Loading...
HomeMy WebLinkAboutResolution - 2015-R0397 - Contract - Yates Flooring - Carpet Replacement - 12/03/2015Resolution No. 2015-RO397 Item No. 5.13 December 3, 2015 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Change Order No. 1 to that certain Contract No. 12290 by and between the City of Lubbock and Yates Flooring, for carpet replacement at the Lubbock Civic Center per Bid/RFP No. ITB 15 -12290 -PD, and related documents. Said Change Order No. I is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on December 3. 2015 ATTEST: Rebec t Garza, City Secretary APPROVED AS TO CONTENT: Freddy ChAtez, Civic APPROVED AS TO FORM: Justi �itt, Assi tart City Attorney ccdocs/RES. Change Order 1 - Contract 12290 - Civic Center - Yates Carpet November 19, 2015 City of Lubbock Purchasing and Contract Management Change Order Contract No: 12290 Contractor: Yates Flooring Change Order No. 01 Contract Title: Carpet Replacement at the Civic Center BID/RFP No. ITB 15 -12290 -PD Project Number: 91195 1. "Change Order" means a written order to a Contractor executed by the Owner in accordance with the contract authorizing an addition to, deletion from, or adjustment or revision of the requirements of the contract documents, or an adjustment to the compensation payable to Contractor, or to the time for performance of the contract and completion of the Project, or a combination thereof, which does not alter the nature of the thing to be constructed and is an integral part of the project objective. Adjustments to "Estimated Quantities" to a line item in a Unit Price contract do not require a Change Order. All work that alters the nature of the thing to be constructed or that is not an integral part of theproiect objective must be let out for public bid Description of change (alteration, deviation, addition, or deletion) caused by conditions encountered during construction not covered by the specifications and drawings of the project (attach additional pages ifnecessary): This change order will provide for additional carpet that will be used in the hallways of the meeting room area in order to keep a pattern consistency throughout this area and for the overage as a result of the special order design for the overall project. 2. Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs, including material quantities, material costs, taxes, insurance, employee benefits, other related costs, profit and overhead. Where certain unit prices are contained in the initial contract, no deviations are allowed in computing negotiated change order costs. ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM. ITEM DESCRIPTION AMOUNT A. ORIGINAL CONTRACT VALUE: $ 548.610.00 �m"� B. AMOUNT OF THIS CHANGE ORDER: Councilapprmni required i/aver $25.000 $29.646.00 /o COSTCENTER: 91195 ACCOUNT: M2 C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A): 5.4 % D. AMOUNT OF PREVIOUS CHANGE ORDERS: $ 0 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): $ 29,646.00 F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (EIA): 25% mcmase 5.4 % or decrease G. NEW CONTRACT AMOUNT (A+E): $ 578,256.00 3. It is mutually agreed that the above dollar amount and the time extension, as applicable, as set forth in this Change Order constitutes full compensation to the Contractor for all costs, expenses and damages to the Contractor, whether direct, consequential or otherwise, in anyway incident to, or arising out of or resulting directly or indirectly; from the work performed or modified by the Contractor under this Change Order. Purchasine and Contract blanaeement Deaartmenrl: i (1)CO TRA R Date (2 PROJEARC N EER Date Ap ved as to Content: ApproveQ to Form: l I — C�J O -R'S R�E -SE ATIVE Date (4) A O Date 11 2 3 a �fl (5) CAPITAL PR 1 TS MANAGER Date (6) P HASDM-*Nff CVNTRAG MANAGER Date Chat O e ov r 000 require a Contra r Sheet and the following signator CITY OF LUBBOCK A T: (7) MAYOR Date (8) CrrY S CRETARY to Council Date: De mber 3, 2015 Agenda Item #: S.1 Resolution #: PUR45 (Rev 122012) Yates Carpet & Tile 1901 W. Loop 289. Suite 11 Lubbock, TX. 79407 Phone (806) 795-0070 Fax (806) 797-7111 DATE: October 22, 2015 SOLD TO: ADDRESS: CITY, STATE, ZIP: PHONE: ATM: F CHANGE. ORDER PROJECT: Civic Center • 1501 Mac Davis Lane Cpt 5 Net Effect 8602 Driftwood 102919 50emx50cm 20 x 20 Lubbock, TX FAX: 51,008.23 - EMAIL: 17.94 - CHANGE ORDER NO.: Y of Cpt 6 Net Efrect B603 Driflwood 102927 50ctnX50cm 20 x 20 161.46 50.18 58,102.06 Cpt 5 Net Effect 8602 Driftwood 102919 50emx50cm 20 x 20 17.94 56.20 51,008.23 Cpt4 Net Effect B601 Driftwood 102911 50x50 20 x 20 17.94 56.20 $1,008.23 Cpt Base Net Elrect B603 Driflwood 102927 6" 700.00 2.10 51,470.00 Freight Add carpets 4,5, and 6 in lieu of carpet 3 in conference corridors Also carpet 4,5, and 6 from the offices will have to be used to complete the halls 1.00 250.48 Previous Contract Amount: Change Order Amount: New Contract Amount: ACCEPTANCE OF CHANGES The above paws, speofcations and dndzwns are satisfactory and are M" adopted You are auafor=d to do the wax as apeotkd Payment wu be made as outlined above $250.48 $566,417.00 $11,839.00 $578,256.00 Auftu ed Sfprfabae Name- Rene J. Vargas ACCEPTED BY �1� Authanud Sitatutum