BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, a Contract for engineering
services, by and between the City of Lubbock and Hugo Reed and Associates, Inc. of
Lubbock, Texas and related documents. Said Contract is attached hereto and
incorporated in this resolution as if fully set forth herein and shall be included in the
minutes of the City Council.
Passed by the City Council this
ATTEST:
Reb cca Garza, City Secretary
APPROVED AS TO CONTENT:
Larry Hertel, P.E., City Engineer
APPROVED AS TO FORM:
William de Haas
Contract Mananger/Attorney
gs: /ccdocs/Contract-HugoReed&Assoc. res
September 9, 2002
17th day of September , 2002.
Resolution No. 2002—R0378
September 17, 2002
Item No. 55
98th STREET STORM SEWER PROJECT
from
PROPOSED DETENTION BASINS WEST OF FRANKFORD AVENUE TO PLAYA LAKE 93
CONTRACT FOR ENGINEERING SERVICES
THE STATE OF TEXAS §
THE COUNTY OF LUBBOCK §
THIS CONTRACT is made by and between the City of Lubbock, Texas, hereinafter called
the OWNER, and Hugo Reed and Associates, Inc., hereinafter called HRA.
NOW, THEREFORE, in consideration of the mutual covenants and agreements herein contained,
the OWNER and HRA do mutually agree as follows.
AGREEMENT
ARTICLE 1. CONTRACT PERIOD
This contract becomes effective when fully executed by both parties. The effective date of this
contract shall be September 17, 2002. The Project Contract Period shall be five (5) months,
beginning on the date that HRA receives written Notice to Proceed from the OWNER. HRA will not
begin work or incur costs until so authorized in writing by the OWNER.
ARTICLE 2. SCOPE OF SERVICES
HRA will provide the professional services described in Attachment A, "Project Scope and Services."
The OWNER will furnish services described in Attachment B, "Services to be provided by OWNER."
ARTICLE 3. COMPENSATION
The maximum amount payable under this contract for Basic Services and Basic Reimbursables shall
not exceed $ 150,730.00. Payment is authorized for costs incurred in accordance with the fee
schedule attached hereto and labeled Attachment C, "Basis for Payment."
HRA is authorized to submit periodic requests for payment within thirty days after costs are
incurred as authorized herein. The request for payment shall be made using forms acceptable to
the OWNER and shall show the total amount earned to the date of submission and the amount due
and payable as of the date of the current billing. All requests for payment will be mailed to the
address shown on the signature page of this contract.
ARTICLE 4. WORK AUTHORIZATION
The OWNER will authorize the work as described in Attachment A to be performed by HRA by the
execution of this contract. The total cost authorized shall not exceed the maximum amount payable
established in Article 3, "Compensation," nor shall completion dates extend beyond the end of the
contract period established in Article 1, "Contract Period", unless either is authorized by amendment
as provided hereinafter.
ARTICLE 5. PROGRESS
Upon acceptance of a work authorization, HRA shall undertake and complete the authorized work.
The OWNER or HRA can request conferences to be provided at HRA's office, the office of the
OWNER, or at other agreed upon locations.
Entrineering Services, Hugo Reed & Associates, Inc. & City of Lubbock
Page 1
ARTICLE 6. INSPECTION OF WORK
The OWNER and any of their authorized representatives have the right at all reasonable times to
inspect or otherwise evaluate the work performed or being performed hereunder and the premises in
which it is being performed.
If any inspection or evaluation is made on the premises of HRA, HRA shall provide all reasonable
facilities and assistance for the convenience of the inspectors in the performance of their duties. All
inspections and evaluations shall be performed in such a manner as will not unduly delay the work.
ARTICLE 7. AMENDMENTS
If it becomes necessary at any time during the contract period to change the scope of work, the
contract period, the maximum amount payable, the complexity, or the character of this contract, an
amendment must be prepared and executed within the contract period established in Article 1
above. Any such amendment will be made in writing agreed to by all parties hereto and duly
executed before the end of the contract period specified in Article 1 above.
ARTICLE 8. SUSPENSION OF WORK
Should the OWNER desire to suspend the work but not terminate the contract, the OWNER will
issue a written order to stop work setting out the terms of the suspension. HRA will stop all work and
cease to incur costs during the term of the suspension.
HRA will resume work when notified to do so in writing by the OWNER. Suspension of work does
not extend the contract period. If additional time is required to complete the work because of the
suspension, a contract amendment will be executed in accordance with Article 7, "Amendments."
ARTICLE 9. REPORTING
HRA shall promptly advise the OWNER in writing of events which have a significant impact upon the
contract, including:
1. Problems, delays, or adverse conditions which will materially affect the ability to meet time
schedules and goals, or preclude the attainment of project work units by established time
periods. A statement of the action taken or contemplated shall accompany this disclosure.
2. Favorable developments or events which enable meeting time schedules and goals sooner
than anticipated or producing more work units than originally projected.
ARTICLE 10. RECORDS
HRA agrees to maintain all books, documents, papers, accounting records, and other evidence
pertaining to costs incurred and work performed hereunder and shall make such materials available
at its office during the contract period and for seven years from the date of final payment under the
contract for inspection by the OWNER or any of their duly authorized representatives for the purpose
of making audits, examinations, excerpts, and transcriptions.
ARTICLE 11. OWNERSHIP OF DOCUMENTS
Upon completion or termination of this contract, all documents prepared by HRA or furnished to HRA
by the OWNER shall be delivered to and become the property of the OWNER.
All sketches, photographs, calculations, and other data prepared under this contract shall be made
available, upon request, to the OWNER without restriction or limitation on their further use, however,
re -use of any documents by OWNER or others for any purpose other than originally intended and
Engineering Services, Hugo Reed & Associates. Inc. & City of Lubbock
Page 2
specific to this Project shall be at the sole risk of the user, and HRA shall bear no liability for such re-
use. HRA may, at its own expense, have copies made of the documents or any other data furnished
the OWNER under this contract.
ARTICLE 12. HRA RESOURCES
HRA warrants that the firm presently has adequate qualified personnel in its employment for
performance of services required under this contract, or will be able to obtain such personnel from
sources other than the OWNER. Unless otherwise specified, HRA shall furnish all equipment,
materials, and supplies required to perform the work authorized herein. All employees of HRA or of
any subcontractor shall have such knowledge and experience as will enable them to perform the
duties assigned to them. Any employee of HRA or any subcontractor who, in the opinion of the
OWNER, is incompetent, or whose conduct becomes detrimental to the work, shall immediately be
removed from association with the project.
ARTICLE 13. SUBCONTRACTS
HRA shall not subcontract or otherwise transfer any portion of the work authorized in this contract
unless specifically authorized in writing by the OWNER. HRA will require any subcontractors to
comply with the applicable terms of this contract.
ARTICLE 14. SUCCESSORS AND ASSIGNS
The OWNER and HRA each bind itself, its successors, executors, administrators and assigns of
such other party in respect to all covenants of this agreement. HRA shall not assign, subcontract, or
transfer its interest in this agreement without the written consent of the OWNER.
ARTICLE 15. CERTIFICATE OF INSURANCE
HRA shall provide the OWNER with evidence that it has insurance coverage in accordance with a
current "Certificate of Insurance," which will indicate all insurance currently being maintained in full
force and effect by HRA. The insurance and limits will be reviewed by the OWNER'S Risk
Management Coordinator. HRA will not commence work until the OWNER has reviewed and
approved the insurance coverage.
ARTICLE 16. DISPUTES
HRA shall be responsible for the settlement of all contractual and administrative issues arising out of
procurement made by HRA in support of the work authorized herein.
ARTICLE 17. REMEDIES
Violation or breach of contract terms by HRA shall be grounds for termination of the contract, and
any increased cost to the OWNER arising from HRA's default, breach of contract, or violation of
terms shall be paid by HRA. This agreement shall not be considered as specifying the exclusive
remedy for any default, but all remedies existing at law and in equity may be availed of by either party
and shall be cumulative.
ARTICLE 18. TERMINATION
This contract may be terminated before the completion date established in Article 1, "Contract
Period," by any of the following conditions:
A. By mutual consent and agreement of both parties hereto
Engineering Services, Hugo Reed & Associates. Inc. & City of Lubbock
Page 3
B. By the OWNER, with notice in writing to HRA as consequence of failure by HRA to perform
the services herein set forth in a satisfactory manner and within the limits provided, with
proper allowances being made for circumstances beyond the control of HRA.
C. By either party, upon the failure of the other party to fulfill its obligations as set forth in the
Scope of Services attached hereto and labeled Attachment A and Attachment B, giving
written notice one to the other establishing the effective date of termination.
D. By the OWNER, for reasons of it's own and not subject to the mutual consent of HRA, upon
not less than thirty days written notice to HRA.
E. By satisfactory completion of all services and obligations described herein.
Should the OWNER terminate this contract as herein provided, costs other than costs due and
payable at the time of termination shall thereafter be paid to HRA. In determining the value of the
work performed by HRA prior to termination, the OWNER shall be the sole judge. Payment for work
at termination will be based on work completed at that time, including partially completed surveys,
subject to the conditions established in the paragraph following.
In the case of partially complete projects, eligible costs will be calculated on the number of hours
documented to the satisfaction of the OWNER multiplied by the hourly rate for the appropriate
personnel plus any additional cost authorized in Attachment C, "Basis for Payment," incurred to the
date of termination remaining unpaid.
If HRA defaults in performance of this contract or if the OWNER terminates the contract for fault on
the part of HRA, the OWNER will give consideration to the actual work performed to the date of
default, the cost to the OWNER of employing another firm to complete the required work, and the
time required to do so, and other factors which affect the value to the OWNER of the work
performed at the time of default.
If the termination of this contract is due to the failure of HRA to fulfill its obligations, the OWNER may
take over the project and prosecute the work to completion by contract or otherwise. In such case,
HRA shall be liable to the OWNER for any additional cost occasioned the OWNER thereby.
ARTICLE 19. COMPLIANCE WITH LAWS
HRA shall comply with all Federal, State, and local laws, statutes, ordinances, rules and regulations,
and the orders and decrees of any courts, or administrative bodies or tribunals in any matter
affecting the performance of this contract, including, without limitation, workers' compensation laws,
minimum and maximum salary and wage statutes and regulations, and licensing laws and
regulations. When required, HRA shall furnish the OWNER with satisfactory proof of compliance
therewith.
ARTICLE 20. INDEMNIFICATION
HRA shall save harmless and indemnify the OWNER from all claims and liability due to activities of
HRA, its agents, or employees, performed under this contract, in whole or in part, which result from
an error, omission, or negligent act of HRA or of any agent or person employed by HRA.
HRA shall also save harmless the OWNER from any and all expenses, including attorney fees
which might be incurred by the OWNER in litigation or otherwise resisting said claim or liabilities
which might be imposed on the OWNER as the result of such activities by HRA, its agents, or
employees.
Engineering Services, Hugo Reed & Associates. Inc. & City of Lubbock
Page 4
ARTICLE 21. SIGNATORY WARRANTY
The undersigned signatory for Hugo Reed and Associates, Inc. hereby represents and warrants that
he is an officer of the organization for which he has executed this contract and that he has full and
complete authority to enter into this contract on behalf of his firm.
The undersigned signatory for the OWNER hereby represents and warrants that he/she has full and
complete authority to enter into this contract on behalf of this organization.
IN WITNESS WHEREOF, the parties hereto have caused this contract to be executed, but this
contract shall not be valid until signed by a duly authorized representative of each party.
HUGO REED AND ASSOCIATES, INC.
Stevan M. Coleman, P.E., Vice -President
APPROVED TO CONT NT:
ar Hertel, P City 'n_eeP
Mailing Addresses:
Attest:
Rebe ca Garza, City Secretary
APPROVED AS TO FORM:
William de de Haas, Contract Manager/Attorney
For the purpose of this agreement, the following addresses shall be used to mail all required notices,
reports, claims and correspondence:
For: Hugo Reed and Associates, Inc. For: City of Lubbock
1601 Avenue N 162513 th Street
Lubbock,TX 79401 Lubbock, Texas 79401
Attn: Mr. Bernard J. Gradel, Jr., President Attn: Mr. Larry Hertel, P. E.
Engineering Services, Hugo Reed & Associates, Inc. & City of Lubbock
Page 5
Resolution No. 2002—R0378
ATTACHMENT A
to
AGREEMENT for ENGINEERING SERVICES,
PROJECT SCOPE and SERVICES
OWNER: City of Lubbock, Texas
PROJECT: Engineering Services for Design and Bid: 981h Street Storm Sewer from
Proposed Detention Basins West of Frankford Avenue to Playa Lake 93
The scope of services for this project is as follows:
BASIC SERVICES
A. DESIGN SERVICES
t. The Basic Design Services are outlined in Exhibit A-1, Worksheet B-1,
according to the tasking and man-hours indicated therein.
2. Design deliverables will include one design package of plans,
specifications, and estimates.
3. The design package deliverables will consist of one set of reproducible
mylar original plans, one hard -copy set of the noted specification
sections, a bid form, and a final opinion of probable cost.
4. HRA will provide one hard -copy and one electronic copy of all pertinent
design data including plans, specifications, opinion of probable
construction cost, and supporting data, computer models, and other
calculations and information utilized in the development of the design
package.
B. SURVEYING AND GEOTECHNICAL SERVICES
1. HRA will provide all surveying services as outlined in Exhibit A-1,
Worksheet S-1, for the purposes of establishing the necessary control
and acquiring the necessary field data for the performance of the Basic
Design Services.
2. Hamilton Engineering, Inc. will provide all geotechnical services as
outlined in Exhibit A-1, Worksheet G-1, for the purposes of establishing
the necessary soil testing and parameters for the performance of the
Basic Design Services.
3. HRA will provide one hard -copy of all survey notes and records, and one
electronic copy of all survey data so formatted.
Engineering Services, Hugo Reed & Associates. Inc. & City of Lubbock
Page 6
Resolution No. 2002—RO378
ATTACHMENT B
to
AGREEMENT for ENGINEERING SERVICES,
SERVICES TO BE PROVIDED BY OWNER
OWNER: City of Lubbock, Texas
PROJECT: Engineering Services for Design and Bid: 98th Street Storm Sewer from
Proposed Detention Basins West of Frankford Avenue to Playa Lake 93
The OWNER will provide any and all information available to OWNER, upon request, which may be
pertinent to HRA's prosecution of the work.
OWNER shall promptly notify HRA whenever OWNER becomes aware of any occurrence having a
material impact on the project.
The OWNER shall provide adequate personnel to review submittals and coordinate location and
time for meetings as necessary for the prosecution of the work. OWNER shall appoint a Project
Manager who will be the primary point of contact for HRA during prosecution of HRA's work on the
project, and who shall have authority to make material decisions within his/her delegated authority.
OWNER shall provide timely reviews of submittals and timely responses to HRA's Requests for
Information so as not to unnecessarily hinder the progress of the work.
OWNER shall acquire permission for access to any public or private properties necessary for HRA's
prosecution of the work.
Engineering Services, Hugo Reed & Associates, Inc. & City of Lubbock
Page 7
Resolution No. 2002—RO378
ATTACHMENT C
to
AGREEMENT FOR ENGINEERING SERVICES
BASIS for PAYMENT
OWNER: City of Lubbock, Texas
PROJECT: Engineering Services for Design and Bid: 98"' Street Storm Sewer from
Proposed Detention Basins West of Frankford Avenue to Playa Lake 93
For Services rendered under this Contract, OWNER agrees to pay HRA as follows:
A. GENERAL
t. HRA will be paid according to the personnel classifications and hourly
rate schedules shown in Table C-1, based on actual services performed
on the project by classification and hours. Services performed by the
subcontractor will be billed at cost. Reimbursable expenses will be paid
at cost plus 15% for both HRA and the subcontractor.
2. Monthly payments will be made to HRA based on the uncontested
amount of each monthly statement prepared and submitted by HRA.
Each monthly statement will be itemized to show the amount of work
actually performed by each personnel classification and with associated
reimbursable expenses for both HRA and the subcontractor. Statements
will be submitted in a format acceptable to OWNER.
3. Anticipated delivery date of the project is on or about February 17, 2002,
based on having an executed contract and Notice to Proceed no later
than September 17, 2002. Should the Notice to Proceed on the Project
not be received by the anticipated date, OWNER agrees that it will be
necessary to reconsider the anticipated delivery date and, if necessary, to
modify same by amendment to this contract if so agreed upon by both
the OWNER and HRA.
B. BASIC AND SUPPLEMENTAL SERVICES
The maximum compensation to be billed OWNER by HRA for
performance of the Basic Services and Reimbursables is as follows:
Basic Services Reimbursable Expenses
Hugo Reed and Associates, Inc. $ 99,889 $ 6,571
Surveying (by HRA) $ 29,270
Geotechnical (by Hamilton $ 15,000
Engineering, Inc.)
TOTAL BASIC SERVICES AND REIMBURSABLES $150,730
NOT TO EXCEED:
Engineering Services, Hugo Reed & Associates. Inc. & City of Lubbock
Page 8
Resolution No. 2002—R 0378
TABLE C-1
PERSONNEL SERVICE RATES
for
AGREEMENT FOR ENGINEERING SERVICES
OWNER: City of Lubbock, Texas
PROJECT: Engineering Services for Design and Bid: 98th Street Storm Sewer from
Proposed Detention Basins West of Frankford Avenue to Playa Lake 93
COMPENSATION RATES
Hourly fees listed herein will apply for the term of this contract.
C. PERSONNEL SERVICES
Category of Personnel /hr
Hugo Reed & Associates. Inc.
Principal -in -Charge or Officer
110.00
Project Manager
110.00
Senior Engineer
95.00
Professional Engineer
85.00
Engineer -in -Training
72.00
Engineering Technician/Designer
67.00
CADD Technician
60.00
Clerical
37.00
Senior Registered Professional Land Surveyor
95.00
Registered Professional Land Surveyor
85.00
Surveying Party Chief
55.00
Engineering Services, Hugo Reed & Associates. Inc. & City of Lubbock
Page 9
D. REIMBURSABLE EXPENSES
Reimbursable expenses anticipated for this Project are as shown in Exhibit A-1,
Worksheet R-1. The following expenses are reimbursable:
Reproductions of documents.
Toll telephone line charges for transmission of project data.
Plotting media used in provision of deliverable plans.
Engineering computer use time charges.
Other costs as may be incurred for the acquisition of materials, travel,
subsistence, or services specifically applicable to the Project.
Engineering Services, Hugo Reed & Associates. Inc. & City of Lubbock
Page 10
Resolution No. 2002-R0378
EXHIBIT A-1
TASKING and MAN-HOURS
for
BASIC SERVICES, BASIC SUPPLEMENTAL SERVICES, and BASIC REIMBURSABLES
Engineering Services. Hugo Reed & Associates. Inc. & City of Lubbock
Page I I
CITY OF LUBBOCK, TEXAS
98th STREET STORM SEWER PROJECT
PROPOSED DETENTION BASINS WEST OF FRANKFORD AVENUE TO PLAYA LAKE 93
BASIC SERVICES COMPENSATION FEE WORKSHEET
DESIGN SERVICES Worksheet B-1
TASK 1 SUBTOTAL
$ 15,349
PROJECT CUMULATIVE TOTAL $ 15,349
'sz 4
Classification
Prin. or
Proj. Sr.
Prof.
E.I.T.
Eng.
CADD Clerical
Officer
Mgr. Eng.
Eng.
1
Tech.
Tech.
I Line
Line
Rate
$110.00
$110.00 $95.00
$85.00
$72.00
$67.00
$60.00 $37.00
Hrs.
Extension
Task
I Description
22
plat information
0.5
2
4
1
4
11.5
`v
.L,"
.s m ,.�1r -L• ye.y�...`.k'
�,
,�,
rasa
conr"4
o;��GQUIsfr
� '.
'`
on latest final and preliminary plat information
0.5
4
tom.
$ 908
Revise future "fully -developed" times of concentration
Site visits
2.4
1.1
0.5
2
1
2
2
4
2
7.5
8
$ 654
Revise stage -area relationships for proposed detention
Coordinate with surveyors
2.5
12
2
2
4
8
12
8
20.5
24
$ 1,984
Revise alignment and grades of storm sewer trunk based
Coordinate with geotechnicians; site work observation;
2.6
1.3
review geotech report
2
2
2
4
16
8
34
24
$ 1,902
Revise ]CPR model to reflect storm sewer profile,
Review field survey data; establish approximate project
2.7
1.4
limits
1
1
16
4
12
12
41
29
$ 2,034
Review model results with City staff, prepare summaries,
Develop base maps from survey data
2.8
1.5
1
0.5
8
12
16
2
24
19
52.5
$ 3,667
Develop Opinion of Probable Construction Cost based on
Coordinate with utility companies; distribute base maps for
2.9
revised alignment and storm sewer profile
mark-ups
2
2
8
16
28
$ 2,242
1.6
1
1
4
8 1
12
1
25
$ 1,746
and other misc. plan sheets; 2 sheets
Receive, review, and incorporate utility mark-ups
1
1
8
12
20
42
$ 2,949
1.7
1
2
4
16
23
$ 1,528
routing maps; 2 sheets
Assemble known prior design work, drainage analyses;
2
4
24
24
54
$ 3,728
Develop and prepare plan -profile sheets for storm sewer
coordinate with private sector regarding release of study
2.12
trunk; 5 sheets
work
4
2
16
40
112
174
$ 11,590
18
1
4
8
13
$ 1,026
excavation, and back -fill; 1 sheet
Define right-of-way parcels needed, if any; define drainage
1
2
4
8
20
35
$ 2,416
Egeasements
needed, if any; coordinate with City staff
2.14
i
1-9
1
1
4
2
4
24
4
46
11
$ 808
TASK 1 SUBTOTAL
$ 15,349
PROJECT CUMULATIVE TOTAL $ 15,349
'sz 4
Page B-1
Verify design level of protection with City staff
2.1
1
1
1
3
$ 267
Revise drainage areas based on latest final and preliminary
22
plat information
0.5
2
4
1
4
11.5
$ 820
Revise future "fully -developed" runoff curve numbers based
2.3
on latest final and preliminary plat information
0.5
1
4
8
13.5
$ 908
Revise future "fully -developed" times of concentration
2.4
based on latest final and preliminary plat information
0.5
1
2
4
7.5
$ 524
Revise stage -area relationships for proposed detention
2.5
basins based on latest grading information
0.5
4
8
8
20.5
$ 1,451
Revise alignment and grades of storm sewer trunk based
2.6
on survey data and utility locations
2
8
16
8
34
$ 2,532
Revise ]CPR model to reflect storm sewer profile,
2.7
manholes, etc.
1
16
24
41
$ 3,198
Review model results with City staff, prepare summaries,
2.8
graphs, etc.
1
8
8
2
19
$ 1,486
Develop Opinion of Probable Construction Cost based on
2.9
revised alignment and storm sewer profile
2
2
8
16
28
$ 2,242
Develop and prepare cover, general notes, utility contact,
2.10
and other misc. plan sheets; 2 sheets
1
1
8
12
20
42
$ 2,949
Develop and prepare drainage area maps and storm water
2.11
routing maps; 2 sheets
2
4
24
24
54
$ 3,728
Develop and prepare plan -profile sheets for storm sewer
2.12
trunk; 5 sheets
4
2
16
40
112
174
$ 11,590
Develop and prepare detail sheets for trenching,
2.13
excavation, and back -fill; 1 sheet
1
2
4
8
20
35
$ 2,416
Develop and prepare detail sheets for paving cut and
2.14
repair; 1 sheet
1
1
4
16
24
46
$ 3,137
Page B-1
CITY OF LUBBOCK, TEXAS
98th STREET STORM SEWER PROJECT
PROPOSED DETENTION BASINS WEST OF FRANKFORD AVENUE TO PLAYA LAKE 93
BASIC SERVICES COMPENSATION FEE WORKSHEET
DESIGN SERVICES Worksheet B-1
TASK 2 SUBTOTAL
$ 73,504
PROJECT CUMULATIVE TOTAL $ 88,853
€:^' c �+i 4-0.c y„ '' '„ �'4 a _.*s as fi� : r ✓`'r`c-
X9e 9UBti1
Classification
Prin. or
Proj.
Sr.
Prof.
E.I.T.
Eng.
CADD
Clerical
2
3 3
3
and Opinions of Probable Construction Costs
Officer
Mgr.
Eng.
Eng.
Tech.
Tech.
Line
Line
3.1
Rate
$110.00
$110.00
$95.00
$85.00
$72.00
$67.00
$60.00
$37.00
Hrs.
Extension
Task
Description
Develop and prepare manhole, outlet and misc. details; 2
215
sheets
1
4
8
24
40
77
$ 5,298
Develop and prepare detailed grading plan for outlet at
2.16
Playa Lake 93; 1 sheet
1
4
16
16
37
$ - 2,562
3.3
Develop and prepare traffic control plans in accordance
1
1 8
8
8
4
1
29 1
$ 2,718
2.17
with TMUTCD requirements; 4 sheets
2
8
32
40
82
$ 5,604
Develop and prepare SWPPP, including NOI, NOT,
2.18
Inspection and Certification forms, etc.; 2 sheets
1
8
24
24
57
$ 3,958
Prepare supplemental specifications sections for storm
2.19
sewer trunk and SWPPP
2
4
16
24
8
54
$ 3,984
Coordinate with City staff regarding allowable materials and
2.20
joint types
1
1
1
1
4
$ 362
Calculate D -loads for RCP open trench installation
2.21
1
2
4
12
19
$ 1,504
Prepare final ICPR model based on design drawings
222
1
8
16
1 25
$ 1,942
Prepare quantity take offs based on design drawings,
2.23
update Opinion of Probable Construction Cost
2
2
12
24
16
56
$ 4,118
Coordinate General Conditions with City staff
2.24
1
1
1
l
4
$ 362
Coordinate format of Bid Form with City staff, prepare Bid
2.25
Form
1
8
16
25
$ 1,942
Project management
2.26
2
40
42
$ 4,620
TASK 2 SUBTOTAL
$ 73,504
PROJECT CUMULATIVE TOTAL $ 88,853
€:^' c �+i 4-0.c y„ '' '„ �'4 a _.*s as fi� : r ✓`'r`c-
X9e 9UBti1
TASK 3 SUBTOTAL
4,062
PROJECT CUMULATIVE TOTAL
01" 1Z
$ 92,915
.r �, r,L,ze. .a- 3. t"i 3a 5' "r•s rt%'#r y'�`
-
�TASK
QC/QA preliminary design submittal; plans, specifications,
4.1
review/comment meetings; 3 meetings
2
3 3
3
and Opinions of Probable Construction Costs
9
$ 801
Additional progress review/coordination meetings with City
3.1
staff; 2 meetings
8
2
1
1
1
$ 534
5
$ 472
QC/QA pre -final design submittal; plans, specifications, and
Opinions of Probable Construction Costs, Bid Form
3.2
4
2
2
1
9
$ 872
QC/QA final design submittal; plans, specifications, and
Opinions of Probable Construction Costs, Bid Form
3.3
1
1 8
8
8
4
1
29 1
$ 2,718
TASK 3 SUBTOTAL
4,062
PROJECT CUMULATIVE TOTAL
01" 1Z
$ 92,915
.r �, r,L,ze. .a- 3. t"i 3a 5' "r•s rt%'#r y'�`
-
�TASK
TASK 4 SUBTOTAL
1,335
PROJECT CUMULATIVE TOTAL $ 94,250
Project kick-off meeting with City staff plus submittal
4.1
review/comment meetings; 3 meetings
2
3 3
3
9
$ 801
Additional progress review/coordination meetings with City
4.2
staff; 2 meetings
8
2 2
2
4
6
$ 534
TASK 4 SUBTOTAL
1,335
PROJECT CUMULATIVE TOTAL $ 94,250
Page B-2
Prepare for and attend pre-bid conference; address pre-bid
51
questions
2
2 4
4
12 $ 1,038
Prepare bid addenda as necessary during bid phase
5.2
8
6 12
16
4
46 $ 3,862
Page B-2
CITY OF LUBBOCK, TEXAS
98th STREET STORM SEWER PROJECT
PROPOSED DETENTION BASINS WEST OF FRANKFORD AVENUE TO PLAYA LAKE 93
BASIC SERVICES COMPENSATION FEE WORKSHEET
DESIGN SERVICES Worksheet B-1
Classification Prin. or
Officer
Proj.
Mgr.
Sr.
Eng.
Prof.
Eng.
E.I.T.
Eng. CADD Clerical
Tech. Tech. Line Line
Rate $110.00
$110.00
$95.00
$85.00
$72.00
$67.00 $60.00 $37.00 Hrs. Extension
Task Description
Attend bid opening
5.3
1
1
1
3 $ 267
Bid evaluation assistance
5.4 1
1
1
1
1
5 $ 472
TASK 5 SUBTOTAL
PROJECT CUMULATIVE TOTAL
PROJECT CUMULATIVE TOTAL, BASIC DESIGN SERVICES
Page B-3
$ 5,639
$ 99,889
$ 99,889
CITY OF LUBBOCK, TEXAS
98th STREET STORM SEWER PROJECT
PROPOSED DETENTION BASINS WEST OF FRANKFORD AVENUE TO PLAYA LAKE 93
BASIC SERVICES COMPENSATION WORKSHEET
SURVEYING SERVICES Worksheet S-1
Task
Description
Quantity
Unit
Unit Cost
Line
Extension
X ! f -*S. °��'�`� ,. vim, v � A ;. � � S 4„'tW'�`
f Y � �f +E.,.fi �
+,�= S;
��w. x
��._
� cn.�
'r ✓�"-i 5
v5
F�
�, �� z„ wRi
I
�, �s�
�
S.1
Establish project horizontal and vertical control
2
days
@
$
880.00
/day
$
1,760
S.2
Locate Section corners
0.5
days
@
$
880.00
/day
$
440
S.3
Locate/establish existing rights-of-way
5
days
@
$
880.00
/day
$
4,400
S.4
R -O -W parcel surveys
3
each
@
$
1,200.00
lea
$
3,600
S.5
Drainage easements
4
each
@
$
400.00
lea
$
1,600
S.6
Detail survey of 98th Street intersection
2
days
@
$
880.00
/day
$
1,760
S.7
Locate existing surface improvements in project corridor
4
days
@
$
880.00
/day
$
3,520
S.8
Topography; cross-section in 98th Street
3
days
@
$
880.00
/day
$
2,640
S.9
Topography; cross section drainage easement to Playa Lake 93
1.5
days
@
$
880.00
/day
$
1,320
S.10
Topography; detailed topograpic data at proposed outlet to Playa Lake 93
0.5
days
@
$
880.00
/day
$
440
S.11
PC research, office calculations, and record-keeping
20
hours
@
$
55.00
/hour
$
1,100
S.12
RPLS supervision, GPS processing, review, calculations, and record-keeping
32
hours
@
$
95.00
/hour
$
3,040
S.13
Surveying CAD
40
hours
@
$
60.00
/hour
$
2,400
S.14
GPS equipment
5
days
@
$
250.00
/day
$
1,250
BASIC SERVICES, SURVEYING, TOTAL $ 29,270
Page S-1
CITY OF LUBBOCK, TEXAS
98th STREET STORM SEWER PROJECT
PROPOSED DETENTION BASINS WEST OF FRANKFORD AVENUE TO PLAYA LAKE 93
BASIC SERVICES COMPENSATION WORKSHEET
GEOTECHNICAL SERVICES Worksheet G-1
BASIC SERVICES, GEOTECHNICAL, TOTAL $ 15,000
Page G-1
G.1
Test hole borings - 15 holes @ 20 feet deep along storm sewer route
(approx one test hole per 450 LF):
Push tube sampling until refusal
Standard Penetration Tests will be performed at push tube refusal;
remaining depth of bore will be cored with SPT's taken at five foot
intervals if core sample is unsuitable for testing
Borings will be backfilled with cuttings and HMAC surfaces repaired with
cold mix, if necessary
Coordination with DigTESS and utility entities for locates
Traffic Control
Laboratory testing - soil classification test will be performed at five foot intervals
for basic OSHA -type classifications; unconfined compression tests will be
performed on recovered push tube/core samples at five foot intervals
Engineering services - report (10 copies) detailing field and laboratory results and
engineering studies to provide information on encountered materials, including
rock classification, if any; discussions on pipe line excavation safety per OSHA
1
LS
$15,000.00
LS $ 15,000
criteria
Soil resistivity and pH tests, as necessary and if authorized by Owner, as
Additional Work to Basic Services Contract Amount
0
each
$ 400.00
each
BASIC SERVICES, GEOTECHNICAL, TOTAL $ 15,000
Page G-1
CITY OF LUBBOCK, TEXAS
98th STREET STORM SEWER PROJECT
PROPOSED DETENTION BASINS WEST OF FRANKFORD AVENUE TO PLAYA LAKE 93
BASIC SERVICES REIMBURSABLE EXPENSES WORKSHEET
REIMBURSABLES Worksheet R-1
BASIC SERVICES, REIMBURSABLE EXPENSES, SUBTOTAL $ 5,714
BASIC SERVICES, REIMBURSABLE EXPENSES, SUBTOTAL with 1.15 MULTIPLIER $ 6,571
Page R-1
Resolution No. 2002—RO378
AMENDMENT NO. 1
to
98TH STREET STORM SEWER PROJECT
from
PROPOSED DETENTION BASINS WEST OF FRANKFORD AVENUE TO PLAYA 93
CONTRACT FOR ENGINEERING SERVICES
THE STATE OF TEXAS §
THE COUNTY OF LUBBOCK §
THIS AMENDMENT NO. 1 to THE CONTRACT FOR ENGINEERING SERVICES FOR
THE 98TH STREET STORM SEWER PROJECT from PROPOSED DETENTION BASINS WEST
OF FRANKFORD AVENUE TO PLAYA LAKE 93, said contract dated September 17, 2002, is made
by and between the City of Lubbock, Texas, hereinafter called the OWNER, and Hugo Reed and
Associates, Inc., hereinafter called HRA.
NOW, THEREFORE, in consideration of the mutual covenants and agreements herein contained,
the OWNER and HRA do mutually agree as follows.
ARTICLE 1. CONTRACT PERIOD
The effective date of the original contract was September 17, 2002. The Original Project Contract
Period was agreed to be five (5) months, beginning on the date that HRA received written Notice to
Proceed from the OWNER. No extension to the Contract Period is being proposed by this
AMENDMENT NO. 1.
ARTICLE 2. SCOPE OF SERVICES
This AMENDMENT NO. 1 is being made for the purpose of amending the Original Scope of
Services to include those additional professional services detailed in Attachment A hereto,
"Additional Project Scope and Services."
ARTICLE 3. COMPENSATION
Amendment No. 1 Exhibit A-1 is attached hereto and indicates the tasking and professional service
fees for performance of the additional services authorized by this Amendment as described in
Attachment A. The maximum amount payable under this contract for Basic Services, Additional
Basic Services and Reimbursables will be increased according to the "Basis for Payment' indicated
in Attachment B hereto. This Amendment No. 1 results in a net increase of $2,970.00 to the
maximum amount payable under this contract.
ARTICLE 4. OTHER
No other changes to the original contract are requested or granted as a result of this Amendment.
All other provisions of the original contract will remain in full force and effect. This Amendment shall
become a part of and be incorporated into the original contract upon its full execution by both
OWNER and HRA.
Amendment No. 1 to Contract for Engineering Services, Hugo Reed & Associates, Inc. & City of Lubbock
Page 1
ARTICLE 5. SIGNATORY WARRANTY
The undersigned signatory for Hugo Reed and Associates, Inc. hereby represents and warrants that
he is an officer of the organization for which he has executed this contract and that he has full and
complete authority to enter into this contract on behalf of his firm.
The undersigned signatory for the OWNER hereby represents and warrants that he/she has full and
complete authority to enter into this contract on behalf of this organization.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 1 to the original
contract to be executed, but this Amendment No.1 to the original contract shall not be valid until
signed by a duly authorized representative of each party.
HUGO REED AND ASSOCIATES, INC.
--�t-l9 02
Stevan M. Coleman, P.E., Vice President Date
CITY OF LIXBOCK CA
Attest ✓' Z-' 101nz
arc McDougal, M Date Rebecca Garza Date
APPRO AS TO CO TENT: APPROVED AS TO FORM:
z z, AyrlD�
( arty Hertel, RAE. 15ate Date
City Engineer ac-t:-IFAat�ager/Attorney
Mailing Addresses:
For the purpose of this agreement, the following addresses shall be used to mail all required notices,
reports, claims and correspondence:
For: Hugo Reed and Associates, Inc. For: City of Lubbock
1601 Avenue N 162513 th Street
Lubbock, TX 79401 Lubbock, Texas 79401
Attn: Mr. Bernard J. Grade[, Jr., President Attn: Mr. Larry Hertel, P. E.
Amendment No. 1 to Contract for Engineering Services, Hugo Reed & Associates, Inc. & City of Lubbock
Page 2
ATTACHMENT A
to
AMENDMENT NO. 1 to AGREEMENT for ENGINEERING SERVICES,
ADDITIONAL PROJECT SCOPE and SERVICES
OWNER: City of Lubbock, Texas
PROJECT: Engineering Services for Design and Bid: 98`h Street Storm Sewer
Project from Proposed Detention Basins West of Frankford Avenue to
Playa 93
The scope of services for this Amendment No. 1 to the project is as follows:
BASIC SERVICES
A. GEOTECHNICAL SERVICES
I . The Additional Basic Geotechnical Services are outlined in Exhibit A-1,
according to the tasking indicated therein, for provision of additional
depth for Boring Nos. 6 through 12 of 15 total along the storm sewer
corridor, and for additional in-situ and laboratory sampling and soil
testing.
2. The design deliverables will include results of the additional boring logs
and testing results.
3. The nature of the design package deliverables will not be altered as a
result of this Amendment No. 1.
Amendment No. 1 to Contract for Engineering Services, Hugo Reed & Associates, Inc. & City of Lubbock
Page 3
ATTACHMENT B
to
AMENDMENT NO. 1 to AGREEMENT FOR ENGINEERING SERVICES
BASIS for PAYMENT
OWNER: City of Lubbock, Texas
PROJECT: Engineering Services for Design and Bid: 98th Street Storm Sewer
Project from Proposed Detention Basins West of Frankford Avenue to
Playa 93
For Services rendered under this Contract, OWNER agrees to pay HRA as follows:
A. BASIC SERVICES, ADDITIONAL BASIC SERVICES AND REIMBURSABLES
The maximum compensation to be billed OWNER by HRA for
performance of the Basic Services, the Additional Basic Services
authorized by this Amendment No.1 and Reimbursables, is as follows.
Basic Services
Hugo Reed and Associates, Inc. $ 99,889
Surveying (by HRA) $ 29,270
Geotechnical (by Hamilton $ 17,970
Engineering, Inc.)
TOTAL BASIC SERVICES AND REIMBURSABLES
NOT TO EXCEED:
Reimbursable Expenses
$ 6,571
$153,700
Amendment No. 1 to Contract for Engineering Services, Hugo Reed & Associates, Inc. & City of Lubbock
Page 4
EXHIBIT A-1
TASKING and PROFESSIONAL SERVICE FEES
for
AMENDMENT NO. 1 for ADDITIONAL BASIC SERVICES including SUBCONTRACTOR
Amendment No. 1 to Contract for Engineering Services, Hugo Reed & Associates, Inc. & City of Lubbock
Page 5
Oct 28 02 11:48a William Hamilton
915-550-5899 p.2
W. HAMILTON ENGINEERING, INC.
I'. U. Brix 380:4 0,Ass-u TX 7.9760-3803 (915)550-5866 Fax(915)550-5899
October 28, 2002
Mr. Jason L. Swofford, P.1;.
Flugo Reed and Associates. Inc.
1601 Avenue N
Lubbock. TX 79401
Re: 98" Street Storm Sewer Project, Lubbock, Texas
Dear Mr. Swollbrd:
As outlined in your letter o1*Oc1obcr 18.2002 authori;dng us to increase the test hole depths if cerujin
conditions were not met. Boring Nos. 6 through 12 were drilled below the 20-11>ol depth in order to
determine the location of undisturbed natural material.
Subsequently, the. following Ices were incurred and will be charged as outlined in our letter of
October 18.2002:
SCOPE (>F :6 i_ V- CI;
QUANTITY
UNITCOST
EXTENSION
25.00
Drilling below tilt; 20 -foot Depth:
$
25.00
$
50.00
- Boring No. It-(;
5.0 feet
$
15.00
$ 75.00
- Boring No. B-7
10.0 feet
$
15.00
$ 150.00
- Baring No. B-8
15.0 feet
$
15.00
$ 22.5.00
- Boring No. 13-9
15.0 Icet
$
15.00
$ 22.5.00
- Boring No. B-10
15.0 feet
$
15.00
$ 225.00
- Boring No. B-1 I
15.0 feet
$
15.00
$ 225.00
- Boring No. B-12
15.0 feet
$
15.00
225.00
SP'C or Unconfined C'ompression 'Pests
on Samples below the 20 -loot Depth
- Boring No. B-6
- Boring No. B-7
- Boring No. B-8
- Boring No. IP)
- Boring No. B-10
- Boring No. B -I 1
- Boring No, R-12
Subtotal: $ 11-350.00
1.0 each
$
25.00
$
25.00
2.0 each
$
25.00
$
50.00
3.0 each
$
25.00
$
75.00
3.0 each
$
25.00
$
75.00
3 -0 each
$
25.00
$
75.00
3.0 each
$
25.00
$
75.00
3.0 each
$
25.00
75.00
Subtotal: $ 4.50.00
A 11(.113 Certified Firm
bet 28 02 11:48a William Hamilton 915-550-5899
Mr_ Jason 1.. Swot'ford. P.E.
October 29. 2002
Page 2
SCOPE- Uvx, U,
QUAN-1'1-1'Y
UNIT COST
EXTENSION
Pi.tsticity Index/Minus 200 -mesh S;cvc/Sail
Classification Tests below the 20 -foot Deptli
- Boring No. B-6
1.0 set
$
65.00
$
65.00
- Boring No. B-7
2.0 sets
$
65.00
$
130.00
- Boring No. B -K
3.0 sets
$
65.00
$
195.00
- I3ar;ns No. B-9
3.0 sets
$
65.00
$
195.00
- Boring No. 13-10
3.0 sets
$
65.00
$
19.5.00
- Boring No. 11-11
3.0 sets
$
65.00
$
195.()0
- Boring No. 11-12
3.0 sets
$
6S 00
it
1O5 00
Please do not hesitate to call if you have any questions.