HomeMy WebLinkAboutResolution - 2016-R0051 - Utility Contractors Of America - 02/11/2016Resolution No. 2016-R0051
Item No. 5.10
February 11, 2016
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for
and on behalf of the City of Lubbock, Change Order No.3 to that certain Contract No. 11709 by
and between the City of Lubbock and Utility Contractors of America, Inc., for the South Lubbock
Sanitary Sewer Extension Phase 1, and related documents. Said Change Order No.3 is attached
hereto and incorporated in this resolution as if fully set forth herein and shall be included in the
minutes of the City Council.
Passed by the City Council on February 11, 2016
ATTEST:
_4�061
GLE . R ERTSON, MAYOR
QLae'e_� JK-)
Rebe ca Garza, City Secr
AS TO CONTENT:
P.E., Director of Public Works
APPROVED AS TO FORM:
RES.ChgOrd 3, Contract -Utility Contractors of America, Inc
1.13.16
Lubbock
,,,,, Office of Purchasing and Contract Management
Change Order
Contract No: 11709 Contractor: Utility Contractors of America, Inc.
Change Order No: 03 Contract Title: South Lubbock Sanitary Sewer Extension Phase I — Bid Package B
Bid/RFP No: 14 -11709 -TF Project No: 92178
"Change Order" means a written order to a Contractor, executed by the Owner, in accordance with the Contract authorizing an addition to, deletion
from, or adjustment or revision of the requirements of the Contract documents, or an adjustment to the compensation payable to the Contractor, or to
the time for performance of the Contract and completion of the project, or a combination thereof, which does not alter the nature of project and is an
integral part of the project objective. Adjustments to "Estimated Quantities" to a line time in a Unit Price Contract do not require a Change Order. All
work that alters the nature ofthe construction or that is not an integral pan of the project objective must be let out for public bid.
Description of Change (alteration, deviation, addition, or deletion) caused by conditions encountered during construction not covered by the
specifications and drawings of the project (attached additional pages is necessary:
Per attached backup material, Change Order #3 is a reconciliation change order to identify the quantity adjustments for the unit price
contract. A time component is not a pan of this change order.
Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs, including material quantities, material
costs, taxes, insurance, employee benefits, other related costs, profit and overhead. Where certain unit prices are contained in the initial Contract, no
deviations are allowed in computing negotiated change order costs.
ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM.
ITEM
DESCRIPTION
AMOUNT
A.
ORIGINAL CONTRACT VALUE:
$20,293,159.95
B.
AMOUNT OF THIS CHANGE ORDER Note: Council approval required if over $50,000)
-$661,583.89
COST CENTER ACCOUNT:
C.
PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A)
-3.26%
D.
AMOUNT OF PREVIOUS CHANGE ORDERS:
-$13,848.31
E.
TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D)
-$675,432.20
F.
PERCENT OF CONTRACT OF ALL CHANGE ORDERS /A : (25% maximum)
-3.33%
G.
NEW CONTRACT AMOUNT (A+E):
$19,617,727.75
It is mutually agreed that the above dollar amount and the time extension, as applicable, as set forth in this Change Order constitutes full
compensation to the Contractor for all costs, expenses and damages to the Contractor, whether direct, consequential or otherwise, in anyway incident
to, or arising out of, or resulting directly or indirectly, from the work performed or modified by the Contractor under this Change Order.
Approved as to Content:
weer' sante[_ ^- "Jl
erire
(5) Capit Projects Manager
S! 12/18/2015
Da (2) Project Architect(Engincer Date -
Appr as to For
D i Attor
Date (6) Director of Pur asing &Contract
Management
2/11/2016
Date
Council Date: February 11, 2016 Agenda Item #:
i9
Date
Date
Resolution #: 2016-R0051
PUR45 (Rev 01/2012)
Kimley»)Horn
December 18, 2015
Mr. Zoltan Fekete, P.E.
City of Lubbock, Texas
1625 13th Street
Lubbock, Texas
RE: South Lubbock Sanitary Sewer Extension, Phase I — Bid Package B
Change Order Number 3 - Reconciliation
KHA No. 063126015
Dear Zoltan:
As you are aware, the referenced project has reached final completion. The attached change order
documentation is meant to provide the final quantity adjustments for the materials and labor that was
actually spent on the project by the contractor. As you will see below and in the attached
documentation, this project will end with a credit of $675,432.20. There is not a time component
associated with this final change order.
The change in contract price associated with these changes is detailed below:
• Original contract price: $20,293,159.95
• Net change of this change order: -$661,583.89
• Amount of previous change orders: -$13,848.31
• Contract price with all approved change orders: $19,617,727.75
Should you have any questions please do not hesitate to give me a call
Sincerely,
KIMLEY-HORN AND ASSOCIATES, INC.
Texas Finn Registration No. F-928
Aaron K Rader, P.E.
Copy to: City of Lubbock: Wood Franklin, P.E., John Turpin, P.E., Josh Mstinek, EIT
UCA: Ty Lane, Jonathan Ziegner, P.E.
Walker RPR Services: Ricky Walker, Mark Perry
Kimley-Horn: Jeff James, P.E.
eff FP01tDa1atPmlectlFTW_Ubhbes%tM126015-SLSSE Ph1 BPB CCATFI-CHG ORMChaege 0rdeM34S1-SSE Po1 BPB Charge O w 3 KHA Letter. docx
801 Cherry Street, Unit 11, Suite 950, Ft. Worth, TX 76102
KIMLEY-HORN AND ASSOCIATES, INC.
801 Cherry Street, Suite 950
Fort Worth, TX 76102 Date: December 18, 2015
CHANGE OR EXTRA WORK ORDER NO. 3- RECONCILIATION
PROJECT DESCRIPTION:
South Lubbock Sanitary Sewer Extension Phase I, Bid Pacakge B
KHA Project No.:
063126015
OWNER:
City of Lubbock
CONTRACTOR:
Utility Contractors of America
ORIGINAL CONTRACT AMOUNT:
520,293,159.95
REVISED CONTRACT AMOUNT PER
$350.00
CHANGE ORDER No. 1:
520,227,495.95
REVISED CONTRACT AMOUNT PER
SI8,000.00
CHANGE ORDER No. 2:
$20,279,311.64
REVISED CONTRACT AMOUNT PER
CHANGE ORDER No. 3:
$19,617,727.75
CHANGE OR EXTRA WORK TO BE PERFORMED
Item Approx.
No. Quantity Description of Item
Unit Price
Decrease in
Comr, Price
Increase in
Carm. Rice
4 115 W) 30 -inch Fibergiess Sewer Pipe (SN 46) by Open Cut (0.6 R depth)
5295.00
(SIA25001
5 2.00 3Pinch Fiberglass Sewer Pipe (SN 46) by Open Cut (12-14 ft depth)
$175.00
$350.00
26 1500 48 -Inch Fiberglass Sewv Pipe(SN 46)and 66 -inch Steel Casing Pipe
$1,200.00
SI8,000.00
or Tuntml Liner Plate by Other Than Open Cut
28 1.1010 Fiberglass Tee Base with 5 -ft Dia Manhole
518,000.00
151.1 W W )
34 11 uo1 Connor Proposed pipe to Existing Manhole
$1,500.00
IS1.500.W)
38 11 p 0 Concrete Encas .I
S800.O0
($8.000 W )
39 1_0'0 Vacuum Testing of Sanitary Sewer Manholes
S100.00
1S20W1
41 1_ 'nn Trench Safety System
54.00
IS108W1
42 0.28 Temporary Erosion, Sediment and Water Pollution Prevemion Plan
f40,000.0D
SI 1,200.00
44 404.00 6'C-900 DR -18 PVC Wamr Pipe
56500
526,260.00
46 166.00 Asbestos Cement Pipe Removal
53000
P'"11.00
47 119(.. 27'x6- Tapping Sleeve and 6 -Valve
54.900.00
1$4.800 WI
49 (203 0111 Unclassified Excavation
$7.W
($1.4'1 00)
50 12w, 001 Unclassified Embankment
56.50
61.300.001
51 5,116.70 12' Compacted Subgrade
$4.W
520,466.80
52 5,116.70 Flexible Base(6')
$11.00
$56,283.70
53 7,264.90 1N8AC Type C(2')
$14.0
$101,708.W
54 CON3501 Asphalt Pavement Trench Repair
515.00
ISI40,7534111
55 (9.3118(%h Connate Pavement Repair
$62.00
15583.676 W)
56 11,19610 Gravel Road Repair
$1300
IS; 5.54800,
57 174'001 Asphalt Driveway Repair
526,00
1$19'-92001
58 11-': 1171 Concrete Drivewny Repair
S72.00
ISP._3_24,
59 11.3541x1 Grew[ Driveway Repair
$12.00
IS 1(;2481101
60 11.?3? 191 Curb and Caner Replacement
$3300
(543?89 W )
61 (207(K1) Corrugated Metal Pipe Culvert (24')
S5I.00
($10.557 W)
62 110 W) Safety End Treatment (24')
$1,0013.W
IS 10.000 w)
63 LA391x9 Hydromulch
SI.00
(S5419 W)
64 I,010.W REFL PAV MRK TY I(W) 4-(BRK)(iWMB-)
50.55
$555.50
65 1^:15111x9 REFL PAV MRK TY I(W) 4-(SID)(I00MR-)
50.55
IS] 2.14750)
66 11.11W 191 REFL PAV MRK TY I(Y)4'(BRK)(I00MIL)
50.55
62.1149 50)
67 11'x3 un REFLPAV MRKTY I(Y)4-(SLDHI00MB-)
$0.55
1$1305651
68 1,325.W REFL PAV MRK TY I(W) 8-(SID)(IWMIL)
$I.W
SI,325.00
W 571.00 REFL PAV MRKR TY D -A -A
53.50
$200200
70 111111' REFL PAV MRK TY I( W) 24 -(SLD) H WMIL)
51100
IS72 WI
71 6.W Traffic Carmol
$7,500.00
S45,000.W
72 1401.. Cor and Plug Existing Water Lines
5900.00
IS?.600W)
73 C01u Cut and Plug Existing Sermry Sewer Lina
SI'loom
IS.' --WWI
77 N?60111 4'C-900 DR -18 PVC Were, Pipe
563.25
IS27,577001
79 1'-03 601 Mill and Repave 2- Asphalt Pavement
$31W
(58:435:0)
Tota) Increase in Contrael Amount:
$258,131.60
Tota) Decrease in Contract Amount:
($919715 49)
Net Change in Contract Amount:
6661.593 89j
Percent of Contract Value This Change Order:
-3.26%
Amount of Previous Change Orders:
1513.848.311
Total Amount of All Change Orders
1 S675,432_'0)
Percent of Contract Value All Change Orders:
-3.33%
Revised Contract Amount:
$19,617,727.75
Original Contract Time
360
Net Change in Contract Time of Completion previous change orders:
140
Net Change in Contract Time ofCoutp)etion per COD;
0
Revised Contract Time of Completion:
500