Loading...
HomeMy WebLinkAboutResolution - 2019-R0429 - Bohannan Huston - 11/19/2019 Resolution No. 2019-RO429 Item No. 6.29 November 19, 2019 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Amendment No. 4 to that certain Agreement dated April 28, 2016 for Digital Orthophotographic services, RFP 16-12719-MA / Contract No. 12719, by and between the City of Lubbock and Bohannan Huston, Inc., and related documents. Said Amendment is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on November 19, 2019 DANIEL M. POPE, MAYOR ATTEST: P-0 �,p,4" ,1�� Rebe ca Garza, City Secr tary APPROVED AS TO CONTENT: �U-�— Sally Abbe, 1 irect�orG�I-S- and Data Services Mark"y1earw9od, Assistant City Manager APPROVED AS TO FORM: R n B oke, Assistant City Attorney RES.Amend Ito Contract No. 12719 11.1.19 Resolution No. 2019-RO429 AIV[11N DMENT No. 4 TO Contract 12719 City of Lubbock, TX Digital Orthophotography Project 2016 This Amendment No. 4 to Digital Orthophotography Project 2016 (Contract No. 12719) is entered into this 19th day of November ,2019 between the City of Lubbock,a Texas municipal corporation(the "City") and Bohannan Huston, Inc. of Albuquerque, New Mexico (the "Contractor"). WHEREAS,the City has issued a Request for Proposals Digital Orthophotography Project 2016(RFP 16-12719-MA);and WHEREAS,the City and the Contractor have previously entered into Contract 12719 dated April 28, 2016,Resolution No. 2016-R0141 ("the Agreement");and WHEREAS,the Contractor desires to continue to perform as an independent contractor to provide 3-Inch Resolution Digital Orthophotography and other imagery and GIS services, upon terms and conditions maintained in the Agreement; and WHEREAS, the City and the Contractor hereby desire to further amend said Agreement. NOW THEREFORE,the City and the Contractor hereby agree to amend the Agreement as j follows: 1) That Section 1.4 of the Agreement is hereby substituted and replaced by the following language: 1.4 This contract is for a term beginning January 1, 2020, and ending December 31, 2020. The City of Lubbock does not guarantee any specific amount of compensation, volume, minimum, or maximum amount of services under this contract.Notice of the City's option to extend this contract shall be given at least 30 days,but not more than 90 days, before expiration of the current term." 2) That"Exhibit A, Scope of Work"of the Agreement is hereby substituted and replaced with"Exhibit A"that is attached hereto. 3) That "Exhibit B, Project Pricing Table" of the Agreement is hereby substituted and replaced with"Exhibit B"that is attached hereto. Bohannan Huston Contract 12719 Amendment No.4 11.1.19 1 IN WITNESS WHERE OF,this Agreement is executed as of the Effective Date. CITY Or LUBBOCK,TX: CONTRACTOR: DANIEL M. POPE, MAYOR . De is Satn, SE IOR VICE-PRESIDENT courtyard Jefferson St.NE Albuquerque,NM, 87109-4335 ATTEST: Re eeca Garza, City Seere ary APPROVED AS TO CONTENT: 5��k 5"k Sally Ablig,Director GIS and Data Services G Marls Yea wood,Rssistant bty Manager APPROVED AS TO FORM: 1Z3 nI3r ke,Assistant City Attorney i Bohannan Huston Contract 12719 Amendment No.d 11.1.19 2 EXHIBIT SCOPE OF WORK 1. General Information 1.1. Overview The Contractor shall provide professional services related to the production of high-resolution, natural color, digital orthophotography. These products and services include, but are not limited to, large format frame based digital aerial imagery, project control, ground control, photogrammetry, aerial triangulation, processing of digital elevation data, processing or orthophotography, update of building footprint features, update of industrial canopy structures, update of ADA ramp feature locations, sidewalk feature inventory collection, GIS raster mosaics and webservices tile cache development.These services and products shall conform to this scope of work procured under Request for Proposals (RFP)for Professional Services, RFP 16-12719-MA for the City of Lubbock, Texas Digital Orthophotography Project 2016. Product deliverables provided under this Agreement shall meet the technical specifications outlined in this Scope of Work (Scope). For services identified in this Scope,the Contractor shall not proceed with any work until written authorization to begin the project,the "Notice to Proceed", is provided by the City. The product under this Agreement is described as the acquisition and production of digital orthophotography, feature collection and feature updates at a date mutually agreed upon by the Contractor and the City. The project areas are comprised of area of interests including the City of Lubbock, County of Lubbock, and Lake Alan Henry reservoir pipeline. Figures 1 and 2 show the project areas for digital orthophotography to be performed in late spring 2020. 2. Project Control Project control shall include existing ground control points recovered under the supervision of a Texas professional registered surveyor. The contractor shall strive to re-target and use control points established in previous orthophotography and LiDAR projects as applicable. In addition, Airborne Global Positioning System (AGPS) control and Inertial Measurement Unit(IMU)technology shall be used as part of the digital capture system. The contractor should use existing ground control points wherever possible. Should any new control be required,to the maximum extent possible and practicable, new points should be established within public properties(i.e. within road right-of-ways). In the event ground control or targets are needed on private property, the Contractor shall notify and obtain written permission of the property owner or proper agency prior to placing these ground control targets. I 1 v N G � li W M u M � ry r Y• la 4 1N� „ g µ N � H N N N � N � p « M G � 1y'•w•.11 3• N f M }iy� {dn N �*y ~ M N p N. f- 1. M.M d ypW a y w HM N N tl Jo+ It .N•. y " l". "� G 3W� o. M i1 1 M W /wtl u 9 a •+ N A N N p ++ N.w G M ro Pf � ♦G'1 4 N H G .* F � .. — H J w J N w w 41 G L+ N N H M� N M jVp tl µ i °. °t .n a «u �1 N G } A• H '�1' N .i w 1 " n1 M n '+ a a'w7 w �: n w w n w 1u} .w. "�_W H W 4" a rl Y2 y+� w M MM 99 N 1 W 7 -' 'w w Nw M w w -r" e! w L° yl • F •r r M � i'` e � N ". 1 3 « N d r N 1 xnW r . n H ( r y ! w vi M If µ 1.1" i KN E ,'e a r li 1 I '' ,S •° k ' y ' S t - Mp ♦ NN b u I F 1 I .j"1 u ^ N _ a� Y. • u t� W sl N M ^ w H N K •� N H.G le ilpy W.�. y V w W M N h a �. N N !y.• M ..{I-Yf I. I ■ b W ". rs N Iw [f N N w h ''/ 1r {{N�� d r N o w-M .M epi M {� , N w M �' N = �i P h w p li M Yr p a 1•HiRI u M W V 1'1 N (.Mi H i ,. • N N .. W N M H ~ P a w 4 N ry u' N G M N G MWMI� w - `• ' W N - "..i1 N M H LAH Pipeline AOI [179] --- Lubbock ETJ &Loop 88 Coverage AOI [660] HLAS Option AOI [102] Lubbock AOI 2020 [6267] 1� Figure 1 - Lubbock Flight Area and Option Areas Lubbock I I i I i 1 � E t E , E i I LAH Pipeline AOI [179] HLAS Option AOI [102] Lubbock AOI 2020 [6267] Figure 2 -Lake Alan Henry Pipeline AOI Control will be collected in State Plane,Texas North Central, U.S. Survey Feet, horizontal datum NAD83 (WKID 2276), and vertical datum NAVD88 using units of feet and matching the Geoid of the 2016 LiDAR acquisition project. The Contractor shall provide the location and identification of all ground control and photo control points established and used during the flyover in ArcGIS shapefile or geodatabase format. Latex- based paint shall be the preferred control point marking identification method. Contractor shall identify any control points placed using panel material which will be removed once aerial triangulation and/or flight phases are complete. 3. Digital Orthophotography The Contractor shall produce three-inch (3")-ground pixel resolution four-band color digital orthophotography from imagery acquired at a mutually agreed upon date prior to April 30, 2020, under leaf-off conditions. The full acquisition of digital aerial imagery shall be accomplished using the Microsoft UltraCAM Eagle digital sensor. 3.1. General Technical Specifications The tables shown below contain the general technical specification for the digital orthophotography and associated deliverable formatting. 7: S fi�F'2"z"�' " G �� �. Y r n •?a.'_.. " ® �.�. �. - �, �srassau m.k {o, t r�S$rci w. Orthorectified Ground 0.25 U.S. Survey Foot (3 inch) or better Pixel Resolution Image Type 64 bit 4-band stack imagery(RGBI) File Format Geotiff Compressed File SID format for project area at compression ratio determined in Formats consultation with the City; all compression formats shall be fully compatible with ESRI° and Engineering CAD software suites. Coordinate System State Plane,Texas North Central Zone (WKID 2276) Horizontal Datum NAD 1983 (current refinement) Map Units U.S. Survey Feet Map Scale 1:600 (1"=50') Tile Size Full tiles required of the established index grid Image Overedge None One-Foot US Survev Foot Ort p .4p _�otography Project Mosaic Orthorectified Ground 1.0 U.S. Survey Foot(12 inch) or better Pixel Resolution Image Type 24 bit 3-band stack imagery (RGB) File Format Geotiff accurately represent the shape of the ground and support the orthophoto production and accuracy specifications as outlined in this Scope. Terrain/elevation data used in the development of the DTM/DEM shall be captured by photogrammetric techniques. Existing JDAR data shall be reviewed by the Contractor to determine if significant terrain altering activity has occurred since the JDAR data was acquired. Contractor shall update the DTM in that area. 3.12. True Orthophotography True orthophotography shall be developed in areas in the vicinity of downtown and as indicated in Figure 2. Selected buildings greater than five (5)stories in this area shall be modeled to allow for the correction of building lean and occlusions. Planimetrically accurate and topologically sound feature data shall be collected to provide for detailed digital surface modeling of extruded building walls and relevant building roof superstructure detail. Additional aerial photography shall be collected with 80% overlap to facilitate the correction of occlusions in identified true orthophotography areas. 3.13. ArcGIS Image Service Cache Image Service Cache generated from ESRI ArcGIS image service as compact cache storage format. The cache schema will be defined by the City's existing cache used in 2019. 4. GIS Feature Class Updates Several feature updates to the city existing GIS coverages shall be performed from the newly captured 2020 digital imagery. Updated features must conform to the current feature class schemas provided from the City GIS system. Deliverable development includes merging the updated features into the City's existing coverage while preserving existing multipart features, attribute information, and any associated globally unique identifiers (GUIDs). The contractor will provide a complete redelivery of each feature class and area of interest coverage in an individual geodatabase. Areas of interest for each feature class update will be provided by the City. 4.1. City Sidewalk Feature Collection Sidewalks and walkways located at the side of a street or road will be collected along the perimeter of the visible edge within apparent city right-of-way and along all roadways. Sidewalk features will stop at driveways. Where vegetation and/or tree canopy obscures the visible edge, the sidewalk edge shall be interpolated to the extent possible from the 2019 aerial imagery source, then updated with new information from the 2020 source. Sidewalk polygons will include interior holes for landscape or other isolated areas where they are encountered. Residential concrete flatwork features(e.g. entry walkways) are not included in this feature class. 4.2. City AOI Building Feature Update The City will provide the current building footprint coverage GIS database. This coverage will be updated by the Contractor to reflect the building footprint structures that have been added, modified, and deleted as observed in the Contractor acquired 2020 aerial imagery. Updated building geometry will be limited to buildings exhibiting 120 square feet or greater change.The updated building features will be consolidated into the existing feature class coverage. A second feature class will contain the building footprints that represent the deleted polygons. The building footprint polygons should be attributed with the top elevation of the building and the adjacent ground 6. Product Acceptance Procedures The Contractor is responsible to assure that all services and products required by this Scope are performed and provided in a manner that meets all professional and engineering quality standards and industry-accepted photogrammetric principles. The Contractor shall warranty all project deliverables for a period of two (2)years from the final product delivery date in the project schedule as negotiated in this Agreement.The warranty shall include compliance of all deliverables to the technical specifications, product accuracy specifications, and data format and software compatibility as outlined in this Scope, or as stated and affirmed by the Contractor. The Contractor is responsible for replacing deliverables found to be deficient or defective and costs associated with accomplishing the replacement of data under warranty shall be borne by the Contractor with no additional cost to the City. The City's Project Manager shall be the point of contact with the Contractor for notification of deficiencies or defects.The warranty shall stipulate that the Contractor shall complete the repair or replacement of the defective product within ten (10) working days from receipt of a written notice from the Project Manager, or the Contractor shall meet with the Project Manager within five (5) days of receipt of the written notice of defective product or product not in compliance with specifications. If after meeting with the Project Manager,the data is found to be deficient or defective,the repair and replacement shall be completed within ten (10)working days as stipulated herein, or within a reasonable time period agreed upon by the City and the Contractor. 7. Submittal Schedule A Gantt chart of the Project schedule showing task, duration and product delivery shows calendar days from the issuance of a Notice to Proceed and is shown below.This Project schedule serves as the basis for the Schedule of Fees and "On-Schedule Delivery" period developed for this Project. is a _ I, I a I I c < « 2 I'. `1 14 9 ; li' I I - � I �I a �! J a� E U of Q4 OI Z o-o"o N = = N N Q LLILL � L LL L � LL � LL {i {y LL li O O W LL C O O G C i N N tt] C2 C] t+l 00O m m N N M m h R ? M f l N M O N N N � N N _ _ _ Ej � C C 4� n D is•1 � N 4L'4 N O O cc Cd N LL �- O O O O O O O LL C C C W ll LL �i �G .2 rL Z r2 rL �2 r O > T C1 W � W Y v D .Q o ^ N if i..(. r _✓' p. O C YC1 C N 00 R � 01 � d IT a O 6 v D 0 O ?, O O v m Q, ro •C.-. a m � m ,� 3 A m o m m d w m m m aUi E U rn E:I V O o a a m v o a0 ~ m a` H m m` c m u a0 N 3 O y d O Q t O — O d N LL O ❑ m N U C9 o s E ¢ O U •a 0¢ C7 ❑ w in 6 m 0 _�N Q..N w O r c7 -1 T- - -T- I-J- 142 Iv O EXHIBIT B PRICING TABLE 1 Lubbock Area of Interest (AOI)—includes county area $141,600.00 2 LAH Pipeline AOI $12,500.00 3 Building/Canopy Footprint Update $7,500.00 4 Sidewalk Inventory&ADA Ramp Point Update $81,950.00 5 Extended Coverage (Loop 88 & ETJ buffers AOI) $10,500.00 6 Extended coverage (HLAS AOI) $3,250.00 Total all Items: $257,300.00