope may require changes to the project schedule. Although that is not anticipated, if such changes occur and are significant, it may require an increase to the compensation indicated in Project Proposal. The fee for all tasks presented in this proposal is Lump Sum $414,513. Task A.1.0 - Terminal Public Address (PA) system — Full Design Services $90,028 Task A.2.0 - Access Control and CCTV Upgrades — Concept Design Services $24,964 Task A.3.0 - Reroofing and Building Envelope Weather Tightness — Full Design Services $188,118 Task A.4.0 - Concept Design for Ticketing, Baggage Screening, Security Checkpoint (SSCP) and Revolving Doors — Concept Design Services $81,679 Task A.5.0 - Mechanical and Plumbing Systems — Concept Design Services $29,724 ALL TASKS $414,513 End of Scope RUH Reynolds, Smith and Hills, Inc. 10748 Deenvood Park Boulevard South Jacksonville, Florida 32256-0597 904 256 2500 Fax 904 256 2501 FL Cert. Nos. AAC001886 EB0005620 LCC000210 Approved As To Content: Kelly �Cabell, Exe�tive Director of Aviation City of Lubbock, TX Sy: Glen obertsvrrMavor City of Lubbock Preston Smith International Airport Terminal Building Modifications Submitted by: a -r - �ez Rodney Bishop, Jr., Vice President Attest: Reb cca Garza, City Secretary Concept & Design Phase Services for Various Projects Page 7