Loading...
HomeMy WebLinkAboutResolution - 2003-R0060 - Resolution Declaring Expectation To Reimburse Expenditures - 02/13/2003Resolution No. 2003-R0060 February 13, 2003 Item No. 33 RESOLUTION DECLARING EXPECTATION TO REIMBURSE EXPENDITURES WITH PROCEEDS OF FUTURE DEBT STATE OF TEXAS COUNTY OF LUBBOCK WHEREAS, the City of Lubbock (the "Issuer") intends to issue debt for general purpose improvements for said City (the "Project"), and further intends to make certain capital expenditures with respect to the Project and currently desires and expects to reimburse such capital expenditures with proceeds of such debt; and WHEREAS, under Treas. Reg. § 1.150-2 (the "Regulation"), to fund such reimbursement with proceeds of tax-exempt obligations, the Issuer must declare its expectation to make such reimbursements; and WHEREAS, the Issuer desires to preserve its ability to reimburse the capital expenditures with proceeds of tax-exempt obligations. NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE ISSUER THAT the Issuer reasonably expects to reimburse capital expenditures with respect to the Projects with proceeds of debt hereafter to be incurred by the Issuer, and that this resolution shall constitute a declaration of official intent under the Regulation. The maximum principal amount of obligations expected to be issued for the Project is $11,885,000. Passed by the City Council this 13th day of Februa 0 1/41/ 1,ert ^ARC MG GAL, MAYOR ATTEST: Rebecca Garza, City Secretary OVED AS TO Beverly Hods Managing Di APPROVED AS TO FORM: ,Torm M. Knight ;. Assistant City Attorney JMK:mt CityatUJohn/Reimbursement-8.Res & ccdocs February 3, 2003 Resolution No. 2003—R0060 CITY OF LUBBOCK $11,885,000 GENERAL OBLIGATION BONDS, SERIES 2003 Tentative schedule of projects funded by this issue PARKS PROJECTS Park Benches/Seating Area Funded by 2003 GO: $127,600 Total Cost: $330,000 This project will provide for 66 benches throughout the parks to allow for passive recreation and serve as functional viewing for playgrounds and activity areas. Canyon Lakes Dam #4 Funded by 2003 GO: $2,043,950 Total Cost: $2,885,217 This project will provide for Dam #4 to impound water to more fully develop the Canyon Lakes System. This dam is needed to assure a continuous, navigable body of water between North Loop 289 and Interstate 27. This project will construct and dam with excavations to the stream bed to provide adequate water below Dam #3 to allow for navigation, ties to existing trails in Aztlan Park, realignment of roads and modest landscaping. Irrigation/Lighting Funded by 2003 GO: $2,179,600 Total Cost: $2,987,000 This project will provide for the centralized automation and operation of automatic irrigation systems and lighting throughout the City's park system. Centralized ' control of systems operation will improve efficiency of operation by allowing for rapid adjustment to plant water requirements resulting from daily weather conditions and by reporting changes in electrical demand resulting from faulty lighting fixtures. This reduces overtime needed to readjust time clocks in the field as well as monitoring system performance and automatically halting the operation of damaged systems thus saving water. The existing manual irrigation systems will be replaced with automated systems. Automation of the lighting system will reduce time needed to check individual light fixtures and will better indicate faulty systems resulting in more timely and responsive maintenance. More cost-efficient lighting schedules will also be able to be coordinated with the automated system. STREETS PROJECTS Various State -Federal Match Funded by 2003 GO: $3,110,993 Total Cost: $3,110,993 Local matching funds necessary to qualify for Federal & State funding on transportation projects. Local match typically consists of 100% of right-of-way costs and 20% of design and construction costs. These funds will be used on an as -needed basis as projects come up. Drainage Improvements Funded by 2003 GO: $122,894 Total Cost: $1,136,000 Construction of various drainage improvement needs throughout the City. 98`s Street: Frankford Ave. to Slide Rd. Funded by 2002 GO: $3,165,000 Total Cost: $3,765,000 This project provides for the construction of this T-2 thoroughfare street (88 feet wide) from Frankford Avenue to Slide Road. The completed project will provide for 3 lanes of traffic in each direction plus a continuous left turn lane. TRAFFIC CONTROL PROJECTS Computer system design Funded by 2003 GO: $939,963 Total Cost: $4,685,200 This project consists of design and construction of central traffic computer hardware, software and communications for replacement of the existing system with new equipment and methods. This system will improve the ability to monitor existing signalized intersections, respond to malfunctions sooner and will begin replacing existing electronics before they fail (they have already exceeded their design life). This will also allow new controllers to communicate with the new traffic computer system in an efficient and dependable manner. The communications replacements will be based on the City's communications master plan. Traffic Signal new locations Funded by 2003 GO: $195,000 Total Cost: $440,000 These are locations that will warrant a new signal, major modification to an existing signal and/or school flashing zone beacons.