RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock is hereby authorized and directed to
execute for and on behalf of the City of Lubbock a Change Order No. 1 to a contract (Bid
No. ITB #048 -OINK) with Utility Contractors of America, for relocation of a manhole
and revision of pipeline route, a copy of which Change Order No. 1 is attached hereto and
which shall be spread upon the minutes of this Council and as spread upon the minutes of
this Council shall constitute and be a part hereof as if fully copied herein in detail.
Passed by the City Council this 29th day of August , 2002.
ATTEST:
CQ'e
RebeccG
aarza, City Secretary
APP VE CO NT:
Chester Carthel, Chief Engineer -Public Works
VED AS TO FORM:
G. VandR,6r, First Assistant City
Attorney
DDres/ChOr# 1 Sewer.res
July 25, 2002
Resolution No. 2002—RO316
August 29, 2002
CITY OF LUBBOCK Item No. 47
CHANGE ORDER
CHANGE ORDER M 1 CONTRACTOR: Utility Contractor's of America
DATE: 7/11/02 CITY OF LUBBOCK BID#: ITB #048-01 NK
PROJECT NAME: Annexation Sanitary Sewer System Improvements
Additional work by contractor due to incorrect location of first manhole and revision of the pipeline
route due to easement negotiations.
ITEM DESCRIPTION
A. ORIGINAL CONTRACT VALUE:
B. AMOUNT OF THIS CHANGE ORDER: Councilapprovairequired ifover $25,000
C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A):
D. AMOUNT OF PREVIOUS CHANGE ORDERS:
E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D):
F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A):25% Max.
G. NEW CONTRACT AMOUNT (A+E):
This Chance Order is not valid without the following signatures:
Victor Kilman, Purchasing Manager
orders over
CITY OF LUBBOCK
Sim
PROJECT ARCHITECT/ENGINEER
Approved as to For
/ 25ro2
eat�ast�4anager�Attorn y
Bob Cass, City Manager
ATTEST:
8/29/02 Qk4:tf.� a, 8/29/02
Rebecca Garza, Ci ecretary
PUR-045 (Rev 12/01)
CONTRACTOR'S CHANGE PROPOSAL
=0A, Utility Conlrectors of America, Ltd
027 Highway 82
Woiffcrth, texas 79382
CIO Nc , Pg t of i
CONTRACT NO.
1'ROJE IT NO
S7Z Ch of Lubbock - Annexation
Gower 31stern-88th & Miami
"0. Ches carthel
City of Lubbock
Public Works Engineering �
P O Sox 2000
Lubboa, TX 79457
The proposal is ubpNftd for your Cgneiderefen. A d**W {soar, egvynrnt and rtatedal post brrlBAtdWrn. prets;d Ir vacerdaneo with
AH0 ". Jn90m1 C mwsl end StrpF'retnentary CCndinCns, s;Uctmd haroto. Aedl9on;i Cats to oupport Iternited t!gwee wiH be furnished up; n request.
41 187 yards tM $44.017-stabilizEd base -Manhole Reiocatlon $7,348.00
42 saber & Equlomant Cost b Cay; a 4883,00 -Manhole Relocation $24,315.00
f3 "rucking due to Power lines a new sewer ivcaticn S7,5c0.e0
TOTAL CHANGE ORDER - At)0 $39, lS1.00
It is understood and agraad by the enders gncd thpt t,14 PMosal, if aocepted by ft Owner, will be ftomorated into the Contract Wwaen owner
end Contractor by CHANGE OVER, and It Is !usher agreed tP,et no changod work covered by th;s Proposer win conrrance until smn Change Oder
is signed at bsued by the Owner,
Utility CordEggtors of Ameca, Ltd.
Canwdor
A�x
by
C>tf:
/c 7-9x` sGg s GB: b� �i1:QI 9G:�i ra; 6;�/La 0L=•0N 3712