Loading...
HomeMy WebLinkAboutResolution - 2015-R0335 - Change Order To Contract - Deerwood Construction Inc - Water Line Replacement - 10/08/2015No. 2015-RO335 No. 4.11 October 8, 2015 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Change Order No. 1 to that certain Contract No. 11849 by and between the City of Lubbock and Deerwood Construction, Inc., for Original Town of Lubbock 16" Water Line Replacement per Bid # RFP No. 14 -11849 -TS, and related documents. Said Change Order No. 1 is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on October 8, 2015 GL .' KdhEktSON, ATTEST: Garza, City APPROVED AS TO P.E., Director of Public Works APPROVED AS TO FORM: RES.ChgOrd#1 Contract-11849-Deerwood Construction Inc 9.17.15 Contract No: 11848 Change Order No.1 BID/RFP No. RFP 14 -11949 -TS City of Lubbock Purchasing and Contract Management Change Order CorWacw DeerwaociConstruction, im Contract Title: Od9kWTownor Lubhod 18' WinerUro Raplaowx t Project Number. I. "Change Order" oseans a wrium order to a Contractor a ccutd by the Owner in -martian= with the contract authorizing so, addition to, deletion from, or adjustment or revision of the requirements of the contract documents, or an adjustment to the mmpensatim payable to Contractor, or to the time for perfornance of the contract and completion of the Pmj=L or a cotnbinstim thermf, which don not alter the nature of the thing In be conshuctd and is an in tegral pan of the project objective. Adjustments to `Estimated QuantidC b a line item in a Unit Price conlraet do not mcrui= a Change Ord= All wmrk that at" Description of change (attention, desistlnn, addiden, or deledon) caused by conditions encountered during construction not covered by the specinntlam and drawings of the projecs furach amieneipuzo ifaecesnyj: 1 Sar us, demo. nus aa, AW'004C8 mbftMd m=9%Pvft at 19Lt Sweat A Ave A grid li d"y seri Ave A 2 LCnammer, dean, Merl aQ enmek W asomata m h vadoxn soma ham PreNnr+bnaaatbna acid a M, ra Isea sbrhed tmlmaww pop otaw). Erta eaeavaam, nml ea apxa, Pmeaa addtlxal08dan, pteca ad ennpe batlBl n areas wxr_ prevbioty ew evmvetd tawida mrd gn emaMrrtent YsuasaNm cid retatemem wade b ts'staq iC ware mitre. 4 AdlflmlellbdnYbashtng aaM Nm notYdokd onptmn L Where the Change Order is negotiated. the Change Order must be fully documenid and itemiud as to tests, including material quantities, ...,•rial costs, tasm, insurance, employs benefits, other related coca, profit and overbced. Where certain unit prices sun, eommind in the initial enntract. no deviations art allowed in computing negotimd change order costa ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO TH)S FORM TFIMv I?L•SCRfPTION AMOUNT A. ORIGINAL CONTRACT VALUE S 1.7ol,mtlo B. AMOUNT OF THIS CHANGEORDER cu,mifa7p,wd nasvredjfm..77joaa SW217M COSTCENTER. ACCOUNT: C. PERCENT OF CONTRACT VALUE Tills CHANGE ORDER (B1A) Soo % D. AMOUNT OF PREVIOUS CHANGE ORDERS: 50.00 E. TOTAL AMOUNT OF ALL CHANGE ORDERS(B+D): Sso217.sa F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS(FIA) ve: u:+rary sm % D. erbmm NEW CONTRACT AMOUNT (A+bj: 51,263,52219 I It is mumally agreed that the above dollar amount and the time eomsion, u applicable, as set forth in this Change Order =Amies full comPcoatim b the Contractor for all cosh, expanses and damagm to dee Contractor, whether dir=t consequentid or abo am. is anyway incident to, or arising out or or resulting directly or indirectly; from the w=k performd or toodi9d by the Contractor under. thu Change Order. man-ar . m. ,l • aa• .. CITY OF 4.11 L P=o1uoma2015W335 PUR-35 (tan Iz'.np) Original Town of Lubbock 16" Water Line Replacement Contract #11849 30 HRS $ Cost Summary of Additonal Work $ 1,164.00 Item # Description Units Unit Discription Unit Cost Item Total 1 18th Street and Ave. Ajackhammer out and haul off concrete Backhoe with Jack Hammer 2 HRS $ 120.00 $ 240.00 Excavator with Jack Hammer 4 HRS $ 180.00 $ 720.00 Hual Truck for Excavator 2 HRS $ 200.00 $ 400.00 Haul off 3 LOADS $ 150.00 $ 450.00 $ 1,810.00 2 18th Street and Ave. B jackhammer out and haul off concrete Backhoe with Jack Hammer 7 HRS $ 120.00 $ 840.00 Haul off 4 LOADS $ 150.00 $ 600.00 $ 1,440.00 3 16th Street and Ave. B jackhammer concrete and haul off Backhoe with Jack Hammer 4 HRS $ 120.00 $ 480.00 Haul off 3 LOADS $ 150.00 $ 450.00 $ 930.00 4 18th and Ave. B additional labor for 2-6" and 1-4" tie in's Labor 30 HRS $ 38.80 $ 1,164.00 $ 1,164.00 5 15th Street and Ave. B jackhammer concrete & flow fill Backhoe with Jack Hammer 4 HRS $ 120.00 $ 480.00 Haul off 3 LOADS $ 150.00 $ 450.00 Excavator digging out concrete and flowfill 4 HRS $ 180.00 $ 720.00 $ 1,650.00 6 North Ave. B at cul-de-sac Backhoe with Jack Hammer 2 HRS $ 120.00 $ 240.00 Haul off 1 LOAD $ 150.00 $ 150.00 $ 390.00 Change Orders Summary Worksheet (5).xlsx 8 Install Megalugs on BFV in isolation valve vault 16" Megalugs 2 EA $ Labor 12 HRS $ 226.51 $ 453.02 396.05 $ 396.05 126.10 $ 126.10 12.00 $ 48.00 331.50 $ 331.50 136.50 $ 136.50 97.50 $ 97.50 24.25 $ 24.25 22.10 $ 22.10 4.00 $ 224.00 38.80 $ 1,241.60 $ 3,100.62 299.04 $ 598.08 38.80 $ 465.60 $ 1,063.68 9 Labor for tie in to existing 16" main at Ave. B cul-de-sac Labor for tie in to existing 16" main at Ave. B cul-de-sac 80 HRS $ 38.80 $ 3,104.00 $ 3,104.00 10 Extra excavation and compaction due to prvious repairs and installation proceedures which caused excessive over excavation and subsequent backfilling and compaction Excavation and hauling to stock pile area 582 CY $ Spoil processing, hauling, and compaction 582 CY $ Change Orders Summary Worksheet (5).xlsx 25.00 $ 14,550.00 25.00 $ 14,550.00 $ 29,100.00 Original Town of Lubbock 16" Water Line Replacement Contract #11849 Cost Summary of Additonal Work 7 Service lines and tie-in's at Economy Mills Feeds Stainless steel saddles 2 EA $ 2" Corp 1 EA $ 1" Corp 1 EA $ 2" stiffeners 4 EA $ 2" Curb Stop 1 EA $ 1" Curb Stop 1 EA $ 2" MIPxCIS adaptor 1 EA $ 1" MINCIS adaptor 1 EA $ 1" Meter Coupling 1 EA $ Poly Service Line 56 LF $ Labor 32 HRS $ 8 Install Megalugs on BFV in isolation valve vault 16" Megalugs 2 EA $ Labor 12 HRS $ 226.51 $ 453.02 396.05 $ 396.05 126.10 $ 126.10 12.00 $ 48.00 331.50 $ 331.50 136.50 $ 136.50 97.50 $ 97.50 24.25 $ 24.25 22.10 $ 22.10 4.00 $ 224.00 38.80 $ 1,241.60 $ 3,100.62 299.04 $ 598.08 38.80 $ 465.60 $ 1,063.68 9 Labor for tie in to existing 16" main at Ave. B cul-de-sac Labor for tie in to existing 16" main at Ave. B cul-de-sac 80 HRS $ 38.80 $ 3,104.00 $ 3,104.00 10 Extra excavation and compaction due to prvious repairs and installation proceedures which caused excessive over excavation and subsequent backfilling and compaction Excavation and hauling to stock pile area 582 CY $ Spoil processing, hauling, and compaction 582 CY $ Change Orders Summary Worksheet (5).xlsx 25.00 $ 14,550.00 25.00 $ 14,550.00 $ 29,100.00 T Cf 0 N N V 00 z � w A F+ Ol Q1 T T n 0 H c 3 3 m 0 D 0. CL X r: 0 3 ID C O 1 W N N W W Q1 Q1 A A 4 Vf yrs Vf N H N N N N O O C1 Ot W W N N A A A A n 0 H c 3 3 m 0 D 0. CL X r: 0 3 ID C O 1 W