Loading...
HomeMy WebLinkAboutResolution - 2002-R0317 - Change Order To A Contract - Utility Contractors Of America - 08/29/2002Resolution No. 2002-RO317 August 29, 2002 Item No. 48 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock a Change Order No. 2 to a contract (Bid No. ITB #048 -OINK) with Utility Contractors of America, for a reduction in the amount of work to be performed, a copy of which Change Order No. 2 is attached hereto and which shall be spread upon the minutes of this Council and as spread upon the minutes of this Council shall constitute and be a part hereof as if fully copied herein in detail. Passed by the City Council this 29th day of August 2002. ATTEST: Garza, City APPR D A.16TO ON T: Chester Carthel, Chief Engineer -Public Works /e1]9:Z9]`/NlA M.100 Donald G. V Attorney DDres/ChOr#2Sewer.res July 25, 2002 Resolution No. 2002—RO317 August 29, 2002 CITY OF LUBBOCK Item No. 48 CHANGE ORDER CHANGE ORDER #: 2 CONTRACTOR: _ Utility Contractor's of America DATE: 7/11/02 CITY OF LUBBOCK BID#: ITB #048-01/VK PROJECT NAME: Annexation Sanitary Sewer Svstem Improvements Reduction in contract amount due to an error in the bid form that included a bore and casing under a railroad that is not required (bid items F32 & F33) ITEM DESCRIPTION AMOUNT A. ORIGINAL CONTRACT VALUE: $4,136,593.35 B. AMOUNT OF THIS CHANGE ORDER: Council approval required if over $25,000 C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (BA): D. AMOUNT OF PREVIOUS CHANGE ORDERS: $39,163 00 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): $5,863.00 F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A):25% Max. F,4 G. NEW CONTRACT AMOUNT (A+E): $4,142,456.35 This Chance Order is not valid without the followina signatures: COT CTOR PR OJECTT ARCHITECT/ENGI ER Apr as to For r OWNER'S REPRESENTATIVE a , arngey Victor Kilman, Purchasing Manager - Bob Cass, City Manager Orders over $25.000 ramira the fmt winer CITY QE9 LUBBO?R/ ATTEST: 8/29/02 8 /29/02 Rebecca Garza, City S retary PUR-045 (Rev 12/01) F.29 6" Pipe, Nominal Diameter, Pipe Material per attached 10 LF Sanitary Sewer Systems Components Specification, Section 02513: 16' to 18' depth, furnished and installed, compete, in place, for the unit price per each of: Dollars and ivy Cents ($ The total amount for this item consists of-. Materials: $ 36_Od Labor: $ 1!2'f- 6C' ASTM F.30 6" Pipe, Nominal Diameter, Pipe Material per attached 70 LF Sanitary Sewer Systems Components Specification, Section 02513: 18' to 20' depth, furnished and installed, co,_rn I te, in place for the unit price per each of: -/iF. i..�f,y t_ Dollars and _/YD Cents ($ The total amount for this item consists of. - Materials: $_ Labor: $ ASTM F.31 6" Pipe, Nominal Diameter, Pipe Material per attached 100 LF Sanitary Sewer Systems Components Specification, Section 02513: 20' to 22' depth, fumished and installed, complete, in place, for the unit price per each of: A7- Dollars and yn Cents ($_-1* Lw ) The total amount for this item consists of: Materials: Labor. $ 2 S<o �� v ASTM Q. -3,41 F.32 30" bore under Railroad, furnished and installed, 100 LF complete, in place, for thpunit price per each of: Zv.v/L'lll Dollars and A, -V Cents ($_'�53. ac ) The total amount for this item consists of. Materials: 57 a Labor. $ F.33 30" Nominal I.C( X 0.25" Min Wall Thickness, Steel A36 100 LF Encasement, furnished and installed, complete, in place, for the unit price per each of: D)"/''4 Dollars and Nim Cents The total amount for this item consists of: Materials: $ oea p p Labor. $ opw, n0�- <%(7 p DDS 00 ITB #048-01NK, Addendum #7 Page 31