HomeMy WebLinkAboutResolution - 2025-R0334 - Amend. 1 PSA, Contract 17967, Kimley Horn And Associates, Unpaved Roads - 07/22/2025Resolution No. 2025-R0334 Item No. 6.8 July 22, 2025 RESOLUTION B� IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: TH�11' the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on bchalf of the City of Lubbock, Amendment No. 1 to the professional services agreement Contract No. 17967 for the design of unpaved road improvements by and between the City of Lubbock and Kimley-Horn Associates, Inc., and related documents. Said Amendment is attached hcrcto and incorporated in this resolution as if fully set forth herein and shall bc included in the minutes of the City Council. Passed by thc City Council on ___ Jul�+ 22, 2025 MARK W. MCB �R, MAYOR A1 '1;ST: Cou ncy Par, City Sccrctary AYPROVLD AS TO CON"I'1?NT: � "� � w� �rik Rcjino, Assistant City Manager AP ROVL;D AS `l'O I�ORM: K lli I�cisure, Senior Assistant City Attorney ccdocslRLS.Amcnd �El 17967 KII unpaved roads 7.1.25 Resolution No. 2025-R0334 Amendment 1 To Agreement Between The City of Lubbock, TX And Kimley-Horn and Associates, Inc. THIS IS THE FIRST AMENDMENT TO THE AGREEMENT dated and entered into on the 26th day of March, 2024, Contract No. 17967, by and between the City of Lubbock ("City") and Kimley-Horn Associates, Inc. ("Engineer"), collectively (the "Parties"). Engineer is providing professional services for the design of unpaved road improvements (the "Activities"). On March 25, 2025 the Parties executed a six (6) month extension for time only. The Parties now agree to add to the scope of services Engineer will complete as part of the Activities. NOW THEREFORE, the Parties enter into this amendment and agree as follows: The scope of the Activities shall be amended to include additional services for project management, final design, and franchise utility coordination, the details of which are set forth in "Exhibit A", attached hereto and incorporated herein. The additional services herein shall be performed by the Engineer for an amount not to exceed fifteen thousand and 00/100 Dollars ($15,000.00). All other terms of the Agreement remain the same and are not altered herein. IN WITNESS HEREOF, the parties have executed this Agreement as of this 22nd day of July 2025. CITY OF LUBBOCK Kimley-Horn Associates, Inc. � MARK W. MCBRAYE , AYOR Kevin Hoppers � A TEST: C rtney Paz, City Secretary tor of Engineering/City Engineer Page 1 of 2 APPROVED AS TO CONTENT: APPROVED AS TO FORM: . Kelli Leisure, Senior Assistant City Attorney Page 2 of 2 EXHIBIT A — Amendment 01 Engineering Scope of Services Unpaved Street Improvements City of lubbock PROJECT UNDERSTANDING The project consists of providing the following services to supplement the design of the Unpaved Street Improvements project and is related to Professional Services Contract 17967, dated March 26, 2024 for Engineering Services. This scope of services consists of the following: • Project Management • Final Design • Franchise Utility Coordination The Engineer shall perform the following Additional Services: 1. Project Management 1.1. Project coordination 1.1.1 Coordination with LAN on proposed intersection tie-in at E 78th Street and M.L.K. Blvd. 1.1.2 Internal design team meetings to review and discuss revised paving improvements consisting of: • Oberlin Street grading modifications • Avenue T and 96th Street intersection addition and grading modifications • Intersection design changes along E 78th Street and 94th Street 2. Final Design 2.1. Avenue T Profile Update 2.1.1 Update PGL and gutter profiles through 96th Street and no longer tie-in to previous City plans 2.1.2 Revise plan and profile sheets 2.2. Avenue T and 96t" Street Intersection 2.2.1 Design fully improved intersection per City direction 2.2.2 Create intersection detail sheet detailing design 2.3. Design Cross Sections 2.3.1 Provide printed design cross sections for each project location 2.4. Deliverables 2.4.1 90% & 99% Submittal • Submit electronic PDF file of the design to the City for review and comment. • The Engineer will address one (1) round of review comments in preparation for final submittal. Unpaved Street Improvements Page 1 of 3 Exhibit A— Amendment 01- Engineering Scope of Services June 13, 2025 3. Franchise Utility Coordination 3.1. Utility Conflicts 3.1.1 Engineer will identify utility conflict locations and provide to City for relocation coordination 4. Additional Services Services not specifically identified in the Scope of Services above shall be considered additional and shall be performed on an individual basis upon authorization by the City. Such services shall include, but are not limited to, the following: • Utility relocation coordination • Right of Way acquisition services • Construction Contract Administration • Construction Phase Engineer of Record support services • Construction Phase RPR Services • Design of any offsite drainage improvements beyond the improvements identified in the scope • Design of structural retaining walls • Preparation for and attendance at public meetings • Redesign to reflect project scope changes requested by the City, required to address changed conditions or change in direction previously approved by the City, mandated by changing governmental laws, or necessitated by the City's acceptance of substitutions proposed by the contractor SCHEDULE Engineer is authorized to commence work on the Project upon execution of a mutually acceptable contract and agreed to complete the services in accordance with the schedule outlined in the Professional Services Contract 17967 for Engineering Services. Unpaved Street Improvements Page 2 of 3 Exhibit A—Amendment 01- Engineering Scope of Services June 13, 2025 The Consultant will perform the services in Tasks 1-3 on a labor fee basis with the maximum labor fee shown below: Task and Fee Summary Table Task 1 Project Management Task 2 Final Design Task 3 Franchise Utility Coordination Total Maximum $ 2,200 $ 11,800 $ 1,000 $ 15,000 The Engineer will not exceed the total maximum labor fee shown above without authorization from the City. Individual task amounts are provided for budgeting purposes only. The Engineer reserves the right to reallocate amounts among tasks as necessary. Labor fee will be billed on an hourly basis according to our then-current rates. As to these tasks, direct reimbursable expenses such as express delivery services, fees, travel, and other direct expenses will be billed at 1.15 times cost. A percentage of Engineer labor fee (4.6%) will be added to each invoice to cover certain other expenses such as telecommunications, in-house reproduction, postage, supplies, project related computer time, and local mileage. Unpaved Street Improvements Exhibit A—Amendment 01- Engineering Scope of Services Page 3 of 3 June 13, 2025