Loading...
HomeMy WebLinkAboutResolution - 2015-R0242 - Contract - Mesa Pivot Irrigation - Center Pivot Replacement - 08/13/2015Resolution No. 2015-R0242 Item No. 6.6 August 13, 2015 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Contract No. 12400 Center Pivot Replacement for the Lubbock and Wilson Land Application Sites, by and between the City of Lubbock and Mesa Pivot Irrigation of Wilson, TX, and related documents. Said Contract is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on August 13, 2015 ATTEST: GLEIN BERTSON, MAYOR Rib -eta Garza, City Secretar AS TO P.E., Direr ofXublic Works FORM: RES.Contract-Mesa Pivot Irrigation 7.8.15 Resolution No. 2015-RO242 Contract 12400 City of Lubbock, TX Contract for Services Center Pivot Replacement for the Lubbock and Wilson Land Application Sites THIS CONTRACT made and entered into this 13th day of Aueust, 2015, by and between the City of Lubbock ("City"), and Mesa Pivot Irrigation, ("Contractor"). WITNESSETH: WHEREAS, the City of Lubbock duly advertised for bids for Center Pivot Replacement for the Lubbock and Wilson Land Application Sites and bids were received and duly opened as required by law; and WHEREAS, after careful consideration of the bid submitted by Contractor, the City authorized the execution, in the name of the City of Lubbock a contract with said Contractor covering the purchase and delivery of the said center pivot replacement. NOW, THEREFORE, in consideration of the mutual agreement contained herein, as well as the financial consideration hereinafter referred to, the parties hereby covenant and agree as follows: 1. In accordance with City's specifications and Contractor's bid, copies of which are attached hereto and made part hereof, Contractor will deliver to the City, Center Pivot Replacement for the Lubbock and Wilson Land Application Sites and more specifically referred to as items one and two on the bid submitted by the Contractor or in the specifications attached hereto. 2. The City promises and agrees to employ, and does employ, the Contractor to cause to be done the work provided for in this Contract and to complete and finish the same according to the attached specifications, bid form, and terms and general conditions contained herein. 3. The Contractor shall perform the work according to the procedures outlined in the bid form, specifications and general conditions attached hereto. The contract shall be for a term of SIXTY days, from notice to proceed. 4. This contract shall remain in effect until the expiration date, performance of services ordered, or termination of by either party with a thirty (30) day written notice. Such written notice must state the reason for cancellation. The City of Lubbock reserves the right to award the canceled contract to the next lowest and best bidder as it deems to be in the best interest of the city. 5. Contractor shall at all times be an independent contractor and not an agent or representative of City with regard to performance of the Services. Contractor shall not represent that it is, or hold itself out as, an agent or representative of City. In no event shall Contractor be authorized to enter into any agreement or undertaking for or on behalf of City. 6. The contractor shall obtain and maintain in full force and effect during the term of the contract, commercial general liability coverage with insurance carriers admitted to do business in the State of Texas. The insurance companies must carry a Best's Rating of A- VII or better. The policies will be written on an occurrence basis, subject to the following minimum limits of liability: TYPE AMOUNT General Liability Commercial General Liability 1,000,000 General Aggregate Automotive Liability Combined Single Limit Any Auto 1,000,000 Workers Compensation Statutory Amounts Or Employers' Liability $1,000,000 The City of Lubbock shall be named as additional insured on Auto/General Liability on a Primary and Non -Contributory basis, with a waiver of subrogation in favor of the City of Lubbock on all coverages. All copies of the Certificates of Insurance shall reference the project name or bid number for which the insurance is being supplied. Copies of all endorsements are required. The contractor will provide a Certificate of Insurance to the City as evidence of coverage. The certificate will provide 30 days notice of cancellation, and under the cancellation section, the wording "endeavor to" and "but failure to mail such notice shall impose no obligation or liability of any kind upon the company, its agents or representatives" will be crossed out. A copy of the additional insured endorsement attached to the policy will be included with the certificate. The contractor shall also maintain workers compensation insurance in the statutory amount. If at any time during the life of the contract or any extension, the contractor fails to maintain the required insurance in full force and effect, all work under the contract shall be discontinued immediately. Any failure to maintain the required insurance may be sufficient cause for the City to terminate the contract. 7. Neither the City nor the Contractor shall assign, transfer or encumber any rights, duties or interests accruing from this Contract without the written consent of the other. 8. The City reserves the right to exercise any right or remedy available to it by law, contract, equity, or otherwise, including without limitation, the right to seek any and all forms of relief in a court of competent jurisdiction. Further, the City shall not be subject to any arbitration process prior to exercising its unrestricted right to seek judicial remedy. The remedies set forth herein are cumulative and not exclusive, and may be exercised concurrently. To the extent of any conflict between this provision and another provision in, or related to, this document, this provision shall control. 9. At any time during the term of the contract, or thereafter, the City, or a duly authorized audit representative of the City or the State of Texas, at its expense and at reasonable times, reserves the right to audit Contractor's records and books relevant to all services provided to the City under this Contract. In the event such an audit by the City reveals any errors or overpayments by the City, Contractor shall refund the City the full amount of such overpayments within thirty (30) days of such audit findings, or the City, at its option, reserves the right to deduct such amounts owing the City from any payments due Contractor. 10. Non Appropriation: All funds for payment by the City under this contract are subject to the availability of an annual appropriation for this purpose by the City. In the event of nonappropriation of funds by the City Council of the City of Lubbock for the goods or services provided under the contract, the City will terminate the contract, without termination charge or other liability, on the last day of the then -current fiscal year or when the appropriation made for the then -current year for the goods or services covered by this contract is spent, whichever event occurs first. If at any time funds are not appropriated for the continuance of this contract, cancellation shall be accepted by the Seller on thirty (30) days prior written notice, but failure to give such notice shall be of no effect and the City shall not be obligated under this contract beyond the date of tennination. 11. This Contract consists of the following documents set forth herein; Specifications, and the Bid Foran. IN WITNESS WHEREOF, the parties hereto have caused this Contract to be executed the day and year first above written. Executed in triplicate. CITY OF LUBBOCK Glen ertso , Mayor ATTEST: Reb tcc a Garza, City Secre Uy AS TO Aubrey Spear, Pte. / Director of W ta Utilities CONTRACTOR BY Authorized R esentative CpdLJJ u b ew, 1 A Print NambJ 020 US "W6 $-1 Address W:Isov, i X -193 I City, State, Zip Code City of Lubbock Minimum Specifications for the purchase of Two (2) Center Pivots for Lubbock Land Application and Wilson Land Application Sites It is the intent of this specification, referenced documents, requircments and conditions sections to describe the minimum performance requirements. The vehicle/equipment most meet or exceed the performance or construction described herein. The vendors shall be required to mark compliance or non- compliance to each item description in the space provided. All equipment furnished as standard to the general public on the product by the manufacturer shall be included, even when not specifically identified in this specification. Any deviations from the written specification, with date as shown in the Invitation to Bid (171B), shall be noted on the attached Non -Conformance Form. In order to receive full consideration, IM response quotation must follow this specification and the ITB's terns and conditions. Vendor Name: t 9—S C, Piyo-E f-cs:uJ1,O{l Vendor Phone: RO(�-CrLH'-7Z5% S: /Purchme/Bid Docs/ffB 15 -12400 -SS Center Pivot Replacement for the Lubbock and Wilson land Application Sites 27 Vendor No. Item Description CompBance Yes No New pivots shall be tied into existing pipeline. 1 Overall Length and Scope of The successful bidder will be required to measure the distance of all Work obstacles in each field to ensure clearance of the pivot towers. Purchase, Delivery, and Installation of a 1,257 foot pivot irrigation system 1 I (to replace No. L3), including new flow meter, located at the Lubbock Land Application Site, based on specifications listed below, including ✓ dismantling existing system and moving to a location outside the circle. Purchase, Delivery, and Installation of a 1,291 foot pivot irrigation system 1 2 (to replace No. H17), including new flow meter, located at the Wilson ✓ Land Application Site, based on specifications listed below, including dismantling existing system and moving to a location outside the circle. 2. Main Pipe 2.1 8 inch - 6-5/8 inch, as required to reach desired flows at desired pressure. 2.2 -0.0115 inch wall thickness. 2.3 Piping will be formed from aisisae 1010 coil sheet. 3. Pivot Assembly 3.1 8 inch O.D. riser, Polyseal gasket for high and low pressure. 3.2 4 inch x 4 inch x 3/8 inch angle iron legs With 4 - 2 inch x 2 inch x 3/16 L� inch angle braces on all 4 sides. 3.3 Adjustable ring lock elbow. ✓ 3.4 Connection between pivot assembly and the first span must be flexible to v allow for grade changes on the first tower. 4. Truss Design 4.1 Truss rods 11/16 inch with manufacturer's standard heavy duty under J truss braces. S: /Purchme/Bid Docs/ffB 15 -12400 -SS Center Pivot Replacement for the Lubbock and Wilson land Application Sites 27 S: /Purehaer/Bid Does1rrB 15 -12400 -SS Center Pivot Replacement for the Lubbock and Wilson Land Application Sites 28 Vendor No. Item Description Com liance Yes No 5. Towers Four legs constructed of 3 inch x 3 inch x '/4 inch angle iron bolted to 6- 5 1 5/8 inch x 11 gauge tubular non -towable mobile base. 5.2 Legs must have a minimum of 5 tie braces. 5.3 Wheelbase minimum 13.0 feet maximum span length 160 feet. 6. All Towers 6.1 Connections must be of pin and hinge type design with flexible rubber boot with clamps or acceptable approved equivalent. 7. Steel Structure 7.1 Components shall be hot -dipped galvanized to ASTM 123-73 specifications. 7.2 A minimum coat of 2.O0oz/ft' average shall be applied. 8. Fasteners 8.1 All fasteners used on the system shall be grade 5 zinc coated or better. t/ 9. End Booms 9.1 End booms lengths shall not exceed 40 feet. 10. Hydraulics Operating PSI 25, Maximum 35 PSI. All systems, will be equipped with 10.1 360 degree Senninger spray nozzles, spaced on 120 inch centers, with 30 t/ inch plugged outlets, with plastic plugs. 10.2 Rubber hose drops 3 feet above ground, standard % inch x 12 inch gooseneck use pipe dope on all goosenecks with 1-3/4 pound weights. L/ 10.3 Each drop shall be equipped with a plastic cut-off valve. Oversized main line diameters in a combination With the specified 10.4 minimum diameter shall be provided as necessary for each system to obtain the desired flow volume at the desired operating pressure. Minimum flows at 25 PSI per system at the pivot point — all calculations shall use a 140 C factor — are as follows: 10.5 LLAS Plot L3 —1,000 GPM Z/ HLAS Plot H17 —1050 GPM Fl� S: /Purehaer/Bid Does1rrB 15 -12400 -SS Center Pivot Replacement for the Lubbock and Wilson Land Application Sites 28 S: /Purchase/Bid DucdrrB 15 -12400 -SS Center Pivot Replacement for the Lubbock and Wilson Land Application Sita 29 Vendor No. Item Description CompMance Yes No 11. Flow Meter Seametrics AG2000-800-148 or City approved equal. Spool -type electromagnetic, no moving parts. ✓ 8 inch, Flanged, ANSI 1501b. Drilling 150 psi ✓ Operating temperature; 10-130 degrees F. Non-operating temperature: 40 — 158 degrees F. Accuracy: +/-1 % of reading from 10% to 100% of reading X/ Accuracy: +/-2% of reading from cutoff to 100% of reading Welded steel, epoxy -coated; Dual durometer rubber liner; Diecast aluminum, powder coated electronics housing; 316 stainless steel r/ electrodes. Display Rate -Digits 5: Gallon/minute, Liter/minute, Cubic Feet/minute, Feet/hour, Gallon/second, Liter/second, Cubic Feet/second, Cubic Meter/minute. C./ Display Rate -Digits 8: Gallon, gallonx1000, Liter, Literx1000, Acre feet, cubic feet, million gallon, acre inch Compatible with external power source, 7-32 Vdc, 30mA, lithium battery backup in case of power failure, 10 year life. Conductivity: > 20 microSiemens/cm Empty pipe detection hardware/software, conductivity based. Environmental: NEMA 4X standard l� 12. All Electrical All electrical components must comply with the following national electrical code sections: 1. Article 250-51 Effective Grounding 2. Article 250-114 Effective Grounding 3. Article 310 Minimum Size of Conductors 12.1 4. Article 210-5 Color Code for Branch or Controlled 5. Article 430 Motors, Motor Circuits, or Controlled 6. Article 675 Electrically Driven on Controlled Irrigation Machines. 7. National Fire Protection Standard No. 70, National Electrical Code. S: /Purchase/Bid DucdrrB 15 -12400 -SS Center Pivot Replacement for the Lubbock and Wilson Land Application Sita 29 S: MurchaselBid DocsM IS- 12400 -SS Center Pivot Replacement for the Lubbock and Wilson Land Application Sita 30 Vendor No. [tem Description Compfiance Yes No 12.2 Primary Power 3-phase, 480 volt, 60 hertz single phase, 120 volt, 60 hertz primary, single 12.2.1 phase, 120 volt enclosed surge and lighting protection package shall be provided. 12 3 Programmable Main 12.3.1 System allows for programming of various functions controlled by degrees of rotation. L/ 12.3.2 Accuracy shall be +/- I' with no offset to reset degrees required. V 12.3.3 Programmable functions to include — change rate of speed. ✓ 12.3.4 Change direction, stop/start, and control two auxiliary ports for control of ancillary equipment. 12.3.5 Safety features to include: Disconnect rated at 30 amps, 600 volts. / 12.3.6 Panel must be compatible with FieldNET telemetry system. 12.4 Electric Motor on Gear Drives 12.4.1 All motors shall be %z hp, 460.480 VAC., 3-phase with 1,725 rpm at 60 Hz, and shall be totally enclosed. Full load torque shall be 35oz. R (min) and locked rotor torque 220oz. ft. 12.42 (min) motors shall be rated for continuous duty cycle and have inherent overload protection. 12.4.3 Ball bearings shall be double sealed. 12.4.4 Motors shall have a plastic shroud which protects it from moisture. 12.4.5 Motor lead shall be run in % inch conduit along mobile base and extend up tower leg approximately 3 to 4 feet. 12.5 Center Drive Gearbox 12.5.1 Spur gear drive gearbox designed specifically for use on center pivot systems. 12.5.2 Output ratio 40-1. ✓ The gear drive must be capable of delivering a minimum of 120,000 inch/pounds of instantaneous torques and 36,000 inch/pounds of l/ 12.5.3 continuous torque. S: MurchaselBid DocsM IS- 12400 -SS Center Pivot Replacement for the Lubbock and Wilson Land Application Sita 30 13.0 Tire Size 13.1 Size 11.2 x 38 Galvanized, Reinforced rims, tubeless S: /Purchase/Bid Docs/RB 15-12400SS Center Piwt Replacement for the Lubbock and Wilson Land Application Sites 31 BID FORM Center Pivot Replacement for Lubbock and Wilson Land Application Sites City of Lubbock, TX ITB No. 15 -12400 -SS In compliance with the Invitation to Bid 15 -12400 -SS, the undersigned Bidder having examined the Invitation to Bid and Specifications, and being familiar with the conditions to be met, hereby submits the following Bid for furnishing the material, equipment, labor and everything necessary for providing the items listed below and agrees to deliver said items at the locations and for the prices set forth on this form. A bid will be subject to being considered irregular and may be rejected if it shows omissions, alterations of form, conditional alternate bids, additions or alternates in lieu of the items specified, if the unit prices are obviously unbalanced (either in excess of or below reasonably expected values), or irregularities of any kind. The Invitation to Bid 15 -12400 -SS is by reference incorporated in this contract. The Bid Form must be completed in blue or black ink or by typewriter. Work will be done at two different locations: Lubbock Land Application Site @ 4602 ECR 6700, 4602 E 191 Street, Lubbock, TX 79403 and Wilson Farm @ 547 County Road X, Wilson, TX 79381 *PRICE: F.O.B. Destination, Freight Pre -Paid and Allowed **Days After Receipt of Order (ARO) Unless otherwise specified herein, the City may award the bid either item-by—item or on an all -or -none basis for any item or group of items shown on the bid. PAYMENT TERMS AND DISCOUNTS - Bidder offers a prompt payment discount of%, net _ calendar days. Discounts will not be considered in determining low bid. Unless otherwise indicated on the Bid Form, payment terms will be NET THIRTY DAYS. The City will pay the successful bidder within thirty days after the receipt of a correct invoice or after the date of acceptance, whichever event occurs later. Discounts for prompt payment requiring payment by the City within a stipulated number of days will be interpreted as applying within the stipulated number of calendar days after the date of receipt by the City of a correct invoice or after the date of acceptance that meets contract requirements, whichever event occurs later. Discounts for payment in less than ten days will not be considered. S: /ParchaseBid DocsfrrB 15-12400SS Center Pivot Rcplac=mt for the Lubbock and Wilson Land Application Sites 4 UNIT OF Delivery ITEM QTY MEASURE DESCRIPTION PRICE Days +/ ARO** 1. 1 LS Purchase, Delivery, and Installation of a 1,257 foot pivot irrigation system (to replace No. L3), including new flow meter, located at the Lubbock Land Application Site, based S on specifications listed below, including dismantling e80.2R8 PinX existing system and moving to a location outside the circle. 2 3D 11 PER SPECIFICATIONS. 2. 1 LS Purchase, Delivery, and Installation of a 1,291 foot pivot irrigation system (to replace No. H17), including new flow xJ meter, located at the Wilson Land Application Site, based $ P�� on specifications listed below, including dismantling existing system and moving to a location outside the circle. PER SPECIFICATIONS. $Z b3:5 q8 Total $1 Work will be done at two different locations: Lubbock Land Application Site @ 4602 ECR 6700, 4602 E 191 Street, Lubbock, TX 79403 and Wilson Farm @ 547 County Road X, Wilson, TX 79381 *PRICE: F.O.B. Destination, Freight Pre -Paid and Allowed **Days After Receipt of Order (ARO) Unless otherwise specified herein, the City may award the bid either item-by—item or on an all -or -none basis for any item or group of items shown on the bid. PAYMENT TERMS AND DISCOUNTS - Bidder offers a prompt payment discount of%, net _ calendar days. Discounts will not be considered in determining low bid. Unless otherwise indicated on the Bid Form, payment terms will be NET THIRTY DAYS. The City will pay the successful bidder within thirty days after the receipt of a correct invoice or after the date of acceptance, whichever event occurs later. Discounts for prompt payment requiring payment by the City within a stipulated number of days will be interpreted as applying within the stipulated number of calendar days after the date of receipt by the City of a correct invoice or after the date of acceptance that meets contract requirements, whichever event occurs later. Discounts for payment in less than ten days will not be considered. S: /ParchaseBid DocsfrrB 15-12400SS Center Pivot Rcplac=mt for the Lubbock and Wilson Land Application Sites 4 City of Lubbock, TX Center Pivot Replacement for Lubbock and Wilson Land Application Sites Bid Tabulation August 13, 2015 ITB 15 -12400 -SS Center Pivot Replacement for Lubbock and Wilson Land Application Sites UOM DescriptionNendor Location Unit Price Extended Cost LS Pivot irrigation system (to replace No. L3) Mesa Pivot Irrigation Wilson, TX S 80,398 80,398 LS Pivot irrigation system (to replace No. H17) Mesa Pivot Irrigation Wilson, TX 82,636 82,636 Item by Item Mesa Pivot Irrigation - Items 1-2 Wilson, TX 163,034