Loading...
HomeMy WebLinkAboutResolution - 2002-R0316 - Contract With Utility Contractors Of America For Relocation Of Manhole/Pipeline - 08/29/2002Resolution No. 2002-RO316 August 29, 2002 Item No. 47 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock a Change Order No. 1 to a contract (Bid No. ITB #048 -OINK) with Utility Contractors of America, for relocation of a manhole and revision of pipeline route, a copy of which Change Order No. 1 is attached hereto and which shall be spread upon the minutes of this Council and as spread upon the minutes of this Council shall constitute and be a part hereof as if fully copied herein in detail. Passed by the City Council this 29th day of August , 2002. ATTEST: CQ'e RebeccG aarza, City Secretary APP VE CO NT: Chester Carthel, Chief Engineer -Public Works VED AS TO FORM: G. VandR,6r, First Assistant City Attorney DDres/ChOr# 1 Sewer.res July 25, 2002 Resolution No. 2002—RO316 August 29, 2002 CITY OF LUBBOCK Item No. 47 CHANGE ORDER CHANGE ORDER M 1 CONTRACTOR: Utility Contractor's of America DATE: 7/11/02 CITY OF LUBBOCK BID#: ITB #048-01 NK PROJECT NAME: Annexation Sanitary Sewer System Improvements Additional work by contractor due to incorrect location of first manhole and revision of the pipeline route due to easement negotiations. ITEM DESCRIPTION A. ORIGINAL CONTRACT VALUE: B. AMOUNT OF THIS CHANGE ORDER: Councilapprovairequired ifover $25,000 C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A): D. AMOUNT OF PREVIOUS CHANGE ORDERS: E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A):25% Max. G. NEW CONTRACT AMOUNT (A+E): This Chance Order is not valid without the following signatures: Victor Kilman, Purchasing Manager orders over CITY OF LUBBOCK Sim PROJECT ARCHITECT/ENGINEER Approved as to For / 25ro2 eat�ast�4anager�Attorn y Bob Cass, City Manager ATTEST: 8/29/02 Qk4:tf.� a, 8/29/02 Rebecca Garza, Ci ecretary PUR-045 (Rev 12/01) CONTRACTOR'S CHANGE PROPOSAL =0A, Utility Conlrectors of America, Ltd 027 Highway 82 Woiffcrth, texas 79382 CIO Nc , Pg t of i CONTRACT NO. 1'ROJE IT NO S7Z Ch of Lubbock - Annexation Gower 31stern-88th & Miami "0. Ches carthel City of Lubbock Public Works Engineering � P O Sox 2000 Lubboa, TX 79457 The proposal is ubpNftd for your Cgneiderefen. A d**W {soar, egvynrnt and rtatedal post brrlBAtdWrn. prets;d Ir vacerdaneo with AH0 ". Jn90m1 C mwsl end StrpF'retnentary CCndinCns, s;Uctmd haroto. Aedl9on;i Cats to oupport Iternited t!gwee wiH be furnished up; n request. 41 187 yards tM $44.017-stabilizEd base -Manhole Reiocatlon $7,348.00 42 saber & Equlomant Cost b Cay; a 4883,00 -Manhole Relocation $24,315.00 f3 "rucking due to Power lines a new sewer ivcaticn S7,5c0.e0 TOTAL CHANGE ORDER - At)0 $39, lS1.00 It is understood and agraad by the enders gncd thpt t,14 PMosal, if aocepted by ft Owner, will be ftomorated into the Contract Wwaen owner end Contractor by CHANGE OVER, and It Is !usher agreed tP,et no changod work covered by th;s Proposer win conrrance until smn Change Oder is signed at bsued by the Owner, Utility CordEggtors of Ameca, Ltd. Canwdor A�x by C>tf: /c 7-9x` sGg s GB: b� �i1:QI 9G:�i ra; 6;�/La 0L=•0N 3712