1 ORDINANCE NO. 2002-00060
AN ORDINANCE MAKING CHANGES IN THE FY 2001-02 BUDGET
. OF THE CITY OF LUBBOCK FOR GOVERNMENT PURPOSES; AND
WHEREAS, Section 102.010 of the Local Government Code of the State
of Texas authorizes City Councils to make changes in the budgets for municipal
purposes; and
WHEREAS, the City Council deems it advisable to change the budget for
municipal purposes and reallocate funds as per Exhibit "A" attached hereto;
NOW THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF
THE CITY OF LUBBOCK;
THAT the 2001-02 fiscal year, revised budget of the City of Lubbock
attached hereto as Exhibit "A" is hereby adopted and ordered filed with
appropriate authorities.
THAT a copy of the changes made to the City of Lubbock budget pursuant
to this Ordinance shall be filed with the City Secretary and County Clerk of
Lubbock County as required by law.
AND IT IS SO ORDERED
Passed by the City Council on first reading this 25th day of April, 2002.
Passed by the City Council on second reading this 23rd day of May
2002.
ATTEST:
J\)~ ~v-~ ~a Garza, City Secretary
APPROVED AS TO CONTENT:
1\ J ()" f p -~ r. t4 / BlYliJ . QC\'ft;l_X-k_f
Debra Forte )L~
Deputy City Manager
APPROVED AS TO FORM:
AS/gs/ccdocs/Ordinance Revised Budget 2002.ord
April 12, 2002
l
l
CITY OF LUBBOCK
FISCAL YEAR 2001-02
REVISED BUDGET
(APPROVED)
{Council Meeting May 23, 2002)
CITY OF LUBBOCK
. Lubbock, Texas.
-
-
-' '
-
-
-
-
-
-
-
-
-
-
-
FY2001-02
REVISED BUDGET
TABLE OF CONTENTS
I. TABLE OF CONTENTS
II. SUMMARY OF REVENUES AND EXPENDITURES
General Fund ............................................................................................ 1
Electric Fund ............................................................................................. 6
Water Fund ............................................................................................... 7
Sewer Fund ............................................................................................... 8
Solid Waste Fund ...................................................................................... 9
Airport Fund ............................................................................................ 10
Silent Wings Fund ................................................................................... 11
Storrnwater Drainage Fund ..................................................................... 12
Internal Services Fund ............................................................................ 13
Insurance Health Fund ............................................................................ 16
Self-Insurance Risk Management Fund .................................................. 17
Transit Revenue Fund ............................................................................. 18
Economic Development Fund ................................................................. 19
Community Investment Fund .................................................................. 20
Technology Fund ........... : ........................................................................ 21
HoteVMotel Fund ..................................................................................... 22
Ill. PERSONNEL SUMMARY
Positions Added ...................................................................................... 23
Personnel Summary ................................................................................ 24
IV. CAPITAL PROJECTS ................................................................. 30
Fund Summary
Individual Capital Projects
v. Community Investment Fund Financial Policy ........................................ 7 4
-
EXPENDITURES
-
-
-
-j--~
CITY OF LUBBOCK
GENERAL FUND -SUMMARY OF REVENUES AND EXPENDITURES
ORJG BUDG REVISED VARIANCE -ACCOUNT DESCRIPTION 2001-02 2001-02 REVTOORG
UTILIZATION OF FUND BALANCE 0 100,000 100,000 -TOTAL OPERATING REVENUE 76,432,452 76,379,948 (52,504)
'
EXPENSES/EXPENDITURES
PAYROLL 63,782,740 63,448,830 (333,910) -SUPPLIES 2,967,646 2,995,130 27,484
MAINTENANCE 5,201,958 4,979,470 (222,488)
OTHER CHARGES 14,460,611 14,512,910 52,299 -CAPITAL OUTLAY 533,596 561,596 28,000
OPERATING TRANSFER-PSIP 289,083 305,979 16,896
REIMBURSEMENTS {1,110,560} (1 ,075,5601 35,000 -TOTAL FUND EXPENDITURES 86,125,074 85,728,355 {396,719}
VARIANCE (9,692,622) (9,348,407) 344,215
-TRANSFERS IN 15,357,009 15,140,577 (216,432)
TRANSFERS OUT 5,664,387 5,892,170 227,783
""""
VARIANCE 9,692,622 9,248,407 (444,215)
Total Revenue 91,789,461 91,620,525 (168,936) -. Total Expenditures 91,789,461 91,620,525 {168,936}
Variance 0 0 0 -
r '
1
ACCOUNT DESCRIPTION
Total Tax Revenues
Total Licenses and Permits
CITY OF LUBBOCK
GENERAL FUND
SCHEDULE OF REVENUES
ORIGBUDG REVISED
2001-02 2001-02
65,389,509 65,723,946
1,303,515 1,282,915
Total Intergovernmental Revenue 282,275 280,142
Total Charges for Services 4,473,446 4,376,373
Total Fines and Forfeits 3,280,000 3,180,000
Total Interest Earnings 713,366 497,175
Total Rental Revenue 5,284 7,084
Total Recoveries 471,037 460,293
Total Other Revenue 514,020 572,020
Total Gen Fund Operating Reven 76,432,452 76,379,948
2
VARIANCE
REVTOORG
334,437
(20,600)
(2,133)
(97,073)
(100,000)
(216,191)
1,800
(10,744)
58,000
~52,504}
~
' •.;,. .. , ....
~"""~
CITY OF LUBBOCK
GENERAL FUND
lf""'' SCHEDULE OF TRANSFERS IN
ORIGBUDG REVISED VARIANCE ,.... ACCOUNT DESCRIPTION 2001~02 2001-02 REVTOORG
TRANSFERS FROM -Electric Property 1;175,323 1,175,323 0 " . Utility -COB 3,087,970 2,687,899 (400,071)
Electric GF Infrastructure 1,200,000 1,200,000 0
f""'' Electric lnd Cost 889,259 889,259 0
Electric St Light 1,667,863 1,667,863 0
Electric Gas Tax 256,602 256,602 0
Total Electric Rev Fund 8,277,017 7,876,946 (400,071) -' Water Property 1,290,000 1,290,000 0
Utility ~ COB 941,667 943,787 2,120
fl"'t Water lnd Cost 562,257 562,257 0
Total Water Rev Fund 2,793,924 2,796,044 2,120 -Sewer Property 800,000 800,000 0
Utility-COB 537,404 525,200 (12,204)
Sewer lnd Cost 251,041 251,041 0
Total Sewer Rev Fund 1,588,445 1,576,241 (12,204) ,...
Solid Waste lnd Cost 358,704 358,704 0
Solid Waste Property 180,000 180,000 0
1!""1 Utility~ COB 471,394 471,165 ~229}
Total Solid Waste Fund 1,010,098 1,009,869 (229)
""""
Airport Transfer 31,800 31,800 0
Airport lnd Costs 211,369 211,369 0
AARFCosts 785,326 785,326 0 ,.... Total Airport Rev Fund 1,028.495 1,028.495 0
Hotel Motel Fund 335,844 505,919 170,075
Storm lnd Cost 97,063 97,063 0
r""; Community Improvement 226,123 250,000 23,877
TRANSFERS FROM 15,357,009 15,140,577 {216,432)
M
-
3
ACCOUNT DESCRIPTION
CITY OF LUBBOCK
GENERAL FUND
SCHEDULE OF EXPENDITURES
ORIGBUDG REVISED
2001-02 2001-02
COMMUNCIATIONS/LEGISLATION 1,053,031 1,027,588
COMMUNITY SERVICES 16,755,932 17,047,790
DEVELOPMENT SERVICES 3,307,845 3,092,585
ELECTRIC 2,374,811 2,256,214
FINANCIAL SERVICES 1,618,573 1,634,648
FIRE 19,236,184 19,189,858
GENERAL GOVERNMENT 6,164,730 6,381,497
HUMAN RESOURCES 929,298 927,016
MANAGEMENT SERVICES 657,483 636,384
POLICE 29,378,475 29,332,219
STRATEGIC PLANNING 4,648,711 4,202,558
Total General Fund Operating Expenditures 86,125,073 85,728,357
4
VARIANCE
REVTOORG
(25,443)
291,858
(215,260)
(118,597)
16,075
(46,326)
216,767
(2,282)
(21,099)
(46,256)
{446,153}
{396,716}
;._-
I""! .. '
r-:
CITY OF LUBBOCK
GENERAL FUND ,.
SCHEDULE OF TRANSFERS OUT
ORIG BUDG REVISED VARIANCE -ACCOUNT DESCRIPTION 2001-02 2001-02 REV TO ORG
TRANSFERS OUT -TFR-RES E-COMM 0 0 0
TFR-TO TRAFFIC 0 0 0
TFR-TO COMMUNI 672,552 672,552 0
TFR-TO PUBLIC 320,000 320,000 0
TFR-TO PARKS C 500,000 500,000 0
TFR-TO STREET 0 0 0
TFR-TO PERM ST 1,500,000 1,500,000 0
fiJ""1 TFR-TO GEN FAC 1,581,275 1,809,058 227,783
TRF-TO GEN CAP 0 0 0
TRF-TO ECON DE 132,500 132,500 0 ,..., TFR-TO ELECTRI 0 0 0
TFR-TO WATER 0 0 0
TFR-TO SEWER 0 0 0
,...., TFR-TO SOLID W 0 0 0
TFR-TO AIRPORT 0 0 0
TFR-TO TRANSIT 849,200 849,200 0
TFR-TO LEGISLA 108,860 108,860 0 r-TRANSFERS OUT 5,664,387 5,892,170 227,783
-
-
-
-
5
CITY OF LUBBOCK
ELECTRIC FUND SUMMARY
ACCOUNT DESCRIPTION
Operating Revenue
Operating Expenses
Operating Income
Non-Operating Revenue/expenses
Income/Loss Before Transfers
Transfers In/Out & Debt Service
Net Income (loss)-GAAP Basis
6
ORIG BUDG
2001-02
1 00,195,455
79,740,633
20,454,822
2,736,867
23,191,689
20,079,458
3,112,231
REVISED
2001-02
88,252,093
68,536,955
19,715,138
1,344,547
21,059,685
19,457,517
1,602,168
City of Lubbock
SUMMARY OF REVENUE AND EXPENDITURES
!""'"-WATER FUND
ORIG BUDG REVISED VARIANCE
,..., 2001-02 2001-02 REVTOORG
REVENUES
General Consumers Metered 28,858,000 28,858,000 0
Municipal Sales 977,285 977,285 0 ..... Sales To Other Cities 275,000 275,000 0 '"
Reimburse From Other Cities 250,000 250,000 0
Municipalities 240,000 240,000 0 ,.... Fire Hydrant Rental 48,000 48,000 0
Interest on Investment 313,525 234,217 (79,308)
Service Charges Checks 22,000 22,000 0 ,..., Reconnection Service Fee 120,000 270,000 150,000
Miscellaneous Other 14,563 14,563 0
LAH Recreation 270,500 270,500 0
TOTAL REVENUES 31,388,873 31,459,565 70,692 ,...
OPERATING EXPENSES
Water Utilities Administrati 715,525 714,007 (1,518) -Engineering 476,964 475,241 (1,723)
Metering & Customer Services 1,074,946 1,069,613 (5,333)
Equipment Maintenance 353,300 350,726 (2,574) -Pipeline Maintenance 1,340,197 1,335,641 (4,556)
I· Laboratory Services 366,538 364,623 (1,915)
Pumping & Control 2,916,886 2,911,143 (5,743)
Water Treatment 6,067,677 6,054,122 (13,555) ,.... Water Production 648,810 647,170 (1,640)
' Water Reservoir 674,909 673,777 (1,132)
Collections 1,821,350 1,821,350 0 ,_ Uncollectible Accounts 258,400 258,400 0
TOTAL OPERATING EXPENSES 16,715,502 16,675,813 (39,689)
-OTHER EXPENDITURES
Payment to Debt Service 5,320,355 5,244,188 (76,167)
Indirect Cost Allocation 562,257 562,257 0
Interest on Bonds 5,982,432 5,923,501 {58,931} -TOTAL OTHER EXPENDITURES 11,865,044 11,729,946 {135,098}
RESERVES AND RETAINAGES:
~ Water Facilities and Systeml 203,341 203,341 0
LAH Development 5,000 5,000 0
Rate Stabilization Reserves 0 242,652 242,652
Trans -Legislation 54,430 54,430 0
Trans to Community lmprovem 313,889 314,596 707
In Lieu of Property Tax 1,29o;ooo 1,290,000 0
Utility/COB 941,667 943,787 2,120
II"'\ TOTAL RESERVES/RETAININGS 2,808,327 3,053,806 245,479
TOTAL FUND EXPENDITURES 31,388,873 31,459,565 70,692
,_ REMAINING BALANCE 0 0 0
7
City of Lubbock
SUMMARY OF REVENUE AND EXPENDITURES
SEWER FUND
ORIG BUDG REVISED VARIANCE
2001-02 2001-02 REV TO ORG
REVENUES
Sewer Service Charges 16,170,597 15,779,018 (391,579)
Land Application 535,500 535,500 0
Surcharge 522,600 557,600 35,000
Sales of Effluent 500,000 500,000 0
Interest on Investments 177,766 127,555 (50,211)
Other Revenues 7,000 7,000 0
Transfer from Debt Service 0 0 0
Sale of Surplus Equip 0 0 0
Transfer From Rate Stab. 0 72,683 72,683
Transfer from General Fund 0 0 0
TOTAL REVENUES 17,913,463 17,579,356 (334,107)
OPERATING EXPENSES
Water Reclamation 4,700,947 4,663,663 (37,284)
Wastewater Collection 946,831 935,371 (11 ,460)
Land Application 2,448,505 2,444,130 {4,375)
Industrial Monitoring/Pre 397,539 395,843 (1 ,696)
Wastewater Laboratory 371,929 370,562 (1 ,367)
Collections 372,641 372,641 0
Uncollectable Accounts 109,036 109,036 0
Mise Other Expenses 0 0 0
TOTAL OPERATING EXPENSES 9,347,428 9,291,246 (56, 182)
OTHER EXPENDITURES
Payment to Gen. Debt Service 4,077,586 4,077,586 0
Indirect Cost Allocation 251,041 251,041 0
Interest on Bonds 2,404,786 2,404,786 0
TOTAL OTHER EXPENDITURES 6,733,413 6,733,413 0
RESERVES AND RETAINAGES:
Sewer Facilities and Systemn 261,653 0 (261,653)
Rate Stabilization Reserves 0 0 0
Trans -Legislation 54,430 54,430 0
Trans to Community lmprovem 179,135 175,067 (4,068)
Trans to Solid Waste Cap. 0 0 0
In Lieu of Property Tax 800,000 800,000 0
Utility/COB 537,404 525,200 {12,204}
TOTAL RESERVES/RETAINING$ 1,832,622 1,554,697 {277,925}
TOTAL FUND EXPENDITURES 17,913,463 17,579,356 {334,107}
REMAINING BALANCE 0 0 0
8
-.
c -
~
City of Lubbock
SUMMARY OF REVENUE AND EXPENDITURES
~ SOLID WASTE FUND
ORIG BUDG REVISED VARIANCE -2001-02 2001-02 REV TO ORG
REVENUES: -Garbage Service Charges:
Residential Collections 8,666,786 8,666,786 0
Municipal Collections 160,000 160,000 0
Net Garbage Service Charges: 8,826,786 8,826,786 0 -Landfill Fees 3,322,622 3,322,622 0
Municipal Landfill Fees 3,378,143 3,378,143 0 -Composting Revenue 43,292 0 (43,292)
Interest on Investments 104,160 139,821 35,661
Recycling Programs 35,000 35,000 0 ,.... Scrap Material 0 25,505 25,505
Miscellaneous Revenues 3,125 3,125 0
TOTAL REVENUES: 15,713,128 15,731,002 17,874
!""" OPERATING EXPENDITURES:
Residential Collection 6,923,004 6,880,950 (42,054)
Solid Waste Disposal 2,604,803 2,570,209 (34,594)
Contractual Services 716,473 714,011 (2,462)
Recycling 500,357 551,781 51,424
Collections 314,088 314,088 0
Uncollectible Accounts 100,711 100,711 0
Total Operating Expenditures 11,159,436 11,131,750 (27,686)
-OTHER EXPENDITURES
Indirect Cost Allocation 358,704 358,704 0
Utility-COB 471,394 471,165 (229)
In Lieu of Property Tax 180,000 180,000 0 ,....._ Payment to Debt Service 951,300 951,300 0
Total Other Expenditures 1,961,398 1,961,169 (229)
l""'l RESERVES AND RETAINAGES:
Solid Waste Fac. & Sys. lmpt 1,132,845 1,132,845 0
Cap Proj Fd-Post Clos Care 215,230 215,230 0
~ Transfer-Legislation 87,088 87,088 0
Transfer to Comm lnvestmt 1,157,131 1,157,055 (76)
Rate Stabilization Reserves 0 45,865 45,865
Total Reserves/Retainages 2,592,294 2,638,083 45,789 -Total Fund/Expenditures 15,713,128 15,731,002 17,874
Remaining Balance 0 0 0 -
9
CITY OF LUBBOCK
SUMMARY OF REVENUES AND EXPENDITURES
AIRPORT FUND
ORIGBUDG REVISED VARIANCE
ACCOUNT DESCRIPTION 2001-02 2001-02 REVTOORG
REVENUES:
Landing Area 873,750 868,750 (5,000)
Hanger Area 375,175 372,950 (2,225)
Terminal Area 2,661,000 2,732,444 71,444
Parking Area 1,267,740 1,229,740 (38,000)
Agriculture and Rent 42,000 50,000 8,000
Industrial Area 52,500 232,149 179,649
Interest on Investments 38,080 28,308 (9,772)
Marketing Contrib-Hotel Tax 25,887 25,887 0
Miscellaneous 20,900 107,400 86,500
TFR-From Airport CP 0 50,000 50,000
TOTAL REVENUES 5,357,032 5,697,628 340,596
OPERATING EXPENDITURES:·
Administration and Marketing 764,614 806,944 42,330
Field Maintenance 601,999 528,053 (73,946)
Maintenance 1,814,922 1,791,477 (23,445)
Security Access 387,759 661,757 273,998
Security Police 404,109 420,667 16,558
Total Oper. Expenditures 3,973,404 4,208,898 235,494
OTHER EXPENDITURES:
Trnfr to Gen Fd-Terminal Rf 31,800 31,800 0
Trans to General Fund/ARFF 785,326 785,326 0
Trans to Silent Wings Mus 88,837 71,268 (17,569)
Transfer to Solid Waste 232,991 232,991 0
Contr to EF&SI-Power Lines 33,306 33,306 0
Transfer to Sewer-Parking
Indirect Cost Allocation 211,369 211,369 0
Total Other Expenditures 1,383,629 1,366,060 (17,569)
RESERVES AND RETAINAGES:
Air Facil & Sys Imp Fund 0 122,670 122,670
Total Reserves/Retainages 0 122,670 122,670
Total Fund Expenditures 5,357,033 5,697,628 340,595
Remaining Balance 0 0 0
10
-"
~
,..
-
,..,.,
-
!"""'
M
-;
-
,-
-
-
CITY OF LUBBOCK
SUMMARY OF REVENUES AND EXPENDITURES
SILENT WINGS FUND
ACTUAL REVISED
ACCOUNT DESCRIPTION 2001-02 2001-02
REVENUES:
Air show proceeds 0 350,000
Tmfer from Airport Rev. Fund 0 71,268
TFR from Tech Fund 0 170,000
TOTAL REVENUES 0 591,268
OPERATING EXPENDITURES:
Silent Wings Museum Adm. 0 241,271
Air Show Operations 0 270,000
Total Oper. Expenditures 0 511,271
OTHER EXPENDITURES:
Total Other Expenditures 0 0
RESERVES AND RETAINAGES:
Total Reserves/Retainages 0 0
Total Fund Expenditures 0 511,271
Remaining Balance 0 79,997
11
VARIANCE
REVTOORG
350,000
71,268
170,000
591,268
241,271
270,000
511,271
0
0
511,271
79,997
City of Lubbock
SUMMARY OF REVENUE AND EXPENDITURES
STORM DRAINAGE FUND
ORIG BUDG REVISED VARIANCE
2001-02 2001-02 REVTOORG
REVENUES
Interest on Investments 9,793 12,124 2,331
General Consumers Metered 5,950,080 5,953,723 3,643
Book Sales 300 300 0
TOTAL REVENUES 5,960,173 5,966,147 5,974
OPERATING EXPENDITURES
Stormwater Utility Oper. 517,315 526,297 8,982
Street Cleaning Operations 391,042 388,854 (2,188)
Storm Sewer Maint Oper. 155,720 154,900 (820)
Utility Collections 317,423 317,423 0
TOTAL EXPENSES 1,381,500 1,387,474 5,974
OTHER EXPENDITURES
Payment to Debt Service 2,317,792 2,317,792 0
Indirect Cost Allocations 97,063 97,063 0
TOTAL OTHER EXPENDITURES 2,414,855 2,414,855 0
RESERVES AND RETAINING$
Stormwater Capital Projects 2,163,818 2,163,818 0
TOTAL RESERVES AND RETAININGS 2,163,818 2,163,818 0
TOTAL FUND EXPENDITURES 5,960,173 5,966,147 5,974
REMAINING BALANCE 0 0 0
12
CITY OF LUBBOCK
SUMMARY OF REVENUES AND EXPENDITURES
~ INTERNAL SERVICES FUND
ORIGBUDG REVISED VARIANCE -ACCOUNT DESCRIPTION 2001~02 2001~02 REVTOORG
Fleet Revenue:
!"'"" Dept-Sales Labor 1,482,000 1,482,000 0
Dept~Admin Charges 199,500 199,500 0
Dept-Equip. Rental 29,000 29,000 0
Dept-Outside Charges 885,947 885,947 0 -Sales Auto Parts 1,453,015 1,453,015 0
Sales Gasoline 1,399,000 1,399,000 0
Outside Purchased Gas 305,000 305,000 0 ....., COGS -Auto Parts (1 ,252,599} (1,252,599) 0
COGS -Unleaded (805,000) (805,000) 0
COGS -Diesel (465,000} (465,000) 0 ,.... COGS -Outside Purch. Gas (264,625} (264,625) 0
COGS -Outside Purch. Diesel (16,660) (16,660) 0
COGS -Outside Charges (805,406) (805,406) 0
Interest on Investment 7,140 7,682 542
Total Fleet Revenue . 2,151,312 2,151,854 542
Fleet Operations ~2,111,514} (2,094,863} 16,651
FLEET NET REVENUE 39,798 56,991 17,193
!"""!
Radio Shop Revenue
Dept-Sales Labor & Parts 509,396 509,396 0 -Interest on Investment 128 5,539 5,411
COGS-Radio Parts ~120,000} (120,000} 0
Total Radio Shop Revenue 389,524 394,935 5,411
~ Radio Shop Operations ~380,079} {384,815} {4,736}
RADIO SHOP NET REVENUE 9,445 10,120 675
Information Svcs Revenue
Dept-Gen Data Processing 3,780,380 3,780,380 0
Interest On Investment 2,188 16,842 14,654
Total Information SVcs Revenue 3,782,568 3,797,222 14,654 -Information Svcs Operations ~3. 782,568} {3,767,665} 14,903
INFORMATION SVCS NET REVENUE 0 29,557 29,557
I"""! Comm Center Revenue
~ --' Dept-Communications Charges 1,885,916 1,925,512 39,596
Total Communications Revenue 1,885,916 1,925,512 39,596 -Police Comm Center Operations (1 ,638,551) ( 1,678, 189) (39,638)
Fire Comm Center Operations ~247,323l {247,323} 0
Total Comm Center Operations !1,885,874) {1,925,512} ~39,638} -COMM CENTER NET REVENUE 42 0 (42)
-13
CITY OF LUBBOCK
SUMMARY OF REVENUES AND EXPENDITURES
INTERNAL SERVICES FUND
ORIG BUDG REVISED VARIANCE
ACCOUNT DESCRIPTION 2001-02 2001-02 REVTOORG
Telephone Services
Phone-Surcharge 363,168 363,168 0
Phone-System 939,853 981,414 41,561
Phone Set Maint 471,300 471,300 0
Total Telephone Services Rev 1,774,321 1,815,882 41,561
Telephone Svcs Operations (1 ,291 ,920} (1 ,300,193} (8,273)
Telephone Transfers {312,000l {327,930) {15,930l
Total Telephone Expenditures p,603,920) (1,628,123) {24,203l
Telephone Svcs NET REVENUE 170,401 187,759 17,358
Facilities Mgt Revenue
Miscellaneous Bldg Maint 20,000 20,000 0
Building Rent 14,283 14,283 0
Dept-Bldg Service Charge 231,736 203,766 (27,970}
Dept-Vending Machine 6,000 6,000 0
Building Maint Charges 1,013,008 1,013,008 0
Interest on Investment 17,051 13,993 ~3.058l
Total Facilities Mgt Revenue 1,302,078 1,271,050 {31,0281
Facilities Mgt Operations (1 ,296,432) {1,251,4521 44,980
Facilities Mgt NET REVENUE 5,646 19,598 13,952
Custodial Svcs Revenue
Custodial Charges 846,882 846,882 0
Total Custodial Revenue 846,882 846,882 0
Custodial Contract {846,882} {846,882) 0
CUSTODIAL NET REVENUE 0 0 0
Print Shop Revenue
Dept-Sales Office Supplies 230,000 134,000 (96,000)
Dept-Sales Printing 373,092 373,092 0
Dept-Sales Xerox 26,064 26,064 0
Dept-Mailroom Handling Fee 20,000 20,000 0
COGS-Office Supplies (200,000} (116,522} 83,478
COGS-Printing Supplies (102,000) (102,000} 0
Interest On Investment 18,402 14,298 (4,104)
Use of Fund Balance 0 26,603 26,603
Total Print Shop Revenue 365,558 375,535 9,977
Print Shop Operations {356,038} {375,535} {19,497}
Print Shop Net Revenue 9,520 0 (9,520)
14
Jll"'!!
'
CITY OF LUBBOCK
SUMMARY OF REVENUES AND EXPENDITURES .,.... INTERNAL SERVICES FUND
ORIG BUDG REVISED VARIANCE
!"""! ACCOUNT DESCRIPTION 2001-02 2001M02 REVTOORG
Warehouse Revenue
DeptMSales General Stores 2,632,000 2,632,000 0
""""" Dept-Junk Whrhse 31,000 31,000 0
COGS-General Stores {2,350,000) (2,350,000) 0
Interest On Investment 8,717 7,725 (992} -Total Warehouse Revenue 321,717 320,725 1992)
Warehouse Operations (274,845) {271,960} 2,885
WAREHOUSE NET REVENUE 46,872 48,765 1,893
Env Compliance Revenue
Environmental Compliance 225,362 225,362 0
f"""< Interest On Investment 70 300 230
~ Total Env Compliance Revenue 225,432 225,662 230
Env Compliance Operations ~223,5902 {222,944} 646
ENV COMPLIANCE NET REVENUE 1,842 2,718 876 ,.....
Switchboard Revenue
DeptMSwitchboard Revenue 68,000 73,822 5,822 ..... Interest on Investment 11,362 9,126 {2,236}
Total Switchboard Revenue 79,362 82,948 3,586
Switchboard Operations F0,746} {76,568} {5,822} -Switchboard Net Revenue 8,616 6,380 {2,236)
Investment Pool
!""'' Dept-Investment Pool Rev 256,513 275,009 18,496
Total Investment Pool Revenue 256,513 275,009 18,496
Investment Pool Operations {253,742} {275,009} {21,267}
Investment Pool Net Revenue 2,771 0 (2,771)
legislation
Interest on Investment 5,733 4,540 (1,193} -Dept-legislation Revenue 359,238 359,238 0 t '
Total legislation Revenue 364,971 363,778 {1,193}
legislation Operations {357,118} (357,118} 0 -legislation Net Revenue 7,853 6,660 (1,193)
~
-
15
CITY OF LUBBOCK
SUMMARY OF REVENUES AND EXPENDITURES
INSURANCE HEALTH FUND
ORIG BUDG REVISED VARIANCE
ACCOUNT DESCRIPTION 2001-02 2001-02 REV TO ORG
REVENUES:
Interest on Investments 257,357 248,187 (9, 170)
Med-Premium Employees 1,904,506 1,854,363 (50,143)
Med-Premium City 7,521,768 7,069,287 (452,481)
Den-Premium Employees 217,478 177,790 (39,688)
Den-Premium City 661,063 661,063 0
Prem-Basic Life 48,600 48,600 0
?rem-Optional Life 581,500 581,500 0
Prem-Depend & Child Life 72,000 72,000 0
?rem-Personal Accid lnsur 38,000 38,000 0
?rem-Retiree/COBRA 1,250,777 1,177,706 (73,071)
?rem-Retiree Life 0 11,500 11,500
L TO-Employee 46,093 46,093 0
LTD-City 248,058 248,058 0
?rem-Philadelphia Life 58,633 58,633 0
Prem-Cancer Insurance 183,006 183,006 0
Prem-Critical Care Cov 12,500 12,500 0
Prem-Vision Care 42,000 42,000 0
Prem-Prepaid Legal Cov 22,500 22,500 0
TOTAL REVENUE 13,165,839 12,552,786 (613,053)
OPERATING EXPENDITURES:
Insurance Health 277,564 276,470 ~1,094)
TOTAL OPERATING EXPENDITURES 277,564 276,470 (1 ,094)
OTHER EXPENDITURES
Claims 10,039,680 9,413,794 (625,886)
Reinsurance 396,151 380,080 (16,071)
Life
City Basic Life 48,600 48,600 0
Optional Life 435,500 435,500 0
Dependent Life 72,000 72,000 0
Retiree Life 146,000 146,000 0
Administration 965,725 971,229 5,504
Personal Accident Insurance 38,000 38,000 0
L TO-Employee 46,093 46,093 0
LTD-City 248,058 248,058 0
Cancer Insurance 183,006 183,006 0
Philadelphia Life 58,633 58,633 0
Prem Critical Care 12,500 12,500 0
Prem Vision Care 42,000 42,000 0
Prem Prepaid Legal Cov 22,500 22,500 0
TOTAL OTHER EXPENDITURES 12,754,446 12,117,993 (636,453)
TOTAL FUND EXPENDITURES 13,032,010 12,394,463 (637,547)
REMAINING BALANCE 133,829 158,323 24,494
16
-'
11""1
,...
!""",
-.
-
,.....
~
,....
,.....
-
\~
""""
,_
CITY OF LUBBOCK
SUMMARY OF REVENUES AND EXPENDITURES
SELF INSURANCE RISK MANAGEMENT FUND
ORIGBUDG REVISED
ACCOUNT DESCRIPTION 2001...()2 2001-02
REVENUE:
Interest on Investments 332,448 283,984
Ref-Mise Recoveries of Exp 10,000 10,000
Prem-Workers Camp Claims 2,278,528 2,278,528
Prem-Prop Premiums to Depts 0 600,000
Prem-Liability Prem to Dept 1,618,439 1,618,439
Prem-Surety & Notary 0 0
TOTAL REVENUES 4,239,415 4,790,951
OPERATING EXPENDITURES
Self Insurance Risk 304,525 378,295
TOTAL OPERATING EXPENDITURES 304,525 378,295
OTHER EXPENDITURES
Workers Camp Prem Pymts 1,800,000 1,800,000
Liability Insurance 290,000 290,000
Work Comp Admin 25,000 25,000
Work Camp Claims 600,000 600,000
Automobile Liability 400,000 400,000
General Liability 523,390 523,390
Fire Cas and Boiler 0 0
lnsur Deductible 4,500 4,500
Sur & Notary Bonds 0 0
Property Premiums 0 600,000
Public Official Bonds 272,000 272,000
Outside Legal Service 20,000 20,000
Professional Services 0 0
Gains/Losses 0 0
TOTAL OTHER EXPENDITURES 3,934,890 4,534,890
REIMBURSEMENTS
Reimbursement Other Charges 0 (139,064)
Reimbursement Workers Camp 0 ~32,360)
TOTAL REIMBURSEMENTS 0 (171 ,424)
RESERVES AND RETAINAGES
Desig-Legal Issues 0 0
TOTAL RESERVES/RETAINAGES 0 0
TOTAL FUND EXPENDITURES 4,239,415 4,741,761
REMAINING BALANCE 0 49,190
17
VARIANCE
REV TO ORG
(48,464)
0
0
600,000
0
0
551,536
73,770
73,770
0
0
0
0
0
0
0
0
0
600,000
0
0
0
0
600,000
(139,064)
{32,360)
(171,424)
0
0
502,346
49,190
DESCRIPTION REVENUES:
Grant Revenues:
Federal (JARC)
Federal Operating Assistance
State Operating Assistance
Federal Capital Assistance
Federal Planning Assistance
State Planning Assistance
Federal Capital (Federal 5309)
State Capital (Federal 5309)
Federal Capital-(Texas Tech)
Total Grant Revenue
Contribution from the City:
City Operating Assistance
City Capital Assistance
City Planning Assistance
Total Contribution from the City
Other Revenue:
Fare Box
Texas Tech University
Route Guarantee I Advertising
Total Other Revenue
Total Revenues:
OPERATING EXPENDITURES:
Operations
Capital
Planning
Total Expenditures
Remaining Balance
FISCAL YEAR 2001-2002
SUMMARY OF REVENUES AND EXPENDITURES
TRANSIT REVENUE FUND
ACTUAL ACTUAL ACTUAL
1998-99 1999-00 2000-01
$0 $58,829 $171,171
$1,393,996 $1,000,000 $1,522,720
$946,952 $800,000 $1,240,435
$1,251,232 $4,149,086 $1,798,890
$52,046 $64,000 $80,000
$45,000 $45,000 $40,000
$0 $0 $990,315
$0 $1,000,000 $1,293,146
$0 $51,099 $366,786
$3,689,226 $7,168,014 $7,503,463
$0 $58,829 $596,100
$866,188 $804,371 $233,100
$13,012 $16,000 $20,000
$879,200. $879,200 .. $849,200 ...
$914,742 $966,915 $745,868
$865,406 $950,374 $957,518
$193,500 $158,611 $165,736
$1,973,648 $2,075,900 $1,869,122
$6,542,074 $10,123,114 $10,221,785
$4,314,596 $3,993,558 $5,399,548
$2,117,420 $6,004,556 $4,682,237
$110,058 $125,000 $140,000
$6,542,074 $10,123,114 $10,221,785
$0 $0 $0
Of the $879,200, $556,895 was carried over to following years.
In addition to the $879,200, $430,992 carried over from previous years was utilized.
In addition to the $879,200, $897,8941s avaUable from carryovars from previous years for a total available of $1,5711,894.
-In addition to the $849,200, $602,330 is available from camyovers from previous years to a !Dial available of $1,451,530.
18
APPROVED REVISED
2001-02 2001-02
$391,171 $200,000
$1,200,000 $1,200,000
$500,000 $500,000
$1,665,000 $1,665,000
$96,000 $96,000
$40,000 $40,000
$4,000,000 $1,000,000
$0 $0
$268,000 $268,000
$8,160,171 $4,969,000
$825,200 $825,200
$0 $0
$24,000 $24,000
$849,200-$849,200
$ 1,025,000 $1,025,000
$ 995,480 $995,480
$ 200,000 $200,000
$ 2,220,480 $2,220,480
$11,229,851 $8,038,680
$5,136,851 $4,945,680
$5,933,000 $2,933,000
$160,000 $160,000
$11,229,851 $8,038,680
$0 $0
-
-
~
,..,
-
~
-
-
-.
I"""
'
CITY OF LUBBOCK
SUMMARY OF REVENUES AND EXPENDITURES
ECONOMIC DEVELOPMENT FUND
ORIGINAL REVISED
2000-01 2000-01
REVENUES:
Eco Dev Allocation of Prop Tax 2,017,657 2,017,657
Interest Income 4,952 4,952
Transfer from the Tourism Reserve 55,000 55,000
Transfer from the General Fund 132,500 132,500
Transfer from Community Investment 0 3,000,000
Transfer from Hotel/Motel-Prior Year True-up 0 244,139
TOTAL REVENUES 2,210,109 5,454,248
OPERATING EXPENDITURES:
Market Lubbock Inc 2,022,609 5,266,748
IMAGE Campaign 187,500 187,500
Miscellaneous 0 0
Total Operating Expenditures 2,210,109 5,454,248
Remaining Balance 0 0
19
Variance to
Ori~inal
0
0
0
0
3,000,000
244,139
3,244,139
3,244,139
0
0
3,244,139
0
SUMMARY OF REVENUES AND EXPENDITURES
COMMUNITY INVESTMENT FUND
FINAL
ORIGINAL REVISED REVISED
2001-02 2001-02 2001-02
Beginning Fund Balance 5,320,228 6,064,275 6,050,978
REVENUES:
Bond Sale 10,000,000 0 0
Interest on Investment-Reese 22,000 12,500 12,500
Loan Proceeds 0 0 6,000,000
Utilization of Fund Balance 0 0 4,000,000
Transfer from General Fund 672,552 672,552 672,552
Transfer from Electric Fund 1,029,323 895,966 895,966
Transfer from Water Fund 313,889 314,596 314,596
Transfer from Sewer Fund 179,135 175,067 175,067
Transfer from Solid Waste Fund 1,157,131 1,157,055 1,157,055
TOTAL REVENUES: 13,374,030 3,227,736 13,227,736
OPERATING EXPENDITURES:
Contribution to Reese (5 Yr) 456,285 0 0
Freeport 250,000 250,000 250,000
Ports to Plains 121,000 121,000 121,000
Technology Project-BSL4 2,500,000 50,000 50,000
Project T 1,000,000 1,000,000 10,000,000
Transfer to Econ Dev -MLI for LRRA 550,000 456,285 456,285
Prospect 10,000,000 0 0
Fleming/et.al 0 3,000,000 3,000,000
Total Operating Expenditures 14,877,285 4,877,285 13,877,285
Remaining Balance 3,816,973 4,414,726 1,401,429
20
-
-
-
21
CITY OF LUBBOCK
SUMMARY OF REVENUES AND EXPENDITURES
HOTEL MOTEL TAX
APPROVED
2001-02
REVENUE
HOTEL MOTEL TAX 2,416,144
UTILIZATION OF FUND BALANCE 0
TOTAL REVENUE 2,416,144
EXPENSESIEXPENDITURES
CONVENTION AND TOURISM 1,035,490
CIVIC SERVICESIHISTORIC PRES RENOV & DEBT 449,058
LUBBOCK ARTS ALLIANCE 138,065
MUNICIPAL ARTS ADMINISTRATION 138,065
VISITOR INFO CTRADMINISTRATION 69,378
INBD TOUR TRAV AIRPORT MKTING 25,887
VISITING PART & SPECT SPORTS MK 276,131
TOURISM RESERVE FUND 86,291
HOTEL & MOTEL-CIVIC CENTER 197,779
SPECIAL PROJECTS 0
TRANSFER TO GENERAL FUND-CIVIC LUBBOCK 0
TOTAL EXPENDITURES 2,416,144
REMAINING BALANCE 0
22
REVISED
2001-02 VARIANCE
2,536,951 120,807
160,000 160,000
2,696,951 280,807
1,066,555 31,065
462,529 13,472
142,207 4,142
142,207 4,142
71,459 2,081
26,664 777
284,415 8,284
88,880 2,589
203,712 5,933
48,322 48,322
160,000 160,000
2,696,951 280,807
0 0
r
-
PERSONNEL SUMMARY
r
-
-
-
-
-
FULL TIME POSITIONS ADDED
Civic Center -Special Events Coordinator (Amphitheater)
Park Maintenance/ ROW-Pesticide Applicator
Electric Distribution Underground Lines -Groundman position
Storm Drainage -Civil Engineer
Police Communications -Dispatcher
TOTAL
APPROVED 01-02
1,943
REVISED 01-02
1,949
23
1
1
2
1
1
6
VARIANCE
6
PERSONNEL SUMMARY
FULL TIME AUTHORIZED POSITIONS
GENERAL FUND
Variance
1999-00 2000-01 2001-2002 2001-2002 Approved 2001-02
DEPARTMENT Actual Actual Approved Revised to Revised 2001-02
I. GENERAL GOVERNMENT
CITY MANAGER 10.00 7.50 7.00 7.00 0.00
CITY SECRETARY 4.00 4.00 4.00 4.00 0.00
CITY ATTORNEY 19.00 18.00 18.00 18.00 0.00
BUDGET & RESEARCH 8.00 6.50 6.50 6.50 0.00
INTERNAL AUDIT 2.00 2.50 2.50 2.50 0.00
MUNICIPAL COURT 23.00 23.00 22.00 22.00 0.00
GENERAL GOVERNMENT TOTAL 66.00 61.50 60.00 60.00 0.00
II. MANAGEMENT SERVICES
CULTURAL ARTS SERVICES 5.00 6.00 6.00 6.00 0.00
GARDEN AND ARTS SVCS 1.00 1.00 2.00 2.00 0.00
MANAGEMENTSVCSTOTAL 6.00 7.00 8.00 8.00 0.00
Ill. FINANCIAL SERVICES
ACCOUNTING 16.00 16.00 16.00 17.00 1.00
PURCHASING 8.00 9.00 8.50 7.50 ~1.00)
FINANCIAL SVCS TOTAL 24.00 25.00 24.50 24.50 0.00
IV. STRATEGIC PLANNING
COMPREHENSIVE PLANNING 10.00 10.00 10.00 10.00 0.00
BUILDING INSPECTION 13.00 14.00 15.00 15.00 0.00
EMERGENCY MANAGEMENT 1.00 1.00 1.00 1.00 0.00
STRATEGIC PLANNING TOTAL 24.00 25.00 26.00 26.00 0.00
V. DEVELOPMENT SERVICES
TRAFFIC ENGINEERING 8.00 8.00 8.00 8.00 0.00
TRAFFIC OPERATIONS 19.00 19.00 20.00 20.00 0.00
PAVED STREETS 23.00 23.00 23.00 23.00 0.00
UNPAVED STREETS 13.00 13.00 13.00 13.00 0.00
STREET CLEANING 8.00 8.00 0.00
STORM SEWER MAINTENANCE 3.00 3.00 0.00
CONCRETE CONSTRUCTION 8.00 8.00 8.00 8.00 0.00
STREET/DRAINAGE ENGINEERING 17.00 18.75 17.75 17.75 0.00
DEVELOPMENT SVCS TOTAL 99.00 100.75 89.75 89.75 0.00
VI. COMMUNITY SERVICES
OUTDOOR RECREATION 5.00 5.50 5.00 5.00 0.00
LIBRARY
MAHON 22.00 21.50 23.00 23.00 0.00
GOD EKE 6.00 6.00 6.00 6.00 0.00
PATTERSON 5.00 5.00 5.00 5.00 0.00
GROVES 6.00 6.00 6.00 6.00 0.00
CIVIC CENTER 22.00 22.00 22.00 23.00 1.00
AUDITORIUM/COLISEUM 14.00 14.00 13.00 13.00 0.00
PARK MAINTENANCE/ROW 71.00 72.00 75.00 76.00 1.00
PARK DEVELOPMENT 7.00 6.00 6.00 6.00 0.00
CEMETERY 9.00 9.00 9.00 9.00 0.00
INDOOR RECREATION 14.00 13.00 10.00 10.00 0.00
LAB SERVICES 28.00 26.00 27.00 33.00 6.00
ANIMAL SERVICES SHELTER 8.00 8.00 8.00 8.00 0.00
ANIMAL FIELD SERVICES 11.00 11.00 11.00 11.00 0.00
ENVIRONMENTAL INSPECTION 22.00 17.00 16.00 10.00 (6.00)
VECTOR CONTROL 8.00 8.00 8.00 8.00 0.00
NEIGHBORHOOD SERVICES 1.00 0.25 0.25 0.25 0.00
COMMUNITY SERVICES TOTAL 259.00 250.25 250.25 252.25 2.00
24
-PERSONNEL SUMMARY
FULL TIME AUTHORIZED POSITIONS
GENERAL FUND -
Variance
1999-00 2()00.()1 2001-2002 2001-2002 Approved 2001-02
~ DEPARTMENT Actual Actual Aperoved Revised to Revised 2001-02
VIII. HUMAN RESOURCES
HUMAN RESOURCES 11.00 11.00 12.00 12.00 0.00 -HUMAN RESOURCES TOTAL 11.00 11.00 12.00 12.00 0.00
IX. FIRE
ADMINISTRATION 6.00 6.00 6.00 6.00 0.00 ,.... PREVENTION 10.00 10.00 10.00 10.00 0.00
TRAINING 5.00 5.00 5.00 5.00 0.00
EQUIPMENT MAINT 4.00 4.00 4.00 4.00 0.00
SUPPRESSION 239.00 239.00 239.00 239.00 0.00
FIRE TOTAL 264.00 264.00 264.00 264.00 0.00
X. POLICE -ADMINISTRATION 22.50 22.50 22.50 23.50 1.00
TRAINING 7.00 7.00 7.00 7.00 0.00
RECORDS 20.00 20.00 17.00 17.00 0.00
INVESTIGATIONS 89.00 85.00 84.00 84.00 0.00
!""" PATROL 240.00 232.00 231.00 230.00 (1.00)
POLICE TOTAL 378.50 366.50 361.50 361.50 0.00
XI. STREET LIGHTING 6.00 6.00 8.00 8.00 0.00 -STREET LIGHTING TOTAL 6.00 6.00 8.00 8.00 0.00
XII. COMMUNICATION/LEGISLATION
CITY COUNCIL 6.00 6.00 6.00 6.00 0.00 -PUBLIC INFORMATION 7.00 8.00 8.00 8.00 0.00
COMM I LEGISLATION TOTAL 13.00 14.00 14.00 14.00 0.00
GENERAL FUND TOTAL r 1,150.50 1,131.00 1,118.00 1,120.00 2.00
-
...
-
-
-
-25
PERSONNEL SUMMARY
FULL TIME AUTHORIZED POSITIONS
GRANT FUNDED
Variance
1999-00 2000-01 2001-02 2001-02 Approved 2001-02
DEPARTMENT Actual Actual A~:proved Revised to Revised 2001-02
GRANT FUNDED POSITIONS
COMMUNITY SERVICES
LAB SERVICES 13.00 17.00 14.00 15.00 1.00
COMMUNITY DEV. ADMIN. 11.00 10.25 10.25 10.25 0.00
COMMUNITY DEV. FIELD 12.00 12.00 12.00 12.00 0.00
LIBRARY-MAHON 6.00 6.00 6.00 6.00 0.00
ENVIRONMENTAL INSPECTION 7.00 7.00 6.00 (1.00)
DEVELOPMENT SERVICES
STREET DRAJNAGE /ENG./ MPO 2.00 2.00 2.00 2.00 0.00
STRATEGIC PLANNING
COMPREHENSIVE PLANNING 1.00 1.00 1.00 1.00 0.00
POLICE
INVESTIGATIONS 5.00 5.00 5.00 5.00 0.00
GRANT FUNDED TOTAL 50.00 60.25 57.25 57.25 0.00
TOTAL GRANT & AUTHORIZED 1,200.50 1,191.25 1,175.25 1,177.25 2.00
26
PERSONNEL SUMMARY ,..... FULL TIME AUTHORIZED POSITIONS
ENTERPRISE FUNDS
Variance ~ 1999-00 2000.01 2001-02 2001-02 Approved 2001-02
DEPARTMENT Actual Actual Af!(!OVed Revised to Revised 2001-02
I. ELECTRIC
ADMINISTRATION 6.50 7.50 8.50 8.50 0.00
!"""' PROMOTION 10.00 10.00 10.00 10.00 0.00
PRODUCTION OPERATIONS 26.00 28.00 28.00 28.00 0.00
PRODUCTION MAINTENANCE 22.00 20.00 21.00 21.00 0.00
DISTRIBUTION ENGINEERING 17.00 20.00 21.00 21.00 0.00 -DISTRIBUTION UNDERGROUND LINES 20.00 20.00 20.00 22.00 2.00
DISTRIBUTION OVERHEAD LINES 28.00 28.00 28.00 28.00 0.00
DISTRIBUTION CUSTOMER SERVICE 19.00 19.00 18.00 18.00 0.00
DISTRIBUTION SUBSTATIONS 11.00 11.00 11.00 11.00 0.00
DISTRIBUTION METER SHOP 6.00 6.00 6.00 6.00 0.00
FIELD SERVICES ·COLLECTIONS 27.00 29.00 29.00 29.00 0.00
CUSTOMER SERVICE 37.00 35.00 35.00 35.00 0.00
(BILLING & COUECTION)
BUSINESS DEVELOPMENT 2.50 2.50 2.50 2.50 0.00
JRM GENERATION FACILITY 22.00 21.00 20.00 20.00 0.00
ELECTRIC TOTAL 254.00 257.00 258.00 260.00 2.00
II. WATER ,... ADMINISTRATION 5.00 5.50 7.50 7.50 0.00
ENGINEERING 15.00 16.00 17.00 17.00 0.00
METERING & CUSTOMER SERV 18.50 19.50 20.50 20.50 0.00
EQUIPMENT MAINTENANCE 6.00 6.00 6.00 6.00 0.00
I"'I!l PIPELINE MAINTENANCE 35.00 34.00 34.00 34.00 0.00
LABORATORY 7.00 7.00 7.00 7.00 0.00
PUMPING & CONTROL 21.00 21.00 21.00 21.00 0.00
TREATMENT 13.00 13.00 13.00 13.00 0.00
PRODUCTION 6.00 6.00 6.00 6.00 0.00 -WATER RESERVOIR 4.00 4.00 2.00 2.00 0.00
WATER TOTAL 130.50 132.00 134.00 134.00 0.00
Ill. SEWER -RECLAMATION 27.00 27.25 26.25 26.25 0.00
COLLECTION 14.50 14.50 15.50 15.50 0.00
LAND APPLICATION 14.00 15.00 16.00 16.00 0.00
INDUSTRIAL MONITOR & PRETREATMENT 7.00 7.00 7.00 7.00 0.00
~ WASTEWATER LAB 5.00 5.00 7.00 7.00 0.00
SEWER TOTAL 67.50 68.75 71.75 71.75 0.00
IV. SOLID WASTE MANAGEMENT
RESIDENTIAL 44.00 51.50 53.50 52.50 (1.00)
DISPOSAL 24.00 25.00 24.00 24.00 0.00
CONTRACTUAL COLLECTION 7.00 10.00 10.00 10.00 0.00 -RECYCLING 5.00 5.50 5.50 6.50 1.00
SOLIDWASTE MANAGEMENT TOTAL 60.00 92.00 93.00 93.00 0.00
V. AIRPORT
ADMIN & MARKETING 8.00 9.00 8.00 8.00 0.00
OPERATIONS 7.00 9.00 7.00 7.00 0.00
MAINTENANCE 12.00 13.00 13.00 13.00 0.00
SILENT WINGS 0.00 0.00 2.00 2.00 0.00
SECURITY-POLICE 9.00 9.00 9.00 9.00 0.00 -SECURITY ACCESS CONTROL 9.00 9.00 9.00 9.00 0.00
AIRPORT TOTAL 45.00 49.00 48.00 48.00 0.00
-
27
PERSONNEL SUMMARY
FULL TIME AUTHORIZED POSITIONS
ENTERPRISE FUNDS
Variance
1999-00 2000.01 2001-02 2001-02 Approved 2001-02
DEPARTMENT Actual Actual Aeeroved Revised to Revised 2001-02
VI. STORM DRAINAGE
STORM DRAINAGE 5.00 5.00 5.00 6.00 1.00
STREET CLEANING 8.00 8.00 0.00
STORM SEWER MAINTENANCE 3.00 3.00 0.00
STORM DRAINAGE TOTAL 5.00 5.00 16.00 17.00 1.00
VII. INTERNAL SERVICES
FLEET SERVICES 35.00 37.50 29.37 29.37 0.00
FLEET PARTS 0.00 0.00 7.13 7.13 0.00
POLICE COMMUNICATIONS 41.00 36.00 36.00 37.00 1.00
FIRE COMMUNICATIONS 0.00 5.00 5.00 5.00 0.00
RADIO SHOP 3.00 4.00 4.00 4.00 0.00
CENTRALVVAREHOUSE 4.00 4.00 4.25 4.25 0.00
PRINT SHOP 5.00 5.00 3.25 3.25 0.00
SWITCHBOARD OPERATORS 2.00 2.00 2.00 2.00 0.00
TELEPHONE SERVICES 1.50 1.50 3.00 3.00 0.00
BUILDING SERVICES 14.00 14.50 14.50 14.50 0.00
INFORMATION TECHNOLOGY 23.50 24.50 24.00 24.00 0.00
INVESTMENT POOL 1.00 1.00 1.00 1.00 0.00
LEGISLATION 1.00 1.50 1.50 1.50 0.00
ENVIRONMENTAL COMPLIANCE 2.50 2.50 2.50 2.50 0.00
INTERNAL SERVICES TOTAL 133.50 139.00 137.50 138.50 1.00
VIII. INSURANCE
.RISK MGT. INSURANCE 4.00 4.00 4.50 4.50 0.00
HEALTH INSURANCE 3.00 5.00 5.00 5.00 0.00
INSURANCE TOTAL 7.00 9.00 9.50 9.50 0.00
ENTERPRISE & INTERNAL SERV. FUNDS TOTAL 722.50 751.75 767.75 771.75 4.00
ALL FUNDS TOTAL
(INCLUDES GRANT FUNDED) 1,923.00 1,943.00 1,943.00 1,949.00 6.00
28
-I
CAPITALPROJECTS.
-
-
-
-
-
,
t ;
-'
-
-
Further information restating to the City of Lubbock's municipally owned utility is
a competitive matter as defined by Resolution 6559 of the City of Lubbock and as
defined in Chapter 552 of the Texas Government Code and is not subject to
public release.
29
No Text
-
-
--
r
,...
-
-
-•
-
PROJECT NAME
Opticom Expansion -Funeral Escort
Replacement Are Station #8
TOTAL PROJECTS BUDGET
SOURCE OF FUNDING
Public Safety Capital Projects Fund
Public Safety Improvement Plan
Unknown
TOTAL FUNDING
CITY OF LUBBOCK
FISCAL YEAR 2001-02 REVISED BUDGET
CAPITAL PROJECTS BUDGET
PUBLIC SAFETY CAPITAL PROJECTS
LIFE TO APPROVED REVISED
DATE 2001-02 2001-02 2002-03
$0 $0 $100,000 $530,000
0 0 85,000 0
$0 $0 $185,000 $530,000
$0 $0 $100,000 $0
0 0 85,000 0
0 0 0 530,000
$0 $0 $185,000 $530,000
30
TOTAL
2003-04 2004-05 2005-06 BUDGET
$0 $0 $0 $630,000
0 0 0 85,000
$0 $0 $0 $715,000
$0 $0 $0 $100,000
0 0 0 85,000
0 0 0 530,000
$0 $0 $0 $715,000
FUND: PUBLIC SAFETY CAPITAL PROJECTS
PROJECT: OPTICOM EXPANSION FOR FUNERAL
ESCORT
FUND PROJECT#: 900-
LOCATION: CITY-WIDE
PROJECT CITY TRAFFIC ENGINEER
MANAGER:
PROJECT DESCRIPTION
ADD OPTICOM EMERGENCY PRE-EMPTION EQUIPMENT TO APPROXIMATELY 150 SIGNAL LOCATIONS CITY-WIDE TO
ALLOW POLICE DEPARTMENT AND EMS VEHICLES OPTIMUM USE OF THE OPICOM SYSTEM. THIS SYSTEM WOULD
INCREASE THE CURRENT SYSTEM FROM JUST BEING USED BY THE FIRE DEPARTMENT IN ONLY THE DIRECTIONS
THEY NEED TO ALL THE DIRECTIONS AND LOCATIONS NEEDED FOR POLICE AND EMS "HOT' RESPONSE AS WELL AS
POLICE FUNERAL ESCORT USE. THE EQUIPING OF THE EMS VEHICLES IS THROUGH SEPARATE CONTRACT WITH
UMC. FOR THE POLICE TO FULLY UTILIZE THE OPTICOM SYSTEM FOR "HOT" RUNS WOULD REQUIRE TRANSMITTERS
IN APPROXIMATELY 160VEHICLES. INSTALLATION WILL BE BY CITY STAFF.
ANNUAL OPERATING IMPACT
ESTIMATED MAINTENANCE AND OPERATION OF THE ADDITIONAL OPTICOM SYSTEM EQUIPMENT WILL BE ABOUT
$30,000NEAR. THE AGREEMENT WITH UMC FOR THEIR EMS VEHICLES TO UTILIZE THE SYSTEM WILL COVER THE
MAJORITY OF THIS COST. ADDITIONAL FUNDING FOR TRAFFIC OPERATIONS 4525.8265 SIGNAL MAINTENANCE
ACCOUNT WILL NEED TO BE INCREASED BEYOND THE INITIAL 5 YEARS TO COVER THE MAINTENANCE OF THE
EQUIPMENT.
BID 20000
START I END
$0
ACCOUNT ACCOUNT
!COMPLETION 6/03
FULL-TIME SAL8002
PROF SVCS 8302
TRAF CNTRL SYS IMP
9244
TOTAL
ACCOUNT ACCOUNT
$100,000.00
SOURCE OF FUNDING L-T-D REV 01-02 BUD02-03 TOTAL FUTURE
PUBLIC SAFETY CAPITAL PROJECTS FUND 0 100,000 0 100,000 0
ftOTAL $0 $100,000 $0 $100,000 $o I
31
-
-
-
-
-
-
-
-'
-
-
-
-
-
-
FUND: PUBLIC SAFETY CAPITAL PROJECTS
PROJECT: REPLACEMENT FIRE STATION #8
FUND PROJECT#: 900-
LOCATION: 2120 50TH ST.
PROJECT RIGHT OF WAY AGENT
MANAGER:
PROJECT DESCRIPTION
THIS PROJECT WILL ACQUIRE A PIECE OF PROPERTY LOCATED AT 2120 50TH STREET FOR THE REPLACEMENT OF
FIRE STATION #8.
ANNUAL OPERATING IMPACT
THERE WILL BE NO OPERATING IMPACT FOR THIS PROJECT.
ACCOUNT
!COMPLETION
I BID 20000
II ACCOUNT
9/02
FULL-TIME SAL 8002
OFFC SUP 8107
OTHER OFFC SUP 8110
ADVRTSNG & PROM
ACCOUNT
TOTAL
$83,000
ACCOUNT
LAND9280
RIGHT-OF-WAY 9284
PROF SVCS 8302
BLDGS-MUNICIPAL 9210
BLDGS-OTHER 9212
$85,000.00
ACCOUNT
SOURCE OF FUNDING L-T-D REV 01-02 BUD02-03 TOTAL FUTURE
PUBLIC SAFETY IMPROVEMENT PLAN 0 85,000 0 85,000 0
[OTAL $0 $85,000 $0 $85,000 $o I
32
No Text
-
~
CITY OF LUBBOCK
FISCAL YEAR 2001-02 REVISED BUDGET
CAPITAL PROJECTS BUDGET -PARKS CAPITAL PROJECTS
LIFE TO APPROVED REVISED TOTAL
PROJECT NAME DATE 2001-02 2001-02 2002-03 2003-04 2004-05 2005-06 BUDGET
!""" Fiesta Plaza at Buddy Holly Rec Area $166,667 $333,333 $990 $0 $0 $0 $0 $500,990
TOTAL PROJECTS BUDGET $166,667 $333,333 $990 $0 $0 $0 $0 $500,990
-SOURCE OF FUNDING
2000 General Obligation Bonds $166,667 $0 $0 $0 $0 $0 $0 $166,667
2002 General Obligation Bonds 0 333,333 990 0 0 0 0 $334,323 -TOTAL FUNDING $166,667 $333,333 $990 $0 $0 $0 $0 $500,990
-
-
-
-
-
-
-' '
33
FUND: PARKS CAPITAL PROJECTS FUND PROJECT#: 905-90008
LOCATION: N. UNIV AVE & CANYON LAKES DRIVE
PROJECT: FIESTA PLAZA@ BUDDY HOLLY REC AREA PROJECT PARK DEVELOPMENT COORDINATOR
MANAGER:
PROJECT DESCRIPTION
THIS PROJECT WILL PROVIDE FOR IRRIGATION, STAGE AREA, RETAINING WALL CAP STONES, FOUNTAIN AS WELL
AS STEPS DOWN TO THE WATER TO BE CONSTRUCTED WITHIN THE NATURAL TOPOGRAPHY OF THE BUDDY HOLLY
RECREATIONAL AREA SUITABLE FOR SUCH EVENTS AS THE ANNUAL FIESTAS CINCO DE MAYO, LOS DIAS DE LOS
MUERTOS AND DIA DE LA INDEPENDENCIA, AND MUSICAL EVENTS. THE CULTURAL AND TRADITIONAL ACTIVITES
WILL ALLOW THE CITIZENS TO LEARN OF AND ENJOY A WIDER UNDERSTANDING OF ONES HERITAGE THROUGH
THE ANCESTRAL ACTIVITIES OFFERED FROM SUCH A PLACE THAT IS INDIGENOUS TO THE AREA.
THIS PROJECT RESPONDS TO THE CITY COUNCIL GOALS AND POLICIES TO IMPROVE THE IMAGE OF LUBBOCK AND
ENHANCE THE QUALITY OF LIFE.
ANNUAL OPERATING IMPACT
AFTER THE PROJECT IS COMPLETED THERE WILL BE SOME MAINTENANCE ISSUES THAT WILL BE ADDRESSED IN
THE OPERATING BUDGET.
ACCOUNT
FULL-TIME SAL 8002
OFFC SUP 8107
PROF SVCS 8302
I¢0MPLETION 4104
BID 20000
START I END
12102 I 3to3
$2,000
ACCOUNT
FULL-TIME SAL 8002
OFFC SUP 8107
PROF SVCS 8302
ADVRTSNG & PROM
PROJECT SCHEDULING
FULL-TIME SAL 8002
TEMP EMP SAL 8081
PROF SVCS 8302
REC SYS IMP 9246
SYS IMP-OTHER 9251
TOTAL
ACCOUNT ACCOUNT
$500,990.00
SOURCE OF FUNDING L-T-D REV 01-02 BUD 02-03 TOTAL FUTURE
2000 GENERAL OBLIGATION BONDS
2002 GENERAL OBLIGATION BONDS
[OTAL
166,667 0
333,333 990
$500,000 $990
34
0 166,667
0 334,323
$0 $500,990
0
0
$o I
-I
-
!""'
-
-
--
-
-
-t
-
-
-
-
LIFE TO
PROJECT NAME DATE
Frankford: 82nd/98th $100,000
TOTAL PROJECTS BUDGET $100,000
SOURCE OF FUNDING
2001 General Obligation Bonds $100,000
2002 General Obligation Bonds 0
TOTAL FUNDING $100,000
CITY OF LUBBOCK
FISCAL YEAR 2001-02 REVISED BUDGET
CAPITAL PROJECTS BUDGET
STREET CAPITAL PROJECTS
APPROVED REVISED TOTAL
2001-02 2001-02 2002-03 2003-04 2004-05 2005-06 BUDGET
$2,676,000 ($1,000) $0 $0 $0 $0 $2,775,000
$2,676,000 ($1,000) $0 $0 $0 $0 $2,n5,ooo
$0 $0 $0 $0 $0 $0 $100,000
2,676,000 (1,000) 0 0 0 0 2,675,000
$2,676,000 ($1,000) $0 $0 $0 $0 $2,ns.ooo
35
FUND: STREET CAPITAL PROJECTS FUND PROJECT#: 915-90092
LOCATION: FRANKFORD AVENUE
PROJECT: FRANKFORD A VENUE FROM 82ND STREET
TO 98TH STREET PROJECT CllY ENGINEER
MANAGER:
PROJECT DESCRIPTION
THIS PROJECT PROVIDES FOR THE CONSTRUCTION OF THIS T-2 THOROUGHFARE STREET (88 FEET WIDE) FROM
82ND STREET TO 98TH STREET. THE COMPLETED PROJECT WILL PROVIDE FOR 3 LANES OF TRAFFIC IN EACH
DIRECTION PLUS A CONTINUOUS LEFT TURN LANE.
ANNUAL OPERATING IMPACT
THIS PROJECT WILL IMPACT THE OPERATING BUDGET BY AN ESTIMATED PAVING MAINTENANCE COST OF $10,000
ANNUALLY.
PROJECT SCHEDULING
I DESIGN 10000 II BID 20000 CONSTRUCTION 3000011 ACQUISITION 40000 II INSTALLATION 50000 I
I
I
START I END
10/00 I 10/02
$200,000
ACCOUNT
FULL-TIME SAL 8002
PROF SVCS 8302
START I END
II 10/02 I 12/02
$10,000
II ACCOUNT
FULL-TIME SAL 8002
ADVRTSNG & PROM
lCOMPLETION 1/04
ISOURCE OF FUNDING
~001 GENERAL OBLIGATION BONDS
2002 GENERAL OBLIGATION BONDS
!TOTAL
START I END II START I END II START I END I
1/03 I 1/04 ll 10/01 I 10/02 II I I $2,545,000 $20,000 $0
ACCOUNT II ACCOUNT II ACCOUNT
FULL-TIME SAL 8002
PROF SVCS 8302
LAND9280
RIGHT-OF-WAY 9284
STREET SYS IMP 9240 FULL-TIME SAL 8002
PROF SVCS 8302
TOTAL
L-T-D
100,000
2,676,000
$2,776,000
REV01-02
36
0
-1,000
$2,775,000.00
BUD02-03 TOTAL
0 100,000
0 2,675,000
$0 $2,775,000
FUTURE
0
0
$o I
,...
-
"""" PROJECT NAME
Computer System Design
,....., TOTAl PROJECTS BUDGET
SOURCE OF FUNDING ,... 1988-95 General Obligation Bonds
2000 General Obligaton Bonds
2001 General Obligation Bonds
Traffic Control System Capital ,... 2002 General Obligation Bonds
Future Bonds
TOTAl FUNDING -
-
-
CITY OF LUBBOCK
FISCAL YEAR 2001-02 REVISED BUDGET
CAPITAL PROJECTS BUDGET
TRAFFIC CONTROL SYSTEM CAPITAL PROJECTS
LIFE TO APPROVED REVISED
DATE 2001-02 2001-02 2002-03 2003-04
$2,760,237 $685,000 $300,000 $500,000 $764,963
$2,760,237 $685,000 $300,000 $500,000 $764,963
$1,485,707 $0 $0 $0 $0
290,037 0 0 0 0
690,000 0 0 0 0
294,493 0 0 0 0
0 685,000 300,000 0 0
0 0 0 500,000 764,963
$2,760,237 $685,000 $300,000 $500,000 $764,963
37
TOTAL
2004-05 2005-06 BUDGET
$0 $0 $5,010,200
$0 $0 $5,010,200
$0 $0 $1,485,707
0 0 290,037
0 0 690,000
0 0 294,493
0 0 985,000
0 0 1,264,963
$0 $0 $5,010,200
FUND: TRAFFIC CONTROL SYSTEM CAPITAL PROJECTS FUND PROJECT#: 930-9296
LOCATION: CITY WIDE
PROJECT: COMPUTER SYSTEM DESIGN PROJECT CITY TRAFFIC ENGINEER
MANAGER:
PROJECT DESCRIPTION
THIS PROJECT CONSISTS OF DESIGN AND CONSTRUCTION OF CENTRAL TRAFFIC COMPUTER HARDWARE,
SOFTWARE AND COMMUNICATIONS FOR REPLACEMENT OF THE EXISTING SYSTEM WITH NEW EQUIPMENT AND
METHODS. THIS SYSTEM WILL IMPROVE THE ABILITY TO MONITOR EXISTING SIGNALIZED INTERSECTIONS,
RESPOND TO MALFUNCTIONS SOONER AND WILL BEGIN REPLACING EXISTING ELECTRONICS BEFORE THEY FAIL
(THEY HAVE ALREADY EXCEEDED THEIR DESIGN LIFE). THIS WILL ALSO ALLOW NEW CONTROLLERS TO
COMMUNICATE WITH THE NEW TRAFFIC COMPUTER SYSTEM IN AN EFFICIENT AND DEPENDABLE MANNER. THE
COMMUNICATIONS REPLACEMENTS WILL BE BASED ON THE CITY'S COMMUNICATIONS MASTER PLAN. 1 C&C/AERIAL
DEVICE WAS ADDED TO THIS PROJECT REPLAC!:SV890139 @$8'5,bOO ..
·~~~~=======================A=N:N:U:AL=:O:P:E:RA:TI=:NG=:IM:P:A:C:T==========================~
NONE
FULL-TIME SAL 8002
PROF SVCS 8302
II ACCOUNT ACCOUNT
FULL-TIME SAL 8002 FULL-TIME SAL 8002 COMM EQUIP 9223
OTHER OFFC SUP 8110 TRAF CNTRL SYS IMP FULL-TIME SAL 8002
PROF SVCS 8302 9244 TEMP EMP SAL 8081
ADVRTSNG & PROM
FULL-TIME SAL 8002
TEMP EMP SAL 8081
COMM EQUIP 9223
COMP EQUIP 9225
TRAF CNTRL SYS IMP
9244
jgOMPLETION 8/05 TOTAL $3,745,237.00
SOURCE OF FUNDING L-T-D REV01..02 BUD02..03 TOTAL FUTURE
1988-95 GENERAL OBLIGATION BONDS 1,485,707 0 0 1,485,707 0
~000 GENERAL OBLIGATION BONDS 290,037 0 0 290,037 0
~001 GENERAL OBLIGATION BONDS 690,000 0 0 690,000 0
ifRAFFIC CONTROL SYSTEM CAPITAL 294,493 0 0 294,493 0
~002 GENERAL OBLIGATION BONDS 685,000 300,000 0 985,000 0
FUTURE BONDS 0 0 0 0 1,264,963
ftOTAL $3,445,237 $300,000 $0 $3,745,237 $1,264,963 I
38
CITY OF LUBBOCK
FISCAL YEAR 2001-02 REVISED BUDGET
CAPITAL PROJECTS BUDGET
GENERAL CAPITAL PROJECTS
LIFE TO APPROVED REVISED TOTAL -PROJECT NAME DATE 2001-02 2001-02 2002-03 2003-04 2004-05 2005-06 BUDGET
Computers FY 01-02 $0 $225,000 $50,000 $0 $0 $0 $0 $275,000
TIF CN2 Equipment 0 0 549,529 0 0 0 0 549,529
'""" TOTAL PROJECTS BUDGET $0 $225,000 $599,529 $0 $0 $0 $0 $824,529
-SOURCE OF FUNDING ,,
TIF CN2 Grant $0 $0 $499,799 $0 $0 $0 $0 $499,799
Technology Fund 0 225,000 99,730 0 0 0 0 324,730 -TOTAL FUNDING $0 $225,000 $599,529 $0 $0 $0 $0 $824,529
-' l
r
r
-
-
-
-
39
I
I
I
FUND: GENERAL CAPITAL PROJECTS
PROJECT: COMPUTERS CITYWIDE 01-02
FUND PROJECT#: 940-90163
LOCATION: CITY~WIDE
PROJECT INFORMATION TECHNOLOGY DIRECTOR
MANAGER:
PROJECT DESCRIPTION
THIS PROJECT WILL FUND THE PURCHASE AND REPLACEMENTS OF COMPUTERS AND SOFTWARE FOR THE
FOLLOWING DEPARTMENTS: ACCOUNTING-LOCAL,JETDIRECT 500X,NETPORT EXPRESS PRINTERS=$4,500;CITY
COUNCIL~HP4550N=$900;FIRE PREVENTION-HP4550N=$1,500;BUILDING INSPECTION~EXTENTNET DX, NETPORT
EXPRESS XL PRINTERS=$3,000;PLANNING-PLOTTER=$10,000; EOC-COLOR PRINTER=$450;PAVED STREETS~LOCAL
PRINTER=$900;STREET/DRAINAGE ENGINEERING-NETPORT EXPRESS PRO,INTERNAL,JETDIRECT, HP DESKJET,HPLJ
IIP=$5,500;PARK MAl NT-NEWPORT EXPRESS PR0=$1 ,500;PURCHASING-EIGHT DESKPRO'S=15,000;HUMAN
RESOURCES-DESKPR0=$2,500;PUBLIC INFO-ARMADA7360MT=$4,800; FIRE ADMIN-TWO DESKPR05166=$5,000; FIRE
PREV-ARMADA1580=$4,800; TRAINING ACAD-THREE DESKPRO 5233MMX=$7,500; PLANNING-2 DESKPRO
5233MMX,THREE DESKPRO 5266MMX=$17,100;PAVED STREETS-DESKPR05166,LTE 5200=$5,000;TRAFFIC ENGIN-
SP700, PROLINEA5100=$11 ,400; GODEKE2 DESKPR0=$5,000;1NDOOR REC-TWO DESKPR0-$5,000;0UTDOOR REC-
PROLINEA,THREE DESKPR0-$10,000;EXPANDED LEVEL:PLANNING-GEOMEDIA PR0=$6,000;EIS-2 COMPUTERS AND
DOCKING STATIONS=$1 0,344;BUILDING INSPECTION-COMPUTERS FOR KIVA=$14,400;EIS-LAPTOPS=$7,000;FIRE-
CLASSROOM COMPUTERS=$12,500;CITY ATTORNEY-CD PORT=$7,500;PLANNING-PRINTERICOPIERISCANNER-
$35,000;TRAFFIC-PC TRAVEL-$5,000
REVISED FY 01/02 = $50,000
ANNUAL OPERATING IMPACT
NONE EXPECTED
PROJECT SCHEDULING
DESIGN 10000 II BID 20000 CONSTRUCTION 300001 ACQUISITION 40000 II INSTALLATION 50000 I
START I END START I END START I END I START I END I START I END I
I II I I I 10/01 I 09/02 I I I $0 $0 $0 $275,000 $0
ACCOUNT II ACCOUNT ACCOUNT II ACCOUNT II ACCOUNT
COMM EQUIP 9223
!COMPLETION 9/02 TOTAL $275,000.00
SOURCE OF FUNDING
TECHNOLOGY FUND
GENERAL CAPITAL PROJECTS FUND
[OTAL
L-T-D
165,000
60,000
$225,000
40
REV 01-02
50,000
0
$50,000
BUD 02-03 TOTAL
0 215,000
0 60,000
$0
FUTURE
0
0
$0 I
FUND: GENERAL CAPITAL PROJECTS FUND PROJECT#: 940.
LOCATION: VARIOUS LOCATIONS
PROJECT: TIF CN2 EQUIPMENT PROJECT TELECOMMUNICATIONS COORDINATOR
MANAGER:
PROJECT DESCRIPTION
THE TIF CN2 GRANT WILL ALLOW FOR ACCESS LUBBOCK COMMUNITY NETWORK (CilY OF LUBBOCK, LUBBOCK
HOUSING AUTHORITY, YWCA AND THE BOYS & GIRLS CLUBS OF LUBBOCK)TO IMPLEMENT A COMMUNITY
TECHNOLOGY NETWORK. THE PROJECT CONSISTS OF:
1 -A WIRELESS COMMUNICATIONS NETWORK
2-VIDEO CONFERENCING
3-VIDEO STREAMING
4-WEBSITE CLEARINGHOUSE.
""" THE NETWORK IS STRUCTURED TO ENHANCE COMMUNICATION AND INFORMATION SHARING AMONG A DIVERSE
GROUP OF PUBLIC SERVICE PROVIDERS.
-
-
-
-
-
"""
TOTAL BUDGET FOR THIS PROJECT IS $549,529. TIF WILL PROVIDE $499,779 WITH THE CITY'S MATCH TOTALING
$49,750.
ANNUAL OPERATING IMPACT
SHOULD BE A MINIMAL IMPACT THAT WILL BE ABSORBED IN THE INFORMATION TECHNOLOGY SERVICES BUDGET.
ACCOUNT
!COMPLETION
BID20000
START I END
5/02 I e1o2
$2,000
ACCOUNT
PROF SVCS 8302
ADVRTSNG & PROM
04/03
ACCOUNT
TOTAL
COMM EQUIP 9223
OTHER EQUIP 9226
FULL-TIME SAL 8002
FULL-TIME SAL 8002
PROF SVCS 8302
COMM EQUIP 9223
COMP EQUIP 9225
OTHER EQUIP 9226
$549,529.00
SOURCE OF FUNDING L-T-D REV 01-02 BUD02-03 TOTAL FUTURE -TIF CN2 GRANT
"fECHNOLOGY FUND
tfOTAL
0 499,779
0 49,750
$0 $549,529
41
0
0
$0
499,779
49,750
$549,529
0
0
$0 I
No Text
-CITY OF LUBBOCK
FISCAL YEAR 2001-02 REVISED BUDGET
CAPITAL PROJECTS BUDGET
GENERAL FACILITIES AND SYSTEM IMPROVEMENTS CAPITAL PROJECTS ,...
LIFE TO APPROVED REVISED TOTAL
PROJECT NAME DATE 2001-02 2001-02 2002-03 2003-04 2004-05 2005-06 BUDGET ,... EIS Structural Standards $757,240 $0 $57,698 $0 $0 $0 $0 $814,938
Munidpal Facility Security 460,058 0 0 0 0 0 0 460,058
Fire Alarm Sprinkler System Auditorium 190,000 0 115,000 0 0 0 0 305,000
77th & Quaker Landfill 310,000 0 20,000 0 0 0 0 330,000 -Coliseum Storage Facilities 0 46,682 17,000 0 0 0 0 63,682
Fleet Replacements FY 01-02 0 544,000 20,000 0 0 0 0 564,000
Fleet Replacements (Revised) FY 01-02 0 0 548,693 0 0 0 0 548,693
SAS Telephone Enhancement 0 0 65,000 0 0 0 0 65,000 -TOTAL PROJECTS BUDGET
! '
$1,717,298 $590,682 $843,391 $0 $0 $0 $0 $3,151,371
SOURCE OF FUNDING
General Facilities & System lmprv $1,717,298 $590,682 $715,693 $0 $0 $0 $0 $3,023,673
""' Environmental Designation 0 0 20,000 0 0 0 0 20,000
Corbin House Settlement 0 0 57,698 0 0 0 0 57,698
Technology Fund 0 0 50,000 0 0 0 0 50,000
TOTAL FUNDING $1,717,298 $590,682 $843,391 $0 $0 $0 $0 $3,151,371 ~
-
-
-
-
-
-
-42
I
I
I
FUND: GENERAL FACILITIES AND SYSTEM
IMPROVEMENTS CAPITAL PROJECTS
FUND PROJECT#: 945-8401
LOCATION: VARIOUS LOCATIONS
PROJECT: EIS STRUCTURAL STANDARDS COMPLIANCE PROJECT ENVIRONMENTAL INSPECTION SERVICES
MANAGER: MANAGER
PROJECT DESCRIPTION
THIS PROJECT WILL PROVIDE FUNDING FOR DEMOLITION OF SIXTY CONDEMNED BUILDINGS THROUGHOUT THE
CITY OF LUBBOCK. REMOVING UNSIGHTLY, DETERIORATING STRUCTURES PROMOTES A CLEAN AND SAFE
ENVIRONMENT. WHEN IT IS DETERMINED THAT A STRUCTURE IS SUB-STANDARD, THE PROJECT IS PLACED OUT
FOR BID. CURRENTLY, BIDS ARE AVERAGING $2.89 PER SQUARE FOOT. THE ENVIRONMENTAL INSPECTION
SERVICES MANAGER KEEPS AN ITEMIZED ACCOUNT OF THE EXPENSES INCURRED BY THE CITY FOR DEMOLITION
OR REMOVAL OF ANY STRUCTURE AND THE CLEANING OF THE LOT. THIS AMOUNT IS PAYABLE IMMEDIATELY AND IT
IS FILED AS A LIEN AGAINST THE PROPERTY.
ANNUAL OPERATING IMPACT
NONE
PROJECT SCHEDULING
DESIGN 10000 I BID20000 I CONSTRUCTION 3000011 ACQUISITION 40000 INSTALLATION 50000 I
START I END START I END
I II I I $0 $0
ACCOUNT II ACCOUNT II
START I END II START I END
10/96 I ongoing II
$814,938 I
ACCOUNT
FULL-TIME SAL 8002
PROF SVCS 8302
BLDGS-OTHER 9212
UTILITY RELOC 9252
SYS IMP-DTHER 9251
II
I
$0
ACCOUNT
START I END I
II I I $0
II ACCOUNT
~OMPLETION ongoing TOTAL $814,938.00
SOURCE OF FUNDING L-T-D REV01-02 BUD02-03 TOTAL FUTURE
GENERAL FACILITIES & SYSTEM 0
MPROVEMENTS CAPITAL PROJECTS 757,240 0 0 757,240 0
CORBIN HOUSE SETTLEMENT 0 57,698 0 57,698 0
lTOTAL $757,240 $57,698 $0 $o I
43
-
-
-
-
-
-
-
-
-
FUND: GENERAL FACILITIES AND SYSTEM
IMPROVEMENTS CAPITAL PROJECTS
PROJECT: MUNICIPAL FACILITY SECURITY
FUND PROJECT#: 945-9193
LOCATION: VARIOUS LOCATIONS
PROJECT FACILITIES MANAGER
MANAGER:
PROJECT DESCRIPTION
MUNICIPAL BUILDING-CONSTRUCT A FOYER AT THE EAST ENTRANCE TO LIMIT UNAUTHORIZED ACCESS TO THIS
FACILITY. SECURITY FEATURES WILL INCLUDE, BUT NOT LIMITED TO: STOREFRONT TYPE ENTRANCE AT THE NEW
FOYER, METAL DETECTORS, X-RAY CAPABILITIES, CARD READERS, CAMERAS, MONITORS, PHONE INTERCOM
SYSTEM AND OTHER RELATED ITEMS.
MUNICIPAL SQUARE -INSTALL BOLLARDS NEAR THE MUNICIPAL COURT ENTRANCE AND BULLET RESISTANT FILM
ON THE WINDOWS AT INFORMATION TECHNOLOGY.
CIVIC CENTER-INSTALL OVERHEAD ROLLUP GATES AT THE 3-4 ACCESS POINTS IN THE UNDERGROUND COVERED
PARKING AREA. INSTALL BOLLARDS AS REQUIRED.
HEALTH DEPARTMENT -INSTALL CARD READERS AND BOLLARDS AS REQUIRED.
LUBBOCK BUSINESS CENTER-INSTALL BOLLARDS AT THE NORTH AND WEST ENTRANCES.
WATER RECLAMATION PLANT-INSTALL BULLET RESISTANT COVERING ON THE CONTROL TOWER WINDOWS AND
AN INFRARED SYSTEM AT THE CHLORINE STORAGE AREA.
INSTALL MONITORS ON THE FRESH AIR INTAKES OF THE HVAC SYSTEMS AT THE MUNICIPAL BUILDING, MUNICIPAL
SQUARE, CIVIC CENTER, COLISEUM AND AUDITORIUM. ADDITIONAL REQUESTS AS SUBMITTED AND APPROVED.
ANNUAL OPERATING IMPACT
MINIMAL
PROJECT SCHEDULING
DESIGN 10000 I BID 20000 I CONSTRUCTION 30000 ACQUISITION 40000 INSTALLATION 50000 I
START J END
01/02 I 04/02
$25,000
ACCOUNT
FULL-TIME SAL 8002
OFFC SUP 8107
PROF SVCS 8302
I
II
START I END
04/02 I 05102
$5,000
ACCOUNT
FULL-TIME SAL 8002
OFFC SUP 8107
PROF SVCS 8302
ADVRTSNG & PROM
!COMPLETION 10/02
SOURCE OF FUNDING
GENERAL FACILITIES AND SYSTEM
IMPROVEMENTS CAPITAL PROJECTS FUND
!TOTAL
II START I END START I END START I END
II
II
05/02 I 10/02 II 5/02 I 10/02 II I
$400,058 $30,000 $0
ACCOUNT II ACCOUNT II ACCOUNT
FULL-TIME SAL 8002
PROF SVCS 8302
BLDGS MUNICIPAL 9210
OTHER EQUIP 9226
TOTAL $460,058.00
L·T -D REV 01-02 BUD 02-03 TOTAL FUTURE
460,058 0 0 460,058 0
0
I
I
$460,058 $0 $0 $460,058 $o I
44
FUND: GENERAL FACILITIES AND SYSTEM
IMPROVEMENTS CAPITAL PROJECTS
PROJECT: FIRE ALARM SPRINKLER SYSTEM
AUDITORIUM
FUND PROJECT#: 945-9538
LOCATION: 2720 DRIVE OF CHAMPIONS
PROJECT FACILITIES MANAGER
MANAGER:
PROJECT DESCRIPTION
THIS PROJECT WOULD PROVIDE FOR THE INSTALLATION OF FIRE ALARM STATIONS THROUGHOUT THE FACILITY, AN
AUTOMATED VOICE EVACUATION SYSTEM AND SPRINKLER SYSTEM. THE EVACUATION SYSTEM WOULD INSTRUCT
PATRONS IN THE CASE OF FIRE OR NEED TO EVACUATE THE FACILITY. THIS NEED WAS IDENTIFIED BY THE FIRE
MARSHALS OFFICE DURING AN INSPECTION OF THE FACILITY.
ANNUAL OPERATING IMPACT
MINIMAL
PROJECT SCHEDULING
I BID 20000
START START I END
10/00 I 6/01 II 7/01 I 9/01
$16,000 $2,000
ACCOUNT II ACCOUNT ACCOUNT
FULL-TIME SAL 8002 FULL-TIME SAL 8002 FULL-TIME SAL 8002
OFFC SUP 8107 OFFC SUP 8107 TEMP EMP SAL 8081
OTHER OFFC SUP 8110 OTHER OFFC SUP 8110 PROF SVCS 8302
PROF SVCS 8302 PROF SVCS 8302
ADVRTSNG & PROM
!COMPLETION 1/03
$OURCE OF FUNDING
!GENERAL FACILITIES & SYSTEM
IMPROVEMENTS CAPITAL PROJECTS
fTOTAL
BLDGS MUNICIPAL 9210
BLDGS-OTHER 9212
WATER SYS IMP 9241
TOTAL
L-T-D REV 01-02
190,000 115,000
$190,000 $115,000
45
ACCOUNT ACCOUNT
$305,000.00
BUD02-03 TOTAL FUTURE
0
0 305,000 0
$0 $305,000 $o I
r""'
r""'
-
-
-
-
I
I
FUND: GENERAL FACILITIES AND SYSTEM
IMPROVEMENTS CAPITAL PROJECTS
FUND PROJECT#: 945-9605
LOCATION: 77TH & QUAKER
PROJECT: 77TH & QUAKER LANDFILL PROJECT ENVIRONMENTAL COMPLIANCE MANAGER
MANAGER:
PROJECT DESCRIPTION
CONTROL MEASURES FOR CLOSED LANDFILL EXPERIENCING FUGITIVE GAS EMISSIONS.
ANNUAL OPERATING IMPACT
N/A.
PROJECT SCHEDULING
DESIGN 10000 I BID20000 I CONSTRUCTION 30000 ACQUISITION 40000 II INSTALLATION 50000 I
START I END START I END START I END II START I END I START I END
I II I II 5/98 I 9/02 II I II I
$0 $0 $330,000 $0 $0
ACCOUNT II ACCOUNT II ACCOUNT II ACCOUNT II ACCOUNT
PROF SVCS 8302
BLDGS-OTHER 9212
WLKS, DRVS & PRKNG
LOTS8291
!COMPLETION 9102 TOTAL $330,000.00
SOURCE OF FUNDING
GENERAL FACILITIES & SYSTEM IMPROVEME
ENVIRONMENTAL DESIGNATION
lfoTAL
310,000 0
0 20,000
$310,000
46
BUD02-03
0
0
$0
TOTAL
310,000
20,000
$330,000
FUTURE
0
0
$o I
FUND: GENERAL FACILITIES AND SYSTEM
IMPROVEMENTS CAPITAL PROJECTS
PROJECT: COLISEUM STORAGE FACILITIES
FUND PROJECT#: 945-90109
LOCATION: 2720 DRIVE OF CHAMPIONS
PROJECT CIVIC CENTERS MANAGER
MANAGER:
PROJECT DESCRIPTION
THIS PROJECT WOULD PROVIDE FOR THE CONSTRUCTION OF ADDITIONAL STORAGE FACILITIES TO BE LOCATED IN
THE NORTH PARKING LOT OF THE LUBBOCK MUNICIPAL COLISEUM. THE FACILITIES WILL BE UTILIZED FOR
STORAGE OF BUILDING EQUIPMENT, SUCH AS TABLES, CHAIRS, STAGING, ETC. CURRENTLY SOME EQUIPMENT IS
HAVING TO BE STORED ON THE EXTERIOR OF THE BUILDING, UNPROTECTED FROM THE ELEMENTS. THE STORAGE
WILL BE SITUATED IN SUCH A MANNER SO AS NOT TO IMPACT THE PARKING NEEDS OF MAJOR EVENTS.
ANNUAL OPERATING IMPACT
THIS PROJECT WOULD NOT IMPACT THE ANNUAL OPERATION BUDGET.
$1,000
ACCOUNT
FULL-TIME SAL 8002
OFFC SUP 8107
PROF SVCS 8302
!COMPLETION 9/02
BID 20000
START I END
121oo 1 1101
$1,000
ACCOUNT
FULL-TIME SAL 8002
OFFC SUP 8107
PROF SVCS 8302
ADVRTSNG & PROM
PROJECT SCHEDULING
ACCOUNT
FULL-TIME SAL 8002
PROF SVCS 8302
BLDGS MUNICIPAL 9210
BLDGS-OTHER 9212
TOTAL
ACCOUNT ACCOUNT
$63,682.00
SOURCE OF FUNDING L-T-D REV 01-02 BUD 02-03 TOTAL FUTURE
GENERAL FACILITIES & SYSTEM
IMPROVEMENTS CAPITAL PROJECTS
!TOTAL
46,682 17,000
$46,682 $17,000
47
0 63,682 0
0
$0 $63,682 $o I
-
-
-
-
-
-
-
FUND: GENERAL FACILITIES AND SYSTEM
IMPROVEMENTS CAPITAL PROJECTS
PROJECT: FLEET REPLACEMENTS FY01~02
FUND PROJECT#: 945-90175
LOCATION: VARIOUS
PROJECT FLEET SERVICES MANAGER
MANAGER:
PROJECT DESCRIPTION
VEHICLE REPLACEMENT FOR GENERAL FUND DEPARTMENTS:
MUNICIPAL COURT 1 INTERMEDIATE UNMARKED SEDAN $21,424 REPLACES V910121; ENVIRON INSPECT SVCS 3 1/2
TON PU $50,191 REPLACES V910108, V910100, V920061; BUILDING INSP 11/2 TON PU $17,930 REPLACES V950070;
PAVED STREETS 1 1 TON DUALL Y/C&C FLATBED $28,466 REPLACES V840047; UNPAVED STREETS 1 MOTOR GRADER
$28,466 REPLACES V860051; PARK MAINTENANCE 1 C&C W/EXISTING WATER TANK $47,382 REPLACES V850097, 3 1/2
TON PU TOTALING $49,812 REPLACING V900119, V900120, V900147, 1 314 TON PU $24,241 REPLACES V930054;
OUTDOOR REC 11/2TON EXT. CAB V8 $19,532 REPLACES V910053; AUD./COL 11/2 PU $20,143 REPLACES V900104;
ANIMAL SERVICES 1 3/4 TON C&C/ANIMAL CONT. BODY $40,324 REPLACES V920080; 3 3/4 TON CARGO VAN TOTALING
$66,786 REPLACES V950090, V950091, V960062;POLICE INVESTIGATIONS 31NTERMEDIATE UNMARKED SEDAN
TOTALING $64,272 REPLACES V940008, V960015, V980047. 1 FULL SIZED MARKED PD UNIT $23,609 REPLACES
V950072; POLICE PATROL 2 PARKING CONTROL 3 WHEELERS TOTALING $38,456 REPLACES V970064, V970065
REVISED FY 01-02: CHANGED PARK MAINTENANCE C&C W/EXISTING WATER TANK-$47,382 TO 1 C&C SHUTTLE
LOADING SYSTEM-$67,382
ANNUAL OPERATING IMPACT
MAINTENANCE COSTS ON OLDER VEHICLES WILL DECREASE ..
I DESIGN 10000 I BID 20000
I START J END START I END
I II I
$0 $0
ACCOUNT II ACCOUNT
!COMPLETION 9/02
SOURCE OF FUNDING
pENERAL FACILITIES & SYSTEM
MPROVEMENTS CAPITAL PROJECTS
tfoTAL
PROJECT SCHEDULING I !CONSTRUCTION 3000011 ACQUISITION 40000 II INSTALLATION 50000 I
START I END II START I END II START I END I
II I II 10/01 I 9/02 II I
$0 $564,000 $0
II ACCOUNT II ACCOUNT II ACCOUNT
MOTOR VEHICLES 9220
HVY MOV EQUIP 9221
TOTAL $564,000.00
L-T-D REV 01-02 BUD02-03 TOTAL FUTURE
544,000 20,000 0 564,000 0
0
$544,000 $20,000 $0 $564,000 $o I
48
FUND: GENERAL FACILITIES AND SYSTEM
IMPROVEMENTS CAPITAL PROJECTS
FUND PROJECT#: 945.
LOCATION: VARIOUS
PROJECT: FLEET REPLACEMENTS @ REVISED 01/02 PROJECT FLEET SERVICES MANAGER
MANAGER:
PROJECT DESCRIPTION
VEHICLE REPLACEMENT FOR GENERAL FUND DEPARTMENTS:
MUN. COURT (1) INT SEDAN $21424 REPLACES V920059; ENVIRONMENTAL INSP.(3) 1/2 TON PU $49,812 REPLACE
V910119, V920120, & V920045., (1) 1/2 TON EXT CAB $20,206 REPLACES V900149; BUILDING INSP. (2) 1/2 TON PU
$35,857 REPLACE V890179 & V960075; CEMETERY (2)COMPACT PU $32,798 REPLACE V910051 & V910061; FIRE EQUIP
MAINT (2) 6-9 PASS SUV $62,742 REPLACE V940005 & V930063; POLICE ADMIN {1)FS SEDAN UNMARKED $23,039
REPLACES V950005; POLICE TRAINING (2) FS SEDANS UNMARKED $46,078 REPLACES V930005 & V940013;
INVESTIGATIONS (6) INT. UNMARKED SEDANS $128,544 REPLACE V950000, V910115, V920040, V920046, V940001, &
V970003. (3) FS MARKED UNIT $68,822 REPLACES V940006, V920056 ,V940048; TRAFFIC ENGINEERING (1)1 TON
DUALLY$35,130 REPLACES V940112; PARK MAINT (1) 3/4 TON PU $24,241 REPLACES V920110.
ANNUAL OPERATING IMPACT
MAINTENANCE COSTS ON VEHICLES WILL DECREASE
PROJECT SCHEDULING
BID 20000
START I END
$0
ACCOUNT ACCOUNT ACCOUNT ACCOUNT
MOTOR VEHICLES 9220
!COMPLETION 9/02 TOTAL $548,693.00
~OURCE OF FUNDING L-T-D REV 01-02 BUD02-03 TOTAL FUTURE
GENERAL FACILITIES & SYSTEM
IMPROVEMENTS CAPITAL PROJECTS
fTOTAL
0 548,693
$0 $548,693
49
0
$0
0
548,693
$548,693
0
$o I
-
-
-
-
-
I -I
-
-
-
-
-
FUND: GENERAL FACILITIES AND SYSTEM
IMPROVEMENTS CAPITAL PROJECTS
PROJECT: TELEPHONE SYSTEM ENHANCEMENT
FUND PROJECT#: 945-
LOCATION: 3801 50TH STREET
PROJECT CIVIC CENTERS MANAGER
MANAGER:
PROJECT DESCRIPTION
INSTALlATION OF MERIDIAN 1, MINI DIGITAL BUSINESS COMMUNICATIONS SYSTEM FOR USE BY TICKETING
SYSTEM. SYSTEM SHALL BE EQUIPEDWITH 48 DIGITAL STATION PORTS, 2 PRI/DTI T1 SPAN, AND 8 UNIVERSAL
TRUNK PORTS. THIS SYSTEM WILL ALLOW THE EXISTING TICKETING OPERATION TO PROVIDE IMPROVED
CUSTOMER SERVICE BY INTERGRATING MENU OPTIONS TO CALLERS AND ALLOWING THE PHONE SYSTEM TO
EXPAND WITH ADDITONAL PHONE LINES WHEN THE NEED ARISES. OVER THE PAST SEVEN YEARS THE TICKETING
SYSTEM HAS INCREASED ITS VOLUME OF PAID TICKET ADMISSIONS FROM 71,563 (FY 94/95) TO 251,643 IN FY
2000/01. THE GROSS REVENUE DURING THIS SAME TIME PERIOD HAS GONE FROM $1.1 MILLION TO $5.3 MILLION.
THE NUMBER OF PHONE CALLS HANDLED BY THIS OPERATION HAS ALSO GROWN TREMENDOUSLY, ESPCIALL YON
"FIRST DAY TICKET SALES" FOR MAJOR EVENTS. INCREASED DAY-TO-DAY PHONE ACTIVITY WOULD HAVE OPTIONS
TO MENUS SO AS TO ACCESS EVENT/TICKET INFORMATION WITHOUT BEING PlACED ON HOLD UNTIL THE NEXT
TICKET AGENT IS AVAilABLE.
ADDITIONAL BENEFITS AS A RESULT OF SYSTEM:
• T-1 LINE FOR THE PHONE SYSTEM, WHICH IS MORE RELIABLE
• A MENU SYSTEM FOR CALLERS TO PROVIDE INFORMATION ON SPECIFIC EVENTS, VENUES, ETC. AND ALLOW
THEM TO ACCESS THAT INFORMATION MORE QUICKLY ON A 24 HOUR BASIS; AND WITHOUT HAVING TO SPEAK TO A
ANNUALOPERAnNGIMPACT
SOME SAVINGS ASSOCIATED WITH MONTHLY TELEPHONE LINE FEES COULD BE REDUCED ONCE THE ENTIRE
SYSTEM HAS BEEN FINALIZED.
DESIGN 10000 I BID20000
START I END START I END
I II I $0 $0
ACCOUNT II ACCOUNT
lcOMPLEnON 8/02
SOURCE OF FUNDING
lfECHNOLOGY FUND
~ENERAL FACILITIES SYSTEM IMPROVEMENT
CAPITAL PROJECTS FUND
lTOTAL
PROJECT SCHEDULING
IICONSTRUCTION 3000011 ACQUISITION 40000 II INSTALLATION 50000 I
II START I END II START I END II START I END I
II
II
I II 6/02 I 8/02 II 6/02 I 8/02
$0 $55,000 $10,000
ACCOUNT II ACCOUNT II ACCOUNT
COMM EQUIP 9223 FULL-TIME SAL8002
PROF SVCS 8302 PROF SVCS 8302
COMM EQUIP 9223
TOTAL $65,000.00
L-T-D REV 01-02 BUD 02-03 TOTAL FUTURE
0 50,000
15,000
$0
50
0 50,000 0
15,000
0
$0 $65,000 so I
No Text
-
-
-
!"""~ i i
-
-
-
-
-
-
PROJECT NAME
Pump station Rehab
Water Facilities Security lmprov
TOTAL PROJECTS BUDGET
SOURCE OF FUNDING
Water Capital Projects Fund
1998 Certificate of Obligation Bonds
1998 CO Unallocated Interest
1999 Tax & Water Works Unallocated lnt
1999 Tax & Water Works Unallocated
Future Bonds
TOTAL FUNDING
LIFE TO
DATE
$5,200,000
271,000
$5,471,000
$2,743,825
2,727,175
0
0
0
0
$5,471,000
CITY OF LUBBOCK
FISCAL YEAR 2001-02 REVISED BUDGET
CAPITAL PROJECTS BUDGET
WATER CAPITAL PROJECTS
APPROVED REVISED
2001-02 2001-02 2002-03
$0 $2,700,000 $6,700,000
0 275,000 275,000
$0 $2,975,000 $6,975,000
$0 $275,000 $275,000
0 0 0
0 600,257 0
0 405,765 0
0 1,693,978 0
0 0 6,700,000
$0 $2,975,000 $6,975,000
51
2003-04
$0
275,000
$275,000
$275,000
0
0
0
0
0
$275,000
2004-05
$0
0
$0
$0
0
0
0
0
0
$0
2005-06
$0
0
$0
$0
0
0
0
0
0
$0
TOTAL
BUDGET
$14,600,000
1,096,000
$15,696,000
$3,568,825
2,727,175
600,257
405,765
1,693,978
6,700,000
$15,696,000
FUND: WATER CAPITAL PROJECTS
PROJECT: PUMP STATION REHAB
FUND PROJECT#: 223-9567
LOCATION: 82ND & MEMPHIS AVE.
PROJECT CHIEF ENGINEER
MANAGER:
PROJECT DESCRIPTION
REPLACEMENT OF THE 10.0 MILLION GALLON RESERVOIR AT P.S. 10. THE REPLACEMENT IS NECESSARY DUE TO
TNRCC REQUIREMENTS TO REPLACE THE ROOF AND STRUCTURAL PROBLEMS WITH THE RESERVOIR.
ANNUAL OPERATING IMPACT
IMPROVED DISTRIBUTION SYSTEM OPERATIONS BY ALLOWING THE FULL USE OF THE RESERVIOR.
BID 20000
START I END
4/98 I 4/02
$300,000 $12,000
ACCOUNT ACCOUNT
FULL-TIME SAL 8002 FULL-TIME SAL 8002 TEMP EMP SAL 8081
OFFC SUP 8107 OFFC SUP 8107 PROF SVCS 8302
OTHER OFFC SUP 8110 OTHER OFFC SUP 8110 BLDGS MUNICIPAL 9210
PROF SVCS 8302 ADVRTSNG & PROM WATER SYS IMP 9241
SEWER SYS IMP 9242
TRAF CNTRL SYS IMP
9244
l£oMPLETION 9/02
UTILITY RELOC 9252
FENCES 9282
TOTAL
ACCOUNT
$7,900,000.00
ACCOUNT
SOURCE OF FUNDING L-T-D REV 01-02 BUD02-03 TOTAL FUTURE
1998 CERTIFICATE OF OBLIGATION BONDS 5,200,000 600,257 0 5,800,257 0
1999 TAX & WATERWORKS 0 2,099,743 0 2,099,743 0
FUTURE BONDS 0 0 0 0 6,700,000
[OTAL $5,200,000 $2,700,000 $0 $7,900,000 $6,700,000
52
-
-
-
-
-'
-
--
-
-
I
I
I
FUND: WATER CAPITAL PROJECTS
PROJECT: WATER FACILITIES SECURITY
IMPROVEMENTS
FUND PROJECT#: 223-90055
LOCATION: VARIOUS POTABLE WATER FACILITIES
PROJECT WATER PRODUCTION & TREATMENT
MANAGER: SUPERINTENDENT
PROJECT DESCRIPTION
THIS PROJECT WILL ALLOW ENHANCEMENT OF SECURITY AT ALL POTABLE WATER FACILITIES. BASED ON SITE
SURVEYS AND RECOMMENDATIONS BY THE LUBBOCK POLICE DEPARTMENT THIS PROJECT IS DESIGNED TO
ADDRESS THE RISK OF CRIMINAL TRESPASS THAT COULD RESULT IN FACILITY DAMAGE OR WATER
CONTAMINATION AT PUMP STATIONS, STORAGE FACILITIES, TERMINAL STORAGE, SUDAN PUMP STATION AND THE
WATER TREATMENT PLANT. A VULNERABILITY ASSESSMENT OF THE WATER SYSTEM WILL BE PERFORMED BY
DECEMBER 2002, AND THIS PROJECT WILL BE USED TO IMPLEMENT SOLUTIONS TO SECURITY NEEDS RESULTING
FROM THE ASSESSMENT.
ANNUAL OPERATING IMPACT
NONE EXPECTED
PROJECT SCHEDULING
DESIGN 10000 II BID20000 !!CONSTRUCTION 300001 ACQUISITION 40000 II INSTALLATION 50000 I
I START I END START END II START I END I START END II START I END I
10199 I 9/03 II I II 01/00 I 09/03 I 01/00 09/03 :I I I $500 $0 $71,800 $473,700 $0
ACCOUNT II ACCOUNT II ACCOUNT II ACCOUNT II ACCOUNT
PROF SVCS 8302 FULL-TIME SAL 8002 WLKS,DRVS&
PROF SVCS 8302 PRKNGO LOTS 8291
WATER SYS IMP 9241 FENCES 9282
SYS IMP-OTHER 9251 COMM EQUIP 9223
FENCES 9282 OTHER EQUIP 9226
FULL-TIME SAL 8002
PROF SVCS 8302
BLDG5-0THER 9212
~OMPLETION 09/03 TOTAL $546,000.00
SOURCE OF FUNDING LMT-D REV01-02 BUD02~3 TOTAL FUTURE
VI/ATER CAPITAL PROJECTS FUND 271,000 275,000 0 546,000 500,000
fToTAL $271,000 $275,000 $0 $546,ooo $soo.ooo I
53
No Text
!"""!
!""""
~
r"l '
-
-
-f
-
-
LIFE TO
PROJECT NAME DATE
HLAS Transmission Sys Improvement $1,593,000
TOTAL PROJECTS BUDGET $1,593,000
SOURCE OF FUNDING
2002A Certificate of Obligation Bonds $1,593,000
TOTAL FUNDING $1,593,000
CITY OF LUBBOCK
FISCAL YEAR 2001-02 REVISED BUDGET
CAPITAL PROJECTS BUDGET
SEWER CAPITAL PROJECTS
APPROVED REVISED
2001-02 2001-02 2002-03
$150,000 $757,000 $0
$150,000 $757,000 $0
$150,000 $757,000 $0
$150,000 $757,000 $0
5.4
TOTAL
2003-04 2004-05 2005-06 BUDGET
$0 $0 $0 $2,500,000
$0 $0 $0 $2,500,000
$0 $0 $0 $2,500,000
$0 $0 $0 $2,500,000
FUND: SEWER CAPITAL PROJECTS
PROJECT: HLAS TRANSMISSION SYSTEM
IMPROVEMENTS
FUND PROJECT#: 233-90127
LOCATION: HANCOCK LAND APPLICATION SITE
PROJECT CHIEF WATER UTILITIES ENGINEER
MANAGER:
PROJECT DESCRIPTION
IMPROVEMENTS TO THE HANCOCK LAND APPLICATION SITE (HLAS) TRANSMISSION SYSTEM TO INCREASE FLOW.
THE FIRST PHASE OF THE PROJECT IS THE REPLACEMENT OF APPROXIMATELY 2 MILES OF THE EXISTING 15"
PIPELINE WITH 36" PIPE. THIS WILL INCREASE THE POSSIBLE FLOW Tb HLAS FROM ITS CURRENT LIMIT OF ABOUT 7
MGDTO 10 MGD.. . ..
ANNUAL OPERATING IMPACT
IMPROVED EFFICIENCY OF LAND APPLICATION SYSTEM.
ACCOUNT
FULL-TIME SAL 8002
OFFC SUP 8107
OTHER OFFC SUP 8110
PROF SVCS 8302
JCOMPLETION 12/02
SOURCE OF FUNDING
2002A CERTIFICATE OF
OBLIGATION BONDS
lfoTAL
ACCOUNT
FULL-TIME SAL 8002
OFFC SUP 8107
OTHER OFFC SUP 8110
ADVRTSNG & PROM
ACCOUNT
FULL-TIME SAL 8002
TEMP EMP SAL 8081
SEWER SYS IMP 9242
UTILITY RELOC 9252
SYS IMP-OTHER 9251
FENCES9282
LAND CAPITAL OUTLAY
9280
TOTAL
L·T·D REV01-D2
1,743,000 757,000
$1,743,000 $757,000
55
ACCOUNT ACCOUNT
$2,500,000.00
BUD02·03 TOTAL FUTURE
0 2,500,000 0
0
$0 $2,500,000 $0
-CITY OF LUBBOCK
FISCAL YEAR 2001-02 REVISED BUDGET
CAPITAL PROJECTS BUDGET -AIRPORT CAPITAL PROJECTS
LIFE TO APPROVED REVISED TOTAL
!""" PROJECT NAME DATE 2001-02 2001-02 2002-03 2003-04 2004-05 2005-06 BUDGET
Install Runway Signs $151,850 $3,466 $7,945 $0 $0 $0 $0 $163,261
Blast Wall 0 0 1,625,617 0 0 0 0 1,625,617
I'""' EDA Sewer & Water 900,000 0 (130,996) 0 0 0 0 769,004
West Port Apron & Taxiway 2,098,875 4,213,674 (374,876) 0 0 0 0 5,937,673
ARFF Training Area 3,754,743 0 (206,368) 0 0 0 0 3,548,375
Silent Wings Renovations 973,750 1,195,085 145,000 0 0 0 0 2,313,835
M Improve Terminal Building 0 403,340 170,000 0 0 0 0 573,340
Vehicle Gates Improvements 0 0 256,443 0 0 0 0 256,443
Screening & Exit Modifications 0 0 800,000 0 0 0 0 800,000
Fingerprint Scanning Equipment 0 0 30,000 0 0 0 0 30,000
!"""! Undesignated Security Project 0 0 393,120 0 0 0 0 393,120
TOTAL PROJECTS BUDGET $7,879,218 $5,815,565 $2,715,885 $0 $0 $0 $0 $16,410,668
"""' SOURCE OF FUNDING ~ .;
i Airport Capital Projects Fnd $230,166 $270,500 $75,382 $0 $0 $0 $0 $576,048
Airport Facilities & System lmpr. 0 654,835 0 0 0 0 0 654,835 -FAA Entitlement Grant 5,172,100 3,420,008 564,627 0 0 0 0 9,156,735
Passenger Facility Charges 833,368 1,200,472 219,865 0 0 0 0 2,253,705
FAA Discretionary Funding 0 0 1,899,789 0 0 0 0 1,899,789
1995 Airport Revenue Bonds 19,834 0 0 0 0 0 0 19,834 -Airport Operations fund 251 0 12,550 0 0 0 0 0 12,550
LP&LGrant 150,000 0 0 0 0 0 0 150,000
General Facilities & System lmpr. 235,000 200,000 0 0 0 0 0 435,000
EDAGrant 500,000 0 (130,878) 0 0 0 0 369,122 -HUDGrant 323,750 0 0 0 0 0 0 323,750
Silent Wings Fund 315,000 55,500 91,500 0 0 0 0 462,000
TX Aviation Heritage Found Inc 100,000 1,700 (4,400) 0 0 0 0 97,300
TOTAL FUNDING $7,879,218 $5,815,565 $2,715,885 $0 $0 $0 $0 $16,410,668
I'""'
-
-
-
56
I
I
I
FUND: AIRPORT CAPITAL PROJECTS FUND PROJECT#: 253-9161
LOCATION: LUBBOCK INTERNATIONAL AIRPORT
PROJECT: INSTALL RUNWAYfT'AXIWAY GUIDANCE
SIGNS PROJECT DEPUTY DIRECTOR OF AVIATION
MANAGER:
PROJECT DESCRIPTION
THE PROJECT WILL UPGRADE THE AIRFIELD GUIDANCE SIGNAGE IN ORDER TO COMPLY WITH FAA REGULATIONS.
ANNUAL OPERATING IMPACT
THERE WILL BE NO OPERATING IMPACT. THIS PROJECT UPGRADES AN EXISTING LIGHTING SYSTEM.
PROJECT SCHEDULING
DESIGN 10000 :I BID20000 I CONSTRUCTION 30000 II ACQUISITION 40000 II INSTALLATION 50000 I
START I END START I END START I END II START I END II START I END I
08100 I 11101 II 03/01 I 07/01 I 10/01 I 03102 I I II I I $41,217 $150 $121,894 $0 $0
ACCOUNT II ACCOUNT II ACCOUNT II ACCOUNT II ACCOUNT
PROF SVCS 8302 ADVRTSNG & PROM TEMP EMP SAL 8081
lCOMPLETION 03102
SOURCE OF FUNDING
FAA ENTITLEMENT GRANT
PASSENGER FACILITY CHARGE
ffoTAL
TOTAL
L-T-D
139,785
15,531
$155,316
57
REV 01-02
2,972
4,973
$7,945
$163,261.00
BUD 02-03 TOTAL
0 142,757
0 20,504
$0 $163,261
FUTURE
0
0
$o I
-
-
-
r
-
-
,...
11""'1
r-'
FUND: AIRPORT CAPITAL PROJECTS FUND PROJECT #: 253.9192
LOCATION: LUBBOCK INTERNATIONAL AIRPORT
PROJECT: BLAST WALL AT TERMINAL BUILDING PROJECT DEPUTY DIRECTOR OF AVIATION
MANAGER:
PROJECT DESCRIPTION
THIS PROJECT CONSISTS OF PERFORMING FORCE CALCULATIONS TO SIMULATE DIFFERENT EXPLOSIONS
DETERMINING WHAT TYPE OF STRUCTURE OR MASS WOULD BE REQUIRED TO MITIGATE ALL THE FORCES
ASSOCIATED WITH A BLAST WITHIN 300 FEET OF THE TERMINAL BUILDING. RESULTS WILL BE PRESENTED IN A
CERTIFIED BLAST ANALYSIS WHICH WILL INCLUDE ANY PROBABLE IMPACT ON AIRLINE OPERATING AT THE
AIRPORT. THIS PROJECT WILL INCLUDE SCHEMATIC SITE IMPROVEMENTS CONSISTENT WITH THE FINDINGS IN THE
ANALYSIS AND CONSTRUCTION OF THE SELECTED SITE IMPROVEMENTS AS APPROVED BY THE FAA.
ANNUAL OPERATING IMPACT
THIS PROJECT WILL ELIMINATE THE NEED FOR SECURITY GUARDS IN THE PARKING LOT.
BID20000
START I END
1 o1o 1 I o6/o2
$1,000
ACCOUNT ACCOUNT ACCOUNT
PROF SVCS 8302 ADVRTSNG & PROM SYS IMP-OTHER 9251 ...
~OMPLETION 07/03 TOTAL $1,625,617.00
SOURCE OF FUNDING L-T-D REV01-02 BUD02-03 TOTAL FUTURE
FAA ENTITLEMENT GRANT 0 522,788 0 522,788 0
PASSENGER FACILITY CHARGES 0 259,483 0 259,483 0
IFAA DISCRETIONARY FUNDING 0 843,346 0 843,346 0
ttoTAL $0 $1,625,617 $0 $1,625,617 $o I
58
FUND: AIRPORT CAPITAL PROJECTS FUND PROJECT#: 253-9642
LOCATION: LUBBOCK INTERNATIONAL AIRPORT
PROJECT: EDA SEWER & WATER PROJECT DEPUTY DIRECTOR OF AVIATION
MANAGER:
PROJECT DESCRIPTION
TO FUND ENGINEERING AND CONSTRUCTION OF WATER AND SEWER LINES TO SERVE THE INTERPORT INDUSTRIAL
PARK AT THE AIRPORT. PROJECT ALSO INCLUDES SOME FORCE MAIN, CASING UNDERNEATH RUNWAY 8/26 AND
TPIXIWAYS HAND J, A LIFT STATION, PUMPS, AND MANHOLES.
ANNUAL OPERATING IMPACT
NONE EXPECTED.
PROJECT SCHEDULING
BID 20000
START I END
o2t99 I o3/99
$312
ACCOUNT ACCOUNT ACCOUNT
PROF SVCS 8302 ADVRTSNG & PROM SYS IMP-OTHER 9251
~OMPLETION 09102 TOTAL $769,004.00
ISOURCE OF FUNDING L·T-D REV01-02 BUD02-03 TOTAL FUTURE
fA,tRPORT CAPITAL PROJECTS FUND 230,166 -118 0 230,048 0
1995 AIRPORT REVENUE BONDS 19,834 0 0 19,834 0
EDAGRANT 500,000 -130,878 0 369,122 0
LPLGRANT 150,000 0 0 150,000 0
fTOTAL $900,000 ($130,996) $0 $769,004 $o I
59
-
-
-
..
FUND: AIRPORT CAPITAL PROJECTS FUND PROJECT #: 253-9975
LOCATION: LUBBOCK INTERNATIONAL AIRPORT
PROJECT: WEST PORT APRON & TAX.IWAY PROJECT DEPUTY DIRECTOR OF AVIATION
MANAGER:
PROJECT DESCRIPTION
THIS PROJECT CONSISTS OF CONSTRUCTING AN EXTENSION TO THE SOUTH OF THE AIR CARGO APRON AND
TAX.IWAY SYSTEM PREVIOUSLY CONSTRUCTED UNDER AN AlP-AND PFC-FUNDED PROJECT. THE CITY HAS
ALREADY RECEIVED A REQUEST TO EXPAND THE EXISTING APRON AREA.
ANNUAL OPERATING IMPACT
THIS RAMP WILL BE REVENUE PRODUCING PROPERTY VIA RAMP FEES. GENt:RAL OPERATING EXPENSES WILL BE
11""' BORNE BY TENANTS. THERE SHOULD BE NO EXTENSIVE MAiNTENANCE COSTS ASSOCIATEDWITH THIS PROJECT
FOR THE FIRST YEARS OTHER THAN ROUTINE UPKEEP AND MARKINGS ON THE PAVEMENT. MINIMAL SEALING OF
JOINTS WILL TAKE PLACE AFTER 8 TO 10 YEARS. -
PROJECT SCHEDULING
I DESIGN 10000 II BID20000 I CONSTRUCTION 30000 ACQUISITION 40000 I INSTALLATION 50000
I START I END START I END START I END START I END II START I END
I 05/99 I 03/02 :I 11/99 I 11/01 I 03/01 I 10/02 I I II I I $876,150 $1,000 $4,890,523 $0 $0
ACCOUNT II ACCOUNT II ACCOUNT II ACCOUNT II ACCOUNT
PROF SVCS 8302 ADVRTSNG & PROM SYS IMP-OTHER 9251 -
l!""'
' j§OMPLETION 10102 TOTAL $5,767,673.00
SOURCE OF FUNDING L·T-D REV01-D2 BUD02-D3 TOTAL FUTURE
r""! "'M-ENTITLEMENT GRANT 4,772,869 -537,253 0 4,235,616 0
PASSENGER FACILITY CHARGE 1,369,680 144,777 0 1,514,457 0
AIRPORT CAPITAL PROJECTS FUND 0 17,600 0 17,600 0
I'""
I
ttoTAL $6,142,549 ($374,876) $0 $o I -
60
FUND: AIRPORT CAPITAL PROJECTS FUND PROJECT #: 253-90067
LOCATION: LUBBOCK INTERNATIONAL AIRPORT
PROJECT: ARFF TRAINING AREA PROJECT DEPUTY DIRECTOR OF AVIATION
MANAGER:
PROJECT DESCRIPTION
THIS PROJECT CONSISTS OF CONSTRUCTING AN AIRCRAFT RESCUE AND FIREFIGHTING TRAINING AREA ON
AIRPORT PROPERTY.
ANNUAL OPERATING IMPACT
PROJECTED OVERTIME SAVINGS OF $5,000 DUE TO FAA MANDATED TRAINING BEING CONDUCED ON SITE.
PROJECT SCHEDULING
BID20000
START I END
1 otoo I 111oo
$1,821
ACCOUNT ACCOUNT ACCOUNT ACCOUNT
PROF SVCS 8302 ADVRTSNG & PROM
!COMPLETION 09/02
SOURCE OF FUNDING
FAA ENTITLEMENT GRANT
PASSENGER FACILITY CHARGE
ffoTAL
SYS IMP-OTHER 9251
TOTAL
L-T-D REV 01-02
3,146,448 0
608,295 -206,368
$3,754,743 ($206,368)
61
$3,548,375.00
BUD02-03 TOTAL
0 3,146,448
0 401,927
$0 $3,548,375
FUTURE
0
0
$o I
-
-
-
-
-
-
-
-
-
FUND: AIRPORT CAPITAL PROJECTS FUND PROJECT #: 253-90138
LOCATION: LUBBOCK INTERNATIONAL AIRPORT
PROJECT: SILENT WINGS MUSEUM RENOVATION
PROJECT PROJECT DEPUTY DIRECTOR OF AVIATION
MANAGER:
PROJECT DESCRIPTION
RENOVATION OF PORTIONS OF THE OLD TERMINAL BUILDING 10 HOUSE A MUSEOMDEOfCAIEO TO THE
PRESERVATION OF WORLD WAR 11 ARTIFACTS AND ARCHIVAL MATERIALS. .
ANNUAL OPERATING IMPACT
INCREASE IN MAINTENANCE AND UPKEEP, HVAC, ELECTRIC, AND WATER.COSTS.
BID20000
START I END
12101 I o21o2
$2,000
ACCOUNT ACCOUNT ACCOUNT
PROF SVCS 8302 ADVRTSNG & PROM SYS IMP-OTHER 9251
FUND: AIRPORT CAPITAL PROJECTS
PROJECT: IMPROVE TERMINAL BUILDING (CANOPY &
RDWY)
FUND PROJECT#: 253-90187
LOCATION: LUBBOCK INTERNATIONAL AIRPORT
PROJECT DEPUTY DIRECTOR OF AVIATION
MANAGER:
PROJECT DESCRIPTION
IMPROVEMENT, DEVELOPMENT, AND RELOCATION OF TAXI/LIMO HOLDING AREA AND COMMUNICATIONS SYSTEM TO
INCREASE THE CAPACITY OF THE TERMINAL DRIVEWAY AT THE FRONT OF THE TERMINAL BUILDING.
ANNUAL OPERATING IMPACT
THERE WILL BE MINIMAL OPERATING IMPACT.
I BID 20000
START I END
10/01 I 12/01 II 01/02 I 02/02
$94,900 $2,000
ACCOUNT II ACCOUNT
PROF SVCS 8302 ADVRTSNG & PROM
I¢0MPLETION 04/03
SOURCE OF FUNDING
FAA ENTITLEMENT GRANT
PASSENGER FACTILITY CHARGE
fTOTAL
PROJECT SCHEDULING
ACCOUNT
STREET SYS IMP 9240
TOTAL
L-T-D REV 01-02
363,006 153,000
40,334 17,000
$403,340 $170,000
63
ACCOUNT ACCOUNT
$573,340.00
BUD02-03 TOTAL
0 516,006
0 57,334
$0 $573,340
FUTURE
0
0
$o I
-
-
-
-
-
FUND: AIRPORT CAPITAL PROJECTS FUND PROJECT#: 253
LOCATION: LUBBOCK INTERNATIONAL AIRPORT
PROJECT: VEHICLE GATES IMPROVEMENTS PROJECT DEPUTY DIRECTOR OF AVIATION
MANAGER:
PROJECT DESCRIPTION
THIS PROJECT JNVOLVES THE INSTALLATION OF CARD READERS AND GAiE OPERATORS AT FIVE VEHICLE GATES
AROUND THE PERIMETER TO CONNECT THESE GATES TO OUR FAR 107.14 COMPUTERIZED ACCESS CONTROL
SYSTEM.
ANNUAL OPERATING IMPACT
MINIMAL ADDITIONAL MAINTENANCE COST ON SECURITY ACCESS SYSTEM.
PROJECT SCHEDULING
BID 20000
START I END
10102 I 11102
$1,000
ACCOUNT ACCOUNT ACCOUNT
PROF SVCS 8302 ADVRTSNG & PROM SYS IMP-OTHER 9251
lCOMPLETION 06/03 TOTAL $256,443.00
SOURCE OF FUNDING L-T-D REV 01..02 BUD02..03 TOTAL FUTURE
FAA DISCRETIONARY FUNDING 0 256,443 0 256,443 0
ftOTAL $0 $256,443 $0 $256,443 $0 I
I
I
I
I
FUND: AIRPORT CAPITAL PROJECTS FUND PROJECT#: 253
LOCATION: LUBBOCK INTERNATIONAL AIRPORT
PROJECT: SCREENING & EXIT MODIFICATIONS PROJECT DEPUTY DIRECTOR OF AVIATION
MANAGER:
PROJECT DESCRIPTION
THIS PROJECT CONSISTS OF MODIFICATION TO THE SCREENING CHECKPOINT AND STERILE AREA EXITS TO
ACCOMMODATE PASSENGER SCREENING OPERATIONS.
ANNUAL OPERATING IMPACT
NONE.
PROJECT SCHEDULING
DESIGN 10000
:I
BID 20000 I CONSTRUCTION 3000011 ACQUISITION 40000 II INSTALLATION 50000 I
START I END START I END START I END II START I END II START I END I
08/02 I 10/02 :I 11/02 I 12/02 I 01/03 I 09/03 ll I II I I $96,000 $1,000 $703,000 $0 $0
ACCOUNT II ACCOUNT II ACCOUNT II ACCOUNT II ACCOUNT
PROF SVCS 8302 ADVRTSNG & PROM SYS IMP-OTHER 9251
lCOMPLETION 09/03 TOTAL $800,000.00
$OURCE OF FUNDING L-T-D REV 01-02 BUD 02.03 TOTAL FUTURE
FAA DISCRETIONARY 0 800,000 0 800,000 0
ftoTAL $0 $800,000 $0 $800,000 $o I
65·
-
"""'
~-
-
-
FUND: AIRPORT CAPITAL PROJECTS FUND PROJECT #: 253
LOCATION: LUBBOCK INTERNATIONAL AIRPORT
PROJECT: FINGERPRINT SCANNING EQUIPMENT PROJECT DEPUTY DIRECTOR OF AVIATION
MANAGER:
PROJECT DESCRIPTION
THIS PROJECT WILL INCLUDE THE PURCHASE AND INSTALLATION OF EQUIPMENT TO ACCOMMODATE REQUIRED
FINGERPRINT SCREENING REQUIRED FOR THE ISSUANCE OF SECURITY BADGES. THIS EQUIPMENT WILL REDUCE
THE WAITING PERIOD THAT AIRPORT EMPLOYEES AND TENANTS CURRENTLY ENDURE.
ANNUAL OPERATING IMPACT
NONE.
PROJECT SCHEDULING
DESIGN 10000 I 81020000 I CONSTRUCTION 300001! ACQUISITION 40000 1f INSTALLATION 50000 I
START I END START I END START I END II START I END II START I END I
I II I II I II 05/02 I 09/02 II I
$0 $0 $0 $30,000 $0
ACCOUNT II ACCOUNT II ACCOUNT II ACCOUNT II ACCOUNT
OTHER EQUIP 9226
lCOMPLETION 09/02 TOTAL $30,000.00
!SOURCE OF FUNDING L-T-D REV 01-02 BUD 02-03 TOTAL FUTURE
FAA ENTITLEMENT GRANT 0 30,000 0 30,000 0
fTOTAL $0 $30,000 $0 so I
66'
----------------------------------------··----------
FUND: AIRPORT CAPITAL PROJECTS FUND PROJECT#: 253
LOCATION: LUBBOCK INTERNATIONAL AIRPORT
PROJECT: UNDESIGNATED SECURITY PROJECT PROJECT DEPUTY DIRECTOR OF AVIATION
MANAGER:
PROJECT DESCRIPTION
THIS PROJECT WILL FUND MODIFICATIONS, ADDITIONS, OR OTHER SECURITY RELATED NEEDS MANDATED BY
TSNFAA REGULATIONS. CURRENT DIRECTIVES FROM TSAIFAA INDICATE UNSPECIFIED MAJOR SECURITY NEEDS,
ELIGIBLE FOR 100% AlP FUNDING.
ANNUAL OPERATING IMPACT
NONE.
BID 20000
START I END
$0
ACCOUNT ACCOUNT ACCOUNT ACCOUNT ACCOUNT
SYS IMP-OTHER 9251
I¢0MPLETION 12103 TOTAL $393,120.00
[SOURCE OF FUNDING L-T-D REV 01-02 BUD02-03 TOTAL FUTURE
FAA ENTITLEMENT GRANT 0 393,120 0 393,120 0
ftoTAL $0 $393,120 $0 $393,120 $0 I
67
-
-
,..,
PROJECT NAME
Recon. & Resurface Parking Lot ,..... Modifications to Revolving Doors
TOTAL PROJECTS BUDGET
-SOURCE OF FUNDING
Solid Waste Loan
Airport Facilities & System lmprov -Airline Reimbursement
TOTAL FUNDING
,....
-
-
-
-
CITY OF LUBBOCK
FISCAL YEAR 2001-02 REVISED BUDGET
CAPITAL PROJECTS BUDGET
AIRPORT FACILITIES AND SYSTEM IMPROVEMENTS
LIFE TO APPROVED REVISED
DATE 2001-02 2001-02 2002-03 2003-04
$20,000 $2,450,647 $0 $0 $0
0 0 150,000 0 0
$20,000 $2,450,647 $150,000 $0 $0
0 2,450,647 (32,277) 0 0
20,000 0 32,277 0 0
0 0 150,000 0 0
$20,000 $2,450,647 $150,000 $0 $0
68.
TOTAL
2004-05 2005-06 BUDGET
$0 $0 $2,470,647
0 0 150,000
$0 $0 $2,620,647
0 0 2,418,370
0 0 52,277
0 0 150,000
$0 $0 $2,620,647
FUND PROJECT#: 254-9176 FUND: AIRPORT FACILITIES AND SYSTEM
IMPROVEMENTS CAPITAL PROJECTS LOCATION: LUBBOCK INTERNATIONAL AIRPORT
PROJECT: RECONFIGURATION & RESURFACING OF
PUBLIC PARKING LO PROJECT DEPUTY DIRECTOR OF AVIATION
MANAGER:
PROJECT DESCRIPTION
RECONSTRUCTION, RESURFACING, AND RECONFIGURATION OF AIRPORT PUBLIC PARKING LOTS AT THE TERMINAL
BUILDING AND THE OLD TERMINAL BUILDING.
ANNUAL OPERATING IMPACT
THE EXISTING CONDITION OF THE PARKING LOT IS DETERIORATING AND REQUIRES REPAIR. THIS PROJECT WILL
DECREASE THE ANNUAL PAVING COSTS ASSOCIATED WITH THE AIRPORT PARKING LOTS.
BID 20000
START I END
1 o1o1 I 11101
$2,000
ACCOUNT ACCOUNT
PROF SVCS 8302 ADVRTSNG & PROM
!COMPLETION 12/02
ACCOUNT
STREET SYS IMP 9240 TREES, SHRUBS,
PLANTS 9283
TOTAL $2,470,647.00
ACCOUNT
SOURCE OF FUNDING L-T-D REV 01-02 BUD 02-03 TOTAL FUTURE
~OLIO WASTE LOAN 2,450,647 -32,277
!AIRPORT FACILITIES & SYSTEMS IMPROVEME 20,000 32,277
tTOTAL $2,470,647 $0
69 ..
0 2,418,370
0 52,277
$0 $2,470,647
0
0
$0 I
-
-
-
-
-
-
-
-
FUND: AIRPORT FACILITIES AND SYSTEM
IMPROVEMENTS CAPITAL PROJECTS
FUND PROJECT#: 254
LOCATION: LUBBOCK INTERNATIONAL AIRPORT
PROJECT: MODIFICATIONS TO REVOLVING DOORS PROJECT DEPUTY DIRECTOR OF AVIATION
MANAGER:
PROJECT DESCRIPTION
THIS PROJECT WILL ALLOW FOR THE PURCHASE AND INSTALLATION OF EQUIPMENT THAT WILL PREVENT THE
UNAUTHORIZED INTRODUCTION OF ITEMS AND PERSONS INTO THE STERILE AREA THROUGH TWO REVOLVING
DOORS IN THE TERMINAL.
ANNUAL OPERATING IMPACT
THIS EQUIPMENT WILL ELIMINATE THE NEED FOR GUARDS AT THE REVOLVING DOORS.
PROJECT SCHEDULING
I DESIGN 10000
11
BID 20000 I !CONSTRUCTION 300001 ACQUISITION 40000 II INSTALLATION 50000 I
I START I END START I END II START I END I START I END !I START I END I
I I II I II I I 05/02 I 12/02 I I I $0 $0 $0 $150,000 $0
ACCOUNT II ACCOUNT II ACCOUNT II ACCOUNT II ACCOUNT
OTHER EQUIP 9226
!COMPLETION 12102 TOTAL $150,000.00
!SOURCE OF FUNDING L·T·D REV01-02 BUD02-03 TOTAL FUTURE
~IRLINE REIMBURSEMENT 0 150,000 0 150,000 0
fi'oTAL $0 $150,000 $0 $150,000 $o I
70
No Text
-
CITY OF LUBBOCK
FISCAL YEAR 2001-02 REVISED BUDGET -CAPITAL PROJECTS BUDGET
INTERNAL SERVICE CAPITAL PROJECTS
-UFETO APPROVED REVISED TOTAL
PROJECT NAME DATE 2001-02 2001-02 2002-03 2003-04 2004-05 2005-06 BUDGET
Radio Replacement $0 $200,000 $50,000 $0 $0 $0 $0 $250,000 -Truck Hoist (OSHA) 0 47,500 30,000 0 0 0 0 77,500
TOTAL PROJECTS BUDGET $0 $247,500 $80,000 $0 $0 $0 $0 $327,500
SOURCE OF FUNDING -Designation for Radio Replacement $0 $200,000 $50,000 $0 $0 $0 $0 $250,000
Transfer from Switchboard 0 0 30,000 0 0 0 0 30,000
Fleet Services Capital Projects Fnd 0 47,500 0 0 0 0 0 47,500
~ TOTAL FUNDING $0 $247,500 $80,000 $0 $0 $0 $0 $327,500
-
-
-
-
-
-
71
FUND: INTERNAL SERVICE CAPITAL PROJECTS FUND PROJECT#: 326-90199
LOCATION: 302 MUNICIPAL DR.
PROJECT: RADIO REPLACEMENT PROJECT ELECTRONICS TECHNICIAN Ill
MANAGER:
PROJECT DESCRIPTION
REPLACEMENT OF RADIOS THAT HAVE REACHED LIFE SPAN. IN YEARS PAST THIS WAS DONE THRU WARRANTY
SYSTEM. REPAIR COST OF UNITS COULD EXCEED THE COST OF PURCHASING A NEW UNIT.
ANNUAL OPERATING IMPACT
FUNDS FOR THIS PROJECT ARE ALREADY BEING COLLECTED. RADIO UNITS HAVE REACHED THEIR LIFE SPAN AND
NEED TO BE REPLACED.
BID20000
START I END
$0
ACCOUNT ACCOUNT
!COMPLETION 4/02
ACCOUNT
TOTAL
COMM EQUIP 9223
FULL-TIME SAL 8002
TEMP EMP SAL 8081
PROF SVCS 8302
ACCOUNT
$250,000.00
SOURCE OF FUNDING L-T-D REV 01-02 BUD 02-03 TOTAL FUTURE
RADIO CAPITAL PROJECTS FUND 200,000 50,000 0 250,000 0
lTOTAL $200,000 $50,000 $0 $250,000 $o I
72
-
FUND: INTERNAL SERVICE CAPITAL PROJECTS
PROJECT: TRUCK HOIST
FUND PROJECT#: 312-90202
LOCATION: FLEET SERVICES
PROJECT FLEET SERVICES MANAGER
MANAGER:
PROJECT DESCRIPTION
PURCHASE OF A TRUCK HOIST TO ASSIST IN REPAIRS OF HEAVY-DUlY VEHICLES.
REVISED 01/02: r-$30,000 ADDED FOR THE FILLING OF THE OIL CHANGE PITS PREVIOUSLY IN USE AND A WASH BAY PIT IN THE REAR
SHOPAREA..
-
ANNUAL OPERATING IMPACT
MINIMAL
-PROJECTSCHEDUUNG
I BID20000
r; START I END END
I II I
$0 $0 -ACCOUNT II ACCOUNT ACCOUNT ACCOUNT ACCOUNT
OTHER EQUIP 9226
FULL-TIME SAL 8002 -PROF SVCS 8302
-
-
!COMPLETION 9/02 TOTAL $77,500.00 -~OURCE OF FUNDING L-T ~ REV 01-02 BUD 02-03 TOTAL FUTURE
FLEET SERVICES CAPITAL PROJECT FUND 47,500 30,000 0 77,500 0
-
lTOTAL $47,500 $0 $77,500 $o I
73
No Text
COMMUNITY INVESTMENT FUNP
POLICY ..... . -
-
-
-
-
-
-
-
-
-
-
-
-
-.
COMMUNITY INVESTMENT FUND
FINANCIAL POLICY
OVERVIEW. These funds are budgeted by gross receipts and will be transferred to the
Community Investment Fund at the end of each fiscal year. They replace each fund's
previously budgeted contingency reserve. If funds are not needed for extraordinary
events, the transfers occur on 9-30 of each year.
The underlying philosophy is that monies will be transferred to the Community
Investment Fund from each contributing City of Lubbock fund. Market Lubbock will
then present, for City Council approval, funding requests for specific projects. Requests
for Community Investment funded projects may include, but are not limited to, items
such as incentives and capital improvements. Funds requested from the Community
Investment Fund shall not be used to fund Market Lubbock, Inc. operational
expenses ... only for project specific items.
I. FY 1998-99, Community Investment Fund, Phase I and Creation
Pursuant to the Mayor's Task Force requesting the city provide additional funding for
economic development out of our current operations, without raising taxes, Phase I was
implemented by city staff in the current budget and adopted by City Council in August,
1998.
In the first year, an amount equal to approximately $2.1 million toward the requested
total funding of $10 million over time was presented by staff and approved in the
F¥1998-99 operating budget. The monies were derived from 1% of gross receipts as
budgeted for that fiscal year per fund. It is expected to be an ongoing item in these funds.
The funds contributing in addition to the general fund are the enterprise funds, which are
positively enhanced by growth and economic development activity. Those funds include
electric, water, sewer and solid waste.
That amount is expected to be sustained at the same allocation formula for ongoing
funding annually, unless it is required for operations.
II. FY 1999-00, Enhanced Community Investment Fund, Phase IT
In FY 1999-00 an additional contribution was added -1% of gross revenue or
approximately $1 million that could also be sustained in future years. The source is the
Solid Waste Enterprise Fund. By reviewing historical commitments of the Electric
Enterprise to Economic Development and to the General Operating Fund, approximately
$4.5 million annually is committed as follows:
General fund infrastructure = $1.2 million
Economic Development= $100,000
74
Street lighting capital projects= $500,000
Street lighting budget = $1.9 million
ED program II = $330,000
ED program III= $190,000
Contribution toTS= $110,000
Business Development Office= $190,000
Of a $72 million budget, $4.5 million represents approximately 6.2%. The Solid Waste
budget is $17.2 million, 6% represents approximately $1,032,000.
III. FY 2001-02, Revision to General Fund Contribution
A. This year there is a change in the Community Investment Policy. The policy will
change the contribution from the General Fund to one penny on the property tax
instead of 1% of the total General Fund gross receipts. This policy change is
included in the proposed budget for FY 2001-02. The Community Investment
Fund will continue to receive 1% of gross revenues from those Enterprise Funds
that benefit from community growth, Electric, Water, Sewer and Solid Waste.
B. At Revised Budget the following amendments are added:
1. These funds can be utilized in supplemental grant agreements to Market
Lubbock, Inc. as Interim financing. The ability for Economic
Development to bridge local bank loans furthers our ability to pursue
clients for retention/expansion and attraction.
2. To pledge funding for Economic Development the policy is amended to
guarantee 30% of the annual allocation to be made, previous 0% was
guaranteed. This initially would allow $1,000,000 to be utilized to repay
any loans incurred, either internally or externally.
3. As prudent fiscal stewards council recognizes the need to monitor debt
ratios. Therefore, this philosophy will set a ceiling whereby the pledges
should not exceed 50% ofthe annual allocation to the fund.
• Original FY 1999
• Revised Last 05.23.02
75