Loading...
HomeMy WebLinkAboutResolution - 2016-R0319 - Change Order - Utility Contractos Of America Inc. - Sanitary Sewer Expansion - 09/22/2016Resolution No.2016-R0319 Item No.6.6 September 22,2016 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Change Order No.2 to that certain Contract No.12218 by and between the City of Lubbock and Utility Contractors of America,Inc., for the South Lubbock Sanitary Sewer Extension Phase 2-Bid Package A. and related documents. Said Change Order No. 2 is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on September 22,2016 DANIEL M.POPE.MAYOR ATTEST: cca Garza,City SecitvSecrdtan APPROVED AS mCONTENT APPROVED AS TO FORM: RES.ChgOrd 2.Contract-Utility Contractors of America,Inc 8.29.16 V�• i•`.• city LubbOa Office of Purchasing and Contract Management Change Order Contract No: 12218 Contractor: Utility Contractors of America, Inc. Change Order No: 02 Contract Title: South Lubbock Sanitary Sewer Extension Phase 2 — Bid Package A Bid/RFP No: 15-12218-PD Project No: 92310 "Change Order" means a written order to a Contractor, executed by the Owner, in accordance with the Contract authorizing an addition to, deletion from, or adjustment or revision of the requirements of the Contract documents, or an adjustment to the compensation payable to the Contractor, or to the time for performance of the Contract and completion of the project, or a combination thereof, which does not alter the nature of project and is an integral part of the project objective. Adjustments to "Estimated Quantities" to a line time in a Unit Price Contract do not require a Change Order. All work that alters the nature of the construction or that is not an integral part of the project objective must be let out for public bid. Description of Change (alteration, deviation, addition, or deletion) caused by conditions encountered during construction not covered by the snecifications and drawines of the Droiect (attached additional rages is MUM Per attached backup material, Change Order #2 includes the following items: Item 99) Required item to connect sewer lateral to the new manhole at the intersection of University Ave and FM 1585. Item 100) Required to re-work/densify subgrade of pavement on University Avenue in front of Wal-Mart. A time extension of 105 days is included in this change order. A breakdown of the time extension request is included in the backup material for this change order. Where the Change Order is negotiated the Change Order most be fully documented and itemized as to costs, including material quantities, material costs, taxes, insurance, employee benefits, other related costs, profit and overhead. Where certain unit prices are contained in the initial Contract, no deviations are allowed in computing negotiated change order costs. ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM. ITEM DESCRIPTION AMOUNT A. ORIGINAL CONTRACT VALUE: $11,921,273.80 B. AMOUNT OF THIS CHANGE ORDER: (Note: Council approval required if over $30,000) $42,500.00 COST CENTER: I ACCOUNT: C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A) 0.36% D. AMOUNT OF PREVIOUS CHANGE ORDERS: $561,338.00 E. TOTAL AMOUNT OF ALL CHANGE ORDERS B+D $603,838.00 F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): (25 %maximum) 5.07% G. NEW CONTRACT AMOUNT (A+E): $12,525,111.80 It is mutually agreed that the above dollar amount and the time extension, as applicable, as set forth in this Change Order constitutes full compensation to the Contractor for all costs, expenses and damages to the Contractor, whether direct, consequential or otherwise, in anyway incident to, or arising out of, or resulting directly or indirectly, from the work performed or modified by the Contractor under this Change Order. (1) ntr cV A ed to Content: O + r s Represen 've (5) Capit4f Projects Manager ' PE August 24, 2016 ateO (2) Project Architect/Engineer Date Approved as to Form: 2 tao ate q/0t/autl Date (6) Director o mchasing & Contract bate Manageme 9/22/2016 (7) Mayor I Date (8) Council Date: September 22, 2016 Agenda hem #: 6.6 9/22/2016 2016-RO319 PUR-45 (Rev 01/2012) Kimley>Morn August 24, 2016 Mr. Josh Kristinek, P.E. City of Lubbock, Texas 1625 13th Street Lubbock, Texas RE: South Lubbock Sanitary Sewer Extension, Phase 2 — Bid Package A Change Order Number 2 KHA No. 063126011 Dear Josh As you are aware, the tie-in of the proposed University Avenue sewer line extension at the intersection of University Avenue and FM 1585 and pavement revisions at University Avenue from 98'^ Street to 1001" Street are being added to this project. This change order and the following description of the items are a result of this additional work for the above referenced project. Please refer to the breakdown that is attached for the specific change of each item. Item 99: This item will include excavating, chipping and removing the flowable fill and concrete encasement, cutting the fiberglass tee base, and performing the fiberglass patch for the new lateral sewer line. This change will result in an increase of $14,500.00. Item 100: This item includes re -working and re-densifying the subgrade for the pavement along University Avenue in front of the new Wal-Mart. The contractor was stopped so that additional pavement width could be designed during which time the subgrade went out of compliance. This change will result in an increase of $28,000.00. The change in contract price associated with these changes is detailed below: • Original contract price: $11,921,273.80 • Net change of this change order: $42,500.00 • Amount of previous change orders: $561,338.00 • Contract price with all approved change orders: $12,525,111.80 Kimley Morn Pa,m_ 2 The work outlined above was part of the critical path for the project. Other items included in the time extension are: re -alignment of a portion of the roadway, additional concrete pavement work, and weather days. This work is expected to take an additional 105 days that are recommended to be added to the contract. A breakdown of the time extension request from the contractor is attached. • Original contract time: 300 days • Original NTP date: June 15, 2015 • Contract time change with this change order: 105 days • Contract time change of previous change orders: 108 days • Contract time with all approved change orders: 513 days • Revised Substantial Completion Date: November 9, 2016 Should you have any questions please do not hesitate to give me a call. Sincerely, K/MLEY-HORN AND ASSOCIATES, INC. Texas Firm Registration No. F-928 �k�,P.E. Aaron K Rader, P.E. Copy to: City of Lubbock: Wood Franklin, P.E., John Turpin, P.E., Josh Kristinek, EIT UCA: Ty Lane, Jonathan Ziegner, P.E. Walker RPR Services: Ricky Walker, Mark Perry Kimley-Horn: Jeff James, P.E. %TTNFP01\Date rojWG W_UTAItlesWS3126011\CCASd Padage AWFI-CHG ORD1Change ONersW -Uni, rsity MH Tein'SLSSE Ph2 SPA CNnge Order 1 KHA Leger.Eoex KIMLEY-HORN AND ASSOCIATES, INC. 801 Cherry Street, Suite 950 Fort Worth, TX 76102 CHANGE OR EXTRA WORK ORDER NO.2 PROJECT DESCRIPTION: KHA Project No.: OWNER: CONTRACTOR: ORIGINAL CONTRACT AMOUNT: REVISED CONTRACT AMOUNT PER CHANGE ORDER No. 1: CHANGE ORDER No. 2: South Lubbock Sanitary Sewer Extension Phase 2, Bid Pacakge A 063126011 City of Lubbock Utility Contractors of America $11,921,273.80 $12,482,611.80 $12,525,111.80 CHANGE OR EXTRA WORK TO BE PERFORMED Date: August 24, 2016 Item Approx. Decrease in Increase in No. Quantity Description of Item Unit Price Contr. Price Contr. Price 99 1 LS CONNECT PROPOSED SEWER PIPE TO PROPOSED $14,500.00 $14,500.00 MANHOLE AT UNIVERSITY AVE & FM 1585 100 1 LS RE-WORK/DENSIFY SUBGRADE $28,000.00 $28,000.00 Total Increase in Contract Amount: Total Decrease in Contract Amount: Net Change in Contract Amount: Percent of Contract Value This Change Order: Amount of Previous Change Orders: Total Amount of All Change Orders Percent of Contract Value All Change Orders: Revised Contract Amount: Original Contract Time Net Change in Contract Time of Completion previous change orders: Net Change in Contract Time of Completion per CO2: Revised Contract Time of Completion: $42,500.00 $0.00 $42,500.00 0.36% $561,338.00 $603,838.00 5.07% $12,525,111.80 300 108 105 4112 oFtWFp0I0 Bt&Tmi W1W_hhia%31260111CCAadP*&WAVXFl010ORDCh"VRde►w24A6vc iyAftTimWSSEPUBPACTmepeOda2Bwdaqub CERTIFICATE OF INTERESTED PARTIES FORM 1295 lofl Complete Nos. 1- 4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1, 2, 3, 5, and 6 if there are no interested parties. CERTIFICATION OF FILING Certificate Number: 2016-115561 1 Name of business entity filing form, and the city, state and country of the business entity's place of business. Utility Contractors of America, Inc. Lubbock, TX United States Date Filed: 09/22/2016 2 Name of governmental entity or state agency that is a party to the contract for which the form is being filed. City of Lubbock Date Acknowledged: 09/23/2016 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a description of the services, goods, or other property to be provided under the contract. SLSSE Phase 2 South Lubbock Sanitary Sewer Extension Phase 2 4 Name of interested Party City, State, Country (place of business) Nature of interest (check applicable) Controlling I Intermediary Lane, Ty Lubbock, TX United States X Ziegner, Jonathan Lubbock, TX United States X 5 Check only if there is NO Interested Party. 6 AFFIDAVIT I swear, or affirm, under penalty of perjury, that the above disclosure is true and correct. Signature of authorized agent of contracting business entity AFFIX NOTARY STAMP / SEAL ABOVE Sworn to and subscribed before me, by the said , this the day of , 20 , to certify which, witness my hand and seal of office. Signature of officer administering oath Printed name of officer administering oath Tide of officer administering oath Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.277 CERTIFICATE OF INTERESTED PARTIES FORM 1295 10f 1 Complete Nos. i - 4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1. 2, 3. 5, and 6 if there are no interested parties. CERTIFICATION OF FILING Certificate Number: 1 Name of business entity filing form, and the city, state and country of the business entity's place of business. 2016.115561 Utility Contractors of America, Inc. Lubbock, TX United States Date Filed: 09/22/2016 2 Name of governmental entity or state agency that is a party to the contract for which the form is being filed. City of Lubbock Date Acknowledged: 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a description of the services, goods, or other property to be provided under the contract. SLSSE Phase 2 South Lubbock Sanitary Sewer Extension Phase 2 4 Nature of interest Name of Interested Party City, State, Country (place of business) (check applicable) Controlling I intermediary Lane, Ty Lubbock, TX United States X Ziegner, Jonathan Lubbock, TX United States X 5 Check only if there Is NO Interested Party. El 6 AFFIDAVIT I swear, or arm, under penalty of perjury, that the above disclosure is true and correct. Tammy VanBuren ," , f Notary Public, State of Texas 1 My Commission Expires /L1 ., ,ks% �' September 27, 2020 Signature of authorized agent of contracting business entity AFFIX NOTARY STAMP / SEAL ABOVE 1' Sworn to and subscribed before me, by the said 1 j r. 5 �� _S , this the day of , 20 I . to rtify c�h`wiitn`e`~sss my hand and seal of office. tq va��1r e iA Signature of offi admim ring oath Printed name of officer administering oath Title of officer administering oath r.n111a Niuvwcu uy www.etnics.state.ix.us Version V1.0.277