HomeMy WebLinkAboutResolution - 2004-R0190 - Change Order To Streets Maintenace Program Contract - Lone Star Dirt & Paving - 04/22/2004Resolution No. 2004-80190 April 22, 2004 Item No. 20 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock a Change Order No. 1 to the 2004 Secondary Streets Maintenance Program Contract, attached herewith, by and between the City of Lubbock and Lone Star Dirt & Paving, LLP, and any associated documents, which Change Order shall be spread upon the minutes of the Council and as spread upon the minutes of this Council shall constitute and be a part of this Resolution as if fully copied herein in detail. Passed by the City Council this 22nd ATTEST: �1 -'�;Z �� Rebec a Garza, City Secretary APPROVED AS TO CONTENT: 4(2, 1 14fz�� Don Je4f4mgs, St et Superintendent APPROVED AS TO FORM: Donald G. Vandiver Attorney of Counsel DdRes/SeeStr04chgOrd April 5, 2004 Resolution No. 2004—RO190 Aptil 22, 2004 CITY OF LUBBOCK Item No. 20 CHANGE ORDER CHANGE ORDER #: 1 CONTRACTOR: Lone Star Dirt £t Paving, LLP DATE: 3/30/04 CITY OF LUBBOCK BID#: ITB 217-03/RS PROJECT NAME: 2004 Secondary Streets Maintenance Program Change Order within the scope of the contract means a Change Order that DOES NOT ALTER THE NATURE OF THE THING TO BE CONSTRUCTED AND THAT IS AN INTEGRAL PART OF THE PROJECT OBJECTIVE. After performance of a construction contract begins, Change Orders may be approved if necessary to 1) make changes in plans or specifications; or 2) decrease or incrtase the quantity of work to be performed or materials, equipment, or supplies to be furnished. This does not mean that a department can redefine the project. All work that alters the nature of the thing to be constructed or that is not an integral Dart of the Droiect obiective must be let out for public bid by the Purchasing Department. Description of change (alteration, deviation, addition, or deletion) caused by conditions encountered during construction not covered by the specifications and drawings of the project (attach additional pages if necessary): See attachment A. Change Orders must either be negotiated in the best interest of the City of Lubbock or put out for public bid by the Purchasing Department. Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs, including material quantities, material costs, taxes, insurance, employee benefits, other related costs, profit and overhead. Where certain unit prices are contained in the initial contract, no deviations are allowed in computing negotiated change order costs. ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM. ITEM DESCRIPTION A. ORIGINAL CONTRACT VALUE: B. AMOUNT OF THIS CHANGE ORDER: council approval required if over $25,000 C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A): D. AMOUNT OF PREVIOUS CHANGE ORDERS: E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 25% Maximum G. NEW CONTRACT AMOUNT (A+E): LACT R Date (2) PROJECT A HITE as Wontent: Approved as to Form: (3) OWNEF03 REP SENVATIVE ' Date (4) Vt�� 4- (5) Victor Kilman, Pu ' hasing Manager Date a. OU1,3c 1 uma vac, F,vvv r vyun c circ /vuumng 5rgnacures: F�TT, 911]:r $714,146.70 1 � �ME� $0.00 $121,000.00 g $835,146.70 Da e �Da V CITY OCK ATTEST: 4/22/04 4/22/04 (7) M rc Mc gal, Ma Date (8) Rebee a Garza, City Secretary Date PUR-045 (Rev 03/04) t. Resolution No. 2004-RO190 Attachment A The intersections at 82nd Street and Quaker Avenue, 82nd Street and Indiana Avenue, and 82nd Street and University Avenue are in need of dual left turn lanes. To accomplish this, the existing lane lines will have to be covered with a seal coat extending approximately 400 feet in each direction. This Change Order increases the amount of gallons of emulsion for Bid Item No. 1 (A, B, and C) by 7,015 gallons and by 6,415 gallons for Bid Item No. 2 (A, B, and C). It also increases the cubic yards of Grade 4 rock for Bid Item No. 4 (A, B, and C) by 175 cubic yards and by 155 cubic yards of Grade 5 rock for Bid Item No. 5 (A, B, and C). The intersection of Erskine Street and North Indiana Avenue is scheduled to have a signal light installed. To facilitate this action a right turn lane needs to be installed on the west side of the intersection (for the east bound traffic). This Change Order increases the quantities of Bid Item No. 7 (A, B, and C) by 250 square yards to accomplish this. In addition, the amount of 6 inch black base patching (Bid Item No. 7) to be done on the 2004 Secondary Streets Maintenance Program was underestimated. To complete the patching necessary on the streets to be sealed Bid Item No. 7 (A, B, and C) needs to be increased by 2,000 square yards. The funding for this work will come from a Traffic Engineering Project Fund ($60,000) and from funds still available in the Permanent Street Maintenance Fund ($61,000).