HomeMy WebLinkAboutResolution - 2002-R0075 - Modification To Contract - US Department Of Health And Human Services - 02/28/2002Resolution No. 2002-R0075
February 28, 2002
Item No. 28
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock is hereby authorized and directed to
execute for and on behalf of the City of Lubbock a Modification No. 1 to a Contract
between the U.S. Department of Health and Human Services and the City of Lubbock for
the development of a Lubbock Metropolitan Medical Response System, and any
associated documents, a copy of which Modification No. 1 is attached hereto and which
shall be spread upon the minutes of this Council and as spread upon the minutes of this
Council shall constitute and be a part hereof as if fully copied herein in detail.
Passed by the City Council this 28th day of February '2002.
("� X1 /t -�� �
WINDY SI ON, MAYOR
ATTEST:
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
Ken 04on, Emergency Management Coordinator
APPROVED AS TO FO
G. Vandiver, First
Attorney
Mres/MetroMedRespModCon..res
February 20, 2002
Resolution No. 2002—R0075
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT I'.
CONTRACT ID CODE
PAGE OF PAGES1 1 5
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.5.
PROJECT NO. (lfapplicable)
MODIFICATION # 1
01/24/02
000027
6. ISSUED BY
7. ADMINISTERED BY (If other than Item 6)
CODE
CODE
DHHS/Program Support Center
Division of Acquisiton Management, AOS
General Acquisitions Branch
.`1? Na»,
Parklawn Building, Room 5-101
56M Fishers Lane, Rockville, MD 20857
8. NAME AND ADDRESS OF CONTRACTOR (No., sheet county, State, andZIP Code)
X
9A. AMENDMENT OF SOLICITATION NO.
City of Lubbock
1625 13th Street
Lubbock, TX 79401
9B. DATED (SEE ITEM11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
233-01-0049
X
10B. DATED (See Item 13)
09/08/01
CODE I FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
❑ The above numbered solicitation is amended as set forth in Item 14. The hour and date specked for receipt of Offers ❑ is extended, ❑ is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c)
By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE
PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this
amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation
and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
Appro. No.: 7520140 CAN: 2-1994438 OBJ. Class: 252Z Increase: $ 200,000.00
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
X
A THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes In paying office, appropnation-date, eta) SET FORTH IN
ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
X
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OR
FAR 52.243-1 Changes - Fixed Price AUG 1987 Alternate I APR 1984
D.OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor ❑ is not, ® is required to sign this document and return 3 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
See attached pages.
Except as provided herein, all terms and conditions of the*cuinenf referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
154 NAME AND TITLE OF SIGNER (T),pe or print) 164 NAME AND TITLE OF CONTRACTING OFFICER (Type or prim)
WINDY SITTON, MAYOP. Michele Trotter
15B. CONTRACTOR/OFFEROR
NSN 7540.01-152-8070 r
PREVIOUS EDITION UNUSABLE
TEF Created bry ELd—ic Dxwne t ServicesNSDHHS: !3011443-1454
15C. DATE SIGNED 1166/ UNIAD ST
. 28, 02
ST:
16C. DATE SIGNED
1
13-11 —�
30 (REV. 10-83)
Modification Number 1
Contract Number 233-01-0049
Page 2 of 5
The.purpose of the above referenced modification is to change
item 11 in the payment schedule, statement of work, and delivery
schedule and to add item 12 to the payment schedule, statement of
work and delivery schedule as follows:
1. Section B - Supplies or Services and Prices/Costs, B.1.
Consideration, Deliverables 8, 9, 10, and 11 are deleted in
their entirety and replaced with the following:
ITEM
Deliverables 8, 9, 10, and 11
Component MMRS Plan for Local
Hospitals and Healthcare Systems
MMRS Training Plan (includes
initial and refresher training
requirements)
MMRS Pharmaceutical and
Equipment Plan
AMOUNT OF PAYMENT
$ 160,000
Progress Reports (This should be
a brief monthly status report)
2. Section B - Supplies or Services and Prices/Costs, B.1.
Consideration, the following item is added:
ITEM
AMOUNT OF PAYMENT
12. Detailed List of $ 200,000
Pharmaceuticals and
Equipment Acquisitions
Continuation and Sustainment
Planning Template
Final Operational Report -
3. Section C - Description/Specifications/Work Statement, 3.
Statement of Work, the following item 11 is deleted in its
entirety and replaced with the following:
11. Provide monthly progress reports that describe
activities undertaken the previous month and the
progress on the contract deliverables. By the
Modification Number 1
Contract Number 233-01-0049
Page 3 of 5
fifteenth (15th) of each month, these reports shall be
sent to the Project Officer, the Program Support Center
(PSC) Contracting Officer, and to the Office of
Emergency Preparedness. These reports shall describe
successful. endeavors and barriers encountered. Any
barrier encountered shall be accompanied with a plan to
resolve the issue Include all meeting minutes that
relate to MMRS development.
4. Section C - Description/Specifications/Work Statement, 3.
Statement of Work, the following item is added:
NOTE: 11 The deliverables will be compared to the Statement
of Work (SOW)..requirements as articulated in the
attached Evaluation Instrument (Appendix C).
12. Continue MMRS planning efforts to ensure that the MMRS
is operational, including acquisition of
pharmaceuticals and equipment as identified, planned
and approved in deliverable number 10. Continue to
submit brief monthly progress reports and a final
report at the end of the contract period. The final
report must constitute an assessment of response
capabilities (enhanced.or created) that exist now as a
result of the MMRS planning effort. The report shall
identify actual equipment and pharmaceuticals procured
and received under the contract. Identify additional
assets/requirements that you will look to the Federal
Government to provide. These additional assets must be
addressed in an addendum to the Basic MMRS Plan.
Complete the Five -Year MMRS Continuation Planning
Template provided by OEP (see Appendix D). This
information will be useful for possible future planning
purposes. The broad categories for continuation
planning are MMRS Maintenance, Pharmaceuticals,
Equipment, and Training. Do not consider this template
to be all-inclusive. Add items to the template as
needed.
The final report shall include a statement that the
MMRS has achieved operational status. The final report
shall be presented to the Project Officer at the end of
the contract period.
5. Section F - Deliveries or Performance, F.1. Period of
Performance will be changed as follows:
Modification Number 1 Page 4 of 5
Contract Number 233-01-0049
The period of performance for this contract shall be
September 17, 2001, through December 19, 2004, unless
extended by modification.
6. Section F - Deliveries or Performance, F.2. Reporting
Requirements and Deliverables the following item 11 is
deleted in its entirety and replaced with the following:
Item Description Quantity Due Date
11 Progress Reports (This should 3* 15th day of
be a brief monthly status each month
report) 12/19/04
*Provide electronic versions (Disk, CD, or email)
NOTE: All deliverables shall contain the number of the
contract.
One copy of all deliverables shall be furnished to the
Project Officer. The Project Officer will be
designated upon contract award.
One copy of all deliverables shall be furnished to
Commander James Sabatinos, Office of Emergency
Preparedness, USPHS/DHHS, 12300 Twinbrook Parkway,
Suite 360, Rockville, MD 20852. Commander Sabatinos
may be reached by e-mail at: isabatinos@osophs.dhhs.gov
One copy of all progress reports and the final report
shall be furnished to Michele Trotter, Contracting
Officer, AOS/PSC/DHHS, 5600 Fishers Lane, Room 5-101,
Rockville, MD 20857. Ms. Trotter may be reached by
e-mail at: mtrotterCpsc.gov
7. Section F - Deliveries or Performance, F.2. Reporting
Requirements and Deliverables the following item is added:
Item Description - Quantity Due Date
12 Detailed List of 2 12/19/04
Pharmaceuticals and
Equipment Acquisitions
Continuation and 2 12/19/04
Sustainment Planning
Template
Modification Number 1 Page 5 of 5.
Contract Number 233-01-0049
Final Operational Report 3 12/19/04
8. Section J - List of Attachments, Item 3, Appendix C is
added as follows:
2. Appendix C - 2001 MMRS Contract Deliverable Evaluation
Instrument for Item 12 (Page 1 of 1)
9. Section J - List of Attachments, Item 4, Appendix D is added
as follows:
3. Appendix D - Five -Year MMRS Continuation and
Sustainment Planning Template (Page 1 of 1)
10. All other terms and conditions remain the same.
Resolution No. 2002—R0075
APPENDIX C
'Evaluator Date
12 Deliverable #12: Continue Progress Reports. Detailed list of pharmaceutical and equipment
acquisitions. Final Operational Report (Include as an appendix to the Basic MMRS Plan).
Contract Reference: (2001 Statement of Work #12)
When this modification is implemented, disregard the final report requirements detailed in SOW 11.
(Deliverable #11)
Continue MMRS planning efforts to ensure that the MMRS is operational, including acquisition of
pharmaceuticals and equipment as identified, planned and approved in deliverable #10. Continue to
submit brief monthly progress reports and a final report at the end of the contract period. The final
report must constitute an assessment of response capabilities (enhanced or created) that exist now
as a result of the MMRS planning effort. The report shall identify actual equipment and
pharmaceuticals procured and received under the contract. Identify additional assets/requirements
that the jurisdiction will look to the Federal Government to provide. These additional assets must be
addressed in an addendum to the Basic MMRS Plan. Complete the Five -Year MMRS Continuation
Planning Template provided by OEP. This information will be useful for possible future planning
purposes. The broad categories for continuation planning are MMRS Planning, Maintenance of
Pharmaceuticals/Equipment, Training, and Exercises. Do not consider this template to be all-
inclusive. Add items to the template as needed. The final report shall include a statement that the
MMRS has achieved operational status. The final report shall be presented to the Project Officer at
the end of the contract period.
Indicators of Fulfillment:
12.01 ❑ Does the final report constitute an assessment of response capabilities (enhanced or created)
that exist now as a result of the MMRS planning effort?
12.02 ❑ Does the final report identify actual equipment and pharmaceuticals procured and received under
this contract?
12.03 ❑ Does the final report identify additional assets/requirements that the jurisdiction will look to the
Federal Government to provide?
12.04 ❑ Are the additional assets included in an addendum to the Basic MMRS Plan?
12.05 ❑ Has the Five -Year MMRS Continuation Planning Template been completed and provided in the
final report?
12.06 ❑ Does the final report include a statement that the MMRS has achieved operational status?
12.07 ❑ Does the final report include an electronic copy in Microsoft Word Format? (Reference F.2
Reporting Requirements And Deliverables, Item #12)
12.08 Notes:
2001 MMRS Contract Deliverable Evaluation Instrument Page 1 of 1
APPENDIX D
Resolution No. 2002-R0075
C•dy
2000 Population
Projected Sustainment Costs
1/16/2002 Page 1 of 1
FIX
_---_
MIMIC
-_---
Ml
1
1/16/2002 Page 1 of 1