Loading...
HomeMy WebLinkAboutResolution - 2000-R0416 - BID #236-00/RS Hodges Community Center Renovation - Phase II (Facilities Mgmt) - 11/07/2000Resolution No. 2000-RO416 November 7, 2000 Item No. 47 RESOLUTION IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock, a contract for Hodges Community Center Renovation — Phase II per ITB #236-00/RS, by and between the City of Lubbock and Art Cuevas Construction, Inc. of Lubbock, Texas, and related documents. Said contract is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council this 7th day of November '2000. WINDY SIT N, MAYOR ATTEST: Kaythi& Darnell, City Secretary APPROVED AS TO CONTENT: Victor Kilman, Pqrchasing Manager APPROVED AS TO FORM: 1=kr _i�Y•�-- .Gly /�y�. William de Haas Competition and Contracts Manager/Attorney gs:ccdocs/Art Cuevas Construction, Inc. 102500 a m BOND CHECK BEST RATING ucENAs DATE f CITY OF LUBBOCK SPECIFICATIONS FOR HODGES COMMUNITY CENTER RENOVATION - PHASE 11 BID #236-00/RS A City Of Planned Progress" CITY OF LUBBOCK Lubbock, Texas Pon City of Lubbock PURCHASING DEPARTMENT ROOM L04, MUNICIPAL BUILDING ^� 162513 TH STREET LUBBOCK, TEXAS 79401 PH: (806)775-2167 FAX:(806)775-2164 http://purchasing.ci.lubbock.tx.us ITB #00-236, Addendum #1 ADDENDUM #1 ITB #00-236 Hodges Community Center Renovation -Phase II MAILED TO VENDOR: October 12, 2000 CLOSE DATE: October 18, 2000 @ 3:00 P. M. The following items take precedence over specifications for the above named Invitation to Bid (ITB). Where any item called for in the ITB documents is supplemented here, the original requirements, not affected by this addendum, shall remain in effect. 1. On the Drawings, LEGEND, New Rubber Base and Painted Trim has been changed to read: "New Rubber Base and/or Painted Trim". 2. In the Specifications, Page 26, WALLS, change "Marlite" to read "FRP" material. 3. On the Drawings, East Vestibule (109) shall be included for "Painted Trim -added". 4. In the Specifications, Page 26, WALLS, the clarification shall be noted that if the wall covering (Sound Soak) equal to (Surfaces -Omega) does not make a bend without cutting the material at the corners, the corner trim will be necessary. Otherwise, if the material can wrap around the corners, -" the corner trim can be omitted. 5. On the Drawings, the room numbers are as follows: Entry --101 Center Hall -102 North Hall -103 Office -104 Golden Room -105 Storage Closet -106 !- Kitchen -107 Social Hall -108 East Vestibule -109 Main Corridor -110 Phone Booth -111 Mechanical Room Hall -112 All requests for additional information or clarification must be submitted in writing and directed to: Questions may be faxed to: or Email to: 00-236addl ■n Ron Shuffield, Senior Buyer City of Lubbock P.O. Box 2000 Lubbock, Texas 79457 (806)775-2164 Rsh geld@m 'I.ci.lubbock.tx.us l ATHANK;6U, CITY OF LUBBOCK Ron Shuffield Senior Buyer PLEASE RETURN ONE COPY OF THIS ADDENDUM WITH YOUR BID. CITY OF LUBBOCK INVITATION TO BID FOR TITLE: HODGES COMMUNITY CENTER RENOVATION -PHASE 11 ADDRESS: LUBBOCK, TEXAS BID NUMBER: 236-00/RS PROJECT NUMBER: 90034.8302.20000 CONTRACT PREPARED BY: PURCHASING DEPARTMENT INDEX :Q. 1. NOTICE TO BIDDERS 2. GENERAL INSTRUCTIONS TO BIDDERS 3. BID SUBMITTAL - BID FOR LUMP SUM CONTRACTS 4. PAYMENT BOND 5. PERFORMANCE BOND 6. CERTIFICATE OF INSURANCE -• 7. CONTRACT 8. GENERAL CONDITIONS OF THE AGREEMENT 9. CURRENT WAGE DETERMINATIONS ,..� 10. SPECIFICATIONS r: s _: NOTICE TO BIDDERS NOTICE TO BIDDERS BID #236-00/RS Sealed bids addressed to Victor Kilman, Purchasing Manager, City of Lubbock, Texas, will be received in the office of the Purchasing Manager, Municipal Building, 1625 13th Street, Room L-04, Lubbock, Texas, 79401, until 3:00 o'clock p.m. on the 18th day of October, 2000, or as changed by the issuance of formal addenda to all planholders, to furnish all labor and materials and perform all work for the construction of the following described project: "HODGES COMMUNITY CENTER RENOVATION - PHASE II" After the expiration of the time and date above first written, said sealed bids will be opened in the office of the Purchasing Manager and publicly read aloud. It is the sole responsibility of the bidder to insure that his bid is actually in the office of the Purchasing Manager for the City of Lubbock, before the expiration of the date above first written. a The City of Lubbock will consider the bids on the 26th day of October, 2000, at the Municipal Building, 1625 13th Street, Lubbock, Texas, or as soon thereafter as may be reasonably convenient, subject to the right to reject any or all bids and waive any formalities. The successful bidder will be required to furnish a performance bond in accordance with Chapter 2253, Government Code, in the amount of 100% of the total contract price in the event that said contract price exceeds $100,000 and the successful bidder will be required to furnish a payment bond in accordance with Chapter 2253, Government Code, in the amount of 100% of the total contract price in the event that said contract price exceeds $25,000. Said statutory bonds should be issued by a company carrying a current Best Rating of B or superior. Bidders are required, whether or not a payment or performance bond is required, to submit a cashier's or certified check issued by a bank satisfactory to the City of Lubbock, or a bid bond from a reliable surety company, payable without recourse to the order of the City of Lubbock in an amount not less than 5% of the total amount of the bid submitted as a guarantee that bidder will enter into a contract and execute all necessary bonds (if required) within 10 days after notice of award of the contract to him. 1041 It shall be each bidders sole responsibility to inspect the site of the work and to inform himself regarding all local conditions under which the work is to be done. It shall be understood and agreed that all such factors have been thoroughly investigated and considered in the preparation of the bid submitted. There will be a pre-bid conference on 10th day of October, 2000 at 10:00 o'clock a.m., in the Purchasing Conference Room L04, Lubbock, Texas is Attention of each bidder is particularly called to the schedule of general prevailing rate of per diem wages included in the contract documents on file in the office of the Purchasing Manager of the City of Lubbock, which document is specifically referred to in this notice to bidders. Each bidder's attention is further directed to provision of Article 5159a, Vernon's Ann. Civil St., and the requirements contained therein concerning the above wage scale and payment by the contractor of the prevailing rates of wages as heretofore established by owner in said wage scale. The City of Lubbock hereby notifies all bidders that in regard to any contract entered into pursuant to this advertisement, minority and women business enterprises will be afforded equal opportunities to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, disability, or national origin in consideration for an award. r The City of Lubbock does not discriminate against persons with disabilities. City of Lubbock pre-bid meetings and bid openings are available to all persons regardless of disability. If you would like bid information made available in a more accessible format or if you require assistance, please contact the City of Lubbock Human Relations Office at (806) 775- 2281 at least 48 hours in advance of the meeting. CITY 9F LUBBOC VICTOR KILMAN PURCHASING MAN ER Bid documents may be examined at no charge in the Purchasing Department at 1625 13th Street, Room L-04, Lubbock, Texas 79401; and may be obtained by telephone (806) 775-2167/Fax (806) 775-2164. 1 r_ GENERAL INSTRUCTIONS TO BIDDERS rwa GENERAL INSTRUCTIONS TO BIDDERS 1 BID DELIVERY, TIME & DATE 1.1 The City of Lubbock is seeking written and sealed competitive bids to furnish HODGES COMMUNITY CENTER RENOVATION .- PHASE II per the attached specifications and contract documents. Sealed, bids will be received no later than 3:00 p.m. CST, 18th, at the office listed below. Any bid received after the date and hour specified will be rejected and returned unopened to the bidder. Each bid and supporting documentation must be in a sealed envelope or container plainly labeled in the lower left-hand corner: .• "ITB #236-00/RS, HODGES COMMUNITY CENTER RENOVATION - PHASE 11" and the bid opening date and time., Bidders must also include their company name and address on the outside of the envelope or container. Bids must be addressed to: Victor Kilman, Purchasing Manager City of Lubbock 1625 13th Street, Room L-04 Lubbock, Texas 79401 1.2 Bidders are responsible for making certain bids are delivered to the Purchasing Department. Mailing of a bid does not ensure that the bid will be delivered on time or delivered at all. If bidder does not hand deliver bid, we suggest that he/she use some sort of delivery service that provides a receipt. 1.3 Bids will be accepted in person, by United States Mail, by United Parcel Service, or by private courier service. No bids will be accepted by oral communication, telephone, electronic mail, telegraphic transmission, or telefacsimile transmission. THE CITY WILL NOT ACCEPT FAX BIDS. 1.4 The City of Lubbock reserves the right to postpone the date and time for opening bids through an addendum. 2 PRE-BID MEETING 2.1 For the purpose of familiarizing bidders with the requirements, answering questions, and issuing addenda as needed for the clarification of the Invitation to Bid (ITB) documents, a non -mandatory pre-bid meeting will be held at 1000 a m October 10th in Purchasing Conference Room L04 Lubbock, Texas. All persons attending the meeting will be asked to identify themselves and the prospective bidder they represent. 2.2 It is the bidder's responsibility to attend the pre-bid meeting though the meeting is not mandatory. The x j City not be responsible for providing information discussed at the pre-bid meeting to bidders who do not attend the pre-bid meeting. 04 3 ADDENDA & MODIFICATIONS 3.1 Any changes, additions, or clarifications to the ITB are made by written bid addenda. 3.2 Any bidder in doubt as to the true meaning of any part of the specifications or other documents may request an interpretation thereof from the Purchasing Department. At the request of the bidder, or in the event the Purchasing Department deems the interpretation to be substantive, the interpretation will be made by written addendum issued by the Purchasing Department. Such addendum issued by the +" Purchasing Department will be sent to all bidders receiving the original Invitation to Bid (ITB) and will become part of the bid package having the same binding effect as provisions of the original bid. NO VERBAL EXPLANATIONS OR INTERPRETATIONS WILL BE BINDING. In order to have a request for interpretation considered, the request must be submitted in writing and must be received by the City of Lubbock Purchasing Department no later than five (5) days before the bid closing date. 3.3 All addenda, amendments, and interpretations of this solicitation shall be in writing. The City of Lubbock shall not be legally bound by any amendment or interpretation that is not in writing. Only information supplied by the City in writing or in this ITB should be used in preparing bid responses. All contacts that a bidder may have had before or after receipt of this ITB with any individuals, employees, or representatives of the City and any information that may have been read in any news media or seen or heard in any communication facility regarding this bid should be disregarded in preparing responses. 3.4 The City does not assume responsibility for the receipt of any addendum sent to bidders. 4 EXAMINATION OF DOCUMENTS AND REQUIREMENTS 4.1 Each bidder shall carefully examine all ITB documents and thoroughly familiarize itself with all requirements before submitting a bid to ensure that their bid meets the intent of these specifications. 4.2 Before submitting a bid, each bidder shall be responsible for making all investigations and examinations that are necessary to ascertain conditions and requirements affecting the requirements of this Invitation to Bid. Failure to make such investigations and examinations shall not relieve the bidder from obligation to comply, in every detail, with all provisions and requirements of the Invitation to Bid. 5 BID PREPARATION COSTS 5.1 Issuance of this ITB does not commit the City of Lubbock, in any way, to pay any costs incurred in the preparation and submission of a bid. 5.2 The issuance of this ITB does not obligate the City of Lubbock to enter into contract for any services or equipment. 5.3 All costs related to the preparation and submission of a bid shall be paid by the bidder. 6 TRADE SECRETS CONFIDENTIAL INFORMATION AND THE TEXAS PUBLIC INFORMATION ACT 6.1 If you consider any portion of your bid to be privileged or confidential by statute or judicial decision, including trade secrets and commercial or financial information, clearly identify those portions. 6.2 The City of Lubbock will honor your notations of trade secrets and confidential information and decline to release such information initially, but please note that the final determination of whether a particular portion of your bid is in fact a trade secretor commercial or financial information that may be withheld from public inspection will be made by the Texas Attorney General or a court of competent jurisdiction. In the event a public information request is received for a portion of your bid that you have marked as being confidential information, you will be notified of such request and you will be required to justify your legal position in writing to the Texas Attorney General pursuant to Section 552.305 of the Government. Code. In the event that it is determined by opinion or order of the Texas Attorney General or a court of competent jurisdiction that such information is in fact not privileged and confidential under Section 552.110 of the Government Code and Section 252.049 of the Local Government Code, then such information will be made available to the requester. 6.3 Marking your entire bid CON FIDENTIAUPROPRIETARY is not in conformance with the Texas Open Records Act. 7 LICENSES, PERMITS, TAXES The price or prices for the work shall include full compensation for all taxes, permits, etc. that the bidder is or may be required to pay. 1"- 8 CONFLICT OF INTEREST 8.1 The bidder shall not offer or accept gifts or anything of value nor enter into any business arrangement with any employee, official or agent of the City of Lubbock. 8.2 By signing and executing this bid, the bidder certifies and represents to the City the bidder has not offered, conferred or agreed to confer any pecuniary benefit or other thing of value for the receipt of special treatment, advantage, information, recipient's decision, opinion, recommendation, vote or any other exercise of discretion concerning this bid. 9 CONTRACT DOCUMENTS 9.1 All work covered by the contract shall be done in accordance with contract documents described in the General Conditions. 9.2 All bidders shall be thoroughly familiar with all of the requirements set forth on the contract documents for r the construction of this project and shall be responsible for the satisfactory completion of all work contemplated by said contract documents. 2 10 PLANS FOR USE BY BIDDERS It is the intent of the City of Lubbock that all parties with an interest in submitting a bid on the project covered by the contract documents be given a reasonable opportunity to examine the documents and prepare a bid without charge or forfeiture of deposit. The contract documents, may be examined without charge as noted in the Notice to Bidders. 11 BIDDER INQUIRIES AND CLARIFICATION OF REQUIREMENTS 11.1 It is the intent and purpose of the City of Lubbock that this request permit competitive bids. It shall be the bidder's responsibility to advise the Purchasing Manager if any language, requirements, etc., or any combinations thereof, inadvertently restricts or limits the requirements stated in this ITB to a single source Such notification must be submitted in writing and must be received by the City of Lubbock Purchasing Office no later than five (5) business days before the bid closing date. A review of such notifications will be made. 11.2 NO BIDDER SHALL REQUEST ANY INFORMATION VERBALLY, ALL REQUESTS FOR ; ADDITIONAL INFORMATION OR CLARIFICATION CONCERNING THIS INVITATION TO BID (ITB) MUST BE SUBMITTED IN WRITING NO LATER THAN FIVE (5) BUSINESS DAYS PRIOR TO THE BID CLOSING DATE AND ADDRESSED TO: RON SHUFFIELD, SENIOR BUYER City of Lubbock 1625 13'' Street Lubbock, Texas 79401 Fax: (806) 775-2164 Email: RShuffield@mail.ci.lubbock.tx.us@mail.ci.lubbock.tx.us 12 TIME AND ORDER FOR COMPLETION } 12.1 The construction covered by the contract documents shall be fully completed within TWENTY (20) CONSECUTIVE CALENDAR DAYS from the date specified in the Notice to Proceed issued by the City of Lubbock to the successful bidder. 13 14 15 12.2 The Contractor will be permitted to prosecute the work in the order of his own choosing, provided, however, the City reserves the right to require the Contractor to submit a progress schedule of the work contemplated by the contract documents. In the event the City requires a progress schedule to be submitted, and it is determined by the City that the progress of the work is not in accordance with the progress schedule so submitted, the City may direct the Contractor to take such action as the City deems necessary to insure completion of the project within the time specified. PAYMENT ` All payments due to Contractor shall be made in accordance with the provisions of the General Conditions of the contract documents. AFFIDAVITS OF BILLS PAID The City of Lubbock reserves the right, prior to final acceptance of this project to require the Contractor to execute an affidavit that all bills for labor, materials and incidentals incurred in the construction of the improvements contemplated by the contract documents have been paid in full and that there are no claims pending, of which the Contractor has been notified. MATERIALS AND WORKMANSHIP The intent of these contract documents is that only materials and workmanship of the best quality and grade will be furnished. The fact that the specifications may fail to be sufficiently complete in some detail will not relieve the Contractor of full responsibility for providing materials of high quality and for protecting them adequately until incorporated into the project. The presence or absence of a representative of the City on the site will not relieve the Contractor of full responsibility of complying with this provision. The specifications for materials and methods set forth in the contract documents provide minimum standards of quality, which the Owner believes necessary to procure a satisfactory project. 3 16 GUARANTEES 16.1 All equipment and materials incorporated in the project and all construction shall be guaranteed against defective materials and workmanship. Prior to final acceptance, the Contractor shall furnish to the Owner, a written general guarantee which shall provide that the Contractor shall remedy any defects in the work, and pay for any and all damages of any nature whatsoever resulting in such defects, when such defects appear within ONE year from date of final acceptance of the work as a result of defective materials or workmanship, at no cost to the Owner (City of Lubbock). 16.2 Notwithstanding any provisions contained in the contractual agreement, the Contractor represents and warrants fault -free, performance and fault -free result in the processing date and date -related data (including, but not limited to calculating, comparing and sequencing) of all hardware, software and firmware products delivered and services provided under this Contract, individually or in combination, as the case may be from the effective date of this Contract. Also, the Contractor warrants the year 2000 calculations will be recognized and accommodated and will not, in any way, result in hardware, software or firmware failure. The City of Lubbock, at its sole option, may require the Contractor, at any time, to demonstrate the procedures it intends to follow in order to comply with all the obligations contained herein. 16.3 The obligations contained herein apply to products and services provided by the Contractor, its sub- contractor or any third party involved in the creation or development of the products and services to be delivered to the City of Lubbock under this Contract. Failure to comply with any of the obligations contained herein, may result in the City of Lubbock availing itself of any of its rights under the law and under this Contract including, but not limited to, its right pertaining to termination or default. 16.4 The warranties contained herein are separate and discrete from any other warranties specified in this Contract, and are not subject to any disclaimer of warranty, implied or expressed, or limitation to the Contractor's liability which may be specified in this Contract, its appendices, its schedules, its annexes or any document incorporated in this Contract by reference. 17 PLANS FOR THE CONTRACTOR The contractor will be furnished one set of plans and specifications, and related contract documents for his use during construction. Plans and specifications for use during construction will only be furnished directly to the Contractor. The Contractor shall then distribute copies of plans and specifications to suppliers, subcontractors or others, as required for proper prosecution of the work contemplated by the Contractor. 18 PROTECTION OF THE WORK The Contractor shall be responsible for the care, preservation, conservation, and protection of all materials, =- supplies, machinery, equipment, tools, apparatus, accessories, facilities, and all means of construction, and any and all parts of the work whether the Contractor has been paid, partially paid, or not paid for such work, until the date the City issues its certificate of completion to Contractor. The City reserves the right, after the bids have been opened and before the contract has been awarded, to require of a bidder the following information: (a) The experience record of the bidder showing completed jobs of a similar nature to the one covered by the intended contract and all work in progress with bond amounts and percentage completed. (b) A sworn statement of the current financial condition of the bidder. (c) Equipment schedule. 19 TEXAS STATE SALES TAX 19.1 This contract is issued by an organization which qualifies for exemption provisions pursuant to provisions of Article 20.04 of the Texas Limited Sales, Excise and Use Tax Act. 19.2 The Contractor must obtain a limited sales, excise and use tax permit which shall enable him to buy the materials to be incorporated into the work without paying the tax at the time of purchase. 20 PROTECTION OF SUBSURFACE LINES AND STRUCTURES It shall be the Contractor's responsibility to prosecute the work contemplated by the contract documents in such a way as to exercise due care to locate and prevent damage to all underground pipelines, utility lines, conduits or other underground structures which might or could be damaged by Contractor during the construction of the, project contemplated by these contract documents. The City of Lubbock agrees that it will furnish Contractor the location of all such underground lines and utilities of which it has knowledge. However, such fact shall not relieve 4 the Contractor of his responsibilities aforementioned. All such underground lines or structures cut or damaged by Contractor during the prosecution of the work contemplated by this contract shall be repaired immediately by Contractor to the satisfaction of the City of Lubbock, Texas, at Contractor's expense. 21 BARRICADES AND SAFETY MEASURES The contractor shall, at his own expense, furnish and erect such barricades, fences, lights and danger signals, and shall take such other precautionary measures for the protection of persons, property and the work as may be necessary. The Contractor will be held responsible for all damage to the work due to failure of barricades, signs, and lights to protect it, and when damage is incurred, the damaged portion shall be immediately removed and ,. replaced by Contractor at his own cost and expense. The Contractor's responsibility for maintenance of barricades, signs, and lights shall not cease until the date of issuance to Contractor of City's certificate of acceptance of the project. ,., 22 EXPLOSIVES 22.1 The use of explosives will not be permitted unless written permission to do so is obtained by the Contractor from the City. In all cases where written permission is obtained for the use of explosives, the Contractor shall assume full responsibility for all damage, which may occur as a direct or indirect result of the blasting. In addition, in all cases where explosives are authorized to be used, the Contractor shall use utmost care so as not to endanger life or property and the Contractor shall further use only such methods as are currently utilized by persons, firms, or corporations engaged in similar type of construction activity. 22.2 Explosive materials shall not be stored or kept at the construction site by the Contractor. 22.3 In all cases where explosives are to be used during the construction of the project contemplated by this .:contract, it shall be the duty of the Contractor to notify each utility company having structures (above or below the ground) in proximity to the site of the work of Contractor's intention to use explosives, and such notice shall be given sufficiently in advance to enable the companies to take such steps as they may deem necessary to protect their property from injury. Such notice, however, shall not relieve the '"` Contractor of responsibility for any damage resulting from his blasting operations. 23 CONTRACTOR'S REPRESENTATIVE The successful bidder shall be required to have a responsible local representative available at all times while the work is in progress under this contract. The successful bidder shall be required to furnish the name, address and telephone number where such local representative may be reached during the time that the work contemplated by this contract is in progress. 24 - INSURANCE 24.1 The Contractor shall not commence work under this contract until he has obtained all insurance as required in the General Conditions of the contract documents, from an underwriter authorized to do business in the State of Texas and satisfactory to the City. Proof of coverage shall be furnished to the City and written notice of cancellation or any material change will be provided ten (10) days in advance of cancellation or change. All policies shall contain an agreement on the part of the insurer waiving the right to subrogation. The Contractor shall procure and carry at his sole cost and expense through the life of this contract, insurance protection as hereinafter specified. Coverage in excess of that specified herein also shall be acceptable. Such insurance shall be carried with an insurance company authorized to transact business in the State of Texas and shall cover all operations in connection with this contract, whether performed by the Contractor or a subcontractor, or separate policies shall be provided covering the operation of each subcontractor. A certificate of insurance specifying each and all coverage's shall be submitted before contract execution. 24.2 The insurance certificates furnished shall name the City as an additional insured, or in the alternative, shall be accompanied by a statement from the Contractor to the effect that no work on this particular project shall be subcontracted. It shall be the contractors responsibility to provide ell to the owner all proof of coverage insurance documents including workers compensation coverage for each subcontractor. 25 LABOR AND WORKING HOURS 25.1 Attention of each bidder is particularly called to the schedule of general prevailing rate of per diem wages included in these contract documents. The wage rate that must be paid on this project shall not be less than specified in the schedule of general prevailing rates of per diem wages as above mentioned. The 5 bidders' attention is further directed to the requirements of Article 5159a, Vernon's Annotated Civil Statutes providing for the payment of the wage schedules above mentioned and the bidder's obligations thereunder. The inclusion of the schedule of general prevailing rate of per diem wages in these contract documents does not release the Contractor from compliance with any wage law that may be applicable. Construction work under this contract requiring an inspector will not be performed on weekends or holidays unless the following conditions exist: 26.1.1 The project being constructed is essential to the City of Lubbock's ability to provide the necessary service to its citizens. 26.1.2 Delays in construction are due to factors outside the control oftheContractor. The Contractor is approaching the penalty provisions of the contract and Contractor can show',he has made a diligent effort to complete the contract within the allotted time. 25.2 Before construction work requiring an inspector is to be performed on weekends or holidays, the Contractor must notify the Owner's Representative not less than three full working days prior to the weekend or holiday he desires to do work and obtain written permission from the Owner's Representative to do such work.. The final decision on whether to allow construction work requiring an inspector on weekends or holidays will be made by the -Owner's Represent atve.y 25.3 In any event, if a condition should occur or arise at the site, of this project or from the work being done under this contract which is hazardous or dangerous to property or life, the Contractor shall immediately commence work, regardless of the day of the week or the time of day, to correct or alleviate such condition so that it is no longer dangerous to property or life. 26 PAYMENT OF EMPLOYEES AND FILING OF PAYROLLS The contractor and each of his subcontractors shall pay each of h?e . , pl a�e _N. .o...�. �� -���_ . .� }� b is employees engaged in work on the project under this contract in full (less mandatory legal deductions) in cash, or by check readily cashable without discount, not less often than once each week. The Contractor and each of his subcontractors engaged at the site of the work shall not later than the seventh day following the payment of wages, file with the Owner's Representative, or Engineer, a certified, sworn, legible copy of such payroll. This shall contain the name of each employee; his classification, the number of hours worked on each day, rate of pay, and net pay. The affidavit shall state that the copy is a true and correct copy of such payroll, that no rebates or deductions (except as shown) have been made, or will in the future be made from the wages paid as shown thereon. The Contractor, must classify employees according to one of the classifications set forth in the schedule of general prevailing rate of per diem wages, which schedule is included in the contract documents. The Contractor shall forfeit as a penalty to the City of Lubbock on whose behalf this contract is made, ten dollars for each laborer, workman, or mechanic employed for each calendar day, or portion thereof, such laborer, workman or mechanic is paid less than the wages assigned to his particular classification as set forth in the schedule of general prevailing rate of per diem wages included in these contract documents. 27 PROVISIONS CONCERNING ESCALATION CLAUSES Bids submitted containing any conditions which provide for changes in the stated bid price due to increases or decreases in the cost of materials, labor or other items required for the project will be rejected and returned to the bidder without being considered. 28 PREPARATION FOR BID 28.1 The bidder shall submit his bid on forms furnished by the City. All blank spaces in the form shall be " correctly filled in and the bidder shall state the price both in words and, numerals, for which he intends to do the work contemplated or furnish the materials required. Such prices shall be written in ink, distinctly and legibly, or typewritten. In case of discrepancy between the price written in words and the price written ._ in figures, the price written in words shall govern. 28.2 If the bid is submitted by an individual, his name must be,signed by him or his duly authorized agent. If a bid is submitted by a firm, association, or partnership, the name and address of each member must be given and the bid signed by a member of the firm, association or partnership, or person duly authorized. If the bid is submitted by a company or corporation, the company or corporate name and business address must be given, and the bid signed by an official or duly authorized agent. Powers of attorney authorizing agents or others to sign bids must be properly certified and must be in writing and submitted with the bid. The bid shall be executed in ink. 6 28.3 Each bid shall be enclosed in a sealed envelope, addressed as specified in the Notice to Bidders, and endorsed on the outside of the envelope in the following manner: ' 28.3.1 Bidder's name 28.3.2 Bid for (description of the project). 28.4 Bid submittals may be withdrawn and resubmitted at any time before the time set for opening of the bids, but no bid may be withdrawn or altered thereafter. 29 BOUND COPY OF CONTRACT DOCUMENTS k Bidder understands and agrees that the contract to be executed by bidder shall be bound and include the following: (a) Notice to Bidders. (b) General Instructions to Bidders. - ~ (c) Bidder's Submittal. (d) Statutory Bond (if required). (e) Contract Agreement. (f) General Conditions. (g) Special Conditions (if any). (h) Specifications. (i) Insurance Certificates. ,� Q) All other documents made available to bidder for his inspection in accordance with the Notice to Bidders. If Plans and Specifications are too bulky or cumbersome to be physically bound, they are to be considered incorporated by reference into the aforementioned contract documents. 30 QUALIFICATIONS OF BIDDERS The bidder may be required before the award of any contract to show to the complete satisfaction of the City of Lubbock that it has the necessary facilities, ability, and financial resources to provide the service specified therein ^�=in a satisfactory manner. The bidder may also be required to give a past history and references in order to satisfy the City of Lubbock about the bidder's qualifications. The City of Lubbock may make reasonable investigations deemed necessary and proper to determine the ability of the bidder to perform the work, and the bidder shall Ala furnish to the City of Lubbock all information for this purpose that may be requested. The City of Lubbock reserves the right to reject any bid if the evidence submitted by, or investigation of, the bidder fails to satisfy the City of Lubbock that the bidder is properly qualified to carry out the obligations of the contract and to complete the work described therein. Evaluation of the bidder's qualifications shall include: (a) The ability, capacity, skill, and financial resources to perform the work or provide the service required. (b) The ability of the bidder to perform the work or provide the service promptly or within the time specified, without delay or interference. (c) The character, integrity, reputation, judgment, experience, and efficiency of the bidder. (d) The quality of performance of previous contracts or services. 31 BID AWARD 31.1 The City of Lubbock reserves the right to reject any or all bids, reject any particular item on a bid, and to waive immaterial formalities and to accept the offer most advantageous to the City of Lubbock in its sole discretion. Unless otherwise specified herein, the City shall award the bid based on the total Lump Sum Bid. 31.2 All bids are evaluated for compliance with specifications before the bid price is considered. Response to specifications is primary in determining the best low bid. Failure to comply with the specifications may result in disqualification of the bid. 31.3 In case of tie bids, preference will be given to local bidders. Consistent and continued tie bidding may be cause for rejection of bids by the City of Lubbock and/or investigation by the Attorney General to determine possible Anti -Trust violations. 31.4 Before the City may award a bid to a nonresident bidder, the nonresident bidder's bid must be lower than lowest bid submitted by a responsible Texas bidder by the same margin or amount that a Texas bidder would be required to underbid the nonresident bidder in the nonresident bidders' home state. 31.5 Any contract made, or purchase order issued, as a result of this Invitation to Bid, shall be entered into the State of Texas and under the laws of the State of Texas. In connection with the performance of work, the Bidder agrees to comply with the Fair Labor Standard Act, Equal Opportunity Employment Act, and all _ other applicable Federal, State, and Local laws, regulations, and executive orders to the extent that the same may be applicable. - 31.6 NO INDIVIDUAL OF ANY USING DEPARTMENT HAS THE AUTHORITY TO LEGALLY AND/OR FINANCIALLY COMMIT THE CITY TO ANY 'CONTRACTo AGREEMENT OR PURCHASE ORDER FOR GOODS OR SERVICES, UNLESS SPECIFICALLY SANCTIONED BY THE REQUIREMENTS OF THIS INVITATION TO BID. 8 BID SUBMITTAL BID SUBMITTAL LUMP SUM BID CONTRACT ,wo* DATE: 10-18-00 PROJECT NUMBER: #236-00/RS - HODGES COMMUNITY CENTER RENOVATION . PHASE 11 Bid of Art Cuevas Construction, Inc (hereinafter called Eidder) To the Honorable Mayor and City Council City of Lubbock, Texas (hereinafter called Owner) Gentlemen: The Bidder, in compliance with your Invitation to Bid for the construction of a HODGES COMMUNITY' CENTER RENOVATION -PHASE II having carefully examined the plans, specifications, instructions to bidders, notice to bidders and all other related contract documents and the site of the intended work, and being familiar with all of the conditions surrounding the construction of the intended project including the availability of materials and labor, hereby intends to furnish all labor, materials, and supplies; and to construct the project in accordance with the plans, spec cations and contract documents, within the time set forth therein and at the price stated below. The price to cover all expenses incurred in performing the work required under the contract documents. MATERIALS: Twelvethousand Five hundred thirty &00/100 _($_12,530.00 ) SERVICES: Eighteen thousand seven hundred nintyfour & ($ 18,794.00 ) TOTAL BID: thirtvone thousand three hundred twenty four($ 31,324.00 ) (Amount shall be shown in both words and numerals. In case of discrepancy, the amount shown in words shall govern.) Bidder hereby agrees to commence the work on the above project on or before a date to be specified in a written "Notice to Proceed" of the Owner and to fully complete the project within 20 (TWENTY) consecutive calendar days thereafter as stipulated in the specifications and other contract documents. Bidder hereby further agrees to pay to Owner as liquidated damages the sum of $500.00 (FIVE HUNDRED DOLLARS) for each consecutive calendar day in excess of r- the time set forth herein above for completion of this project, all as more fully set forth in the general conditions of the contract documents. r Bidder understands and agrees that this bid submittal shall be completed and submitted in accordance with instruction number 28 of the General Instructions to Bidders. Bidder understands that the Owner reserves the right to reject any or all bids and to waive any formality in the bidding. The Bidder agrees that this bid shall be good and may not be withdrawn for a period of thirty (30) calendar days after the scheduled closing time for receiving bids. The undersigned Bidder hereby declares that he has visited the site of the work and has carefully examined the plans, specifications and contract documents pertaining to the work covered by this bid, and he further agrees to .commence work on or before the date specified in the written notice to proceed, and to substantially complete the work on which he has bid; as provided in the contract documents. Bidders are required, whether or not a payment or performance bond is required, to submit a cashier's check or check issued by a bank satisfactory to the City of Lubbock, or a bid bond from a reliable surety company, payable recourse to the order of the City of Lubbock in an amount not less than five percent (5%) of the total amount of the miffed as a guarantee that bidder will enter into a contract, obtain all required insurance policies, and execute all ary bonds (if required) within (ten) 10 days after notice of award of the contract to him. Enclosed with this bid is a Cashier's Check or Certified Check for s ($ 1 or a Bid Bond_in the sum of Dollars which it is agreed shalt be collected and retained by the Owner as`liquidated damages in the .The bid is accepted by the Owner and the undersigned fails to execute the necessary contract documents, ance certificates, and the required bond (if any) with the Owner within ten (10) days after the date Qf receipt -itten notification of acceptance of said bid; otherwise, said check or bond shall be returned to the srsigned upon demand. Bidder understands and agrees that the contract to be executed by Bidder shall be bound and include all contract iments made available to him for his inspection in accordance with the Notice to Bidders. ursuant to Texas Local Government, Code 252 043(a), a ompetitive sealed bid that has been opened may not be ;hanged for the purpose of correcting an error in the bid 3rice. Therefore, any corrections to the, bid price must be made on the Bid Submittal form prior to bid opening. (Seal if Bidder is a Corporation) ATTEST: ' n A7 Secre— Bidder acknowledges receipt of the following addenda: Addenda No. Date 1 a Addenda No. Date Addenda No. Date Addenda No. Date MlWBE Firm: 2 Date: ! O%B 1 .. o 9-c c� -q,Q Au i ed Signature 7e ta<,- Cwf-VA (Printed or Typed Name) Comoan� Address,�— c►ty, �ea-(/ Sta a Zip Code -r Telephone: 0 6 - �m °'Q Fax: 80 (o - $"- , b- o City of Lubbock PURCHASING DEPARTMENT ROOM L04, MUNICIPAL BUILDING 1625 13TH STREET LUBBOCK, TEXAS 79401 PH: (806)775-2167 FAX:(806)775-2164 http://purchasing.ci.lubbock.tx.us ITB #00-236, Addendum #1 ADDENDUM #1 ITB #00-236 Hodges Community Center Renovation -Phase 11 MAILED TO VENDOR: October 12, 2000 CLOSE DATE: October 18, 2000 @ 3:00 P. M. The following items take precedence over specifications for the above named Invitation to Bid (ITB). Where any item called for in the ITS; documents is supplemented here, the original requirements, not affected by this addendum, shall remain in effect. 1. On the Drawings, LEGEND, New Rubber Base and Painted Trim has been changed to read: "New Rubber Base and/or Painted Trim". 2. In the Specifications, Page 26, WALLS, change "Mariite" to read "FRP" material. 3. On the Drawings, East Vestibule (109) shall be included for "Painted Trim -added". 4. In the Specifications, Page 26, WALLS, the clarification shall be noted that if the wall covering (Sound Soak) equal to (Surfaces -Omega) does not make a bend without cutting the material at the corners, the corner trim will be necessary. Otherwise, if the material can wrap around the comers, the comer trim can be omitted. 5. On the Drawings, the room numbers are as follows: Entry -101 Center Hall -102 North Hall -103 Office -104 Golden Room -105 Storage Closet -106 Kitchen -107 Social Hall -108 East Vestibule -109 Main Corridor -110 Phone Booth -111 Mechanical Room Hall -112 All requests for additional information or clarification must be submitted in writing and directed to: Questions may be faxed to or Email to: 00-236add1 10, Ron Shuffield, Senior Buyer City of Lubbock P.O. Box 2000 Lubbock, Texas 79457 (806)775-2164 RshWeId@m9fl.ci.Iubbock.tx.us HANK OU, CITY OF LUBBOCK Ron Shuffield Senior Buyer PLEASE RETURN ONE COPY OF THIS ADDENDUM WITH YOUR BID. 0 IU/ lb/ UU UU,OU 1•A3 lbUU7U4Vl9(J DAVID '!.,VfE INS to 01 :l;.. r, ryr$: riF....�y: .::>.. ..'')'':>:r• :i.l,�'•.<%>,.n(•,:w^': �4.:v:r{:.:..,.y,.�; :}7?"x•.F'Se,::>:..A:•xf'S.•. Ike .! S •T lav �.nN.R.vi.f. /i: ,..i•5 �.•:..N:ip+:n?i •'i'•• •x•: ■ ':t•• '•'x^ i:• 'a i<g9Wala�o-Yi;>.,r•+Cr :>:•.'.. x•s:.,>,.,:z:�:,.'•>i•:'•,C:}•s� �N �lI.i11,r R.. •e:'�1/'�o-:�':• r;x•> ;,.xn•<..u«:<u.�«,,{..w n , h f x' .s: �.:nx.w„r rs�!x•xa iE (M���/y�� v. i)):{:: M>:4x.:4:R554f,?�K; ::<v:..xn:ae n..:.x.,• r:.:•.: M• >�•. ,_ +:",";flx x..:.u:<.aMsa.s<,rw:.:x>sya.., {� ir<a*F�. Sy., ;:<a •x•: x.xx• .....:. �.::L:Lw r w>.xn?.... .n.n•.x y PROTLUCER..•.:..I: •I.ir: : O R:.:,•iF . r :.n.K•4My4'..%.w,rAJ... J%�SaK..:Zv!{••:I:nJ%yP •� • . . . •%n x a "`>ir• x.,•.:::�s:2i.°„�iaY,�'.a,ia •%:`.��:i..a.x?.Mxo� >i�,>a46? DAVID TATE INSURANCE AGENCY IS <' F •:r. ;> 10/17/00 •'>x..n: CERTIFICATE !S ISSUED AS A MATTER CIF INFORMA h 5233 79TH AND CONFERS NO RIGFfrS UPON THE CERTIFICATE CERATF. DOES NOT ED OF ALTER THE THIS q AFFORDED BY THE POUCIES LOW, LUBBOCK TX 79424 COMPANIES AFFORDING COVERAGE (806) 794-1177 COMPANY — A COMMERICAL CASUALTY INSURANCE CO ILIsuREp •- . . COWANY Art Cuevas Construction Inc. a 7406 8 3rd COMPANY C Lubbock TX 79424 COMPANY B06 866-9000 D �>i:�(y�t,�y1 K�7..r:�i a'i�'!>t t�s':.Y'•.�}:�'�.•: ,.:i �. RS^ :L35{i;6:y:, ::4w. rn• ,i►W7T.>1:1A. .. �•:: ::>e� . ,>:x> <F ii £kx: Si .• •,:r'i;Y•:;,T..:Af:! ':i>�..,,..';.»n •:•r••: :.,yn>s. x.:....r..•>xr. rY.L .. •:'.••u:,e:.iJi:v :x. r)a•;i:.ii: „f, Ty;•'.ry...: a6. � v.. •.aea j1..� :'«'<Y,...xs:,:<.Ms>,x.,r`ay >•ii'ti.:.6a Aki::i+i:i:ja:yxai.'vG�G;$ ..,<.w:•nso>. .,a . ' s • •..L:..s:v ivi»i<:w,.�a:.:s' Sys •,ose a •t„": .>s<..:.':,ikk•.:w: .•.'sC ..,:,:,a414w;.: a } s4:>:: t::a<>arvtka"M`o.. .. ... ..,•. S e' . w•.:v: > uw» , a.won:a..c.% x.w> ni3!3.: x.,a:�:4%S.4>Fk .e; 7!•?::.74"k:?.iwa o's3x0Af7Xkx ?:xshxi i i � ?r» .'+abs THIS 13 TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOWBELOWHAVE Il BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITNBTANDING ANY REOUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RgapECT TO wH)CH THIS CERTIFICATE MAY 13E ISSUED OR MAY PERTAIN, THU INSURANCE AFFORDHD BY THE POLICIES DESCRIBED HEREIN IS SUBJECT To ALL THE TER EXCLUSIONS AND CONDITIONS OF SUCH 061 -mg i ILtRC QU^%AfAI AAnv uwlm_ .r........ __ _., _.._ _.. __ __ WAIVER OF SUBROGATION 'ON^ryWORK COMP IN FAVOR OF CITY OF LUBBOCK , .rx.±}�•t� .. fix.:-rr.,}� '{..• ;.> •>:^>n•: •.�......, . �1':' '::�:.r �.?al:�,:<:pY:Ga:<:>w �.I' iL'J.Q�,11}i..V:y.;. n}'.:,+5^">:•:: •.' ,<4„v:n•MR: <<::: •!:•':, y `?\riv,) ..::;i..K�;.:ai:.. ::.R.xw.in•sM�i..;.nax<ott:«<e:<•sh }4C. y: .w'a�:w ri.:°s4, M.:<• �,<.:r,^S:.<i�a>�"�<Y�^^ sw••.:.sa.:,• ,.r,e.�w`� adb:i�:lsf: w �4Mss'�1'ed9>sa•xP:A:.'^.�.a�:.ro'x':ski*�"`ocwd 3°•"'.:. �`�' SHOULD ANY OF THE ABOVE Of•6CRIBED POLICIES BE CANCELLta UMM THE> EXPIRATION DATE THEREOF, THE w&U1NQ WILL LL ENDEAVOR To MAIL BOX 140 00 ICE CITY LUBBOCK 10 DAYS WRITTEN NOTTO THE CERTIFICATE HOLDER NAN® To TM LEFT, 0 BVT FAIIPE TO MAIL SUCH NOTICE SHALL It;IPOSE NO OBIJQATION OR LLABIUTY LUH90CIC F `TEXAS 79452 OF ANY KIINQ UPON THE QQMPANY. ITS AOFUTR RA N*Dm .M- -- .. ..... •• ••— �—_.- r.��vvr•r .w. . �.Y YtJ111fIV- LTH tiYl°EOFINSURANCE POUCYNUms" POLICY EFFECTIVE DATE (MM E111 7 POLICY EXPIRATION DATE (MMIDD^ LLNITE QENERALLIABILITY COMMER� IAL GENS IAL LIABILITY CLAMMS MADE r / / / / GENERAL AGGREGATE f PRODUCTS - COMP/OP AGG : PERSONAL s ADV INJURY _ 'f OCCUR OWNER'S & CONTRACTOR'S PROT� EACH OCCURRENCE Il FIRE DAMAGE (Any one IiN) i MED EV (Any one Ommon) i AUTOMOSLLE LL4BUM ANY AUTO I / / / / / COMBINED SINGLE LIMIT y ALL OWNED AUTOS I INJURY (Por Pereoa) f SCHEDULED AUT08oODILY . HIRED AUTOS I NON -OWNED AUTOS I 5(F%cddanqYINJURY Pw a E PROFERTY DAMAGE f QANAQE LIABILITY ANY Auto AUTO ONLY- EA AWDENT i OTHER THAN AUTO ONLY: EACH ACGDENT f AGGAEMATE $ !7(CESS LIALIILITY UM6pELLA FORM OTHER THAN UMBRELLA FGAM I EACH OCCURRENCE i A4oR>=GATE a f A womERs coMPENBATION ANDO-L • LL18lUTYPRItrTQq/ X F18 RO TROOFTHE a PAATNERsAamCUTNINCLE O�S ARE excL OTHER THER J 10 5 4 3 7 0 n I 04/27/00 04/27/01 { STATUTORY LI111i5 EACH ACCIDENT $600000 _ DISEASE - POLICY UMMIT 6500000 DWE48E - EACH 61ePLOYEE x 5 0 0 0 0 0 WAIVER OF SUBROGATION 'ON^ryWORK COMP IN FAVOR OF CITY OF LUBBOCK , .rx.±}�•t� .. fix.:-rr.,}� '{..• ;.> •>:^>n•: •.�......, . �1':' '::�:.r �.?al:�,:<:pY:Ga:<:>w �.I' iL'J.Q�,11}i..V:y.;. n}'.:,+5^">:•:: •.' ,<4„v:n•MR: <<::: •!:•':, y `?\riv,) ..::;i..K�;.:ai:.. ::.R.xw.in•sM�i..;.nax<ott:«<e:<•sh }4C. y: .w'a�:w ri.:°s4, M.:<• �,<.:r,^S:.<i�a>�"�<Y�^^ sw••.:.sa.:,• ,.r,e.�w`� adb:i�:lsf: w �4Mss'�1'ed9>sa•xP:A:.'^.�.a�:.ro'x':ski*�"`ocwd 3°•"'.:. �`�' SHOULD ANY OF THE ABOVE Of•6CRIBED POLICIES BE CANCELLta UMM THE> EXPIRATION DATE THEREOF, THE w&U1NQ WILL LL ENDEAVOR To MAIL BOX 140 00 ICE CITY LUBBOCK 10 DAYS WRITTEN NOTTO THE CERTIFICATE HOLDER NAN® To TM LEFT, 0 BVT FAIIPE TO MAIL SUCH NOTICE SHALL It;IPOSE NO OBIJQATION OR LLABIUTY LUH90CIC F `TEXAS 79452 OF ANY KIINQ UPON THE QQMPANY. ITS AOFUTR RA N*Dm .M- OCT -18-1900 08:14 FROM ACORD S}ta".•s:<;''A�4M>;....:•:m::nsst�t...ue6>iyiki;�R� Bledsoe insurance Agency, Inc. 5143 69th Street P.O. Box 65028 Lubbock, TX 79464 ONLY TO 8665100 P.01 DATE (MMMONY) Job: Hodges Community Center - Phase II k - City of Lubbock Po Box 2000 Mw Lubbock, TX 79457 ............... _....n..v vnwncv.'f5`'IiRI:RM[43R3iiiR�i� SHOULD ANY OF THE ABOVE DROMBED POWES tat? CANCELL99 WON THE EXPIRATION DATE THEREOF. TME McVIN6 CpMPANY V"LL. ETIDEAYOR TO MAIL DAYS WRITTEN NOTICE To THE CUMPICATE HOLDER NAMED TO TlW LEFT. BUT FAtwlT TO MAIL MOTICE $HART. IMPOgE No WL"110H OR LIASIUTY TnT0i P 611 i cANY INsuRED I A Maryland Casualty Co. Art Cuevas Construction, Inc. QQWANY O.Securitv National Ins. Co. 7406 83rd St Lubbock, TX 79424 COmy c WMDPANY . s..�kx�Sswµ��tt�est,tge 4�',%.n . ^ THIS IS TO CERTIFY lt� .a�'r�h��`'; tuna ' u "� "k '. THAT THE POLICIES OF INSURANCE; LISTED SCLOW HATE BEEN IISSUEb TO THE INSURED NAMW ABOVE FOR T YPEER_IO INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE OF ANY CONTRACT OR OTHER DOCUMENT WITH RESSPEOT TO WHICH THIS AFFORDED BY THE POLICIES. DESCF48ED HEREIN I$ SUBJECT TO ALL THE TERM$, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY NA BEEN REDUCED BY PAID CLAIMS Yp TYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE POLICY EXPIRATION DATE (MM/DD/YY) DATE (MIAMD/M LIMITS GENERAL LIABILITY A X COMMEROfAt OENF_RAL LIA91LIT1' $ CP 3 0 7 3 4 7 2 6 12/20/00 • S 2 000 C PAc�aucrs.co,�,ProssAGC m -m12/20/9 xQ o=wt : 2 000 C SR'S & ONT OWNgR'S B ODIVTR4GCORTi PMT SAL a Aw INJURY : 1000010 EA0H =UaRENOE S COO 0 RRE OAMACR(:• ons Arel E 50,0 AVT MQeILE UAeIUrf MEO EXP (Any one i 0 0 B X AIYYAum } TCA298807908/19/99 08/Z9/00 COMBINDSINGLE LIMIT t ALL OWNED AUTOS 5 0 o 0 &CNEDULEDAUTCS Saxy 74JURYS HIRED AUTOS NON OWNED AUTOS IL YDN� a .�, PPADMTYDAMAGE Ia OARAQE LIABILITY ANYAUTO AUTQONLY.FAA AtY�IDMT S �~ EACH A0006NT $ EXCEUL"ILITY AGGAEQAM $ UMBRELLA FORM / / / / EACI..000URaRE v_,g y y AGGREGATE ww OTHER THAN UMBRELLA FORM WORYMS COMP09ATION AND 8 —•— EMPLOYERB' LIABILITYA THE PROPPIE'fM INCL EL EAON AOCIDEN7 t Owl PAWNEF$MXffCUTIVE neMIP fff .- ._. � _ EL DLSGASF. DMI r -v i R&P w Job: Hodges Community Center - Phase II k - City of Lubbock Po Box 2000 Mw Lubbock, TX 79457 ............... _....n..v vnwncv.'f5`'IiRI:RM[43R3iiiR�i� SHOULD ANY OF THE ABOVE DROMBED POWES tat? CANCELL99 WON THE EXPIRATION DATE THEREOF. TME McVIN6 CpMPANY V"LL. ETIDEAYOR TO MAIL DAYS WRITTEN NOTICE To THE CUMPICATE HOLDER NAMED TO TlW LEFT. BUT FAtwlT TO MAIL MOTICE $HART. IMPOgE No WL"110H OR LIASIUTY TnT0i P 611 THE AMERICAN INSTITUTE OF ARCHITECTS AIA Document A310 APR Bid Band ART CUEVAS CONSTRUCTION, INC. KNOW ALL MEN BY THESE PRESENTS, that we 7406 83rd Street, Lubbock TX 79424 r■* as Principal, hereinafter called the Principal, and MERCHANTS BONDING COMPANY (MUTUAL) 2100 Fleur Dr., Des Moines IA 50321-1158 a corporation duly organized under the laws of the State of Iowa as Surety, hereinafter called the Surety, are held and firmly bound unto CITY OF LUBBOCK, TEXAS as Obligee, hereinafter called the Obligee, in the sum of FIVE PERCENT OF THE GREATEST AMOUNT BID Dollars {$ 5 % G-4.11.) for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, The Principal has submitted a bid for HODGES COMMUNITY CENTER RENOVATION — PHASE H NOW. THEREFORE, If the Obligee shall accept the bid of the Principal and the Princloal shall enter into a Contract with the Obligee in accordance with the terns of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of fad and meterlat fumished in the prosecution thereat, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the Prindpal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified In said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said bid, then this obiigation shall be null and void, otherwise to remain in fud faro: and effect. Signed and sealed this 18th MUMS) day of October , 2000 ART CUEVAS CONSTRUCTION, INC. (pr++wow)) (sew) M«>; (M2RCHANTS BONDING COMPANY (MUTUAL) owe) AIA D=MINT A310, BID UMD . AIA 0. FEBRUARY Wo ED , THE AMER CANNSTiTUT111 OR ARCHrrECT8, 1736 Ha Y. AVE., NX, YIIASMINC-MN. D.C. 20006 PM wATSON1IBM H, INC. Richardson. Texas Merchants Bohding- Company (MUTUAL) POWER OF ATTORNEY Know All Persona By These Presents, that the MERCHANTS BONDING COMPANY (MUTUAL), a corporation duly organized under the laws of the State of Iowa, and having its principal office In the City of Des Moines, County of Polk, Slate of Iowa, hath made. constituted and appointed, and does by these presents make, constitute and appoint Larry Tr =m Smith of Lubbock and State of Tues its true and lawful Attorney -in -Fact, with full power and authority hereby conferred in its name, place and stead, to siert, execute, acknowledge and deliver in its behalf as surety any and all bonds, undertakings, recognizances or other written obligations in the nature thereof, subject to the limitation that any such instrument shalt not exceed the amount of: THREE MILLION (=3,000,000.00) DOLLARS find to bind the MERCHANTS BONDING COMPANY (MUTUAL) thereby as fully and to the same extent as if such bond or undertaking was signed by the duly authonzed officers of the MERCHANTS BONDING COMPANY (MUTUAL), and all such act$ of $aid Attorney-in-fact, pursuant to the authority herein given, are hereby ratified and confirmed. This Power-of-Attomey is made and executed pursuant to and by authonty of the following Amended Subslituted and Restated By -Laws adopted by the Board of Directors of the MERCHANTS BONDING COMPANY (MUTUAL) on October 3, 1992. ARTICLE II, SECTION a. —The Chairman of the Board or President or any Vice President or Secretary shall have power and author• ity to appoint Attorneys -in -Fact, and to authorize them to execute on behalf of the Company, and attach Inc Seal of the Company thereto, bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereat, ARTICLE II, SECTION H. — The signature of any authorized officer and the Seal of the Company may be affixed by facsimile to any Power of Attorney or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the Company, and such signature and seat when so used shall have the same force and effect as though manually fixed. in Witness Whereof, MERCHANTS BONDING COMPANY (MUTUAL) hag mused these presents to be signedtry its President and its corporate seat to be hereto affixed, this 2-nd day of June , 2000. •.oftoo •�• X011 Cpl•.• ON, 011 1L 1933 C; STATE OF IOWA COUNTY OF POLK as. MERCHANTS BONDING COMPANY (MUTUAL) By /-` - v 7 � Pmvwni On this 2nd day of .dine 2000 before me appeared tarry Taylor, to me personally known, who being by me duly swam did say that he is President of the MERCHANTS BONDING COMPANY (MUTUAL), the corporation described in the foregoing Instrument, and that the Seal affixed to the Said instrument is the Corporate Seal of the said Corporation and that the said Instrument was signed and sealed In behalf of said Corporation by authority of its Board of Directors. In Testimony Whereof, I have hereunto sat my hand and affixed my Offidal Seal et the City of Des Moines, Iowa, the day and yoar first above written. • t.' McC '4C� •see x : Notary Pueltc, Polk Countff Iowa �• IOWA ; 40. STATE OF IOWA •.• , ► A� .•• 1Rek COUNTY OF POLK sa • • oleo & @ • •• I, Witham Warner, Jr, Secretary of the MERCHANTS BONDING COMPANY (MUTUAL), do hereby cartify that the above and foregoing Is a true and correct copy of the POWER -0F -ATTORNEY, executed by said MERCHANTS BONDING. COMPANY (MUTUAL), which is still In force and OWL .... In Witness Whereof, I have hereunto suet my hand and allured the Seal of the Company on this l8 y ofD�� •i5, . Cad••. Mao 041+4 IZAef 1933' '•bt•��t.' •\'\tee° COMPLAINT NOTICE: Should any dispute arise about your premium or about a claim that you have filed, write to the company that issued -^ the bond or policy. If the problem is not resolved, you may also write to the State Board of Insurance, P.O. Box 149091, Austin, Texas 78714-9091, Fax # (512) 475-1771. This notice of complaint procedure is for information only and does not become a part or condition of this bond or policy: MSC 0838 rA. PAYMENT BOND BOND CHECK f BEST RATING LICENSEV IN TEXAS DATEN 2� as Bya� �.. TEXAS STATUTORY PAYMENT BOND (PUBLIC WORKS) BOND NO. TXC 1818 KNOW ALL MEN BY THESE PRESENTS: THAT, ART CUEVAS CONSTRUCTION, INC., 7406 83'd St. Lubbock TX 79424 , (hereinafter called the Principal), as Principal, and MERCHANTS BONDING COMPANY (MUTUAL) , a corporation organized and existing under the laws of the State of Iowa licensed to do business in the State of Texas and admitted to write bonds, as surety, (hereinafter called the Surety), are held and firmly bound unto CITY OF LUBBOCK P.O. Box 2000, Lubbock TX 79457 , (hereinafter , called the Obligee), in the amount of THIRTY ONE THOUSAND, THREE HUNDRED TWENTY FOUR AND 00/100 Dollars ($ 31,324.00 ) for the payment whereof, the said Principal and Surety bind themselves, and their heirs, administrators, executors, successors, and assigns, jointly and severally, firmly by these presents. WHERE AS, the Principal has entered into a certain contract with the Obligee, dated the 7th day of November 2000 for •• BID NO. 236-00/RS - HODGES COMMUNITY CENTER RENOVATION, PHASE II , which contract is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein. NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, That if the said Principal shall pay all claimants supplying labor and material to him or a subcontractor in the prosecution of the work provided for in said contract, then this obligation shall be null and void; otherwise to remain in full force and effect; PROVIDED, HOWEVER, That this bond is executed pursuant to the provisions of Chapter 2253 of the Texas Government Code and all liabilities on this bond shall be determined in accordance with the ,.. provisions, conditions and limitations of said Chapter to the same extent as if it were copied at length herein. this IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this instrument 7th day of November 2000 PRINCIPAL: ART CUEVAS CONSTRUCTION, INC. BY: 0 Lo D� SURETY: MERCHANTS BONDING COMPANY (MUTUAL)- BY: - Don E. Smith Attorney -In -Fact " WATSON//SMITH, INC. Richardson, Texas r Merchants Bonding Company (MUTUAL) tt� . POWER OF ATTORNEY, 0* Know All Persons By These Presents, that the MERCHANTS BONDING COMPANY (MUTUAL), a corporation duty organized under the laws of the Slate of Iowa, and having its principal office in the City of Des Moines, County of Polk, State of Iowa, hath made, constituted and appointed, and does by these presents make, constitute and appoint RAY WATSON AND/OR DON E. SMITH of RICHARDSON and State of TEXAS its true and [awful Attorney -in -Fact, with full power and authority hereby conferred in its name, place and stead, to sign, execute, acknowledge and deliver in its behalf as surely any and all bonds, undertakings, recognizances or other written obligations in the nature thereof, subject to the limitation that any such instrument shall not exceed the amount of: THREE MILLION ($3,000,000.00) DOLLARS and to bind the MERCHANTS BONDING COMPANY (MUTUAL) thereby as fully and to the same extent as if such bond or undertaking was signed by the duly authorized officers of the MERCHANTS BONDING COMPANY (MUTUAL), and all such acts of said Attorney -in -Fact, pursuant to the authority herein given, are hereby ratilied and confirmed. This Power -of -Attorney is made and executed pursuant to and by authority of the following Amended Substituted and Restated By -Laws adopted by the Board of Directors of the MERCHANTS BONDING COMPANY (MUTUAL) on October 3, 1992. ARTICLE It, SECTION B.—The Chairman of the Board or President or any Vice President or Secretary shall have power and author- ity to appoint Attorneys -in -Fact, and to authorize them to execute on behalf of the Company, and attach the Seal of the Company thereto, bonds and undertakings, recognizances• contracts of indemnity and other writings obligatory in the nature thereof. ARTICLE II. SECTION 9. —The signature of any authorized officer and the Seal of the Company may be affixed by facsimile to any Power of Attorney or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the Company, and such signature and seal when so used shall have the same force and effect as though manually fixed. In Witness Whereof, MERCHANTS BONDING COMPANY (,',IUTUAL) has caused these presents to be signed by its President and its corporate seal to be hereto affixed, this 29TII day of DECEMBER . 1999• •' •MERCHAtITS BONDING COMPANY (MUTUAL) . • Q\NG C 04* * . .o y 1933 : c: By /"7 •••��� ,,, •`1a• _ Preseent STATE OF 1OV/A COUNTY OF POLK ss • •' On this 29Th day of DECEMBER 1999 before me appeared Larry Taylor, tome personally known. who being by me duly sworn did say that he is President of the MERCHANTS BONDING COMPANY (MUTUAL). the corpora!ion described in the foregoing instrument, and that the Seal affixed to the said instrument is the Corporate Seal of the said Ccrporation and that the said instrument was signed and sealed in behalf of said Corporation by authority of its Board of Directors. In Tes4umony Wherecf. 1 have hereunto s?t ny hand and affixed my Official Seat at the City of Des Moines. lava. the day and year firs; above written. J 9� : o Z Notary Public. Polk County, lotiv3 IOWA STATE OF IOVIA R 1 At - COUNTY OF POLK ss. .... 1. William Warner, Jr., Secretary of the MERCHANTS BONDING COMPANY (MUTUAL), do hereby certify that the above and foregoing is a true and correct copy of the POWER-OF-ATTORNEY, executed by said MERCHANTS BONDING COMPANY (MUTUAL), which is still in force and effect. In Witness Whereof, I have hereunto set my hand and affixed the Seal of the Company on this 7th day of November 2000 .c•, •OHO Rc?,p •'Oq �. Sxrora n d: '9�•yc slow Msc 0914 (190) Be y 1 y33 ; c • it s COMPLAINT NOTICE: Should any dispute arise about your premium or about a claim that you have filed, write to the company that issued the bond or policy. If the problem is not resolved, you may also write to the State Board of Insurance, P.O. Box 149091, Austin, Texas 78714-9091, Fax # (512) 475-1771. This notice of complaint procedure is for information only and does not become a part or condition of this bond or policy. MSC 0838 r , TEXAS STATUTORY PERFORMANCE BOND (PUBLIC WORKS) BOND NO. TXC1818 KNOW ALL MEN BY THESE PRESENTS: { THAT, ART CUEVAS CONSTRUCTION. INC., 7406 83rd St. Lubbock TX 79424 , (hereinafter called the Principal), as Principal, and MERCHANTS BONDING COMPANY (MUTUAL) 2100FIeur Dr_y nes Moines IA 50321-1148 , a corporation organized and existing under the laws of the State of Iowa , licensed to do business in the State of Texas and admitted to write bonds, as surety, (hereinafter called the Surety), are held and firmly bound unto CITY OF LUBBOCK P.O. Box 2000, Lubbock TX 79457 , (hereinafter called the Obligee), in the amount of THIRTY ONE THOUSAND, THREE HUNDRED TWENTY FOUR AND 00/100 Dollars ($ 31,324.00 ) for the payment whereof, the said Principal and Surety bind themselves, and their heirs, administrators, executors, successors, and assigns, jointly and severally, firmly by these presents. WHERE AS, the Principal has entered into a certain contract with the Obligee, dated the 7th day of November 2000 for BID NO. 236-OO/RS - HODGES COMMUNITY CENTER RENOVATION, PHASE II which contract is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein. ;., NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, That if the said Principal shall faithfully perform the work in accordance with the plans, specifications and contract documents, then this obligation shall be null and void; otherwise to remain in full force and effect; PROVIDED, HOWEVER, That this bond is executed pursuant to the provisions of Chapter 2253 of the Texas Government Code and all liabilities on this bond shall be determined in accordance with the provisions, conditions and limitations of said Chapter to the same extent as if it were copied at length herein. IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this instrument this 7th day of November 2000 PRINCIPAL: ART CUEVAS CONSTRUCTION, INC. " BY: Q t SURETY: MERCHANTS BONDING COMPANY (MUTUAL) BY: X Don E. Smith Attorney -In -Fact WATSON//SMITH, TRIC Richardson, Texas rte+ ,. .� Merchants Bonding Company CA UTUAL) POWER OF ATTORNEY On this 29TH day of DECEMBER 1999 , before me appeared Larry Taylor, to me personally knovm, who being by me duly sworn did say that he is President of the MERCHANTS BONDING COMPANY (MUTUAL). the corpora?ion described in the foregoing instrument• and that the Seal affixed to the said instrument is the Corporate Seal of the said Ccrperation and that the said instrument was signed and sealed in behalf of said Corporation by authority of its Board of Directors. In Testimony Wherecf, I have hereunto set my hand and affixed my Official Seal a; the City of Des Moines. lova. the day and year firs; above written. Notary Public, Polk County Iowa IOWA .• Off, • • .... • ytvQ' STATE OF IOVIA '•, R 1 A�- COUNTY OF POLK ss. I, William Warner, Jr.. Secretary of the MERCHANTS BONDING COMPANY (MUTUAL), do hereby certify that the above and foregoing is a true and correct copy of the POWER-OF-ATTORNEY, executed by said MERCHANTS BONDING COMPANY (MUTUAL), which is still ' in force and effect. r In Witness Whereof, I have hereunto set my hand and affixed the Seal of the Company on this 7th day of November 2000 "4...seawaq :. 5[� . �. • .� rrsc oa,i fagot , � 1933 C: c Know All Persons By These Presents, that the MERCHANTS BONDING COMPANY (MUTUAL), a corporation duty organized under the laws of the State of Iowa, and having its principal office in the City of Des Moines, County of Polk. State of Iowa, hath made, constituted and appointed, and does by these presents make, constitute and appoint RAY WATSON AND/OR DON E. SMITH of RICUARDSON and State of "TEXAS its true and lawful Attorney -in -Fact, with full power and authority hereby conferred in its name, place and stead, to sign, execute,'acknowtedge and deliver in its behalf as surety any and all bonds, undertakings, recognizances or other written obligations in the nature thereof, subject to the limitation that any such instrument shall A. not exceed the amount of: THREE MILLION ($3,000,000.00) DOLLARS and to bind the MERCHANTS BONDING COMPANY (MUTUAL) thereby as fully and to the same extent as if such bond or undertaking was signed by the duly authorized officers of the MERCHANTS BONDING COMPANY (MUTUAL), and all such acts of said Attorney -in -Fact, pursuant to the authority herein given, are hereby ratified and confirmed. This Power -of -Attorney is made and executed pursuant to and by authority of the following Amended Substituted and Restated By -Laws adopted by the Board of Directors of the MERCHANTS BONDING COMPANY (MUTUAL) on October 3, 1992. ARTICLE 11, SECTION 8.—The Chairman of the Board or President or any Vice President or Secretary shall have power and author- ity to appoint Attorneys -in -Fact, and to authorize them to execute on behalf of the Company, and attach the Seal of the Company ^' thereto, bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof. ARTICLE if, SECTION 9.—The signature of any authorized officer and the Seal of the Company may be affixed by facsimile to any Power of Attorney or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other r suretyship obligations of the Company, and such signature and seal when so used shall have the same force and effect as though manually fixed. In Witness Whereof, MERCHANTS BONDING COMPANY (D,IUTUAL) hes caused the a presents to be signed by its President and its corporate seat to be hereto affixed, this 29TII day of DECEMBER . 1999. • • ' �' • MERCHAINTS BONDING COMPANY (MUTUAL) 1933: By"7 � .y c; b... '•�N `�•• Presteni STATE OF IObVA • . • " r •"' ' COUNTY OF POLK s On this 29TH day of DECEMBER 1999 , before me appeared Larry Taylor, to me personally knovm, who being by me duly sworn did say that he is President of the MERCHANTS BONDING COMPANY (MUTUAL). the corpora?ion described in the foregoing instrument• and that the Seal affixed to the said instrument is the Corporate Seal of the said Ccrperation and that the said instrument was signed and sealed in behalf of said Corporation by authority of its Board of Directors. In Testimony Wherecf, I have hereunto set my hand and affixed my Official Seal a; the City of Des Moines. lova. the day and year firs; above written. Notary Public, Polk County Iowa IOWA .• Off, • • .... • ytvQ' STATE OF IOVIA '•, R 1 A�- COUNTY OF POLK ss. I, William Warner, Jr.. Secretary of the MERCHANTS BONDING COMPANY (MUTUAL), do hereby certify that the above and foregoing is a true and correct copy of the POWER-OF-ATTORNEY, executed by said MERCHANTS BONDING COMPANY (MUTUAL), which is still ' in force and effect. r In Witness Whereof, I have hereunto set my hand and affixed the Seal of the Company on this 7th day of November 2000 "4...seawaq :. 5[� . �. • .� rrsc oa,i fagot , � 1933 C: c '"' a�-. f. '' C., IM -06 D 7: PRODUCER THIS CERTIFICATE IS MSUI ONLY AND CONFERS NO Bledsoe Insurance Agency, Inc. HOLDER. THIS CERnFICAI ,5143 69th Street ALTER THE COVERAGE AF i P.O. Box 65028 COMPANIES A DATUtMMIDUMV) CERTIFICATE EXTEND OR CIES BELOW. ,lLubbock, TX 79464 COWAW A Ma land Casualty Co. CX". ANY Art Cuevas Construction, Inc. 13Security -National -Ins.• Co. 7406 83rd St coMPaw Lubbock, TX 79424 C*WAW ti A'; 131- ft"15101mm, 6C wo P -Ram. THIS IS TO CERTIVY THAT THE POLIC11M OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE Ar -FORDED BY THE POLICIES DESCRIBED HEREIN Is SUBJECT To ALL THE TERMS. VcCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMF17S SHOWN MAY HAVE BEEN REDUCED By PAID CLAIME rMt OF INSURANCE POLICY NUMBER POLICY efnCTIVE POLM PATION VMWAITS LTR 1, DATE (MMD DATE MWDOMI) *VWPAL UAIKUTV 015NOMILAGOM 1s 2 )00.1. AIX i I commmKLomeml uAmjw SCP30734728 112/20/99, 12/20/00 i JPP==M-00WMPAWjS 2,000,( m CLANS MADE 2 O=R OWNER'S& CONTRACTORS P AUTOM0Xj 1111148 IJAMUTY I I B I ANY AUTO ITCA2988079 7 ALL OWNW AUTOS QV WWAUTOS W NON-OWNAUTM *ARAN UASIUTY ANY A=. C=M UAINUTY UMBSEUAPORM OTHERTHAN VIVINMI. A FORM WORKERS COMP11w;A1"OKAN0 1IMPLOYEW UAIRLITV IN" t PA;%TNeP8/EXEFUTfVE P I I OIMICEMARS' EXCL I I OTHER I Fammu. & AMNJUW It 1,000,00d Oft COMBINED SINGLE 1,MT $ Soo $ PROPERTY DAMAGE AUTO ONLY, EA ACCIDENT IS SACHOCCURRENCE 9 AGIGREGATE t IL EACH ACOVENT S ELVwAw-Pm=UMtT is PP" 13 L I L I DgWmpmom OF OPERATIONSC)CATIONWMICLMI'MIAL rMMS Ce--tificate holder is an additional insured on general liability and auto policies. A waiver of Subrogation applies to general liability. -AA i"'At* vg a g. � ni;�.-:'�'X"*% Z -110-11M a mg ROSS SHOULD ANY OF THE MOVS DESOMM POUCISS BE CANCELLED OVORE THS EMPATION DATE TMMOV, THE MUIN* COWANY WEU. ENDEAVOR To MAL City of Lubbock IA-DAVS WIMITTEN NOTICE TO THE CITAWICATE 14OLDER NAMED TO THE 1.11", PO Box 2000 BUT FAILURE 70 MAIL SUCH NOTICE SMALL IMPOSE NO OULIOATMW OR UA*niw Lubbock, TX 79457 Of ANY M4 6PO*_7HE COMPANY, AOM" OR AUTROA =11111111 AlL0-dDJ0YY0 0, 77 ICA PRODucm tYLVID TATE INSURANCE AGEiiY RUA"nON 5233 7 9T ONLY ANO CONFERS NO RIGHTS UPON THE CEii7IMATE HOLQF.R. THIS CERTIFICATE DpES NOT AMEND, ND OR ALTER THE COVEiiAGE AFFORDED BY THE POLICIES BELOW, LUBBOCK TX 79424 ( 806 ) 794-1177 —COMPANIES AFFORDING COVERAGE COMPANY A COMMERICAL CASUALTY INSURANCE CO INSURED Art Cuevas Construction Inc. I COMPANY a 7406 83rd COMPANY C Lubbock TX 79424 COMPANY* 68061 866-9000 D . I . 0 . D THIS IS TO CERTIFY THAT THE POUCIES OF INSURANCE USTED BELOW HAVEPERIOD INDICATED, NOTWITWSTANDWS ANY RECUIREMENT% TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN LS 8UB.IECT TO ALL TME TERM$, EXCLUSIONS AND CONDITIONS OF SUCH POUCIES, UMITS SHOWN MAY HMAVE �BEEN REDUCED BY PAID CLAIMS. CO TYPE OF INSURANCE LTR TYPE POW DATE (NINKMWOW/M 0A7X(MMMWM I UNWIM GENERAL UABLM I CMMEF401ALGENEPAL LIABILITY CLAIMS MADE F7 0=11 GENERAL AGGREGATE Pfcoucm-, CoMplap AGG PEMONAL s ADV WJUFrf & S S OWNEF43 & CONTRACTORS PLOT EACH C=URRENCE LFIRETJLIAGEiA I 8 MED EXP (Any one pwu)n) AUTOMOBILE LIAMUTY ANYAUTO COMINNED SINGLE LIMIT ALL OWNED ALTOS SCHEDULED AUMS BODILY INJURY (Per pmum) HIRED ALITZ6 NON-OWNEDAUT06 I BODILY INJURY Mar wddenl) PROPERTYDAMAGE MARAGE LUMUITY ANY A= I �YTO qN—Ly- EA ACODENT OTHER THAN AUTO ONLY S EACH ACCIDENT S f 4-- AGOREGATE !XCEGS LIABILITY UMBRELLA FORM EACH OCCURF194CE 6 AGGREGATE III OTHER THANUMBRELLA FORM A WORKEINSCOMPENSAMNAND EPAPLOYM'UPALFTY -V J1054370D 04/27/00 04/27/01 STATUTORY UMTS ... EACIACC13ENT 550-0060— THE PFI0FFlFR3V r 1 211CL PARTNERS/EXeCUTIVE DISEASE - POLICY LIMIT IS500000 1USEAM EACH &MLOYEE13500000 0"ICEm ARE EXCJ OTHER DESCRIPTION OF OPEM'nOMW=ATWNWVlHlCL9SlSPECIAL ITEMS WAIVER OF SUBROGATION ON WORK COMP IN FAVOR OF CITY OF LUBBOCK nw. W. T iw SHOULD MY OF THE ABOVE DOW -NOW POIJIMES U CANCELLED Bmqma THE CITY OF LUBBOCK BOX 2000 LUBBOCK, TEXAS 79452 EXPIRATION DATE THEREOF, THE ISGUINa COMPANY WILL DwrAv011 To MAIL 10 DAYS WRITTEN NOTICE TO THE CERTIFICATE "OLDER NAMED To " LEFT, BUT FAILURE TO MAIL SUCH NOTICE WALL IMPOSE No CGLIcAnON an tjwUTy OF ANY UPON THE COMPANY, ITS A :1 ENT 7-3i� 77- M/T- r ... CONTRACTOR CHECKLIST A CONTRACTOR SHALL: (1) provide coverage for its employees providing services on a project, for the duration of the project based on t proper reporting of classification codes and payroll amounts and filling of any coverage agreements; --; (2) provide a certificate of coverage showing workers' compensation coverage to the governmental entity prior to beginning work on the project; (3) provide the governmental entity, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the contractor's current certificate of coverage ends during the duration of the project; (4) obtain from each person providing services on a project, and provide to the governmental entity: (A) a certificate of coverage, prior to that person beginning work on the project, so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the project; and (B) no later than seven days after receipt by the contractor, a new certificate of coverage showing �., extension of coverage, if the coverage period shown on the current certificate of coverage ends r, during the duration of the project; (5) retain all required certificates of coverage on file for the duration of the project and for one year thereafter; (6) notify the governmental entity in writing by certified mail or personal delivery, within ten (10) days after the contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; (7) post a notice on each project site informing all persons providing services on the project that they are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage. This notice does not satisfy other posting requirements imposed by the Act or other commission rules. This notice must be printed in at least 19 -point normal type, and shall be in both English and Spanish and any other language common to the worker population. The text for the notices shall be the following text provided by the commission on the sample notice, without any additional words or changes: ,"�" 2 REQUIRED WORKERS' COMPENSATION COVERAGE "The law requires that each person working on this site or providing services related to this construction project must (see reverse) be covered by workers' compensation insurance. This includes persons providing, hauling, or delivering equipment and materials, or providing labor or transportation or other service related to the project, regardless of the identity of their employer or status as an employee." "Call the Texas Workers' Compensation Commission at (512)440- 3789 to receive information on the legal requirement for coverage, to verify whether your employer has provided the required coverage, or to report an employer's failure to provide coverage." and (8) contractually require each person with whom it contracts to provide services on a project, to: (A) provide coverage based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements for all of its employees providing services on the project, for the i - duration of the project; '^ (B) provide a certificate of coverage to the contractor prior to that person beginning work on the project; (C) include in all contracts to provide services on the project the language in subsection (e) (3) of this rule; (D) provide the contractor, prior to the end of the coverage period, a new certificate of coverage f^ showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (E) obtain from each other person with whom it contracts, and provide to the contractor: (i) a certificate of coverage, prior to the other person beginning work on the project; and -^ (ii) prior to the end of the coverage period, a new certificate of coverage showing extension of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (F) retain all required certificates of coverage on file for the duration of the project and for one year thereafter; r.. (G) notify the governmental entity in writing by certified mail or personal delivery, within (ten) 10 days ' after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; and (H) contractually require each other person with whom it contracts, to perform as required by paragraphs (A) - (H), with the certificate of coverage to be provided to the person for whom they are providing services. �.. 3 No Text N iii CONTRACT �*+ STATE OF TEXAS COUNTY OF LUBBOCK THIS AGREEMENT, made and entered into this 7th day of November, 2000 by and between the City of Lubbock, County of Lubbock, State of Texas, acting by and through the Mayor, City of Lubbock, thereunto authorized to do so, hereinafter referred to as OWNER, and Art Cuevas Construction. Inc. of the City of Lubbock, County of Lubbock and the State of Texas hereinafter termed CONTRACTOR. WITNESSETH: That for and inconsideration of the payments and agreements hereinafter mentioned, to be made and performed by the OWNER and under the conditions expressed in the bond bearing even date herewith (if any) the CONTRACTOR hereby agrees with OWNER to commence and complete the construction of certain improvements described as follows: BID #236-00/RS - HODGES COMMUNITY CENTER RENOVATION - PHASE II - $31,324.00 and all extra work in connection therewith, under the terms as stated in the contract documents and at his (or their) own proper cost and expense to furnish all materials, supplies, machinery, equipment, tools, superintendence, labor, insurance and other accessories and services necessary to complete the said construction in accordance with the contract documents as defined in the General Condition of Agreement. The CONTRACTOR hereby agrees to commence work within ten days after the date written notice to do so shall have been given to him and to substantially complete same within the time specified in the contract documents. The OWNER agrees to pay the CONTRACTOR in current funds for the performance of the contract in accordance with the bid submitted therefore, subject to additions and deductions, as provided in the contract documents and to make payment on account thereof as provided therein. IN WITNESS WHEREOF, the parties to these presents have executed this agreement in Lubbock, Lubbock County, Texas in the year and day first above written. ATTEST: ., j. Secretary "^ APP VEDAS TO ONTENT: r' R esen ative APPROVED AS TO FORM: City Attorney ATTEST: Corporate Secretary P" CONTRACTOR: sL'itl�rs By: PRINTED NAME: At - TITLE: 1`'C - S; szl" COMPLETE ADDRESS: Art Cuevas Construction, Inc. 7406 83rd Street Lubbock, Texas 79424 �i 1. p k GENERAL CONDITIONS OF THE AGREEMENT r•� GENERAL CONDITIONS OF THE AGREEMENT OWNER Whenever the word Owner, or First Party, are used in this contract, it shall be understood as referring to the City of Lubbock, Texas. 2. CONTRACTOR FIR Whenever the word Contractor, or Second Party, is used, it shall be understood to mean the person, persons, co- partnership or corporation, to wit ART CUEVAS CONSTRUCTION. INC. who has agreed to perform the work embraced in this contract, or their legal representative. 3. OWNER'S REPRESENTATIVE Whenever the word Owner's Representative or representative is used in this contract, it shall be understood as referring to, City of Lubbock, or its representative GARY SMITH, FACILITIES MANAGER, so designated who will inspect constructions; or to such other representatives, supervisors; architects, engineers, or inspectors as may be authorized by said Owner to act in any particular under this agreement. Engineers, supervisors or inspectors will act for the Owner under the direction of Owner's Representative, but shall not directly supervise the Contractor or persons acting on behalf of the Contractor. 4. CONTRACT DOCUMENTS The contract's documents shall consist of the Notice to Bidders, General Instructions to Bidders, Bid, Signed Agreement, Statutory Bonds (if required), General Conditions of the Agreement, Special Conditions of the Agreement (if any), Specifications, Plans, Insurance Certificate, and all other documents made available to Bidder for inspection in accordance with the Notice to Bidders. The above described materials are sometimes referred to herein as the "contract" or "contract documents". "_ 5. INTERPRETATION OF PHRASES Whenever the words "Directed," "Permitted," "Designated," "Required," "Considered Necessary," "Prescribed," or �-* words of like import are used, it shall be understood that the direction, requirement, permission, order, designation or prescription of the Owner's Representative is intended; and similarly, the words "Approved," "Acceptable," "Satisfactory," or words of like import shall mean approved by or acceptable or satisfactory to the Owner's Representative. 6. SUBCONTRACTOR The term Subcontractor, as employed herein, includes only those having a direct contract with the Contractor for performance of work on the project contemplated by these contract documents. Owner shall have no responsibility to any Subcontractor employed by Contractor for performance of work on the project contemplated by these contract documents, but said Subcontractors will look exclusively to Contractor for any payments due Subcontractor. 7. WRITTEN NOTICE Written notice shall be deemed to have been duly served if delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended, or if delivered at or sent certified mail to the last business address known to the party who gives the notice. 8. CONTRACTOR'S RESPONSIBILITIES Unless otherwise stipulated, the Contractor shall provide and pay for all materials, supplies, machinery, equipment, tools, superintendence, labor, insurance, and all water, light, power, fuel, transportation and all other facilities necessary for the execution and completion of the work covered by the contract documents. Unless otherwise specified, all materials shall be new and both workmanship and materials shall be of a good quality. The Contractor shall, if required, furnish satisfactory evidence as to the kind and quality of materials. Materials or work described in words which so applied have well known, technical or trade meaning shall be held to refer such recognized standards. All work shall be done and all materials furnished in strict conformity with the contract documents. 9. SUBSTANTIALLY COMPLETED The term "Substantially Completed" is meant that the structure or project contemplated by the contract documents has been made suitable for use or occupancy or the facility is in a condition to serve its intended purpose, but still may require minor miscellaneous work and adjustment. 10. LAYOUT Except as specifically provided herein, the Contractor shall be responsible for laying out all work and shall accomplish this work in a manner acceptable to the Owner's Representative. The Owner's Representative will check the Contractor's layout of all major structures and any other layout work done by the Contractor at Contractor's request, but this check does not relieve the Contractor of the responsibility of correctly locating all work in accordance with the Plans and Specifications. 11. KEEPING OF PLANS AND SPECIFICATIONS ACCESSIBLE The Contractor shall be furnished copies of all Plans and Specifications without expense to Contractor and Contractor shall keep one copy of same consistently accessible on the job site. 12. RIGHT OF ENTRY The Owner's Representative may make periodic visits to the site to observe the progress or quality of the executed work and to determine, in general, if the work is proceeding in accordance with the contract documents. Owner's Representative will not be required to make exhaustive or continuous onsite inspections to check the quality or quantity of the work, nor will Owner's Representative be responsible for the construction means, methods, techniques, sequences or procedures, or the safety precautions incident thereto. Notwithstanding the Owner's Representative's rights of entry hereunder, the Owner's Representative will not be responsible for the Contractor's failure to perform the work in accordance with the Contract Documents. 13. LINES AND GRADES All lines and grades shall be furnished by the Owner's Representative whenever Owner's Representative deems said lines and grades are necessary for the commencement of the work contemplated by these contract documents or the completion of the work contemplated by these contract documents. Whenever necessary, Contractor shall suspend its work in order to permit Owner's Representative to comply with this requirement, but such suspension will be as brief as practical and Contractor shall be allowed no extra compensation therefore. The Contractor shall give the Owner's Representative ample notice of the time and place where lines and grades will be needed. All stakes, marks, etc., shall be carefully preserved by the Contractor, and in case of careless destruction or removal by Contractor, its Subcontractors, or its employees, such stakes, marks, etc., shall be replaced by the Owner's Representative at Contractor's expense. 14. OWNER'S REPRESENTATIVE'S AUTHORITY AND DUTY Unless otherwise specified, it is mutually agreed between the parties to this Agreement that the Owner's Representative has the authority to review all work included herein. The Owner's Representative has the authority to stop the work whenever such stoppage may be necessary to insure the proper execution of the contract. The Owner's Representative shall, in all cases, determine the amounts and quantities of the several kinds of work which are to be paid for under the contract documents, and shall determine all questions in relation to said work and the construction thereof, and shall, in all cases, decide every question which may arise relative to the execution of this contract on the part of said Contractor. The decision of the Owner's Representative shall be conclusive in the absence of written objection to same delivered to Owner's Representative within fifteen (15) rq calendar days of any decision or direction by Owner's Representative. In the absence of timely written objection by Contractor, as provided herein, any and all objection or objections shall be deemed waived. 15. SUPERINTENDENCE AND INSPECTION It is agreed by the Contractor that the Owner's Representative shall be and is hereby authorized to appoint from time to time such subordinate engineers, supervisors, or inspectors as the said Owner's Representative may deem proper to inspect the materials furnished and the work done under this Agreement, and to see that said material is furnished and said work is„done in accordance with the specifications therefore. The Contractor shall furnish all reasonable aid and assistancerequired by the subordinate engineers, supervisors or inspectors for the proper inspection and examination of the work. The Contractor shall regard and obey the directions and instructions of any subordinate engineers, supervisors or inspectors so appointed, when such directions and instructions are consistent with the obligations of this Agreement and accompanying plans and specifications provided, however, should the Contractor object to any orders by any subordinate engineer, supervisor or inspector, the Contractor may within fifteen (15) calendar days make written appeal to the Owner's Representative for its decision. In the absence of timely written objection by Contractor, as provided herein, any and all objection or objections shall be deemed waived. 16. CONTRACTOR'S DUTY AND SUPERINTENDENCE The Contractor shall give personal attention to the faithful prosecution and completion of this contract and shall keep on the work, during its progress, a competent superintendent and any necessary assistants, all satisfactory to Owner's Representative. The superintendent shall represent the Contractor in its absence and all directions given to superintendent shall be binding as if given to the Contractor. It is expressly agreed that adequate supervision by competent and reasonable representatives of the Contractor is essential to the proper performance of the work and lack of such supervision shall be grounds for suspending operations of the Contractor. The work, from its commencement to completion, shall be under the exclusive charge and control of the Contractor and all risk in connection therewith shall be borne by the Contractor. The Owner or Owner's Representatives shall not be responsible for the acts or omissions of the Contractor, or any subcontractors, or any of Contractor's agents or employees, or any other persons performing any of the work. 17. CONTRACTOR'S UNDERSTANDING It is understood and agreed that the Contractor has, by careful examination, satisfied itself as to the nature and location of the work, the confirmation of the ground, the character, quality and quantity of materials to be - encountered, the character of equipment and facilities needed preliminary to and during the prosecution of the work, and the general and local conditions, and all other matters which in any way affect the work under the contract documents. No oral agreement or conversation with any officer, agent, or employee of the Owner, or Owner's Representative either before or after the execution of this contract, shall affect or modify any of the terms or obligations herein contained. Subject to the rights of Owner as set forth in Paragraph 23 hereof, all modifications and/or amendments to the contract documents, shall be in writing, and executed by Owner's Representative and Contractor. Unless otherwise specified herein, all loss, expense or damage to Contractor arising out of the nature of the work to be done, or from the action of the elements, or from any unforeseen circumstance and the prosecution of the work, shall be sustained and borne by the Contractor at its own cost and expense. 18. CHARACTER OF WORKERS �^^ The Contractor agrees to employ only orderly and competent workers, skillful in the performance in the type of work required under this contract, to do the work; and agrees that whenever the Owner's Representative shall inform Contractor in writing that any man or men on the work, are, in Owner's Representative's sole opinion, incompetent, unfaithful, disorderly, or otherwise unacceptable to Owner or Owner's Representative, such man or men shall be discharged from the work and shall not again be employed on the work without the Owner's Representative's written consent. "'” 3 19. CONSTRUCTION PLANT The Contractor shall provide all labor, tools, equipment, machinery and materials necessary in the prosecution and completion of this contract where it is not otherwise specifically provided that Owner shall furnish same, and it is also understood that Owner shall not be held responsible for the care, preservation, conservation, or protection of any materials, tools, equipment or machinery or any part of the work until it is finally completed and accepted. The building of structures for the housing of risen or equipment will be permitted only at such places as the Owner's Representative shall consent or direct, and the sanitary conditions of the grounds in or about such structure shall at all times be maintained in a manner satisfactory to the Owner's Representative. 20. SANITATION Necessary sanitary conveniences for the use of laborers on the work site, properly secluded from public observation, shall be constructed and maintained by the Contractor in such manner and at such points as shall be approved by the Owner's Representative and their use shall be strictly enforced. 21. OBSERVATION AND TESTING The Owner or Owner's Representative shall have the right at all times to observe and test the work. Contractor shall make necessary arrangements and provide proper facilities and access for such observation and testing at any location wherever such work is in preparation or progress. Contractor shall ascertain the scope of any observation that may be contemplated by Owner or Owner's Representative and shall give ample notice as to the time each part of the work will be ready for such observation. Owner or Owner's Representative may reject any such work found to be defective or not in accordance with the contract documents, regardless of the stage of its completion or the time or place of discovery of such errors and regardless of whether Owner's Representative has previously accepted the work through oversight or otherwise. If any such work should be covered without approval or consent of the Owner, it must, if requested by Owner or Owner's Representative, be uncovered for examination at Contractor's expense. In the event that any part of the work is being fabricated or manufactured at a location where it is not convenient for Owner or Owner's Representative to make observations of such work or require testing of said work, then in such event Owner or Owner's Representative may require Contractor to furnish Owner or Owner's Representative certificates of inspection, testing or approval made by persons competent to perform such tasks at the location where that part of the work is being manufactured or fabricated. All such tests will be in accordance with the methods prescribed by the American Society for Testing and Materials or such other applicable organization as may be required by law or the contract documents. if any such work which is required to be inspected, tested, or approved is covered up without written approval or consent of the Owner or Owner's Representative, it must, if requested by the Owner or Owner's Representative, be uncovered for observation and testing at the Contractor's expense. The cost of all such inspections, tests and approvals shall be borne by the Contractor unless otherwise provided herein. Any work which fails to meet the requirements of any such tests, inspections or approvals, and any work which meets the requirements of any such tests or approvals but does not meet the requirements of the contract documents shall be considered defective, and shall be corrected at the Contractor's expense. Neither observations by the Owner or Owner's Representative, nor inspections, tests, or approvals made by Owner, Owner's Representative, or other persons authorized under the contract documents to make such inspections, tests, or approvals shall relieve the Contractor from its obligation to perform the work in accordance with the requirements of the contract documents. 22. DEFECTS AND THEIR REMEDIES It is expressly agreed that if the work or any part thereof, or any material brought on the site of the work for use in the work or selected for the same, shall be deemed by the Owner or Owner's Representative as unsuitable or not in conformity with plans, specifications and/or contract documents, the Contractor shall, after receipt of written notice thereof from the Owner's Representative, forthwith remove such material and rebuild or otherwise remedy such work so that it shall be in full accordance with the contract documents. It further agreed that any remedial action contemplated as hereinabove set forth shall be at Contractor's expense. 4 A'* 23. CHANGES AND ALTERATIONS The Contractor further agrees that the Owner may make such changes and alterations as the Owner may see fit, E in the line, grade, form dimensions, plans or materials for the work herein contemplated, or any part thereof, either before or after the beginning of the construction, without affecting the validity of this contract and the accompanying bond. If such changes or alterations diminish the quantity of the work to be done, they shall not constitute the basis for a claim for damages, or anticipated profits on the work that may be dispensed with. If they increase the amount of work, and the increased work can fairly be classified under the specifications, such increase shall be paid according to the quantity actually done and at the unit price established for such work under this contract; otherwise such additional work shall be paid for as provided under Extra Work. In case the Owner shall make such changes or alterations as shall make useless any work already done or material already furnished or used in said work, then the Owner shall recompense the Contractor for any material or labor so used, and for actual expenses incurred in preparation for the work as originally planned. 24. EXTRA WORK The term "extra work" as used in this contract shall be understood to mean and include all work that may be required by the Owner or Owner's Representative to be done by the Contractor to accomplish any change, alteration or addition to the work as shown on the plans and specifications or contract documents and not covered by Contractor's bid, except as provided under Changes and Alterations herein. It is agreed that the Contractor shall perform all extra work under the direction of the Owner's Representative when presented with a written work order signed by the Owner's Representative; subject, however, to the right of the Contractor to require written confirmation of such extra work order by the Owner. It is also agreed that the compensation to be paid to the Contractor for performing said extra work shall be determined by the following methods: Method (A) - By agreed unit prices; or .., Method (B) - By agreed lump sum; or Method (C) - If neither Method (A) or Method (B) be agreed upon before the extra work is commenced, then the Contractor shall be paid the lesser of the following: (1) actual field cost of the extra work, plus fifteen (15%) percent; or (2) the amount that would have been charged by a reasonable and prudent Contractor as a reasonable and necessary cost for performance of the extra work. ^ In the event said extra work be performed and paid for under Method (C)(1), then the provisions of this paragraph shall apply and the "actual field cost" is hereby defined to include the cost of all workmen, such as foremen, timekeepers, mechanics and laborers, materials, supplies, teams, trucks, rentals on machinery and equipment, for the time actually employed or used on such extra work, plus actual transportation charges necessarily incurred, together with all expenses incurred directly on account of such extra work, including Social Security, Old Age Benefits, Maintenance Bonds, Public Liability and Property Damage and Workers' Compensation and all other insurances as may be required by law or ordinances or directed by the Owner or Owner's Representative, or by them agreed to. Owner's Representative may direct the form in which accounts of the actual field cost shall be kept and records of these accounts shall be made available to the Owner's Representative. The Owner's Representative may also specify in writing, before the work commences, the method of doing the work and the type and kind of machinery and equipment to be used; otherwise, these matters shall be determined by the Contractor. Unless otherwise agreed upon, the prices for the use of machinery and equipment shall be determined by using 100%, unless otherwise specified, of the latest Schedule of Equipment and Ownership Expenses adopted by the Associated General Contractors of America. Where practical, the terms and prices for era the use of machinery and equipment shall be incorporated in the written extra work order. The fifteen percent (15%) of the actual field cost to be paid to Contractor shall cover and compensate Contractor for its profit, overhead, general superintendence and field office expense, and all other elements of cost and expense not embraced within the actual field cost as herein defined, save that where the Contractor's Camp or Field Office must be maintained primarily on account of such Extra Work, then the cost to maintain and operate the same shall be included in the "actual field cost." 5 , No claim for extra work of any kind will be allowed unless ordered in writing by Owner's Representative. In case any orders or instructions appear to the Contractor to involve extra work for which Contractor should receive compensation or an adjustment in the construction time, Contractor shall prior to commencement of such extra work, make written request to the Owner's Representative for a written order authorizing such extra work. Should a difference of opinion arise as to what does or does not constitute extra work or as to the payment therefore, and the Owner's Representative insists upon its performance, the Contractor shall'proceed with the work after making written request for written order and shall keep adequate and accurate account of the actual field cost thereof, as provided under Method (C)(1). If Contractor does not notify Owner's Representative before the commencement of any extra work, any claim for payment due to alleged extra work shall be deemed waived. 25. DISCREPANCIES AND OMISSIONS It is further agreed that it is the intent of the contract documents that all work described in the bid, the specifications, plans and other contract documents, is to be done for the prices quoted by the Contractor and that such price shall include all appurtenances necessary to complete the work in accordance with the intent of these contract documents as interpreted by Owner's Representative. Notices of any discrepancies or omissions in these plans, specifications, or contract documents, shall be given to the Owners' Representative and a clarification obtained before the bids are received, and if no such notice is received by the Owner's Representative prior to the opening of bids, then it shall be deemed that the Contractor fully understands the work to be included and has provided sufficient sums in its bid to complete the work in accordance with these plans and specifications. If Contractor does not notify Owner's Representative before bidding of any discrepancies or omissions, then it shall be deemed for all purposes that the plans and specifications are sufficient and adequate for completion of the project. It further agreed that any request for clarification must be submitted no later than five (5) calendar days prior to the opening of bids. 26. RIGHT OF OWNER TO MODIFY METHODS AND EQUIPMENT If at any time the methods or equipment used by the Contractor are found to be inadequate to secure the quality of work with the rate of progress required under this contract, the Owner or Owner's Representative may order the Contractor in writing to increase their safety or improve their character and efficiency and the Contractor shall comply with such order. If, at any time, the working force of the Contractor is inadequate for securing the progress herein specified, the Contractor shall, if so ordered in writing, increase its force or equipment, or both, to such an extent as to give reasonable assurance of compliance with the schedule of progress. 27. PROTECTION AGAINST ACCIDENT TO EMPLOYEES AND THE PUBLIC AND GENERAL INDEMNITY The Contractor shall take out and procure a policy or policies of Workers' Compensation Insurance with an insurance company licensed to transact business in the State of Texas, which policy shall comply with the Workers' Compensation laws of the State of Texas. The Contractor shall at all times exercise reasonable precaution for the safety of employees and others on or near the work and shall comply with all applicable provisions of federal, state and municipal laws and building and construction codes. All machinery and equipment and other physical hazards shall be guarded in accordance with the "Manual of Accident Prevention in Construction" of Associated General Contractors of America, except where incompatible with federal, state or municipal laws or regulations. The Contractor, its sureties and insurance carriers shall defend, indemnify and hold harmless the Owner and all of its officers, agents and employees against any all losses, costs, damages, expenses, liabilities, claims and/or causes of action, whether known or unknown, fixed, actual, accrued or contingent, liquidated or unliquidated, including, but not limited to, attorneys' fees and expenses, in connection with, incident to, related to, or arising out of, the Contractor's or any subcontractor's, agent's or employee's, in any manner whatsoever, omission, execution and/or supervision of this contract, and the project which is the subject matter of this contract. The safety precautions taken shall be the sole responsibility of the Contractor, in its sole discretion as an Independent Contractor; inclusion of this paragraph in the Agreement, as well as any notice which may be given by the Owners or the Owner's Representative concerning omissions under this paragraph as the work progresses, are intended as reminders to the Contractor of its duty and shall not be construed as any assumption of duty to supervise safety precautions by either the Contractor or any of its subcontractors. 0-. 28. CONTRACTOR'S INSURANCE The Contractor shall not commence work under this contract until he has obtained all insurance as required in the General Conditions of the contract documents, from an underwriter authorized to do business in the State of Texas and satisfactory to the City. Proof of coverage shall be furnished to the City and written notice of cancellation or any material change will be provided ten (10) calendar days in advance of cancellation or change. All policies of insurance, required herein, including policies of insurance required to be provided by Contractor and its subcontractors, shall contain a waiver of any and all of the insurer's or payor's, in the event of self-insurance, rights to subrogation that any such insurer or payor, in the event of self-insurance, may acquire by virtue of payment of any loss under such insurance or self-insurance. All certificates of insurance submitted to the City in conformity with the provisions hereof shall establish such waiver.. The Contractor shall procure and carry at its sole cost and expense through the life of this contract, insurance �., protection as hereinafter specified. Coverage in excess of that specified herein also shall be acceptable. Such insurance shall be carried with an insurance company authorized to transact business in the State of Texas and shall cover all operations in connection with this contract, whether performed by the Contractor or a subcontractor, or separate policies shall be provided covering the operation of each subcontractor. A certificate of insurance specifying each and all coverages shall be submitted prior to contract execution. The insurance certificates furnished shall name the City as an additional insured, or in the alternative, shall be accompanied by a statement from the Contractor to the effect that no work on this particular project shall be subcontracted., It shall be the contractors responsibility to provide to the owner all proof of coverage insurance documents including workers compensation coverage for each subcontractor. A. General Liability Insurance The contractor shall have Comprehensive General Liability Insurance with limits of $300.000.00 Combined Single Limit in the aggregate and per occurrence to include: Premises and Operations Explosion & Collapse Hazard Underground Damage Hazard Products & Completed Operations Hazard Contractual Liability Independent Contractors Coverage Personal Injury Advertising Injury B. Owner's Protective or Contingent Public Liability Insurance and Property Damage Liability Insurance. For bodily injuries, including accidental death and or property damage, LO Combined Single Limit. This policy shall be submitted prior to contract execution. C. Comprehensive Automobile Liability Insurance The Contractor shall have Comprehensive Automobile Liability Insurance with limits of not less than; Bodily Injury/Property Damage, $300.000.00 Combined Single Limit, to include all owned and nonowned cars including: Employers Nonownership Liability Hired and Nonowned Vehicles. The City is to be named as an additional insured on this policy for this specific job and copy of the endorsement doing so is to be attached to the Certificate of Insurance. D. Builder's Risk Insurance/Installation Floater Insurance. 7 The Contractor shall obtain a Builder's Risk policy in the amount of 0% of the total contract price (100% of potential loss) naming the City of Lubbock as insured. E. Umbrella Liability Insurance The Contractor shall have Umbrella Liability Insurance in the amount of $0 on all contracts with coverage to correspond with Comprehensive General Liability and Comprehensive Automobile Liability coverages. F. Worker's Compensation and Employers Liability Insurance Worker's Compensation Insurance covering all employees whether employed by the Contractor or any Subcontractor on the job with Employers Liability of at least $500.000.00. Definitions: Certificate of coverage ("certificate") - A copy of a certificate of insurance, a certificate of authority to self -insure issued by the commission, or a coverage agreement (TWCC-81, TWCC-82, TWCC- _ 83, or TWCC-84), showing statutory workers' compensation insurance coverage for the person's or entity's employees providing services on a project, for the duration of the project. Duration of the project - includes the time from the beginning of the work on the project until the Contractor's/person's work on the project has been completed and accepted by the governmental entity. Persons providing services on the project ("subcontractor" in Section 406.096, Texas Labor Code) - includes all persons or entities performing all or part of the services the Contractor has undertaken to perform on the project, regardless of whether that person contracted directly with the Contractor and regardless of whether that person has employees. This includes, without limitation, independent contractors, subcontractors, leasing companies, motor carriers, owner - operators, employees of any such entity, or employees of any entity which furnishes persons to provide services on the project. "Services" include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other service related to a project. "Services" does not include activities unrelated to the project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. 2. The Contractor shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all employees of the contractor providing services on _ the project, for the duration of the project. 3. The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the contract. 4. If the coverage period shown on the Contractor's current certificate of coverage ends during the duration of the project, the Contractor must, prior to the end of the coverage period, file a new certificate of coverage with the governmental entity showing that coverage has been extended. 5. The Contractor shall obtain from each person providing services on the project, and provide to the governmental entity: (a) a certificate of coverage, prior to that person beginning work on the project, so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the project; and (b) no later than seven days after receipt by the Contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project. 6 The Contractor shall retain all required certificates of coverage for the duration of the project and for one year thereafter. 7. The Contractor shall notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the Contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project. 8. The Contractor shall post on each project site a notice, in the text, form and manner prescribed by the Texas Workers' Compensation Commission, informing all persons providing services on the project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage. 9. The Contractor shall contractually require each person with whom it contracts to provide services on the project, to: (a) provide coverage, based on proper reporting of classification codes and payroll amounts • and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all of its employees providing services on the project, for the duration of the project; (b) provide to the Contractor, prior to that person beginning work on the project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the project, for the duration of the project; (c) provide the Contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (d) obtain from each other person with whom it contracts, and provide to the Contractor: �-+ - (1) a certificate of coverage, prior to the other person beginning work on the project; and (2) a new certificate of coverage showing extension of coverage, prior to the end of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (e) retain all required certificates of coverage on file for the duration of the project and for one year thereafter; (f) notify the governmental entity in writing by certified mail or personal delivery, within 10 ' days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; and (g) contractually require each person with whom it contracts to perform as required by paragraphs (a) (g), with the certificates of coverage to be provided to the person for whom they are providing services. 10. By signing this contract or providing or causing to be provided a certificate of coverage, the Contractor is representing to the governmental entity that all employees of the Contractor who will provide services on the project will be covered by worker's compensation coverage for the duration of the project, that the coverage will be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self-insured, with the commission's Division of Self -Insurance Regulation. Providing false or misleading information may subject the Contractor to administrative penalties, criminal penalties, civil penalties, or other civil actions. 9 11. The Contractor's failure to comply with any of these provisions is a breach of contract by the Contractor which entitles the governmental entity to declare the contract void if the Contractor does not remedy the breach within ten days after receipt of notice of breach from the governmental entity. G. Proof of Coverage Before work on this contract is commenced, each Contractor and subcontractor shall submit to the Owner for approval five Certificates of Insurance covering each insurance policy carried and offered as evidence of compliance with the above insurance requirements, signed by an authorized representative of the insurance company setting forth: — (1) The name and address of the insured. (2) The location of the operations to which the insurance applies. — (3) The name of the policy and type or types of insurance in force thereunder on the date borne by such certificate. (4) The expiration date of the policy and the limit or limits of liability thereunder on the date borne by such certificate. (5) A provision that the policy may be canceled only by mailing written notice to the named insured at the address shown in the bid specifications. (6) A provision that written notice shall be given to the City ten days prior to any change in or cancellation of the policies shown on the certificate. (7) The certificate or certificates shall be on the form (or identical copies thereof) contained in the job specifications. No substitute of nor amendment thereto will be acceptable. (8) If policy limits are paid, new policy must be secured for new coverage to complete project. (9) A Contractor shall: (a) provide coverage for its employees providing services on a project, for the duration of the project based on proper reporting of classification codes and payroll amounts and filling of any coverage agreements; (b) provide a certificate of coverage showing workers' compensation coverage to the governmental entity prior to beginning work on the project; (c) provide the governmental entity, prior to the end of the coverage period, a new certificate — of coverage showing extension of coverage, if the coverage period shown on the Contractor's current certificate of coverage ends during the duration of the project; (d) obtain from each person providing services on a project, and provide to the governmental — entity: (i) a certificate of coverage, prior to that person beginning work on the project, so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the project; and (ii) no later than seven days after receipt by the Contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (e) retain all required certificates of coverage on file for the duration of the project and for one year thereafter; — (f) notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the Contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; — 10 (g) post a notice on each project site informing all persons providing services on the project that they are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage. This notice does not satisfy other posting requirements imposed by the Texas Worker's Compensation Act or other commission rules. This notice must be printed with a title in at least 30 point bold type and text in at least 19 point normal type, and shall be in both English and Spanish and any other language common to the worker population. The text for the notices shall be the following text provided by the commission on the sample notice, without any additional words or changes: REQUIRED WORKERS' COMPENSATION COVERAGE "The law requires that each person working on this site or providing services related to this construction project must be covered by workers' compensation insurance. This includes persons providing, hauling, or delivering equipment or materials, or providing labor or transportation or other service related to the project, regardless of the identity of their employer or status as an employee." "Call the Texas Workers' Compensation Commission at 5121440-3789 to receive information of the legal requirements for coverage, to verify whether your employer has provided the required coverage, or to report an employer's failure to provide coverage;" and (h) contractually require each person with whom it contracts to provide services on a project, to: (i) provide coverage based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements for all of its employees providing services on the project, for the duration of the project; (ii) provide a certificate of coverage to the Contractor prior to that person beginning work on the project; (iii) include in all contracts to provide services on the project the following language: "By signing this contract or providing or causing to be provided a certificate of coverage, the person signing this contract is representing to the governmental entity that all employees of the person signing this contract who will provide services on the project will be covered by workers' compensation coverage for the duration of the project, that the coverage will be based on proper reprinting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self-insured, with the commission's Division of Self-insurance Regulation. Providing false or misleading information may subject the Contractor to administrative penalties, criminal penalties, civil penalties, or other civil actions."; (iv) provide the Contractor, prior to the end of the coverage period, a new certificate .�, of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (v) obtain from each other person with whom it contracts, and provide to the Contractor: (1) a certificate of coverage, prior to the other person beginning work on the project; and (2) prior to the end of the coverage period, a new certificate of coverage t showing extension of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (vi) retain all required certificates of coverage on file for the duration of the project and for one year thereafter; (vii) notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; and (viii) contractually require each other person with whom it contracts, to perform as required by paragraphs (i) -(viii), with the certificate of coverage to be provided to the person for whom they are providing services. 29. DISABLED EMPLOYEES 30 Contractors having more than fifteen (15) employees agree to comply with the Americans with Disabilities Act of 1990, and agree not to discriminate against a qualified individual with a disability because of the disability of such individual in regard to job application procedures, the hiring, advancement, or discharge of employees, employee compensation, job training, and other terms, conditions, and privileges of employment. Without limiting, in any way, manner or form, the indemnity provided by Contractor in paragraph 27 hereof, the Contractor agrees that it will indemnify and save the Owner and all of its officers, agents and employees, harmless against any and all claims, liabilities, losses, damages, expenses and causes of action arising out of, in any way, manner or form, the demands of subcontractors, laborers, workmen, mechanics, materialmen and furnishers of machinery and parts thereof, equipment, power tools, and supplies, incurred in the performance of this contract and the project which is the subject matter of this contract. When Owner so desires, the Contractor shall furnish satisfactory evidence that all obligations of the nature hereinabove designated have been paid, discharged or waived. If during the progress of the work, Contractor shall allow any indebtedness to accrue for work furnished by any of those designated in the preceding paragraph and shall fail to pay and discharge any such indebtedness within five (5) days after demand is made, then Owner may, during the period for which such indebtedness shall remain unpaid, in addition to any statutory retainage rights it may have, withhold from the unpaid portion of this contract, a sum equal to the amount of such unpaid indebtedness or may apply the sum so withheld to discharge any such indebtedness. 31. PROTECTION AGAINST ROYALTIES OR PATENT INVENTION The Contractor shall pay all royalties and license fees, and shall provide for the use of any design, device, material or process covered by letters patent or copyright by suitable legal agreement with the Patentee or owner thereof. Without limiting, in any way, manner or form, the indemnity provided by Contractor in paragraph 27 hereof, the Contractor shall defend all suits or claims for infringement of any patent or copyrights and shall indemnify and save the Owner, and all of its officers, agents and employees harmless from any loss on account thereof, except that Owner shall defend all such suits and claims and shall be responsible for all such loss when a particular design, device, material or process or the product of a particular manufacturer or manufacturers is specified or required in these contract documents by Owner; provided, however, if choice of alternate design, device, material or process is allowed to the Contractor, then Contractor shall indemnify and save Owner, and all of its officers, agents and employees harmless from any loss on account thereof. Notwithstanding anything herein to the contrary, if the material or process specified or required by Owner and/or this contract is an infringement, the Contractor shall be responsible for such loss unless it gives written notice of such infringement to the Owner's Representative prior to bidding. 32. LAWS AND ORDINANCES 12 The Contractor shall at all times observe and comply with all federal, state and local laws, ordinances and regulations, which in any manner affect the contract or the work, and without limiting, in any way, manner or form, ... the indemnity provided by Contractor in paragraph 27 hereof, Contractor shall indemnify and save harmless the u Owner, and all of its officers, agents, and employees against any claims arising from the violation of any such laws, ordinances, and regulations, whether by the Contractor, its employees, or subcontractors. If the Contractor observes that the plans and specifications are at variance therewith, he shall notify the Owner's Representative in writing prior to bidding and any necessary changes shall be adjusted as provided in the contract for changes in the work. In the absence of timely written notification to Owner's Representative of such variance or variances within said time, any objection and/or assertion that the plans and specifications are at variance with any federal, state or .»„ local laws, ordinances or regulations shall be deemed waived. If the Contractor, its employees or subcontractors perform any work contrary to such laws, ordinances, rules and regulations, and without such notice to the Owner's Representative, Contractor shall bear all costs arising therefrom. The Owner is a municipal corporation of the State of Texas and the law from which it derives its powers, insofar as the same regulates the objects for which, or the manner in which, or the conditions under which the Owner may enter into contracts, shall be controlling, and shall be considered as part of this contract to the same effect as .� though embodied herein. 33. SUBCONTRACTING The Contractor agrees that it will retain personal control and will give its personal attention to the fulfillment of this contract. The Contractor further agrees that subletting of any portion or feature of the work, or materials required in the performance of this contract, shall not relieve the Contractor from its full obligations to the Owner, as ..� provided by the contract documents. 34. TIME FOR SUBSTANTIAL COMPLETION AND LIQUIDATED DAMAGES It is hereby understood and mutually agreed by and between the Contractor and the Owner, that the date of beginning and time for completion as specified in the contract documents, of work to be done hereunder are essential conditions of this contract; and it is further mutually understood and agreed that the work embraced in �• this contract shall be commenced as provided in the contract documents. If the Contractor should neglect, fail, or refuse to substantially complete the work within the time herein specified, then the Contractor does hereby agree as part of the consideration for the awarding of this contract, the Owner !" may withhold permanently from Contractor's total compensation, the sum of $500.00 (FIVE HUNDRED DOLLARS) PER DAY, not as a penalty, but as liquidated damages for the breach of the contract as herein set forth for each and every working day that the Contractor shall be in default after the time stipulated for .., substantially completing the work. It is expressly understood and agreed, by and between Contractor and the Owner, that the time for the substantial completion of the work described herein is reasonable time for the completion of the same, taking into consideration the average climatic range and conditions and usual industrial conditions prevailing in this locality. The amount is fixed and agreed upon by and between the Contractor and the Owner because the actual damages the Owner would sustain in such event would be difficult and/or impossible to estimate, however, the amount �., agreed upon herein is a reasonable forecast of the amount necessary to render just compensation to Owner, and k _ is expressly agreed to ba not disproportionate to actual damages as measured at time of breach. IT IS FURTHER AGREED AND UNDERSTOOD BETWEEN THE CONTRACTOR AND OWNER THAT TIME IS OF THE ESSENCE OF THIS CONTRACT. 35. TIME AND ORDER OF COMPLETION r- It is the meaning and intent of this contract, unless otherwise herein specifically provided, that the Contractor shall be allowed to prosecute its work at such time and sessions, in such order of precedence, and in such manner as shall be most conductive to economy of construction; provided, however, that the order and time of prosecution shall be such that the work shall be substantially completed as a whole and in part, in accordance with this . contract, the plans and specifications, and within the time of completion designated in the bid; provided, also, that when the Owner is having other work done, either by contract or by its own force, the Owner's Representative may �* 13 direct the time and manner of constructing work done under this contract so that conflicts will be avoided and the construction of the various works being done for the Owner shall be harmonized. The Contractor shall submit, at such times as may reasonably be requested by the Owner's Representative, schedules which shall show the order in which the Contractor intends to carry on the work, with dates at which the Contractor will start the several parts of the work and estimated dates of completion of the several parts. 36. TIME OF PERFORMANCE The Contractor agrees that it has submitted its bid in full recognition of the time required for the completion of this project, taking into consideration the average climatic range and industrial conditions prevailing in this locality, and has considered the liquidated damage provisions of paragraph 34 hereinabove set forth and expressly agrees that it shall not be entitled to, nor will it request, an extension of time on this contract, except when its work has been delayed by an act or' neglect of the Owner, Owner's Representative, employees of the Owner or other contractors — employed by the Owner, or by changes ordered in the work, or by strike, walkouts, acts of God or the public enemy, fire or flood. Any request for extension shall be in writing with the written request for same setting forth all justifications, in detail, for the request, and submitted to Owner's Representative within. twenty (20) calendar days — of the occurrence of the event causing said delay. A failure by Owner's Representative to affirmatively grant the extension no later than twenty (20) calendar days of written submission by Contractor shall be deemed a denial, and final. Further, in the absence of timely written notification of such delay and request for extension, as provided herein, any request for extension by Contractor shall be deemed waived. — 37. HINDRANCE AND DELAYS In executing the contract, the Contractor agrees that in undertaking to complete the work within the time herein fixed, Contractor has taken into consideration and made allowances for all hindrances and delays incident to such work, whether growing out of delays due to unusual and unanticipated circumstances, difficulties or delays in securing material or workmen, or any other cause or occurrence. No charge shall be made by the Contractor for hindrance or delays from any cause during the progress of any part of the work embraced in this contract except where the work is stopped by order of the Owner or Owner's Representative for the Owner's convenience, in which event, such expense as in the sole judgment of the Owner's Representative that is caused by such stoppage shall be paid by Owner to Contractor. 38. QUANTITIES AND MEASUREMENTS No extra or customary measurements of any kind will be allowed, but the actual measured or computed length, area, solid contents, number and weight only shall be considered, unless otherwise specifically provided. In the event this contract is let on a unit price basis, then Owner and Contractor agree that this contract, including the — specifications, plans and other contract documents are intended to show clearly all work to be done and material to be furnished hereunder. Where the estimated quantities are shown, and only when same are expressly stated to be estimates, for the various classes of work to be done and material to be furnished under this contract, they are approximate and are to be used only as a basis for estimating the probable cost of the work and for comparing — their bids offered for the work. In the event the amount of -work to be done and.matenals to be furnished are expressly stated to be estimated, and only when same are expressly stated to be estimated, it is understood and agreed that the actual amount of work to be done and the materials to be furnished under this, contract may differ somewhat from these estimates, and that where the basis for payment under this contract is the unit price method, payment shall be for the actual amount of work done and materials furnished on the project. 39. PROTECTION OF ADJOINING PROPERTY The Contractor shall take proper means to protect the adjacent or adjoining property or properties in any way encountered, which may be injured or seriously affected by any process of construction to be undertaken under this agreement, from any damage or injury by reason of said process of construction; and Contractor shall be liable for any and all claims for such damage on account of his failure to fully protect all adjacent property. Without limiting, in any way, manner and form, the indemnity provided by Contractor in paragraph 27 hereof, the Contractor agrees to indemnify, save and hold harmless the Owner, and any of its officers, agents and employees, against any and all claims or damages due to any injury to any adjacent or adjoining property, related to, arising from or growing out of the performance of this contract. 14 e 40. PRICE FOR WORK In consideration of the furnishing of all necessary labor, equipment and material and the completion of all work by the Contractor, and on the delivery of all materials embraced in this contract in full conformity with the specifications and stipulations herein contained, the Owner agrees to pay the Contractor the price set forth in the bid proposal attached hereto, which has been made a part of this contract, and the Contractor hereby agrees to receive such price in full for furnishing all materials and all labor required for the aforesaid work, also, for all expenses incurred b Contractor and for well and truly _ p y y performing the same and the whole thereof in the manner and according to this agreement, the attached specifications, plans, contract documents and requirements of Owner's Representative. 41. PAYMENTS No payments made or certificates given shall be considered as conclusive evidence of the performance of the contract, either wholly or in part, nor shall any certificate or payment be considered as acceptance of defective work. Contractor shall at any time requested during the progress of the work furnish the Owner or Owner's Representative with a verifying certificate showing the Contractor's total outstanding indebtedness in connection with the work. Before final payment is made, Contractor shall satisfy Owner, by affidavit or otherwise, that there are no outstanding liens against Owner's premises by reason of any work under the contract. Acceptance by Contractor of final payment of the contract price shall constitute a waiver of all claims against Owner, Owner's agents and employees, which have not theretofore been timely filed as provided in this contract. 42. PARTIAL PAYMENTS a. On or before the tenth day of each month, the Contractor shall submit to Owner's Representative an application for partial payment or, if the Contractor does not submit such application, the Owner's Representative shall determine the amount to be partially paid. Owner's Representative shall review said application for partial payment if submitted, and the progress of the work made by the Contractor and if found to be in order, shall prepare a certificate for partial payment showing as completely as practical the total value of the work done by the Contractor up to and including the last day of the preceding month. The determination of the partial payment by the Owner's .» Representative shall be in accordance with Paragraph 14 hereof. The Owner shall then pay the Contractor on or before the fifteenth day of the current month the total amount of the Owner's Representative's Certificate of Partial Payment, less 5% of the amount thereof, which 5% shall be retained until final payment, and further, less all previous payments and all further sums that fnay be retained by Owner under the terms of the contract documents. - Any partial payment made hereunder shall not constitute a waiver by the Owner of any and all other rights to enforce the express terms of the contract documents, and all remedies provided therein, as to any and all work performed, to be performed and/or materials delivered hereunder, including, but limited to, work to which said partial payment is attributable. k„ 43. SUBSTANTIAL COMPLETION Contractor shall give Owner's Representative written notice of substantial completion. Within thirty-one (31) working days after the Contractor has given the Owner's Representative written notice that the work has been substantially completed, the Owner's Representative and/or the Owner shall inspect the work and within said time, if the work be found to be substantially completed in accordance with the contract documents, the Owner's Representative shall issue to the Owner and Contractor a certificate of substantial completion. Notwithstanding the issuance of a certificate of substantial completion, Contractor shall proceed with diligence to finally complete the work within the time provided in this contract. 44. FINAL COMPLETION AND PAYMENT The Contractor shall give written notice to Owner's Representative of final completion. Upon written notice of final completion, the Owner's Representative shall proceed to make final measurement to determine whether final completion has occurred. If the Owner's Representative determines final completion has occurred, Owner's Representative shall so certify to the Owner. Upon certification by Owner's Representative of final completion, 15 Owner shall pay to the Contractor on or before the 31 st working day after the date of certification of final „ completion, the balance due Contractor under the terms of this agreement. Neither the certification of final completion nor the final payment, nor any provisions in the contract documents shall relieve the, Contractor of the _ obligation for fulfillment of any warranty which may be required in the contract documents andlor any warranty or warranties implied by law or otherwise. 45. CORRECTION OF WORK Contractor shall promptly remove from Owner's premises all materials condemned by the Owner's Representative on account of failure to conform to the contract documents, whether actually incorporated in the work or not, and Contractor shall at its own expense promptly replace such condemned materials with other materials conforming to the requirements of the contract documents. Contractor shall also bear the expense of restoring all work of other contractors damaged by any such removal or replacement. If Contractor does not remove and replace any such condemned work within a reasonable time after a written notice by the Owner or the Owner's Representative, Owner may remove and replace it at Contractor's expense. Neither the final payment, nor certification of final completion or substantial completion, nor any provision in the contract documents shall relieve the Contractor of responsibility for faulty materials or workmanship, and Contractor shall remedy any defects due thereto and pay for any damage to other work resulting therefrom, which shall appear within a period of one (1) year from the date of certification of final completion by Owner's Representative. 46. PAYMENT WITHHELD The Owner or Owner's Representative may, on account of subsequently discovered evidence, withhold or nullify the whole or part of any certification to such extent as may be necessary to protect itself from loss on account of: (a) Defective work not remedied and/or work not performed. (b) Claims filed or reasonable evidence indicating possible filing of claims. (c) Failure of the Contractor to make payments promptly to subcontractors or for materials or labor. (d) Damage to another contractor. When the above grounds are removed, or the Contractor provides a surety bond satisfactory to the Owner, in the amount withheld, payment shall be made for amounts withheld because of them. 47. CLAIM OR DISPUTE It is further agreed by both parties hereto that all questions of dispute or adjustment presented by the Contractor shall be in writing and filed with the Owner's Representative within fifteen (15) calendar days after the Owner's Representative has given any direction, order or instruction to which the Contractor desires to take exception. Timely written notice of dispute as provided in this contract of any decision by Owner's Representative or Owner shall be a condition precedent to the bringing and/or assertion of any action or claim by Contractor of any right under this Contract. If the matters set forth in the notice of dispute are not granted or otherwise responded to by Owner's Representative within fifteen (15) calendar days of receipt of notice of dispute by Owner's Representative, said objections shall be deemed denied. Any decision by the Owner's Representative, or deemed denial by the Owner's Representative, shall be final and conclusive in the absence of fraud. It is further agreed that the acceptance by the Contractor of the final payment shall be a bar to any and all claims of the Contractor, and constitute a waiver of the right to assert any claim against Owner, Owner's agents and employees and Owner's Representative, by Contractor. 48. NON-COMPLIANCE AND/OR ABANDONMENT BY CONTRACTOR In case the Contractor should (1) abandon and fail or refuse to resume work within fifteen (15) calendar days after written notification from the Owner or the Owner's Representative, or (2) if the Contractor fails to comply with the written orders of the Owner's Representative, when such orders are consistent with this contract, then the Surety on the bond shall be notified in writing and directed to complete the work and a copy of said notice shall be delivered to the Contractor. In the event a bond is not required by law, or otherwise obtained by the Contractor, no further notice of such non-compliance to Contractor shall be required. 16 After receiving said notice of abandonment or non-compliance , the Contractor shall not remove from the work any machinery, equipment, tools, materials or supplies then on the job, but the same, together with any materials and equipment under the contract for work, may be held for use on the work by the Owner or the Surety of the Contractor, or another contractor, in completion of the work; and the Contractor shall not receive any rental or credit therefore (except when used in connection with Extra Work, where credit shall be allowed as provided for under paragraph 24 of this contract); it being understood that the use of such equipment and materials will ultimately reduce the cost to complete the work and be reflected in the final settlement. In the event the Contractor, or Surety, whichever is applicable, should fail to commence compliance with the notice r,. hereinbefore provided within ten (10) calendar days after service of such notice, and/or shall fail to proceed with diligence to complete the project as contemplated and in compliance with all terms and provisions of the contract documents, then the Owner may exercise any and all remedies available to it pursuant to law, contract, equity or otherwise, including, but not limited to, providing for completion of the work in either of the following elective manners: (a) The Owner may employ such force of men and use of machinery, equipment, tools, materials and supplies as said Owner may deem necessary to complete the work and charge the expense of such labor, machinery, equipment, tools, materials and supplies to said Contractor, and the expense so charged shall be deducted and paid by the Owner out of such moneys as may be due, or that may thereafter at any time become due to the Contractor under and by virtue of this Agreement. In case such expense is less than the sum which would have been payable under this contract, if the same had been completed by the Contractor, then said Contractor shall receive the difference. In case such expense is greater than the sum which would have been payable under this contract, if the same had been completed by said Contractor, then the Contractor and/or its Surety shall pay the amount of such excess to the Owner; or (b) The Owner, under sealed bids, after notice published as required by law, at least twice in a newspaper having a general circulation in the County of location of the work, may let the contract for the completion of the work under substantially the same terms and conditions which are provided in this contract. In case of any increase in cost to the Owner under the new contract as compared to what would have been the cost under this contract, such increase shall be charged to the Contractor and the Surety shall be and remain bound therefore. Should the cost to complete any such new contract prove to be less than that which would have been the cost to complete the work under this contract, the Contractor or his Surety shall be credited therewith. In the event the Owner's Representative elects to complete the work, as described above, when the work shall have been finally completed, the Contractor and his Surety shall be so notified and certification of completion as provided in paragraph 44 hereinabove set forth, shall be issued. A complete itemized statement of the contract accounts, certified to by Owner's Representative as being correct shall then be prepared and delivered to Contractor and his Surety, if applicable, whereon the Contractor or his Surety, or the Owner as the case may be, shall pay the balance due as reflected by said statement within 30 days after the date of certification of completion. In the event the statement of accounts shows that the cost to complete the work is less than that which would have been the cost to the Owner had the work been completed by the Contractor under the terms of this contract, or when the Contractor and/or his Surety, if applicable, shall pay the balance shown to be due by them to the Owner, then all machinery, equipment, tools, materials or supplies left on the site of the work shall be turned over to the Contractor and/or his Surety, if applicable. Should the cost to complete the work exceed the contract price, and the Contractor and/or his Surety, if applicable, fail to pay the amount due the Owner within the time designated hereinabove, and there remains any machinery, equipment, tools, materials or supplies on the site of •- the work, notice thereof, together with an itemized list of such equipment and materials shall be mailed to the Contractor and his Surety, if applicable, at the respective addresses designated in this contract; provided, however, that actual written notice given in any manner will satisfy this condition. After mailing, or other giving of such notice, such property shall be held at the risk of the Contractor, and his Surety, if applicable, subject only to the duty of the Owner to exercise ordinary care to protect such property. After fifteen (15) calendar days from the date of said notice the Owner may sell such machinery, equipment, tools, materials or supplies and apply the net sum derived from such sale to the credit of the Contractor and his Surety, if applicable. Such sale may be made at either public or private sale, with or without notice, as the Owner may elect. The Owner shall release any machinery, equipment, tools, materials, or supplies that remain on the jobsite and belong to persons other than the Contractor or his Surety, if applicable, to their proper owners. 17 The remedies provided to Owner by taw, equity, contract, or otherwise, shall be cumulative, to the extent permitted by law. It is expressly agreed and understood that the exercise by Owner of the remedies provided in this paragraph shall not constitute an election of remedies on the part of Owner, and Owner, irrespective of its exercise of remedies hereunder, shall be entitled to exercise concurrently or otherwise, any and all other remedies available to it, by law, equity, contract or otherwise, including but not limited to, liquidated damages, as provided in paragraph 34, hereinabove set forth. 49. LIMITATION ON CONTRACTOR'S REMEDY The remedies of Contractor hereunder shall be limited to, and Owner shall be liable only for, work actually performed by Contractor and/or its subcontractors as set forth_ in the contract documents, and Owner shall not be liable for any consequential, punitive or indirect loss or damage that Contractor may suffer in connection with the project which is the subject matter of this contract. 50. BONDS The successful bidder will be required to furnish a performance bond in accordance with Chapter 2253, Government Code, in the amount of 100% of the total contract price in the event that said contract price exceeds $100,000 and the successful bidder will be required to furnish a payment bond in accordance with Chapter 2253, Government Code, in the amount of 100% of the total contract price in the event that said contract price exceeds $25,000. All bonds, if required, shall be submitted on forms supplied by the Owner, and executed by an approved Surety Company authorized to do business in the State of Texas. It is further agreed that this contract shall not be in effect until such bonds are so furnished. 51. SPECIAL CONDITIONS In the event special conditions are contained herein as part of the contract documents and said special conditions conflict with any of the general conditions contained in this contract, then in such event the special conditions shall — control. 52. LOSS OR EXPENSE DUE TO UNUSUAL OR UNANTICIPATED CIRCUMSTANCES Unless otherwise specified herein, all loss, expense or damage to the Contractor arising out of the nature of the work to be done, or from the action of the elements, or from any unforeseen circumstance or from unusual obstructions or difficulties, naturally occurring, man made or otherwise, which may be encountered in the prosecution of the work, shall be sustained and borne by the Contractor at his own cost and expense. 53. INDEPENDENT CONTRACTOR Contractor is, and shall remain, an independent contractor with full, complete and exclusive power and authority to direct, supervise, and control its own employees and to determine the method of the performance of the work covered hereby. The fact that the Owner or Owner's Representative shall have the right to observe Contractor's work during Contractor's performance and to carry out the other prerogatives which are expressly reserved to and vested in the Owner or Owner's Representative hereunder, is not intended to and shall not at any time change or effect the status of the Contractor as an independent contractor with respect to either the Owner or Owner's Representative or to the Contractor's own employees or to any other person, firm, or corporation. 54. CLEANING UP The Contractor shall at all times keep the premises free from accumulation of debris caused by the work, and at the completion of the work Contractor shall remove all such debris and also its tools, scaffolding, and surplus materials and shall leave the workroom. clean or its, equivalent. The work shall be left in good order and condition. In case of dispute Owner may remove the debris and charge the cost to the Contractor. 55. HAZARDOUS SUBSTANCES AND ASBESTOS Hazardous Substances (herein so called), as defined in the Comprehensive Environmental Response, Compensation, and Liability Act (42 U.S.C.S. §9601(14)) and the regulations promulgated thereunder, as same 18 may be amended from time to time, hydrocarbons or other petroleum products or byproducts and/or asbestos, in any form, shall not (i) be utilized, in any way, manner or form, in the construction of, or incorporation into, the Project; or (ii) be brought upon, placed, or located, by any party, on the Project site, or any other property of the City, without the written consent of the Owner's Representative. If Contractor believes that the utilization of a Hazardous Substance, hydrocarbons or other petroleum products or byproducts and/or asbestos is necessary in the construction of the Project, or that it is necessary to place and/or otherwise locate upon the site of the Project or other property of the City, a Hazardous Substance, hydrocarbons or other petroleum products or byproducts and/or asbestos, Contractor shall notify the Owner's Representative, and request consent therefrom, at least twenty (20) days prior to such action. Owner's Representative may grant or deny the request of Contractor and provide whatever requirements such consent, if granted, is conditioned upon, in its sole and absolute discretion. If the request of Contractor is not granted, or otherwise not responded to, by Owner's Representative within five (5) days of the receipt of said request, said request shall be deemed to be denied. ^* In the event Owner's Representative shall consent to the request of Contractor, Contractor shall be responsible for ensuring that all personnel involved in the Project are (i) trained for the level of expertise required for proper performance of the actions contemplated by this Contract and, in particular, in all aspects of handling, storage, disposal and exposure of Hazardous Substances, hydrocarbons or other petroleum products or byproducts and/or asbestos; and (ii) are provided and utilize all protective equipment, including without limitation, personal protective gear, necessary to provide protection from exposure to Hazardous Substances, hydrocarbons or other petroleum products or byproducts and/or asbestos. 19 No Text RE: RESOLUTION NO. 6262, ITEM NO. 39, APRIL 8, 1999 Craft Acoustical Ceiling Installer Air Conditioner Installer Air Conditioner Installer -Helper Asbestos Worker Asbestos Supervisor Bricklayer �-, Bricklayer -Helper Carpenter Carpenter -Helper Cement Finisher Drywall Hanger Electrician Electrician -Helper Equipment Operator -Heavy L: Equipment Operator -Light Floor Installer Glazier Insulator-Piping/Boiler Insulator -Helper m Iron Worker Laborer -General Mortar Mixer Painter Plumber �., Plumber -Helper Roofer - Roofer -Helper Sheet Metal Worker k" Sheet Metal Worker -Helper Welder -Certified EXHIBIT A City of Lubbock Building Construction Trades Prevailing Rates Hourly Rate 11.50 12.50 6.25 9.00 12.50 12.50 7.00 11.00 7.00 8.00 11.00 13.75 7.00 9.50 8.50 9.50 10.50 11.50 7.00 11.00 6.00 6.00 9.50 12.50 7.00 9.00 7.00 10.00 7.00 11.00 m-• r Craft Asphalt Heaterman Asphalt Shoveler Concrete Finisher Concrete Finisher -Helper Electrician Flagger .. Form Setter Form Setter -Helper Laborer -General Laborer -Utility Mechanic Mechanic -Helper Power Equipment Operators Asphalt Paving Machine Bulldozer Concrete Paving Machine Front End Loader Heavy Equipment Operator. Light Equipment Operator .., Motor Grader Operator Roller Scraper Tractor Truck Driver -Light Truck Driver -Heavy EXHIBIT B Paving and Highway Construction Prevailing Wage Rates 22 Hourly Rate 9.00 6.00 8.00 7.00 12.00 6.00 7.00 6.25 6.00 6.75 8.00 7.00 7.75 8.00 7.75 7.25 8.00 7.25 9.50 6.75 7.25 7.25 6.50 7.00 EXHIBIT C Prevailing Wage Rates Overtime Rate The rate for overtime (in excess of forty hours per week) shall be as required by the Fair Labor Standards Act. EXHIBIT D Prevailing Wage Rates Legal Holiday Rate The rate for legal holidays shall be as required by the fair Labor Standards Act. •. 23 (1) z 0 LL w L E; SPECIFICATIONS FOR HODGES-- PHASE II '00 PAGE I OF 3 w SCOPE OF WORK This project includes complete renovation of both restrooms; installation of sound deadening material on the walls of the large activity room, the meeting room, and children's classroom; installation and painting of trim in the hallways and meeting rooms; replacement of the kitchen counter; addition of electrical outlets in the office; and painting as indicated. The removal of indicated material is also part of this project. DEMOLITION (In all cases be careful not to damage adjacent areas) SOCIAL HALL (11.08) Remove all paneling, dance bar, base and trim from all 4 walls Save paneling, and trim only, for owner. Save dance bar for re -use. TELEPHONE BOOTH (111) Remove all paneling, base and trim Save paneling and trim only, for owner GOLDEN ROOM (105) Remove all paneling, dance bar, base and trim from south wall and east wall. Save paneling and trim only, for owner. Save dance bar for re -use. CLUB ROOM (113) Remove vinyl wall covering and base from east wall. Discard. KITCHEN (107) Remove kitchen sink and faucet. Carefully ! Save sink for reuse. Remove all laminated counter tops. Discard. RESTROOMS (BOTH) Remove all partitions and ADA grab -bars, plumbing covers, soap and paper towel dispensers in both *Carefully save for reuse. Remove all ceramic tile and mortar from walls and floors. Remove mirrors in both. Discard. �""" 25 HODGES RENOVATION -PHASE II DEMOLITION (cont.) Page 2 of 3 Remove all paneling, base and trim from walls. Save paneling and trim for owner. Remove vanity in women's & sink in men's restroom. Save sinks for owner. Remove light fixture over vanity in women's restroom. Save for owner. Remove commode, urinal & in men's restroom. Discard Remove commodes in women's restroom. Save for reuse. HODGES - PHASE II '00 CONSTRUCTION ELECTRICAL Install 3 outlets per plan in Office (104) on a separate circuit from the existing in compliance with code. Permits must be obtained by Contractor- (at no charge) Install new lhtin fig xture in restrooms per owner's selection, not to exceed $200.00 ea. WALLS Install "wall carpeting" equal to Mohawk, fire-rated'A' sound deadening wallcovering (@ $15 sq yd) for sound control in rooms 108, 105, 111, and 113 - per plans. New material to cover only the area formerly covered by paneling or vinyl. Re -install Dance Bar. Install new "Marlite" type material on all walls of both restrooms and women's vestibule, per owner's approval Install new unframed mirrors to meet ADA requirements. 26 27 HODGES II'00 CONSTRUCTION (cont.) PAGE 3 OF 3 PAINT Paint exterior Entry (east) wall with high -use enamel latex paint per owner's selection. Paint all trim to match adjacent wall color. Paint both restroom ceilings per owner's selection. KITCHEN Install new laminated counter tons per plan, per owner's selection. Re -install existing kitchen sink. Install new (Delta' type, ADA )kitchen faucet. TRIM Install new trim (lx3's, paintable) in rooms 104, 105, 107, 108, 113, and corridors 101, 102, 103,109,110,112, as indicated on plans RESTROOM FIXTURES Re -seat and re -install commodes in Women's restroom. Install new ADA urinal, and re -seat and re -install ADA commode in Men's restroom, (similar to existing). Install new ADA vanities in both restrooms, per plan. Re -install partitions, grab -bars, soap dispensers, paper towel dispensers, and ADA plumbing guards in both restrooms. L/Hodges Phase II'00 27