Loading...
HomeMy WebLinkAboutResolution - 2025-R0282 - Change Order 1, Contract 18063, Rink’S Lease Service, Manhattan Heights - 06/24/2025Resolution No. 2025-R0282 Item No. 6.19 June 24, 2025 RESOLUTTON BE IT RESOLVED BY THE CITY COCTNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of I,ubbock, Change Order No. O1 to that certain Contract No. 18063 by and between the City of I,ubbock and Rink's Lease Service, Inc. for water ahead of paving, Manhattan Heights as per RFP 24-18063-TF, and related documents. Said Change Order No. O1 is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on _ June 24, 2025 �� MA K W. MCBRAYER, MA OR AT1'EST: Co ney Paz, City Secrctary APPROVED AS TU CONTENT: � + r Erik Rejino, Assistant City Manager APPROVED AS TO PORM: elli Leisure, Senior Assistant City Attorney ccdocslRES.ChgOrdi# 1 18063 Rink's water Manhattan I Ieights 06.04.25 Office of Purchasing and Contract Management Change Order Contract No: 18063 Contractor: Rink's Lease Service Change Order No: 1 Contract Title: Water Ahead of Paving, Manhattan Heights Bid/RFP No: RFP 24-18063-TF Project No: 92750 "Change Order" means a written order to a Contractor, executed by the Owner, in accordance with the Contract suthorizing an addition to, deletion from, or adjustment or revision of the requirements of the Contract documents, or an adjustment to the compensation payable to the Contractor, or tQ the time for performance of the Contract and completion of the project, or a combination thereof, which does not alter the nature of project and is an integral part of the project objective. Adjustments to "Estimated Quantities" to a line time in a Unit Price Contract do not require a Change Order. All work that atters the nature of the construction or that is not an integral part of the project objective must be let out for public bid. Description of Change (alteraHon, deviatloa, addiHon, or deleNon) caused by conditlons encountered during construction not covered by the specifications and drawings of the nroiect (attached addiNonal oaees is necessarv: This change order includes additional work to install line stops and a valve to delineate the East and West pressure zones. This change order will add $161,436.00 to the contract with no additional time. Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs, including material quantities, material costs, taxes, insurance, employee benefits, other related costs, profit and overhead. Where certain unit prices are contained in the initial Contract, no deviations are allowed in computing negotiated change order costs. ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM ���./ ��� Date 1. ' 1 �: � co�►��t n8t�: June 24, 2�2$ Agenda Item #: City Secretary 6.24 l —� �� Date 06/24/2025 Date Resolution #: 2025-R0282 PUit-45 (Rev 08/2018) Tt is mutually agreed that the above dollar amount and the time extension, as applicable, as set forth in this Change Order constitutes full compensation to the ContracWr for all costs, expenses and damages to the Contractor, whether direct, consequenNal or othenvise, in anyway incident to, or arising out of, or resulNng directly or indirectly; from the work performed or modified by the Contractor under this Change Order. �l�l S . . . PO Box 456 `"`' ""'° 1707 FM 300 Rink's Lease S'ervice, Inc Municipal and Oilf:eld Pipeline Construcdon 806-894-74IS Levelland, Texas 79336 sales a�lnksls.conr . • City of lubbock pROPOSAL �'• 82nd and Indiana Pressure 2one Delineation �� 5/22/2025 Phase 1 Exploratory/Phase 2 Valve Installation � ' ' • • �• � • PH1-1 Mobilization/Demobilization LS 1 $ 2,190.00 $ 2,190.00 PH1-2 Traffic Control LS 1 $ 4,510.00 $ 4,510.00 PHi-3 Trench Safety LS 1 $ 805.00 $ 805.00 PH1-4 Saw Cut and Remove Asphalt SY 20 $ 87.00 $ 1,740.00 PH1-5 Exploratory Excavation LS 1 $ 2,420.00 $ 2,420.00 PH1-6 Temporary Flowfill Paving CY 11 $ 255.00 $ 2,805.00 PH2-1 Mobilization/Demobilization LS 1 $ 6,050.00 $ 6,050.00 PH2-2 Traffic Control LS i $ 10,380.00 $ 10,380.00 PH2-3 Trench Safety LS 1 $ 4,035.00 $ 4,035.00 PH2-4 Saw Cut and Remove Asphalt SY 79 $ 87.00 $ 6,873.00 PH2-5 Excavation and Backfill LS 1 $ 16,130.00 $ 16,130.00 PH2-6 Install 14" Line Stops EA 2 $ 29,815.00 $ 59,630.00 PH2-� Install 12" Gate Vavle and Associated EA 1 $ 18,500.00 $ 18,500.00 Fittings PH2-8 Install Flowable Fill CY 40 $ 255.00 $ 10,200.00 PH2-9 Replace Asphalt Paving - 6" Thick SY 79 $ 192.00 $ 15,168.00 Thls proposal lnc/udes all la6or, equlpment, ond mater/al for instal/atlon SU BTOTAL per project plans and spec/fltatlons $ 161,436.00 TAX (NA) $ _ RJnk's Repr. � � � Sfgnature Customer's Slgnature TOTAL $ 161,436.00