Loading...
HomeMy WebLinkAboutResolution - 2001-R0202 - Agreement To Relocate And Maintain Power Line - South Plains Electric Coop., Inc - 04/26/2001Resolution No. 2001-RO202 June 14, 2001 Item No. 28 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock an agreement entitled "Agreement to Relocate and Maintain Power Line", by and between the City of Lubbock, Texas and South Plains Electric Cooperative, Inc., and all related documents. Said Agreement is attached hereto and incorporated in this Resolution as if fully set forth herein and shall be included in the minutes of the Council. Passed by the City Council this 14th day of June 2001. MNDY SIT , MAYOR ATTEST: Rebecca Garza, City Secretary APPROVED AS TO CONTENT: Ed Bucy, Right of Way Age APPROVED AS TO FORM: Linda L. Chamales Supervising Attorney, Office Practice LLC:cp Ccdocs/SoutliPlainsElecCoop-LIA.Res May 22, 2001 Resolution No. 2001-RO202 June 14, 2001 Item No. 28 AGREEMENT TO RELOCATE AND MAINTAIN POWER LINE THIS AGREEMENT TO RELOCATE AND MAINTAIN POWER LINE, made this 14thday of June , 2001, subject to the terms and conditions set forth herein, between the City of Lubbock, Lubbock International Airport, located at 5401 N. MLK Blvd, Lubbock, Texas 79403 (herein called "City"), and South Plains Electric Cooperative, Inc. (hereinafter called "Utility Company") WHEREAS, the City of Lubbock desires to construct a rail spur to provide access from Burlington Northern Santa Fe Railroad mainline to the proposed Interport Trade Center at the Lubbock International Airport; and WHEREAS, said construction activities will require certain adjustments, and/or relocation of the existing facilities of POWER LINE; and WHEREAS, the parties desire to allocate the costs and responsibilities for relocation of the existing facilities and maintenance of the relocated facilities across and along the rail spur corridor; NOW, THEREFORE, the parties hereto, for the consideration hereinafter expressed do covenant and agree as follows: 1. Subject to the terms and conditions hereinafter set forth City grants permission for South Plains Electric Cooperative, Inc. to relocate, construct and maintain one POWER LINE across and along the rail spur corridor at or near rail spur centerline station 43+50, the location being more particularly shown in Exhibit A and made a part hereof. 2. This agreement shall be effective June 14, 2001, , and shall continue so long as City maintains the rail spur facility in this location. 3. South Plains Electric Cooperative, Inc. agrees to acquire all required rights-of-way for the relocation of the POWER LINE. City agrees to reasonably cooperate with South Plains Electric Cooperative, Inc. to make application for and obtain all necessary permits, licenses or grants of any nature whatsoever required or imposed by any governmental body or other party with respect to the POWER LINE to be installed or relocation. 4. South Plains Electric Cooperative, Inc. agrees to relocate the POWER LINE in accordance with applicable pipeline industry and railroad industry (AREMA) specifications, in a manner satisfactory to City, and without interference with other structures now in place. 5. City agrees to reimburse South Plains Electric Cooperative, Inc. for reasonable costs and expenses, incurred in a one-time relocation of the existing facilities, (including, Utility Relocation & Maintenance Agreement Page 1 but not limited to labor, materials, and supplies, handling and storage charges, subcontractors, transportation and equipment, preliminary engineering, construction engineering and inspection, permit fees, taxes and overheads), which costs have been estimated to be $ 3, 000.00 a. Should the costs of the work materially exceed preliminary estimated cost, due to conditions not known or anticipated at the time of the estimate preparation, and/or substantial change in the scope of work, method of installation, change in location, or other changes of similar nature have taken place, South Plains Electric Cooperative, Inc. shall notify City in writing of such fact and the reasons therefore as promptly as possible and cease work until advised by the City to continue. b. Following completion of the relocation, South Plains Electric Cooperative, Inc. shall submit a final invoice detailing all direct and indirect costs incurred by South Plains Electric Cooperative, Inc. in installing the POWER LINE. South Plains Electric Cooperative, Inc. shall maintain records verifying cost incurred for a period of two years and shall provide said records to the City for review if requested. C. If the relocation is not performed in accordance with applicable pipeline industry and railroad industry (ARMEA) specifications, in a manner satisfactory to City, or if it is placed in an unsatisfactory location, costs for adjustments to the relocated utility shall be the responsibility of South Plains Electric Cooperative, Inc.. d. By agreeing to or by abandoning, relocating or modifying its POWER LINE pursuant to this Agreement, South Plains Electric Cooperative, Inc. shall not thereby be deemed to have abandoned, modified, released, or otherwise destroyed any of its rights existing at the time of the execution of this Agreement under valid and subsisting public or private right-of- way easements granted to or otherwise vested in the South Plains Electric Cooperative, Inc. unless South Plains Electric Cooperative, Inc. shall have released same by written instrument. All POWER LINE relocated by South Plains Electric Cooperative, Inc. will continue to be owned and operated by South Plains Electric Cooperative, Inc.. 6. South Plains Electric Cooperative, Inc. agrees at its own cost and subject to the supervision and control of City, to maintain the POWER LINE in such a manner and to construct of such material that it will not at any time be a source of danger to or interference with the tracks, roadbed or rail corridor of City or the safe operation of the railroad. a. South Plains Electric Cooperative, Inc. will perform any maintenance or repairwork in such a manner to preclude damage to the property of City and preclude interference with the operation of the railroad spur. After Utility Relocation & Maintenance Agreement Page 2 performing maintenance South Plains Electric Cooperative, Inc. shall at its own cost restore City's premises to their former state and within fifteen (15) days pay City the entire cost incurred by City in providing flagmen protection or any other means of protection which, in the judgment of City may be required during the maintenance of the POWER LINE. b. South Plains Electric Cooperative, Inc. assumes, and agrees to defend, indemnify and hold City harmless from and against all loss, costs, expenses (including attorneys' fees), claims, suits and judgments whatsoever in connection with injury to or death of any person(s) or loss of or damage to any property caused by or in any way connected with the installation, maintenance, use, presence, reconstruction, relocation, renewal or removal of POWER LINE, except when caused by the sole fault or negligence of City. C. When the railroad spur is in active use, South Plains Electric Cooperative, Inc. will provide or require all contractors employed for any construction, repair, maintenance, replacement or removal to procure and to maintain during the course of such work at South Plains Electric Cooperative, Inc. or contractor's expense, a policy of Commercial General Liability (CGL) Insurance and Railroad Protective Liability (RPL) Insurance covering liability assumed by South Plains Electric Cooperative, Inc. under this Agreement with a coverage limit of not less than two million dollars ($2,000,000) Combined Single Limit per occurrence for bodily injury and property damage and at least six million dollars ($6,000,000) aggregate limit during each annual policy period d. If at any time after being given timely notice, South Plains Electric Cooperative, Inc. shall, in the judgment of City, fail to perform properly its obligations under this paragraph, City may, at its option, arrange for the performance of such work as it deems necessary for the safe operation of its railroad, and in such event South Plains Electric Cooperative, Inc. agrees to pay, within fifteen (15) days after bill is rendered therefor, the cost incurred by City. Failure on the part of City to perform the obligations of South Plains Electric Cooperative, Inc. shall not release South Plains Electric Cooperative, Inc. from liability for any loss or damage occasioned thereby. 7. South Plains Electric Cooperative, Inc. agrees to comply with all federal, state and local environmental laws and regulations in its use of the rail spur, including, but not limited to the Resource Conservation and Recovery Act, as amended (RCRA), and the Comprehensive Environmental Response, Compensation and Liability Act, as amended (CERCLA). a. South Plains Electric Cooperative, Inc. will not release or suffer the release of oil or hazardous substances, or cause the sudden or nonsudden Utility Relocation & Maintenance Agreement Page 3 pollution of air, water, land, and /or groundwater on City's rail corridor arising from or in connection with the POWER LINE or resulting from any chemical or electronic reaction caused by transmission in or over South Plains Electric Cooperative, Inc.'s POWER LINE. South Plains Electric Cooperative, Inc. agrees to assume responsibility for the investigation and cleanup of such release and shall indemnify and defend City and it agents for all costs and claims, including consultant and attorney fees, arising in any manner out of such a release or with South Plains Electric Cooperative, Inc.'s failure to comply with environmental laws, except to the extent such costs or claims are proximately caused by City's gross negligence or intentional misconduct. b. South Plains Electric Cooperative, Inc. will give City timely notice of any release, violation of environmental laws or inspection or inquiry by governmental authorities charged with enforcing environmental laws with respect to City's rail spur. South Plains Electric Cooperative, Inc. will also give City timely notice of all measures undertaken by or on behalf of South Plains Electric Cooperative, Inc. to investigate, remediate, respond to or otherwise cure such release or violation. 8. This Agreement shall be governed by the Laws of the State of Texas. 9. If any part, section or paragraph of this Agreement is determined to be invalid, illegal, or unenforceable, for any reason, such determination shall not affect the validity, legality or enforceability of all other parts of this Agreement. 10. Unless otherwise so designated in this Agreement, the terms and conditions of this Agreement shall inure to the benefit of and be binding upon the parties hereto and their respective successors, and assigns. 11. This Agreement is the full and complete agreement between the parties with respect to all matters relating to the relocation and/or maintenance of the POWER LINE, and supercedes all other agreement between the parties on this subject. Utility Relocation & Maintenance Agreement Page 4 IN WITNESS WHEREOF, the parties have executed this agreement in duplicate on the day and year first above written. ATTEST: Rebecca Garza, City Secret APPROV TO CONTENT: Mar le, Airport Director APPROVED AS TO FORM Linda Chamales, Supervising Attorney Utility Relocation & Maintenance Agreement Page 5 South Plains Electric Cooperative, Inc. BY Monte L. WolR ott Director of Operations & Engineering Resolution No. 2001-R 0202 June 14, 2001 Item No. 28 EXHIBIT A Resolution No. 2001-RO202 I I i 6 � I , PROPOSED 8' FLAT BOTTOM DITCH WITH 3:1 SIDE SLOPE TO HATCH EXISTING GRACE FROM STA 38+50 - STA 42+50 FLAT BOTTOM DITCH STARTS 20' � PROPOSED CULVERT STA 38+50 FROM TRACK GEMERLME -------mac-__ .1.✓i / \ 3-36' DIAMETER x 29'-Y CULVERTS ------- ALUMINIZED STEEL TYPE 2. (12 GAUGE) vu----�-- \ CULVERT '" WITH (1.80:1) HEADWALLS -__________- TRANSMON FROM 1111p�ADDWALL / I I.4 I SPTROAO�5*00 SLOPE = 0.5% +^'- - - 2]].57 R.O.W. TO FIAT BOTTOM OiTCH I I 1 I 1 - 4' 115 x RCS PROPOSED CULVERT 4A 4]+95�-'• ----____ x-�--- --__--s _----� ` /a I US WTM 6:1 HF 'ALLS 1- 24' DMMTEEL x 27' ' N - --_ELEV. --� OL OF INDUSTRWL SPUR / \ �` ALUMINIZED STEEL TYPE 2 ___�.� ______ / I WRH (3:1) HEADWALLS ______________ LEFT DITCH -------------- 1 _ -:_--�°'�___, RIGHT DITCH J T' `� = 1 DRAT TO i V i 8 \\ __ __ __` �� __ __ __ SUN. - 32]].37 11 'Wr`1`` 50' DRAINAGE EASEMENT-�[ /A \ _ __________ __ ________ _ TO PLAYA _ 8' FIAT BOTTOM �--- I WITH SIDE SLOPE. OK. MATCH _ EXISTING GRADE M 220' +/- G SLOPE 0.5% --------------- ALES: 1 =50' HOR 1 2 VER Lp EEM�NG UTIUTES TO BE ADJUSTED By OTHERS. CONTRACTOR SHOULD COORDINATE CONSTRUCTION ACTIVTIES WITH THE OWNER. VPI STA 47+90 3290 VPI EL = 288.]5 3290 K = 81.5 E = 0.15 + a VPI STA = 38+50 -0.39X WI EL 3285.25 e e F J g CUR 92 EN 50. TOP OF INDUSTRIPL PUR RAIL N w 10 a u g + 3285 E 0. g "5 O.J9X -- -- g0 BEON I STA = DC ___ _____ ______------------- _ ? a RIGHT DITCH I EL 25 3n 50 STA. 2+5 02 Y/LEN = 100.00 .2 % -- --�L- 63.55 RIGHT D H - -- _ _ �- ____ w _ PROPOSED ------ ce SLOPE 3280 4 g is crsou o RwM CULVERT o 3280 �- _ 3 W OW LUMIZED 5 rEEL LE DITCHa - FT SLOPE 0.84X TY E 2 CULVE (12 E) 0 X _ GHT SLOPE Ob]% LE DRC SLOPE - VPI FT DMF D CULVERT SSTT43+4 i.75 C n. WI -� - -- RIG DITCHHEADWALL LEV = 327 .52 V�0 LEFT 0 TCH STA38+50 O M O d 0 ST3 +50 O ,n M O F.L. 32]].S]� M O O\ to cD O O N UJ N W N — N h O N a N 12!N r 00 F.LA.=} ]]. 5] a N N O) O C) N n N IC! O) tr UJ O0 M M M < N CO 0 n N N 0) N l0 M) M) .Ui O Ui O 7 O Q M M— M M M N 7 M N M UJ M DO 4 TA a W of m 00 OD DO 00 DO 0 DO 00 CO 00 0 0 CO N 0 m N N 0 00 0 OO 00 N 00 CO N W W CO 00 m DO N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N - N M M M M M I M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M 36+00 37+00 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 P M,9 m3Cm ,etc E,mars • k6tects • PMnrmrs L.b.1 D 1. .1.0 .1. G CITY OF LUBBOCK LUBBOCK INTERNATIONAL AIRPORT RAILROAD SPUR TO SERVE THE INTERPORT TRADE CENTER EDA # 08.49-03071 Reduced 1/2 Scale Drawing t/11/bi MX Yl x. Xa. X.ana, I"*y gloc LUWIX% Ro}ol Xv N-16%-B) INDUSTRIAL SPUR PLAN AND PROFILE STA. 35+00 TO 49+00 M 6 C04• of 28 k Resolution 0:2001=R0202 -Ku4uL 00+" 9079c iW Q-) I 13 9079c