HomeMy WebLinkAboutResolution - 2015-R0332 - Amendment To Agreement - Parkhill, Smith, & Cooper - LBB Runway - 10/08/2015Resolution No. 2015-R0332
Item No. 4.8
October 8, 2015
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, Amendment No. 2 to the
Professional Services Agreement for Construction Phase Services for LBB Runway 17R -
35L, Phase II, between the City of Lubbock and Parkhill, Smith & Cooper, Inc., and
related documents, the terms of said amendment being attached hereto and incorporated
in this Resolution as if fully set forth herein and shall be included in the minutes of the
Council.
Passed by the City Council this October 8, , 2015.
R ,RTSON, MAYOR
ATTEST:
Rebec a Garza, City ecret
�y�
APPROVED AS TO CONTENT:
Kelly Campbell, A.A.E.
Executive Director of Aviation
Res.Agrmt-Amend No. 2 -Runway 17R-35L,Phase 111,Prof Servs-Parkhi 11. Smith&Cooper, Ltd
9 15 15
Resolution No. 2015-RO332
PAWGIMLL_ &COOPER •1222 85th Street
"s Lubbock, Texas 79423
806.473.2200
May 28, 2015
Ms. Kelly Campbell, A.A.E.
Director of Aviation
Lubbock Preston Smith International Airport
Administration Office, 2nd Floor
5401 N. Martin Luther King Jr. Blvd., Unit 389
Lubbock, Texas 79403
Re: Amendment No. 2 to Agreement for Professional Services,
Constriction Phase Services for LBB Runway 17R -35L Ph II
Dear Ms. Campbell:
As requested, we have prepared Amendment No. 2 for construction phase services related to the LBB
Runway 17R -35L Ph II project. Refer to the detailed fee sheets attached for an itemization of the scope of
services. The contract amendment modifies the scope of professional services included in our original
agreement dated February 27, 2015.
The scope of professional services to be provided aligns with the allotted contract time of 322 calendar days
to final completion. Professional services required in excess of 322 calendar days shall be considered
additional services and paid for according to Agreement for Engineering Services Exhibit A, A2.01 (18) and
Exhibit B, 84.02.
Task 3FDS Lump Sum Fee for Final Design Services (PSC)
Task 45ID Lump Sum Fee for Bidding Phase Services ,;PSG)
Task 5CON Lump Sum Fee for Construction Administrative
Services
Task 6RPR Hourly Rate Fee w/ NTE amount for Project Resident Project
Representative (RPR) Services "-
Task 7CLO Lump Sum Fee for Project Closeout Services
Task 9SSC Reimbursable Fee with NTE Amount for Subconsultant
Services (Electrical, Paving, Surveying, Testing, AGIS)
TOTAL AMENDMENT NO.2
$25,360.00
$29,070.00
$333,440.00
$435,040.00
$36,380.00
$496,900.00
$1,356,190.00
A*m Ammb Austin EI Paso Las Cruse Lubbock Vdland Www-pscwn
Ms. Kelly Campbell, A.A.E. Page 2 May 28, 2015
We propose to modify the agreement between the City of Lubbock and Parkhill, Smith & Cooper, Inc. dated
February 27, 2015 and to provide the approved Task 3, 4, 5, 6, 7, and 9 services under the provisions of
EXHIBIT B - PAYMENTS TO THE ENGINEER, PARAGRAPH B4.01 (Lump Sum and Hourly Rate Method) of
the contract. Any necessary additional services will be provided according to EXHIBIT B - PAYMENTS TO
THE ENGINEER, PARAGRAPH B4.02. Compensation for Tasks 3, 4, 5, 6, 7, and 9 services shall not exceed
the total above without Owner's written approval.
If the terms of this amendment are agreeable to you, please sign and return one copy of this amendment to
our office. We will take receipt of this signed letter as our notice to proceed with these services. We look
forward to working with you in completing this project. If you have any questions please call either Mark
Haberer or John Hamilton.
Sincerely,
PARKHI
INC.
By
John T.n, PE
Sectog2frector/Dirm Principal
By
Mark D. Haberer, PE
Project Manager/Firm Principal
IN TRIPLICATE
Accepted by:
CITY OF LUBBO
t� By
Glen R6 -on
Mayor
Atte
:;
Rebecca Garza
ity Secretary
Approved as to Content:
Y
Kelly Campbell, A.A.E.
Director of Aviation
rmnp M
,V1W
First Assistant City Attorney
MDH/as
Enclosures
10atal'Protects1201512723 15ADM! N',:CINTRACTstFINALU(Campbell_oontrad amendment 2_mdh.doc
PARKHILL, SMITH & COOPER, INC.
PROJECT BUDGET SHEET (Billing Rates)
LOCATION CODE:
01
PROJECT NAME:
LBB Runwa` 17R-35L Ph 11
JOB NO.:
1
TASK:
3 FDS
DATE:
05/28/15
FEE TYPE:
Lump Sum
PREPARED BY:
MDH
PRINCIPAL:
MDH
PROD. MANAGER:
MDH
MARKUP ON REIMB:
15.00%
MARKUP ON DIRECTS:
15.00%
$25,360
TOTAL FEE:
$25,3.59
LABOR.
$25,056
LABOR:
$25,056
DIRECTS
$303
SUBTOTAL:
$25,359
REIMBURSABLE. CONSULTANTS:
REIMBURSABLE. EXPENSES:
REIMB
DIRECT CONSULTANTS:
DIRECT EXPENSES:
$303
TOTAL FEE:
$25,359
LABOR BUDGETS:
DESCRIPTION
LABOR CODE
SS or PL Level
HOURS
RATE
COSTS
Sr Project Manager Civil/Struct
X5
PL VI
48
$190.00
$9.120
Prof Eng II Civil/Struct
X8
PL IV
40
$140.00
$5.600
Eng II1-1 Civil/Struct
Y3
PL I1I
40
$118.00
$4.720
CADD II
E6
SS II
24
$78.00
$1,872
Project Assistant (PASS) EL
P6
SS II
48
$78.00
$3.744
Page 1 of 3
PL -E ESTIMATING SHEET PROJECT: LBB R.— 17R•35L Ph 11 JOB NO.: TASK: 3FDs
SALARY Discipline, Title, Labor Code, Rales
Staff Initials (optional) —>
Staff Discipline —>
Staff Title —>
Support Staff (SS) or Professional Level (PL) --- >
Labor Code --->
Billing Rate--->
1
2
3
4
5
6
7
MDII
MTK
SLS
LLP
AMP
Civil Struct
Civil Struct
Civil Strut
CADD_PASS_
Clerical
CADD_PASS_
Clerical
Sr Project
Manager
Civtl/Struct
Prof Eng 11
Ciw7/Struct
Eng 111-1
Civil/Strrct
CADD 11
Project
Assistant
(PASS) EL
PL VI
PL IV
PL III
SS 11
SS 11
\5
\8
Y3
E6
P6
$190.00
$140.00
$118.00
$78.00
$78.00
TASK
Trips
TOTAL
Compile project specifications according to AC
150/5370 -JOG
Prepare Construction Safety and Phasing Plan (CSPP)
40
8
24
16
40
24
32
16
96
104
BUDGET SUBTOTALS: HOURS Trips
SALARY
1 48
40
40
24
48
20
1 $9,120
1 $5,600
1 $4,720
1 $1,8721
$3,744
1$25,056
Page 2 of 3
EE ESTIMATING SHEET PROJECT:
LBB Rum%ay 17R -35L PI• JOB NO.
TASK 3FDS
DIRECTS
DIRECT CONSULTANT COSTS
SUBTOTAL
611 Structural Consultant
612 Mech/Elec Consultant
613 Environ/Civil Consultant
614 Architectural Consultant
615 Testing Consultant (Geotech, CMT, TAB, etc.)
616 Surveying Consultant
618 Other Consultant - Kitchen / Food Consultant
618 Other Consultant - Acoustical Consultant
618 Other Consultant - AV/ IT Consultant
618 Other Consultant
TOTAL DIRECT CONSULTANTS
DIRECT EXPENSES
621 Travel
Motel Days @
Men @
/Man -day -
Air Travel Air Fare @
Men @
Man
Parking Days @
/Day
=
Car Rental Days @
/Day
=
Mileage Miles @
$0.575
@
Trips =
SUBTOTAL
622 Reproductions
Blackline Prints
34" x 22"
Slits @
$2.50 /Sht @
Sets =
36" x 24"
Slits @
$2.75 /Sht @
Sets =
42" x 30
Slits @
$3.25 /Sht @
Sets =
Other
sf@
$0.55 /sf @
Sets =
Mounting Foam Board
Boards @
$10.00 /ea @
Printing:
Set Up Fee
Originals @
$0.15 /Sht @
Submittals =
8-1/2" x I V BRW 200
Originals @
$0.09 /Sht @
I Sets = $18.00
8-1/2" x I V Color 100
Originals @
$0.55 /Sht @
1 Sets = $55.00
11" x 17" BRW 87
Originals @
$0.18 /Sht @
5 Sets = $78.30
11" x 17" Color 50
Originals @
$1.05 'Slit
1 Sets = $52.50
Binding Cost
Sets @
$2.00 "Set
=
Laminating
Slits @
$2.00 Slit
=
Scan to file
Bum to CD/DVD
CD/DVD @
$13.50 , each
=
Scan Specs
Originals @
$0.15 Slit
=
Scan Drawings
Originals @
$1.50 Slit
=
SUBTOTAL
5204
623 Models/Renderings/Photos
Shots @
/Shot
624 Telephone Calls @
/Call
625 Meals Days r
Men @
/Man -day
626 Field Supplies
628 Postage Mailings @
/Mailing (Standard)
628 Postage 2 Mailings @
$30.00 /Mailing (Overnight)
$60
630 Misc Reimbursable Exp
632 Temporary Personnel
636 Field Equip Rental
639 TDLR Review Inspection Fees
643 NM Gross Receipt Tax
TOTAL DIRECT EXPENSES $264
Page 3 of 3
PARKHILL, SMITH & COOPER, INC.
PROJECT BUDGET SHEET (Billing Rates)
LOCATION CODE: 01
PROJECT NAME: LBB 17R -35L Ph 11
JOB NO.: i
TASK: 4BID
DATE: 05/28/15
FEE TYPE: Lump Sum
PREPARED BY: MDH
PRINCIPAL: MDH
PROD. MANAGER: MDH
MARKUP ON REIM:B: 15.00%
MARKUP ON DIRECTS: 15.00%
x$29,070
TOTAL FEE: $29,074 LABOR: 528,824
LABOR: $28,824 DIRECTS-. $250
REIMBURSABLE. CONSULTANTS
REIMBURSABLE. EXPENSES
DIRECT CONSULTANTS
DIRECT EXPENSES
LABOR BUDGETS:
DESCRIPTION
Sr Project Manager Civil/Struct
Prof Eng II Civil/Struct
Eng III -1 Civil/Struct
CADD II
Project Assistant (PASS) EL
SUBTOTAL: $29,074
REIMB..
$250 I TOTAL FEE: $29,074
LABOR CODE SS or PL Level
X5 PL VI
X8 PL IV
Y3 PL III
E6 SS II
P6 SS II
Page 1 of 3
HOURS
72
46
46
10
32
RATE
$190.00
$140.00
$118.00
$78.00
$78.00
$13,680
$6,440
$5,428
$780
$2.496
FEE ESTIMATING SHEET PROJECT: LBB 17R -35L Pig If JOB NO.: TASK: 4BiD
SALARY Discipline, Title, Labor Code, Rates
1
2
3
4
5
6
7
Staff Initials (optional) —
MDI1
MIK
SLS
I LP
AMP
CADD_PASS_
CADD_PASS_
Staff Discipline—>
Civil_Struct
Civil_Struct
Civil_Struct
Clerical
Clerical
Sr Project
Project
Manager
Prof Eng 11
Eng 111-1
Assistant
Staff Title --,
Civil(Struct
CiviUStruct
Civil,5truct
CADD 11
(PASS) EL
Support Staff (SS) or Professional Level (PL)---->
PL VI
PL IV
PL 111
SS Il
SS 11
X5
X8
Y3
E6
P6
t abor Code ----
Billing Rate ---
$190.00
$140.00
$118.00
$78.00
$78.00
TASK
Trips
TOTAL
Submit original bid documents to CoL Purchasing
4
8
8
8
28
Advertise project (by CoL Purchasing)
Plan distribution (by CoL Purchasing)
Prepare potential bidders list and contact
4
4
8
Conduct Prc-Bid Conference
1
5
3
3
11
Prepare agenda and issue minutes
4
1
1
3
9
Miscellaneous addenda, bidder questions
32
32
24
2
16
106
Attend Bid Opening
1
2
2
4
Evaluate bids and prepare recommendation
2
2
2
2
8
Coordinate and host pre -award meeting with
Contractor and LBB
3
2
2
1
8
Assist with FAA grant
4
2
Coordinate contracts
1
8
4
2
14
Attend LBB Airport Advisory Board Meeting
1
2
2
Attend Lubbock City Council Meeting
1
2
2
BUDGET SUBTOTALS: LIOURS/ 1'ris -
5
72
461
461
10i
32
1
1 206
$13,680
$6,440
1 $5,428
1 $780
1 $2,496
1
1
1 $28,824 11
SALARY
Page 2 of 3
EE ESTIMATING SHEET PROJECT:
LBB 17R -35L Ph 11 JOB NO.
TASK: 4BID
DIRECTS
DIRECT CONSULTANT COSTS
SUBTOTAL
611 Structural Consultant
612 Mech/Elec Consultant
613 Environ/Civil Consultant
614 Architectural Consultant
615 Testing Consultant (Geotech, CMT, TAB, etc.)
616 Surveying Consultant
618 Other Consultant - Kitchen / Food Consultant
618 Other Consultant - Acoustical Consultant
618 Other Consultant - AV/ IT Consultant
618 Other Consultant
TOTAL DIRECT CONSULTANTS
DIRECT EXPENSES
621 Travel
Motel Days @
Men @
/Man -day
Air Travel Air Fare @
Men @
Man
Parking Days @
/Day
=
Car Rental Days @
/Day
=
Mileage 35 Miles @
$0.575
@ 5
Trips = $100.63
SUBTOTAL
$101
622 Reproductions
Blackline Prints
34" x 22"
Slits @
$2.50 /Sht @
Sets =
36" x 24"
Slits @
$2.75 /Sht @
Sets =
42" x 30
Slits @
$3.25 /Sht @
Sets =
Other
sf @
$0.55 /sf @
Sets =
Mounting Foam Board
Boards @
$10.00 /ea @
Printing:
Set Up Fee
Originals @
$0.15 /Sht @
Submittals =
8-1/2" x I V BRW 100
Originals @
$0.09 /Sht @
1 Sets = $9.00
8-1/2" x 1 I" Color 50
Originals @
$0.55 /Sht @
1 Sets = $27.50
11" x 17" BRW 50
Originals @
$0.18 /Sht @
1 Sets = $9.00
1 V x 17" Color 25
Originals @
$1.05 /Sht @
1 Sets = $26.25
Binding Cost
Sets @
$2.00 /Set
=
Laminating
Slits @
$2.00 /Sht
=
Scan to file
Bum to CD/DVD
CD/DVD @
S13.50 /each
=
Scan Specs
Originals @
$0.15 /Sht
=
Scan Drawings
Originals @
$1.50 /Sht
=
SUBTOTAL
$72
623 Models/Renderings/Photos
Shots @
/Shot
624 Telephone 10 Calls
$2.00
/Call
$20
625 Meals Days r
Men @
/Man -day
626 Field Supplies
628 Postage 5 Mailings@
52.00 /Mailing (Standard)
$]0
628 Postage I Mailings @
$15.00 /Mailing (FedEx)
$15
630 Misc Reimbursable Exp
632 Temporary Personnel
636 Field Equip Rental
639 TDLR Review / Inspection Fees
643 NM Gross Receipt Tax
TOTAL DIRECT EXPENSES $217
Page 3 of 3
PARKHILL, SMITH & COOPER, INC.
PROJECT BUDGET SHEET (Billing Rates)
LOCATION CODE:
01
PROJECT NAME:
LBB Runwav 17R-35L Ph 11
JOB NO.:
1
TASK:
5CON
DATE:
05/28/15
FEE TYPE:
Lump Sum
PREPARED BY:
MDH
PRINCIPAL:
MDH
PROJ. MANAGER:
MDH
MARKUP ON REIMB:
15.00%
MARKUP ON DIRECTS:
15.00%
$333,440
TOTAL FEE:
$333,441
LABOR
$322,616
LABOR:
$322,616
DIRECTS
$6,033
SUBTOTAL
$328,649
REIMBURSABLE. CONSULTANTS:
REIMBURSABLE. EXPENSES:
$4,791
KI IMB
$4,791
DIRECT CONSULTANTS:
DIRECT EXPENSES:
$6,033
TOTAL FEE: $333,441
LABOR BUDGETS:
DESCRIPTION
LABOR CODE
SS or PL Level
HOURS
RATE
COSTS
Sr Project Manager Civil/Struct
X5
PL VI
655
$196.00 $128.380
Prof Eng II Civil/Struct
X8
PL IV
575
$144.00
$82.800
Eng I1I-1 Civil/Struct
Y3
PL I1I
598
$122.00
$72.956
CADD II
E6
SS II
16
$80.00
$1.280
Project Assistant (PASS) EL
P6
SS II
465
$80.00
$37.200
Page 1 of 3
FEE ESTIMATING SHEET PROJECT' LRB Run- I IR -35L, Ph 11 JOB NO.: TASK: 500N
SALARY Discipline. Title, labor Code. Rates
1
2
3
4
5
6
7
MDH
MTK
SLS
11,11
AMP
Staff InitiaL%(optional) —
CADD_PASS_
CADD_PASS_
Staf Discipline —>
Cna Struct
Civil Suuct
Civil Struct
Clerical
Clerical
Sr Project
Project
Manager
Prof Eng 11
Eng Ill -I
Assistant
Staff Title —
Civ11/Struct
CiviUStruct
Cnal/Struct
CADD 11
(PASS) EL
PL. VI
Pl I\'
PL, III
SS 11
SS 11
Support Staff(SS) or Professional Leel (PL)--=,
X5
X8
Y3
E6
P6
Labor Code --=
$196.00
$144.00
$122.00
$80.00
$80.00
Billing Rate---
TASK
Trips
TOTAL
CONSTRUCTION PHASE (322 calendar days to
Final Completion)
Conduct Preconstruction Conference, issue
minutes
1
5
2
3
12
Coordinate with Air Carriers, Cargo Carrier,
ATCT and other stakeholders
1
2
2
4
Coordinate subconsultants
40
16
16
72
Review submittals
4
40
80
40
164
Site visits @ 3/wk and 2hrs/ea (46 weeks total)
138
92
92
92
276
Bi -weekly progress meetings (including 2 pre -
pave meetings)
46
92
46
46
46
230
Coord. with RPR, Contractor and Owner
200
150
150
500
Review test reports and field data
50
90
90
80
310
Respond to RFI's (assume 1/month)
10
10
20
10
8
58
Prepare change orders (assume 3 for project)
10
6
6
6
28
Monthly contractor pay requests including final
(12 total)
24
24
24
72
Review monthly DBE summary, wage rates,
weather days, etc.
20
80
40
180
320
Prepare and submit weekly FAA report
50
50
100
Prepare quarterly FAA report and deliver test
reports
12
15
8
Final inspection and prepare punch list
32
32
32
8
104
Prepare stmts. (12 @ 1 hr. each)
12
12
24
BUDGET SUBTOTALS: HOURS' Tri s -
186
6551
575
598
16
465
2309
1
$128.380 1
$82,800
$72,956
$1,280
$37,200
1 1
1$322,616
SALARY 1
Page 2 of 3
EE ESTIMATING SHEET PROJECT:
LBB Rumvay 17R -35L Ph JOB NO.
TASK: 5CON
DIRECTS
DIRECT CONSULTANT COSTS
SUBTOTAL
611 Structural Consultant
612 Mech/Elec Consultant
613 Environ/Civil Consultant
614 Architectural Consultant
615 Testing Consultant (Geotech, CMT, TAB, etc.)
616 Surveying Consultant
618 Other Consultant - Kitchen / Food Consultant
618 Other Consultant - Acoustical Consultant
618 Other Consultant - AV/ IT Consultant
618 Other Consultant
TOTAL DIRECT CONSULTANTS
DIRECT EXPENSES
621 Travel
Motel Days @
Men @
/Man -day =
Air Travel Air Fare @
Men @
/Man =
Parking Days @
/Day
=
Car Rental Days @
/Day
=
Mileage 40 Miles @
$0.575
@ 186
Trips = $4,278.00
SUBTOTAL
$4,278
622 Reproductions
Blackline Prints
34" x 22"
Slits @
$2.50 /Sht @
Sets =
36" x 24"
Slits @
$2.75 /Sht @
Sets =
42" x 30
Slits @
$3.25 /Slit @
Sets =
Other
sf @
$0.55 /sf @
Sets =
Mounting Foam Board
Boards @
$10.00 /ea. @
Printing:
Set Up Fee
Originals @
$0.15 /Sht @
Submittals =
8-1/2" x I V B&W 1500
Originals @
$0.09 /Sht @
1 Sets = $135.00
8-1/2"x ll" Color 250
Originals@
$0.55 /Sht @
I Sets = $137.50
11" x 17" B&W 200
Originals @
$0.18 /Sht @
I Sets = $36.00
11"x 17" Color 200
Originals@
$1.05 /Sht @
I Sets = $210.00
Binding Cost
Sets @
$2.00 /Set
=
Laminating
Slits @
$2.00 /Sht
=
Scan to file
Bum to CD/DVD
CD/DVD @
$13.50 /each
=
Scan Specs
Originals @
$0.15 /Sht
=
Scan Drawings
Originals @
$1.50 /Sht
=
SUBTOTAL
$519
623 Models/Renderings/Photos
Shots @
/Shot
624 Telephone 100 Calls c
$2.00
/Call
$200
625 Meals Days @
Men @
/Man -day
626 Field Supplies
628 Postage 50 Mailings @
$2.00 /Mailing (Standard)
$100
628 Postage 10 Mailings @
$15.00 /Mailing (FedEx)
$150
630 Misc Reimbursable Exp
632 Temporary Personnel
636 Field Equip Rental
639 TDLR Review / Inspection Fees
643 NM Gross Receipt Tax
TOTAL DIRECT EXPENSES $5,247
Page 3 of 3
PARKHILL, SMITH & COOPER, INC.
PROJECT BUDGET SHEET (Billing Rates)
LOCATION CODE:
01
PROJECT NAME:
LBB Runway 17R-35L Ph II
JOB NO.:
1
TASK:
6RPR
DATE:
05/28/15
FEE TYPE:
Hourly Rate xv/Max
PREPARED BY:
MDH
PRINCIPAL:
MDH
PROD. MANAGER:
MDH
MARKUP ON REIMB:
15.00%
MARKUP ON DIRECTS:
15.00%
$435,040
TOTAL FEE:
$435,043
LABOR:
$415,232
LABOR:
$415,232
DIRECTS:
SUBTOTAL:
$415,232
REIMBURSABLE. CONSULTANTS:
REIMBURSABLE. EXPENSES:
$19,811
REIMB
$19,811
DIRECT CONSULTANTS:
DIRECT EXPENSES:
TOTAL FEE:
$435,043
LABOR BUDGETS:
DESCRIPTION
LABOR CODE SS or PL Level
HOURS
RATE
COSTS
RPR III
R2 PL II1
2.604
$113.00
$294.252
RPR III
R2 PL 11I
460
$113.00
$51.980
Engineering Student
SSI
1,500
$46.00
$69.000
Page 1 of 3
FEE ESTIMATING SHEET PROJECT: LBB Runwm 17R -35t. Ph 11 JOB NO TASK: 6RPR
SALARY Discipline, Title, Labor Code, Rates
1 2 3 4
5
6 7
Staff Initials (optional) -->
RPRs Techs
RPRs Techs
Cnril Struct
Staff Discipline —>
Engineering
Staff Title —>
RPR IB
RPR III
Student
Support Staff(SS) or Professional Level (PL)—>
PL III
PL 111
SSI
R2
R2
Labor Code --->
$113.00
$113.00
$46.00
Billing Rate --->
TASK
trips
TOTAL
CONSTRUCTION PHASE (322 calendar days to
final completion)
Pre -project preparation, etc (15 days @ 8hr/day)
120
120
240
RPR Full Time from NTP through Final
Completion @ 9hrs/day
276
2484
2,484
2nd RPR during Daytime CTB, HMAC and
Concrete Paving (assume 30 days @ 10hr/day)
30
300
300
2 RPR's for nighttime concrete placement
(assume 10 nights @ 8hr/night)
20
160
160
Data Collection, Record Keeping, Reporting for
RPR (6hrs/day)
276
1380
1,380
BUDGET SUBTOTALS: HOURS/ Trips -
602
2604
460
1500
4564
SALARY
1
1 $294,252
1 $51,980
1 $69,000
1
1
IS415,232
Page 2 of 3
EE ESTIMATING SHEET PROJECT:
LBB Rumvay 17R-35L Pf JOB NO. TASK: 6RPR
IMBURSABLES
REIMBURSABLE CONSULTANT COSTS
SUBTOTAL
511 Structural Consultant
512 Mech/Elec Consultant
513 EnvironiCivil Consultant
514 Architectural Consultant
515 Testing Consultant (Geotech, CMT, TAB, etc.)
516 Surveying Consultant
518 Other Consultant - Kitchen / Food Consultant
518 Other Consultant - Acoustical Consultant
518 Other Consultant - AV/ IT Consultant
518 Other Consultant
TOTAL REIMBURSABLE CONSULTANTS
REIMBURSABLE EXPENSES
521 Travel
Motel Days @
Men @ /Man-day =
Air Travel Air Fare @
Men @ /Man =
Parking Days n
/Day =
Car Rental Days @
/Day =
Mileage 45 Miles@
$0.575
@ 602 Trips = $15,576.75
SUBTOTAL
$15,577
522 Reproductions
Blackline Color Plots
34" x 22"
Slits @
$2.50 /Sht @ Sets =
36" x 24"
Slits @
$2.75 /Sht @ Sets =
42" x 30
Slits @
$3.25 /Sht @ Sets =
Other
sf@
$0.55 /sf @ Sets =
Mounting Foam Board
Boards @
$10.00 /ea @
Printing:
Set Up Fee
Originals @
$0.15 /Sht @ Submittals =
8-1 2" x 1 I" BRW
Originals @
$0.09 /Sht @ I Sets =
8-1 2" x 11" Color
Originals @
$0.55 /Sht @ I Sets =
1 I" x 17" BRW
Originals @
$0.18 /Sht @ 1 Sets =
11 " x 17" Color
Originals @
$1 05 Slit @ 1 Sets =
Binding Cost
Sets @
$2.00 Set =
Laminating
Slits @
$2.00 Slit =
Scan to file
Bum to CD/DVD
CD DVD @
$13.50 each =
Scan Specs
Originals @
$0.15 Slit =
Scan Drawings
Originals @
$1.50 Slit =
SUBTOTAL
523 Models/Renderings Photos
Shots @ /Shot
524 Telephone 11 Months a
$15000 /Month
$1,650
525 Meals Days r
Men @ /Man-day
526 Field Supplies
528 Postage Mailings @
/Mailing (Standard)
528 Postage Mailings @
/Mailing (Overnight)
530 Misc Reimbursable Exp
532 Temporary Personnel
536 Field Equip Rental
539 TDLR Review Inspection Fees
543 NM Gross Receipt Tax
TOTAL REIMBURSABLE EXPENSES $17,227
Page 3 of 3
PARKHILL, SMITH & COOPER, INC.
PROJECT BUDGET SHEET (Billing Rates)
LOCATION CODE:
01
PROJECT NAME:
LBB Runwav 17R-35L Ph II
JOB NO.:
1
TASK:
7CLO
DATE:
05/28/15
FEE TYPE:
Lump Sum
PREPARED BY:
MDH
PRINCIPAL:
MDH
PROD. MANAGER:
MDH
MARKUP ON REIMB:
15.00%
MARKUP ON DIRECTS:
15.00%
$36,380
TOTAL FEE:
$36,36/1
LABOR
$36.328
LABOR:
$36,328
DIRECTS
$53
SUBTOTAL
$36,381
REIMBURSABLE. CONSULTANTS:
REIMBURSABLE. EXPENSES:
REIMB.
DIRECT CONSULTANTS:
DIRECT EXPENSES:
$53
TOTAL FEE:
$36,381
LABOR BUDGETS:
DESCRIPTION
LABOR CODE
SS or PL Level
HOURS
RATE
COSTS
Sr Project Manager Civil/Struct
X5
PL VI
37
$198.00
$7.326
Prof Eng II Civil/Struct
X8
PL IV
44
$146.00
$6.424
Eng III-1 Civil/Struct
Y3
PL III
52
$123.00
$6.396
RPR III
R2
PL III
24
$114.00
$2,736
CADD I
E7
SS II
44
$81.00
$3,564
Project Assistant (PASS) EL
P6
SS II
122
$81.00
$9,882
Page 1 of 3
FEE ESTIMATING SHEET PROJECT: t as Kw n> 1'R-351. r:' a1 JOB NO.: TASK. 1cLo
SAV ';RY Discipline, Title, Labor Code, Rates
1
2
3
4
5
6
7
Stafflnitials (optional) — -
MDH
MTK
SLS
MFC
LLP
AMP
CADD_PASS_
CADD_PASS_
StaffDascapine--
Civil_Struct
Civil_Struct
Civil_Struct
RPPs Techs
Clerical
Clerical
Sr Pmject
Project
Manager
Prof Eng II
Eng III -1
Assistant
StaffTttle —>
Civil/Struct
Civil'Struct
Civil-Struct
RPR III
CADD I
(PASS) EL
I'll VI
PL IV
PL 111
I PL. III
SS ❑
SS II
Suppon Staff(SS) or Professional Level (I'L)---
X5
X8
Y3
R2
E7
P6
Labor Code --
$19800
$146.00
$123.00
$114.00
$8100
$81.00
Billing Rate--°
TOTAL
TASK
Tris
CLOSEOUT PHASE
Project Final Report
8
8
74
16
1
176
Record drawings
4
8
R
411
60
Revise ALP documents (not included in
scope)
Update Part 139 Signage and Marking Plan
1
2
4
7
Update 5010 Data
1
4
c
Update Airport Chart/Diagram
4
5
GIS
Coordinate as -built survey (ground only, no
aerial)
a
8
Set-up new project in AGIS
Assist with compilation of photo index (not
applicable)
Assist with compilation of survey sketches,
etc
"_
8
8
Gather attribute/enumeration data
2
8
Coordination AGIS submittal with FAA
2
Warranty inspection (1 year following final
completion)
a
10
4
8
BUDGET SUBTOTALS: HOURS/ Tri s -
2
371
441
521
24
441
1221
1323
$7,326
1 $6,424
1 $6,396
1 $1736
$3,564
1 $9,8821
1 $36,328
SALARY
Page 2 of 3
EE ESTIMATING SHEET PROJECT:
LBB Rumvay 17R -35L Ph JOB NO.
TASK: 7CLO
DIRECTS
DIRECT CONSULTANT COSTS
SUBTOTAL
611 Structural Consultant
612 Mech/Elec Consultant
613 Environ/Civil Consultant
614 Architectural Consultant
615 Testing Consultant (Geotech, CMT, TAB, etc.)
616 Surveying Consultant
618 Other Consultant - Kitchen / Food Consultant
618 Other Consultant - Acoustical Consultant
618 Other Consultant - AV/ IT Consultant
618 Other Consultant
TOTAL DIRECT CONSULTANTS
DIRECT EXPENSES
621 Travel
Motel Days @
Men @ /Man -day
-
Air Travel Air Fare @
Men @ Man
-
Parking Days @
/Day
=
Car Rental Days @
/Day
-
Mileage 40 Miles @
$0.575
@ 2 Trips
$46.00
SUBTOTAL
$46
622 Reproductions
Blackline Prints
34" x 22" 87
Slits @
$2.50 /Sht @
Sets
36" x 24"
Slits @
$2.75 /Slit @
Sets
42" x 30
Slits @
$3.25 /Sht @
Sets -
Other
sf@
$0.55 /sf @
Sets
Mounting Foam Board
Boards @
$10.00 /ea @
Printing:
Set Up Fee
Originals @
$0.15 /Sht @
Submittals -
8-1 2" x I V B&W 200
Originals @
$0.09 /Sht @
Sets
8-1 2" x I V Color 100
Originals @
$0.55 /Sht @
Sets
I V x 17" B&W 87
Originals @
$0.18 /Sht @
Sets
I V x 17' Color 20
Originals @
$1.05 Slit
Sets —
Binding Cost
Sets @
$2.00 rSet
=
Laminating
Slits @
$2.00 Slit
=
Scan to file
Burn to CD/DVD
CD/DVD @
$13.50 each
=
Scan Specs
Originals @
$0.15 rSlit
=
Scan Drawings
Originals @
$1.50 'Slit
=
SUBTOTAL
623 Models/Renderings/Photos
Shots @ /Shot
624 Telephone Calls @
$2.00 /Call
625 Meals Days @
Men @ /Man -day
626 Field Supplies
628 Postage Mailings @
$2.00 /Mailing (Standard)
628 Postage Mailings @
$15.00 /Mailing (Fed Ex)
630 Misc Reimbursable Exp
632 Temporary Personnel
636 Field Equip Rental
639 TDLR Review Inspection Fees
643 NM Gross Receipt Tax
TOTAL DIRECT EXPENSES $4611
Page 3 of 3
PARKHILL, SMITH & COOPER, INC.
PROJECT BUDGET SHEET (Billing Rates)
LOCATION CODE:
01
PROJECT NAME:
LBB Runway 17R -35L Ph II
JOB NO.:
1
TASK:
9SSC
DATE:
05/28/15
FEE TYPE:
Hourly Rate Ni,/Mas
PREPARED BY:
MDH
PRINCIPAL:
MDH
PROD. MANAGER:
MDH
MARKUP ON REIMB:
15.00%
MARKUP ON DIRECTS:
15.00%
$496,900
TOTAL FEE:
$496,813—
LABOR:
LABOR:
DIRECTS:
SI]BTOTAL.
REIMBURSABLE. CONSULTANTS:
$496,883
REIMBURSABLE. EXPENSES:
REIMB $496,883
DIRECT CONSULTANTS:
DIRECT EXPENSES:
TOTAL FEE: $496,883
LABOR BUDGETS:
DESCRIPTION
LABOR CODE SS or PL Level HOURS
RATE COSTS
Page 1 of 2
EE ESTIMATING SHEET
PROJECT:
LBB Rumvay 17R -35L Ph JOB NO. TASK: 9SSC
IMBURSABLES
REIMBURSABLE CONSULTANT COSTS
SUBTOTAL
511 Structural Consultant
512 Mech'Elec Consultant
CP Crossno and .Associates
557,368
513 Environ/Civil Consultant
All About Pavements, Inc.
$19,835
514 Architectural Consultant
515 Testing Consultant (Geotech, CMT, TAB, etc.}
CRIT Engineering, Inc.
$284,895
516 Surveying Consultant
PSC
$66,538
518 Other Consultant - Kitchen
Food Consultant
518 Other Consultant - Acoustical Consultant
518 Other Consultant - AV IT Consultant
518 Other Consultant
Geodetix
$12,115
TOTAL REIMBURSABLE CONSULTANTS
5440,751
REIMBURSABLE EXPENSES
521 Travel
Motel
Days @
Men @ Man -day =
Air Travel
Air Fare @
Men @ Man —
Parking
Days @
/Day —
Car Rental
Days @
Day —
Mileage
Miles @
$0.560
@ Trips =
SUBTOTAL
522 Reproductions
Blackline Color Plots
34" x 22"
Slits @
$2.50 'Sht @ Sets =
36" x 24"
Shts @
$2.75 rSht @ Sets =
42" x 30
Slits @
$3.25 !Sht @ Sets =
Other
sf @
$0.55 'Isf @ Sets =
Mounting Foam Board
Boards @
$10.00 .,ea @
Printing:
Set Up Fee
Originals @
$0.15 /Sht @ Submittals
8-1 2" x 1 V BRW
Originals @
$0.09 Sht @ Sets =
8-1'2" x 11" Color
Originals @
$0.55 'Sht @ Sets =
I V x 17" BRW
Originals @
$0.18 ISht @ Sets =
11" x 17" Color
Originals @
$1.05 Slit @ Sets =
Binding Cost
Sets @
$2.00 'Set =
Laminating
Shts @
$2.00 'Sht =
Scan to file
Bum to CD;'DVD
CDr'DVD @
$13.50 'each —
Scan Specs
Originals @
$0.15 'Sht =
Scan Drawings
Originals @
$1.50 `Slit =
SUBTOTAL
523 Models:Renderings;Photos
Shots n Shot
524 Telephone
Calls @
Call
525 Meals
Days n,
Men /a-1 'Man -day
526 Field Supplies
528 Postage
Mailings @
'Mailing (Standard)
528 Postage
Mailings c/ -?i
Mailing (Overnight)
530 Misc Reimbursable Exp
532 Temporary Personnel
536 Field Equip Rental
539 TDLR Review Inspection Fees
543 NM Gross Receipt Tax
TOTAL REIMBURSABLE EXPENSES
Page 2 of 2
C. P. CROSSNO & ASSOCIATES
CONSULTING ENGINEERS
P.O. BOX 180312
DALLAS, TEXAS 75218
( 2 1 4 ) 321-9140
May 27, 2015
Mark D. Haberer, P.E.
Firm Principal
Parkhill, Smith & Cooper, Inc.
Engineers, Architects, Planners
4222 85th Street
Lubbock, Texas 79423
Re: LBB 17R -35L Construction
Administration Services Phase II
Dear Mr. Haberer:
This letter is to serve as both a fee proposal and agreement
between C.P. Crossno & Associates, Consulting Engineers (CPC&A)
and Parkhill, Smith & Cooper, Inc. (PSC) to provide professional
engineering and administrative services associated with the
electrical portion of the Phase II, Lubbock International
Airport Electrical improvement project. CPC&A will provide
engineering to include the following:
1. Attendance of the pre-bid conference
2. Attendance of the pre -construction meeting
3. Attendance of progress meetings at least two per quarter
4. Review and approval of electrical submittals
5. Respond to RFP s
6. Attendance and participation in punch list inspection.
7. Misc. consulting including Q&A, preparation of change
order(s), coordination with RPR, etc.
It is understood that changes in our participation will not be
made without the approval of both CPC&A and PSC. It is also
mutually understood that CPC&A will bill for completed
engineering in coordination with PSC, but that payment will be
made only after PSC receives payment for the engineering task.
CPC&A will provide certificates and maintain professional
liability, general liability insurance. Aircraft and auto
liability insurance will be provided if it becomes necessary to
operate either aircraft or automobile on the airport.
Based on our discussions, it was decided that compensation
should be on a `per hour' basis with a `Not to Exceed' cost.
Billing will be in accordance the attached Engineering Rate
Sheet.
If this is satisfactory, please sign and return one copy to me.
Project Phase II
Not to Exceed
Engineering and Direct Expense Total $ 57,368.00
--------------------------
Charles Paul Crossno, P.E.
May 27, 2015
-------------------------- Approved:
Mr. Mark D. Haberer, P.E.
Date:
All -About Pavements Inc.
Midwest Office — 1109 E White Oak Rd. — Mahomet, IL 61853
(217) 586-2765 — www.allaboutpavements.com — fax (217) 586-1967
May 28, 2015
Mr. Mark D. Haberer, P.E.
Parkhill Smith & Cooper, Inc.
4222 85`x' St
Lubbock, Texas 79423
Re: API Proposal for Phase 2 Construction
Administrative Support Services for Runway 17R -
35L, Lubbock, Texas.
Dear Mark:
All About Pavements, Inc. (API) appreciates the opportunity to submit our proposal to Parkhill,
Smith and Cooper, Inc. (PSC) to assist in the Phase 2 construction administration services for the
rehabilitation Runway 17R -35L. As you requested in your letter dated April 3, 2015, our
services will include the following tasks:
Task 1 - Attend Concrete Pre -Pave Meeting: API will attend pre -construction meeting for
paving work for the Phase 2 work.
Task 2 - Review P-501 Mix Design Submittals: API will review mix design submittals for all
PCC work, including P-501 and P-306.
Task 3 - Construction Site Visits with Summary Reports: For the Phase 2 work, API will
attend up to two site visits during the construction.
Task 4 - Additional Technical Support - RFPs, Construction Troubleshoot: API will
provide additional support as requested by PSC for the Phase 2 construction work. Technical
memorandums will be provided, if necessary.
API proposes to conduct our work an hourly basis, with reimbursement for travel costs, for a
total cost that will not exceed $19,835 for Phase 2 construction work. We appreciate the
opportunity to continue working with PSC during the construction work for Runway 17R -35L.
Should you have any questions, please do not hesitate to call me at 217-586-2765. Please note
that our corporate address has been changed to 1109 E White Oak Rd, Mahomet, IL, 61853.
Pavement Management — Evaluation —Testing — Design
Enclosure
Fee Proposal
Sincerely,
All About Pavements, Inc.
;7r �4;� xz�
Wayne J. Seiler, Ph.D., P.E.
Project Manager
Pavement Management — Evaluation —Testing — Design
a
a
F
w
w
w
O
Q
K
0
x
J
i
2
O
K
a
CMT Engineering, Inc
12804 County Road 2500
Lubbock TX 79404
Office (806) 771-7283
Fax (806) 771-7062
Construction Materials Testing
Fee proposal
Alternate 3
�` CMT
�
Engineering
Project: Lubbock Preston Smith International Airport Runway 17R -35L
Client: Parkhill, Smith and Cooper, Inc
Date: 5/27/2015
Laboratory Tests
Soils
Fee
Ot .
Extension
Standard Proctor 4" mold
S
160.00
19
S
3,040.00
Modified Proctor 4" mold
$
21000
50
S
10,500.00
Alterber Limits
$
70.00
76
$
5,320.00
Classification of soils inc washed rad
$
75.00
51
$
3,825.00
Dry Gradation
$
60.00
41
S
2,460.00
Unconfined Compressive Strength
$
10000
25
$
2,500.00
Sample Prep for UC Strength
S
7500
25
S
1,875.00
PH
$
14000
25
S
3,500.00
Tex -145-E Sulfates
$
20000
25
$
5,000.00
Flex Base
Standard Proctor/Cement Treated ASTM 0 558
$
260.00
31
S
8,060.00
Modified Proctor ASTM D 155
$
26000
1
$
260.00
Bulk Gravity / Moisture Correction
$
5000
1
S
50.00
Atterberg Limits
$
70.00
33
$
2,310.00
Washed Gradation
S
7500
35
$
2,625.00
ASTM D 1633 Compressive Strength of molded specimens
$
25000
125
$
31,250.00
Magnesium Soundness
S
350.00
3
$
1,050.00
L A Abrasion
S
32500
3
$
975.00
Flat and Elongated
$
10000
1
$
10000
Sand Equivalent
$
12500
1
$
125.00
Aggregates
Dry Gradation
$
6000
5
1 S
300,00
Washed Gradation
$
7500
5
S
375.00
Magnesium Soundness
$
35000
3
$
1,050.00
L A. Abrasion
$
32500
5
$
1,625.00
Flat and Elongated
$
100.00
5
$
500.00
Crushed Face Count
S
7500
3
$
225.00
Decanl
$
75.00
3
$
22500
Deleterious
$
75.00
3
$
225.00
Micro Deval
$
300.00
3
$
90000
Sand Equivalent
$
125.00
3
1 S
375.00
Atterberg Limits
$
70.00
3
1 S
21000
Hot Mix
Asphalt Content (Ignition)/ Gradation
S
160.00
1
$
160.00
Marshal Lab Density set of 3
$
140.00
39
S
5,460.00
Marshal Stability / Flow set of 3
$
140.00
39
S
5,460.00
Max Theoretical Density / Rice Gravity
$
13000
39
S
5,07000
Core Thickness Test
$
10.00
78
S
78000
In Place Density from cores
S
35.00
76
S
2,730,00
Field Testing*
Nuclear Field Density 3 min
$
25.00
504
S
12,600.00
Sand Cone
S
55.00
6
$
330.00
Asphalt Core (up to 4" Additional $15 per inch
S
75.00
78
S
5,850.00
Slump
S
25.00
79
S
1,975.00
Entrained Air
S
35.00
66
$
2,310.00
Temperature
$
5 00
79
S
39570
MakingC finders ea Incld breaks
$
3000
19
S
570.00
Making Cylinders ea Incld breaks CLSM
S
30.00
100
S
3,000.00
Making Beams Each 2 min
$
60.00
120
$
7,200.00
Concrete Cores Each 16"
S
320.00
30
$
9,600.00
Concrete Cores Each 14"
S
30000
3
$
900.00
PatchConcree Cores Each
$
30.00
33
$
990.00
Depth Check Bull Prick
S
50.00
206
S
10,300.00
Depth Check Cores - 6" dee
$
12000
129
$
15,480.00
High/Low Concrete Surface Temperature
$
10.00
60
S
60000
Technician / Engineering
Technician Hourly (Two hour minimum
S
5900
900
$
53,100.00
Technician Overtime Hourly"
S
6900
100
S
6,900.00
Pro ect Management
S
17500
32
$
5,600.00
Admin
S
65 00
48
S
3,120.00
Total
$
261,316.00
Field testing is billed in addition to Tech hourly rates
Hourly rates apply portal to portal between 7 00 am and 5 00 pm Monday through Friday Overtime rates
wdP be applied when services are provided outs;de of the before mentioned hours
CMT Engineering, Inc
12804 County Road 2500
Lubbock TX 79404
Office (806) 771-7283
Fax (806) 771-7062
Construction Materials Testing
Fee Proposal
Alternate 5
L l CMT
Engineering
Project: Lubbock Preston Smith International Airport Runway 17R -35L
Client: Parkhill, Smith and Cooper, Inc
Date: 5/27/2015
Laboratory Tests
Solis
Fee
oty.
Extension
Modified Proctor 4" mold
$
21000
53
$
11,130 00
Atterberg Limits
S
7000
53
S
3,71000
Classification of sots inc washed rad
$
7500
53
$
3,97500
Field Testing'
Nuclear Field Density 3 min
$
2500
261
$
6,52500
Technician / Engineering
Technician Hourly Two hour minimum
$
5900
100
$
5,90000
Technician Overtime Hourly*
$
6900
20
$
1.360 00
Project Management
$
17500
4
$
70000
Admin
$
6500
4
S
26000
Total
$
33,580.00
Field testing is billed in addition to Tech hourly rates
Hourly rates apply portal to portal between 7 00 am and 5 00 pm Monday through Friday Overtime rates
will be applied when services are provided outside of the before mentioned hours
PARKHILLSMITHBCOOPER
.11
Mark D. Haberer, PE
4220 851' St.
Lubbock, Texas 79423
Re: LBB Runway 17R -35L Ph 11
Dear Mark:
4222 85th Street
Lubbock Texas 79423
806.473.2200
May 28, 2015
I am providing a proposal for surveying services for the above project. Per the specifications you
provided in the topographic survey requirements on May 28, 2015, 1 propose the following costs
per day of field work:
Field Crew (9 hours @ $263/hour) $ 2,367.00
GPS Instrumentation ($350/day) $ 350.00
Digital Level Instrumentation ($200/day) $ 200.00
Office Prep and Analysis (4 hours @ $140/hour) $ 560.00
Milegge Expenses 25.00
Total Base Daily Rate $ 3,502.00
Using this daily rate, the costs per item are as follows:
Survey grid of CTB lanes every 25 feet
from stations 40+00 to 82+25 (7 days) $24,514.00
Survey of grading along the Runway
Safety Area (RSA) (7 days) $24,514.00
Miscellaneous field work as needed
for other oroiect elements (5 daysl $17,510.00
Total Cost of Surveying Services for Phase 11 $66,538.00
Please let me know if you have any questions regarding this proposal.
Sincerely,
PARKHILL, SMITH & COOPER, INC.
.y az L--) '
Samuel Viyatt, RPL
Profess nal Surveyor
SW/as
X.1201212717121C0RRE5MRurnvay 17R -35L Phase 11LTRWHaberer LBB ITR 35L Ph0 5urv9y ProposW_sw doa
Abilene Amarillo EI Paso Las Cruces Lubbock Midland team•psc.com
H3d000 V HJJWS 1'1IH)IdVd
=Fvg Er
3 �
massa m
O
` E ¢ z
m �
HNIR
a
m
o p (7
2
R
-. -� ` •j -fk�
r��
\1
{
IF
-—
I1
t
1 1
II
1 1
Lu
I 1
Q 1 1
i
1 I
k 1
1 1
1 1
1 1
�
1 1
-
I��I`
.iri 1
L. .i
1 .
a
m
d3d000 V HlIWS7IH)IHt1d Q
oFugVE7 W
�
gMIR€ a I
7 c Y — a
I a _ w
��BdW 4V 3 s
�a4-ap�
Fee Estimate Assumptions
Airports -GIS (AGIS) project intiation is the responsibility of the Airport/PSC.
Geodetix suggests that the AGIS project type be:
Airport Category: NPIAS Part 139 Airport
Project Type: New Airport Survey Project
Verification Options. None. Do not select Geodetic or Imagery verification. Deselect if neccesary
Purpose: Costruction - Airside
Final determination of project type classification, level of verification, and project purpose is the
responsibility of the Airport and the FAA ADO Project Manager.
Aeronautical Survey includes:
General Summary
Update Twy A status code to "demolished".
Add new Runway Edge Lights, in area where Twy A was demolished, from design/construction drawings.
Add new Shoulder Edge Drain, from design/construction drawings.
Update the Perimeter Road, and the widening of the Blast Pads from design/construction drawings.
Update topography within the Runway Safety Area (see Exhibit 1) from field survey data.
LUBBOCK INTERNATIONAL AIRPORT
5/27/2015
Updates to Airport Base -Mapping
All Work In Accordance with AC 150 / 5300-16A, -17C, and -18B
FEE ESTIMATE SUMMARY
Total
Item A-1:
Project Management and Initial Airports -GIS Documentation
$1,800
Item A-2:
Imagery Acquistion, Processing, and Products
$0
Item A-3:
Field Survey Support & Coordination (for surveys conducted by firm other than Geodetix)
$0
Item A-4:
Field Survey - Mob & DeMob (1 mob)
$2,400
Item A-5:
Field Interviews
$0
Item A-6:
Field Survey & Documentation - Photo Control Points (0) and Checkpoints (0)
$0
Item A-7:
Field Survey & Documentation - Geodetic Control (2 stations)
$1,330
Item A-8:
Field Survey & Documentation - Runway Features (All active rwy ends & DT, Qty 0)
$1,800
Item A-9:
Field Survey & Docs - NAVAIDs On -Airport (Qty 0) and Off -Airport (10nm radius, Qty 0)
$0
Item A-10:
Field Survey - GPS Data Post Processing & Review
$375
Item A-11:
Geo -Spatial Data
$3,570
Item A-12:
Airport Airspace Analysis (AAA)
$0
Item A-13:
Imagery Data Submittals (per AC 150/5300-17C)
$0
Item A-14:
Final Survey Data Submittals
$840
Item A-15:
UDDF Development
$0
Item A-16:
Reimbursable Agreement Application Support
$0
Item A-17:
Miscellaneous
$0
Total Fee Estimate
$12,115
Fee Estimate Assumptions
Airports -GIS (AGIS) project intiation is the responsibility of the Airport/PSC.
Geodetix suggests that the AGIS project type be:
Airport Category: NPIAS Part 139 Airport
Project Type: New Airport Survey Project
Verification Options. None. Do not select Geodetic or Imagery verification. Deselect if neccesary
Purpose: Costruction - Airside
Final determination of project type classification, level of verification, and project purpose is the
responsibility of the Airport and the FAA ADO Project Manager.
Aeronautical Survey includes:
General Summary
Update Twy A status code to "demolished".
Add new Runway Edge Lights, in area where Twy A was demolished, from design/construction drawings.
Add new Shoulder Edge Drain, from design/construction drawings.
Update the Perimeter Road, and the widening of the Blast Pads from design/construction drawings.
Update topography within the Runway Safety Area (see Exhibit 1) from field survey data.
5/27/2015
General Summary (continued)
Verify placement of new Runway Edge Lights (at demo'd Twy A) and dimensions of both Blast Pads dimensions
(width and length), from field survey data.
Update changes to attributes/enumerations of features specified above, as required.
Submit updated geo-spatial data file (.dwg) to Airports -GIS.
Copies of all documentation and final survey data will be provided to the Airport.
Documentation
Preparation and submittal of A -GIS Statement of Work.
No Airports -GIS Plans (Imagery or Survey & QC) required.
Preparation and submittal of Final Survey (geo-spatial data file) to AGIS.
Preparation and submittal of brief Final Project Report, including any field survey documentation, to AGIS.
Aerial Imagery
No imagery will be acquired for this project.
Field Survey
Field survey will be tied to the existing PACS/SACS and a first order benchmark.
Required documentation (digital photos, AGIS forms/sketches) will be collected/completed in accordance
with AC 150/5300-16A, -17C and 18B.
No Safety -Critical features will be surveyed.
Mapping Compilation
All airport base -mapping updates, with the exception of the RSA topography, will be compiled from design/construction
drawings, and verified by limited field survey efforts described above.
RSA topography will be generated from points collected by kinematic survey.
Note will be added to attributes of features updated from drawings or field survey, to verify photogrametrically
in conjunction with the next project in which imagery is acquired.
LUBBOCK INTERNATIONAL AIRPORT 5/27/2015
Updates to Airport Base -Mapping
Work In Accordance with AC 150 / 5300-16A, -17C, and -18B
COST DETAILS BY LINE ITEMS
Line Items Total
Item A-1: Project Management and Initial Airports -GIS Documentation
Project Management 8.00 hour(s) $75/hr $600
Statement of Work (submitted to AGIS) 16.00 hour(s) $75/hr $1,200
Implementation Plans (submitted to AGIS)
Geodetic Control Plan 0.00 hour(s) $75/hr $0
Imagery / Remote Sensing Plan 0.00 hour(s) $75/hr $0
Survey and QC Plan 0.00 hour(s) $75/hr $0
SUB -TOTAL $1,800
Item A-2: Imagery Acquistion, Processing, and Products
Aerial Flight Missions with 0.00 mob(s) $0
Flight Mission 1:
photos 1" = 660' (6" pixels) 0.00 exposure(s)
Flight Mission 2:
photos 1" = 1,600' (12" pixels) 0.00 exposure(s)
Flight Mission 3:
photos 1" = X,XXX' (XX" pixels) 0.00 exposure(s)
Photo Products:
Contact Prints (9"x9")
0.00 print(s)
$20/ea
$0
Diapositives (film positives)
0.00 diapositive(s)
$30/ea
$0
Digital Scans (2000 dpi, 12 microns)
0.00 scan(s)
$20/ea
$0
Aerotriangulation:
Models (AT Process)
0.00 frames)
$40/ea
$0
Orthophotos
Flight Mission 1: individual tiles of 1" = 660' Imagery
0.00 ortho(s)
$150/ea
$0
Flight Mission 2: individual tiles of 1" = 1,600' imagery
0.00 ortho(s)
$150/ea
$0
Flight Mission 3: individual tiles
0.00 ortho(s)
$150/ea
$0
Mosaic & 5,000' Tile Production of 1" = 1,600' imag (17C)
0.00 ortho(s)
$50/ea
$0
SUB -TOTAL
$0
Item A-3: Field Survey Support & Coordination (for surveys conducted by firm other than Geodetix)
Survey - Technical Consultation(s)
0.00 hour(s)
$75/hr
$0
QC Review of Data to be submittal to FAA/NGS
0.00 hour(s)
$75/hr
$0
Travel (Will not be invoiced if travel is not required)
0.00 trip
$1,500
$0
SUB -TOTAL
$0
Item A-4: Field Survey - Mob & DeMob (1 mob)
Field Survey Mob/DeMob
2,00 day(s)
$1,200/day
$2,400
SUB -TOTAL
$2,400
Item A-5:! Field Interviews
Airport Manager
0.00 hour(s)
$70/hr
$0
ATCT Manager
0.00 hour(s)
$70/hr
$0
FAA Airways Facilities Manager (NAVAID)
0.00 hour(s)
$70/hr
$0
SUB -TOTAL
$0
5/27/2015
Line Items Geodetix Total
Item A-6: Field Survey & Documentation - Photo Control Points (0) and Checkpoints (0)
Photo Control Layout (in office, on contact prints/.kmz file) 0.00 hour(s) $70/hr $0
Construct Panel Points in Field (Qty 0) 0.00 day(s) $1,200/day $0
Survey Photo Control Points and Checkpoints 0.00 day(s) $1,200/day $0
Surveyor to Complete and Review Airports -GIS forms. 0.00 hour(s) $70/hr $0
1 form per pt @ 0.25 hrs. ea. (Qty 35)
Digital Field Photos - Processing in Office
2.00 hour(s)
$70/ea
$140
(Captions, Add to Airports -GIS forms, Scan, Org., File Log) 2
0.00 hour(s)
$70/hr
$0
photos pre pt. @ 0.25 hrs. ea. (Qty 70 photos)
0.00 hour(s)
$70/ea
$0
OPUS Solutions - Checkpoints (Print, Scan, Organize)
0.00 hour(s)
$70/hr
$0
SUB -TOTAL
Runway Ends & Displaced Thresholds (0)
$0
Item A-7: Field Survey & Documentation - Geodetic Control (2 stations)
$0
PACS/SACS or Temp Points - Recovery and Survey
0.00 day(s)
$1,200/day
$0
Two Benchmarks - Recovery and Survey
0 00 day(s)
$1,200/day
$0
Surveyor to Complete and Review Airports -GIS forms. 9 00 hour(s) $70/ea $630
4 forms per sta + 1 @ 0.25 hrs ea. (Qty 9)
Digital Field Photos - Processing in Office
(Captions, Add to Airports -GIS forms, Scan, Org., File Log) 4 8.00 hour(s) $70/ea $560
photos per sta @ 0.5 hrs. ea. (Qty 8)
Mark Recovery Reports (Submitted, Scan, Org.)
2.00 hour(s)
$70/ea
$140
OPUS Solutions - Geodetic (Print, Scan, Organize)
0.00 hour(s)
$70/ea
$0
Publication of Temp Points in NGS database (if applic.)
0.00 hour(s)
$70/ea
$0
SUB -TOTAL
1 $1,330
Item A-8: Field Survey & Documentation - Runway Features (All active rwy ends & DT, Qty 0)
Runway Ends & Displaced Thresholds (0)
0.00 day(s)
$1,200/day
$0
Runway Profiles (Part 139 - 10' stations with 10' offsets left 0.00 day(s) $1,200/day $0
& right, 2 runs - all runways)
Surveyor to Complete and Review Airports -GIS forms. 0.00 hour(s) $70/hr $0
1 form per pt. +1 @ 0.25 hrs. ea. (Qty 0 forms)
Digital Field Photos - Processing in Office
(Captions, Add to Airports -GIS forms, Scan, Org., File Log) 0.00 hour(s) $70/hr $0
10 photos per end @ 0.25 hrs ea. (Qty 0 photos)
Topography survey of RSA and surrounding features 1.50 day(s) $1,200/day $1,800
SUB -TOTAL 1 $1,800
Item A-9: Field Survey & Docs - NAVAIDs On -Airport (Qty 0) and Off -Airport (10nm radius, Qty 0)
Field Survey 0.00 day(s) $1,200/day $0
Surveyor to Complete and Review Airports -GIS forms. 0.00 hour(s) $70/hr $0
1 form per NAVAID @ 0.25 hrs. ea. (Qty 0)
Digital Field Photos - Processing in Office (Captions, Add to
Airports -GIS forms, Scan, Org., File Log) 0.00 hour(s) $70/hr $0
2 photos per NAVAID @ 0.25 hrs. ea. (Qty 0 photos)
SUB -TOTAL $0
Item A-10: Field Survey - GPS Data Post Processing & Review
Raw GPS Data Processing 4.00 hour(s) $75/hr $300
Quality Review by Reg. Prof. Land Surveyor 1.00 hour(s) $75/hr $75
SUB -TOTAL $376
5/27/2015
Line Items Geodetix Total
Item A-11: Geo -Spatial Data
Mapping Compilation Models Hours/Model
Model Setting 0.00 0.25 $70/hr $0
Limited Features for IAP -only Development **
Hours
$0
VGAS inner, VGRPS, VGPS, VGPCS (660) 0.00 0.00
$70/hr
Airport Property Only (Rwy 17R -35L area only)
$0
VGAS outer & VGATS (1600) 0.00 0.00
$70/hr
$1,680
$0
VGHS & VGCS (1600) 0.00 0.00
$70/hr
$70/hr
$0
Attribution / Enumeration 0.00 0.00
$70/hr
0.00
$0
Final Edit / QC 0.25 Compilation
$0
12.00
$0
**Feature classes required for IAP development include- airportcontrolpoint, landmarksegment, markingarea, navaidequipment,
obstacle, obstructionarea, obstuctionidsurface, runway, runwaycenterline. runwayelement, runwayend, runwaylabel and
Attribution / Enumeration
runwayintersection. Includes obstacle and landmark identification in all -18B VG surfaces
1.00
$70/hr
Airport Property Base -Mapping (Updates Only)
Hours
$3,500
Airport Property Only (Rwy 17R -35L area only)
24.00
1.00
$70/hr
$1,680
SUE - from record drawings
4.00
0.00
$70/hr
$0
Off -Airport (Obstacles & Landmark/Roadways)
0.00
0.00
$70/hr
$0
Topo
12.00
1.00
$70/hr
$840
Attribution / Enumeration
4.00
1.00
$70/hr
$280
Final Edit / QC
0.25
Compilation
$2,800
$700
Post -Construction / As -Built Survey & Update
Hours
$0
Runway (End pts, Disp Thres, EMAS, Blast Pad)
0.00
0.00
$70/hr
$0
Runway Profiles
0.00
0.00
$70/hr
$0
NAVAIDs
0.00
0.00
$70/hr
$0
Taxiways
0.00
7.00
$70/hr
$0
Topo
0.00
5.00
$70/hr
$0
Attribution / Enumeration
0.00
5.00
$70/hr
$0
Final Edit / QC
0.25 Compilation
$0
$0
Geo -Spatial Data Files
Hours
$70
AGIS "Test A Survey File" and error resolution
1.00
NA
$70/hr
$70
Convert CAD file to -18 B GIS
0.00
NA
$70/hr
$0
Convert AGIS file to Standard CAD file w/ Symbology
0.00
NA
$71 /hr
$0
Convert AGIS file to other file type w/ Symbology
0.00
NA
$70/hr
$0
Other:
Other:
Other:
SUB -TOTAL 1 $3,570
5/27/2015
Line Items Geodetix Total
Item A-12: Airport Airspace Analysis (AAA)
Vertically -Guided 0.00 hour(s) $70/ea $0
Digitial Obstacle File Review 0.00 hour(s) $70/ea $0
Non -Vertically Guided 0.00 hour(s) $70/ea $0
SUB -TOTAL $0
Item A-13: Imagery Data Submittals (per AC 160/5300-17C)
AP Imagery Acquisition Report
(Development of summary report, organization of
imagery data and supporting documentation, and
submittal to AGIS & FAA (DVD))
Drthophotos & Metadata to FAA
(Development of metadata, submittal preparation of
both orthos and metadata, submittal to FAA on DVDs)
0.00 hour(s) $75/ea $0
0.00 hour(s) $75/ea $0
SUB -TOTAL $0
Item A-14: Final Survey Data Submittals
Final Field Survey Data to Flight Procedures
Final Project Report Development & Submittal to AGIS
Final Geo -spatial Data (.dwg) Submittal to AGIS
Duplicate of All Submittals to Airport, Eng, or Prime
Consultant on data shuttle upon project completion.
0.00 hour(s)
$70/ea
$0
8.00 hour(s)
$70/ea
$560
2.00 hour(s)
$70/ea
$140
2.00 hour(s)
$70/ea
$140
SUB -TOTAL $840
Item A-16: UDDF Development
UDDF Development
0.00 hour(s)
$70/ea
$0
SUB -TOTAL
$0
Item A-16: Reimbursable Agreement Application Support
Coordination and documentation preparation
0.00 hour(s)
$75/ea
$0
SUB -TOTAL
$0
Item A-17: Miscellaneous
Construction Matenals for Panel Points
0.00 points
$40/ea
$0
Travel - Scoping / Kick -Off Meeting
0.00 person
$1,500
$0
Travel - Interim Meeting
0.00 trip
$1,500
$0
SUB -TOTAL $0
PROJECT TOTAL $12,116
r;
O
N
I -
C14
LO
w
a)
cu
CL
J
LO
M
ti
T
3
c
_
r
.0
t
x
W
w2woo0 9 W.Um M"XW i
m
C
dd
a)
U
C
cC
�
r '
cn
C
0
N
CD
C6 E
A , f
YI /M!4
cc cn
CY) CU a
N
cu
azm
I.
J p N w
C w
U
U � �
�
.`2
C N E 0,
CD C
�
O C
N V O
=
Cc
0 N Q E
-O cu cu 16
C
a)
O
NQ @ m
6
C Cn O Q
E 3 @ L
a) �a yLL'
ti
— m r
VJ
CoOO
coo-
3 m N
U �E
m
�V
a� a)-
wQ
Co
N a) Y
C O <
L_
Q
wr
'E
a) '�a
C
Cn
aS -O p�
P
T
O N E a) (a a
a) a)
E m O c W
E w
a).=o=>
�m
m
oL.�c°mc
O'D
_
o a 0) a) CU
w
' W a� To a)
Z
.2 (D
� m -o .E n C
U 0
Q = L O a) -
n
(6 'C
U O
L n
y.2 m w
a)a)mmm°-Ea)--
U=
m C C m m Z' O`
(U E
=)QQ=)»
>co
VVIS
t
-
i
s
r
-06
L
m
C
a)
U
C
cC
L
a
cn
C
0
N
CD
C6 E
cc cn
CY) CU a
cu
azm
J p N w
C w
U
U � �
�
.`2
C N E 0,
CD C
�
O C
N V O
=
Cc
0 N Q E
-O cu cu 16
C
a)
O
NQ @ m
m
C Cn O Q
E 3 @ L
a) �a yLL'
0
U,,^^
— m r
VJ
CoOO
coo-
3 m N
U �E
m
�V
a� a)-
wQ
Co
N a) Y
C O <
L_
Q
wr
'E
a) '�a
C
Cn
aS -O p�
10
T
O N E a) (a a
a) a)
E m O c W
E w
a).=o=>
�m
m
oL.�c°mc
O'D
_
o a 0) a) CU
w
' W a� To a)
Z
.2 (D
� m -o .E n C
U 0
Q = L O a) -
n
(6 'C
U O
L n
y.2 m w
a)a)mmm°-Ea)--
U=
m C C m m Z' O`
(U E
=)QQ=)»
>co
XLVIS2223.1WJVDPROMO P Ewa9d&2SWi1 Te DaWadREBD.+6+
PARKHILLSMI H&COOPER
City of Lubbock, Texas
LUBBOCK PRESTON SMITH INTERNATIONAL AIRPORT
Runway 17R-36L Phase II REBID
ITB -16-12442-TF
8/2612016 2:00pm
Lubbock Preston Smith
International Airport
Dunininck, Inc EOPC
It m
I De
m*
UnitPriee
Amount
UMtPrioe
Amount
BID VISM
1
Item QP-10 Mobikz tion mobik2ation max
1•
2
Item P-101 Removal of Existinto Concrete Pavement 13 to 15-InchThickness and disposal of off airport property1
,1
3
Item P-101, Removal of Existing Hot-Mix Asphaltic Concrete Base (variable thickness) and either disposed of off-site or
processed to RAP specifications
11,500
CY
$22.00
$253,000.00
$24.15
$277,725.00
4
Item P-101, Removal of Hol-Mix Asphaltic Concrete Surface Course (t2-inch thickness) and Bituminous Base Course
(t4-inch thickness), and either disposed of off-site or processed to RAP specifications
4.210
SY 1
$6.70
$28.207.00
$9.00
$37.890.00
5
Item P-101. Removal of Hot-Mix Asphaltic Concrete Surface Course (t2-inch thickness) and Bituminous Base Course
(t8-Inch Thickness), and either disposed of off-site or processed to RAP specifications
3.700
SY
$13.25
549,025.00
$15.25
$56,425.00
6
Item P-101. Asphalt Joint and Crack Repair, 1/4 to 1-1/2-inch width (including removal of existing sealant and
preparation but excluding sealant material)
22.500
LF
$3.20
$72,000.00
53.00
$67,500.00
7
Item P-101, Material for As hall Joint and Crack repair, 1/4 to 1-1/2-inch width
1.320 GAL
$10.00
$13,200.00
515.00
519 800.00
8
Item P-101, Asphalt Joint and Crack Repair, 1-12 to 2-Inch width Qncludin re aration. matedal, and labor
3,000
LF
$15.00
$45,000.00
$12.00
$35,000.00
9
Item P-101. Asphalt Joint and Crack Repair >2 inch width(including preparation, material, and labor
1,500
LF
$65.00
$97,500.00
$55.00
$82,500.00
10
Item P-101, Spatted and Failed Concrete Pavement Repair(including material and regardless of spall depth)
20
SY
$1.000.00
$20,000.00
589.25
$1,785.110
11
Item P-101, Concrete Crack Repair[Including materia
4301
LF 1
$60.00
$25,600.00
$57.75
$24,833.00
12
Item P-101, Rubber Removal
6,100
SY
$1.50
$9,150.00
$3.15
$19,215.00
13
Item P-152. Excavation and Stockpile of Material to be Reinstalled By Contractor
17,000
CY
$9.20
$156,400.00
$8.40
$142,800.00
14
Item P-152, Excavation and Haul-Off of Material by Contractor
40,000
CY
$23.00
$920,000.00
$21.00
5840,000.00
15
Item P-152, Excavation for Undercutting of Unsuitable Material (including obtaining and Installing suitable borrow
material)
1,000
CY
$27.00
$27,000.00
$27.30
$27,300.00
16
11tern P-152 Embankment
17,500
CY
$6.90
$120.750.00
$6.50
5113 750.00
17
Item P-152, Grading and Topsoil In Unpaved Areas
356,200
SY
$2.60
$926,120.00
$1.00
$356,200.00
18
Item P-152 Grading nd Subgrade Preparation Using In-Place Material6-inch thickness) Under Area's t Paved
50.500
Y
$1.7
$85850.00
$1.50
19
Item P-152 Gradin and Su rade Preparation UsingStockpile Material -inch thickness Under Areas to be Paved
20
Item P-153, Controlled Low Strength Material for Shoulder Backfill
680
CY
$195.00
$132,600.00
$183.75
$124,950.00
21
Item P-155, Lime Treated Su rade Course, 6-inch thickness(using stockpiled materia
49,300
SY
$8,50
$419.050.00
56.30
$310,590.00
22
Item P-155, Hydrated Lime Material -Lime Weight) Used in Lime Treated Su rade Course
680 Ton
$200.00
$176,000.00
$183.75
$161,700.00
23
Item P-156. Temporary Air and Water Pollution, Soil Erosion and Siltation Control
1
LS
$60.000.00
$60,000.00
531.500.00
$31,500.00
24
Item P-304. Cement Treated Base Course, 6-inch thickness
50,500
SY
$17.10
$663,550.00
$17.85
$901,425.00
25
Item P-401, Hot-Mix Asphalt MA Pavements, 4-Inch thickness two 2-inch lifts
10,811 Ton
$145.00
$1,567,595.00
$154.35
$1,668,678.00
26
Item P401, Hot-Mix Asphalt HMA Pavements. 6-Inch thickness two 3-Inch lifts
3.223 Ton
$160.00
$515,680.00
$168.00
$541,464.00
27
Item P-401, Hot-Mix Asphalt MA Pavements, max 3% bonus
1
LS
$62.498.25
$62,498.25
$66,305.00
$66,305.00
28
Item P-501, Portland Cement Concrete Pavement, 16-inch Thickness (including reinforcement where applicable)
48,360
SY
$77.00
$3,723,720.00
$78.50
53,796,260.00
29
Item P-501, Portland Cement Concrete Pavement, 13 to 15-Inch thickness ( including reinforcement where applicable)
3,910
SY
5125.25
$489,727.50
$105.00
$410,550.00
30
Item P-501, Portland Cement Concrete Pavement (18-Inch thickness Including additional milling where necessary)
150
BY
$185.00
$27,750.00
$183.75
$27,563.00
31
Item P-501, Portland Cement Concrete Pavement, 6% Bonus
1
LS
S254,471.85
$254,471.85
$254 063.00
$254,063.00
32
Item P-602. Bituminous Prime Coat, including herbicidal treatment
15,140 GAL
$5.45
582.513.00
$6.25
$94,625.00
33
Item P-605, Joint Sealants for Existing Concrete Keel Section (including removal of existing sealant, labor, and
material)
13,060
LF
52.00
$26,120.00
$2.25
$29,385.00
34
Item P-608, Emulsified Asphalt Seal Coat
20.900
BY
$2.50
S52,250.00
$3.00
$62,700.00
35
Item P-620, Obliteration of Permanent Runway and Taxiway Painting
306,100
SF
$1.10
$336,710.00
$1.00
$306,100.00
36
Item P-620, Obliteration of Temporary Runway and Taxiway Painting
6.200
SF
$1.10
$6,820.00
1 $0.75
54,650.00
37
Item P-620, Permanent Runway and Taxiway Painting (including reflective media
306,100
SF
$0.60
$183,660.00
$0.50
$153,050.00
38
Item P-620, Temporary Runway and Taxiway Painting includin reflective media
6,200
SF
$1.80
$11,160.00
$1.00
$6,200.00
39
1 Item P-621, Saw-Cut Grooving
36,700
SY
$1.75
567,725 00
$2.00
$77,400.00
40
Item D-705. Pipe Underdrain System
8,700
LF
$42.25
$367,575.00
543.50
$376,450.00
41
Item D-705, Connections to Electrical System
10
EA
$1.500.00
$15,000.00
$600.00
S6,000.00
42
Item D-705, Connections to Existing Culvert
4
EA
$2,100.00
$8,400.00
$250.00
$1,000.00
43
Item T-901, Seedina and Fertilizina
80
AC
$6.000.00
$480,000.00
$2.625.00
$210,000.00
44
Item T-904, Soddina
8.900
SY
$10.25
$91,225.00
510.50
S93,450.00
45
Item L-106, 6 inch wide trenching for conduit, 18 inch minimum depth
1,240
LF
56.25
$7,750.00
$1.65
$2,046.00
46
Item L-106, No. 8 AWG, 5 kV, L-624, Type C Cable, Installed in Trench. Duct Bank or Conduit
30,550
LF
$1.80
$54,990.00
$1.50
$45,825.00
47
Item L-108, No. 6 AWG, Solid, Bare Counterpoise Wire, Installed in Trench, Above the Duct Bank or Conduit, Including
Ground Rods and Ground Connectors
1.240
LF
$1.95
$2,418.00
$5.25
$6,510.00
48
Iltem L-100, Non-Metallic, 3 inch x 32 inch saddle racks
30
EA
$155.00
$4,650.00
$150.00
54,500.00
49
Item L-110, Non-Encased Electrical Duct Bank, 2 inch. SCH 40, PVC
530
LF
53.30
$1,749.00
51.45
$769.00
50
Item L-110, Concrete Encased Electrical Conduit, 2 inch. SCH 40, PVC
710
LF 1
$6.00
$4,260.00
$2.00
$1,420.00
51
Item L-125, Replace Existing L-862 HIRL Fixture with new L-862 Fixture including new base plate with ground tab, new
extension column for 24 Inch fixture height, new L-830-18 (150W) Transformer and PVC transformer support
100
EA
$500.00
550,000.00
$600.00
$60,000.00
52
Replace Existing L-862 HIRL Threshold Fixture with new L-662 Threshold Fixture including new base plat with groud
tab, new extension column for24 inch fixture height, new L-830-6 (200W) Transfonnerand PVC transformer support
8
EA
$560.00
$4,480.00
5600.00
$4,800.00
53
Replace Existing L-850 HIRL Fixture with new L-850 Fixture Including new L-630-6 (200W) Transformer and PVC
transformer support
12
EA
51.450.00
$17.400.00
$1.500.00
$18,000.00
54
Iltem L-125, Install New Fixture Identification Tags
120
EA
$12.50
51.500.00
$3.00
5360.00
55
Item L-125, Install New L-868 Light Base in new concrete runway panel
3
EA 1
$1.450.00
$4,350.00
$1,000.00
53,000.00
56
Item L-125, Remove Stripped or Broken Bolt and Repair/Re-tap Can to Receive New Bolt
40
EA
$7.50
$300.00
$50.00
$2,000.00
57
Item L-125, Circuit Discovery and Markin
1
LS
$15,000.00
$15,000.00
$15,000.00
$15,000.00
58
Item MC, Taxiway Crossing and FOD Control
1
LS
$200,000.00
$200,000.00
$157,500.00
$157,500.0
59
Item MC, Pavement Patch / Polhote Repair
430
SY
$61.50
$26,445.00
$60.00
$25.800.00
60
Item MC, All items associated with project phasing and safety (including lighting, signage, barricades, temporary
electrical, etc.)
1
LS
$240,000.00
5240,000.00
$8,400.00
$8,400.00
61
Item MC, Nonwoven Geotextile Interlayer(including anchors
50,750
SY
$3.00
$152,250.00
$3.00
$152,250.00
62
Item PLANS Install new pavement sensors
1
EA
516.000.00
$16,000.00
$15.000.00
$15,000.00
w6iffi6k
XLVIS2223.1WJVDPROMO P Ewa9d&2SWi1 Te DaWadREBD.+6+
Lubbock Preston Smith
City of Lubbock, Texas International Airport
LUBBOCK PRESTON SMITH INTERNATIONAL AIRPORT
Runway 17R -ML Phase II REBID
ITB -16-12442-TF
8/26/2016 2:00pm
Xi2015RMIIe MOMPfASEW&Sd&2S2015 7m ca mRE®xltl
1i3d003 V HJJWS-1-1IH)IdVd
al
a iIFT 4
I
m
R
/i