HomeMy WebLinkAboutResolution - 2025-R0293 - Amendment 2, PSA Contract 17087, HDR, Inc - 06/24/2025Resolution No. 2025-R0293
Item No. 6.15
June 24, 2024
RESOLUTYON
BE IT RESOLVED BY T%iE CTTY COUNCTL O� THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock is hereby authorized and directed to
execute for and on behalf of the City of Lubbock, Amendment No. 2 to the professional
services agreement Contract No. 17087 for the reconstruction of Milwaukee Avenue from 4`n
Street to the City of Lubbock city limits by and between the City of Lubbock and HDR
�ngineering, Inc., and related documents. Said Amendment is attached hereto and
incorporated in this resolution as if fully set forth hcrein and shall be included in the minutes
of the City Council.
Passed by the City Council on _
��
AYOR - --
A�i��res�r:
C ney Paz, City Secretary
APPROV�D AS TO CON"1'LNT:
��C . ..
�rik Rejino, Assistant City Manager
APPROVED AS 1'O 1�ORM:
.
Ke li Leisure, Senior Assistant City Attorney
ccdocslRES.Amend #2 17087 IIDR Milwaukee Ave
6.3.25
June 24, 2025 .
Resolution No. 2025-R0293
Amendment 2
To Agreement Between
The City of Lubbock, TX
And
HDR Engineering, Inc.
THIS IS THE SECOND AMENDMENT TO THE AGREEMENT dated and entered into on the 14th day
of February, 2023, Contract No. 17087, by and between the City of Lubbock ("City") and HDR
Engineering, Inc. ("Engineer"), collectively (the "Parties").
Engineer is providing professional services for the reconstruction of Milwaukee Avenue from 4'h Street to
the City of Lubbock city limits (the "Activities").
The Parties executed a six-month time extension for the performance of the Activities on November 16,
2023. Amendment No. 1 was executed by the Parties to include additional roadway design services on
August 13, 2024.
The Parties now agree to an additional scope of services, time extension, and additional fees, in part to keep
the Engineer retained, as the City awaits a third party to relocate utilities ahead of reconstruction.
NOW THEREFORE, the Parties enter into this amendment and agree as follows:
The additional services to be performed by the Engineer are as described and set forth in "Exhibit A",
attached hereto and incorporated herein. Further, the additional services herein shall be completed for an
amount not to exceed fifty-eight thousand dollars and 001100 ($58,000.00) as set forth in "Exhibit B",
attached hereto and incorporated herein. An additional six (6) months shall be added to the term for the
Engineer to complete the services herein agreed.
All other terms of the Agreement and prior Amendment remain the same and are not altered herein.
IN WITNESS HEREOF, the parties have executed this Agreement as of this 24th day of
June 2025.
CITY OF LUBBOCK
�
MARK W. CBRAYER, MAYOR
HDR Engineering, Inc.
Digftally signed by
... - ��;`�t� Wnrd, Justin
, fla�@: 2025.05.16
i2:4ff:29 •05'00'
Justin Word, P.E., Vice President
TTEST:
ourtney Paz, City Secre ary
Page 1 of 2
APPROVED AS TO CONTENT:
Engineer
�
r
elli Leisure, Senior Assistant City Attorney
Page 2 of 2
: ' ' : �Pl�l�7:�.ylC�laCi):7u�
Exhibit A— Contract Amendment 002
Milwaukee Ave. Reconstruction
Scope of Services
Task 1: Milwaukee End Limit
Design Phase
HDR will revise the project end limit for Milwaukee Ave. to tie into the existing lane configuration
approximately 300' North from Marshall St. This revision will include updates to the Traffic
Control plans, Roadway plans, Signing and Striping Plans, SW3P plans, and the Drainage
plans.
Upon acceptance of a design alternative, HDR will revise the models, plans, specifications, and
estimates for the 100% milestone to reflect the updated project end limits. These updates shall
consist of the following scope of work:
• Update index of sheets.
• Update quantity summary sheets.
• Update typical sections
• Update roadway 3D model
• Update drainage models
• Update drainage memo
• Update drainage area maps for existing and proposed improvements
• Update internal drainage maps for internal drainage system
• Update plan & profile sheets for proposed ditches
• Update plan & profile sheets for the new roadway end limit.
• Update removal sheets for the new roadway end limit.
• Update TCP plan sheets for the new roadway end limit.
• Update SW3P plan sheets for the new roadway end limit.
• Update Signing and Striping plan sheets for the new roadway end limit.
• Update hydrologic and hydraulic data sheets for existing and proposed systems.
• Develop Cross Sections every 50 feet along the stationing. The cross section will extend
from right of way to right of way and will show existing surface, proposed surface, curbs,
retaining walls (where needed), and pavement section.
• Develop opinion of probable construction cost
• Perform a Quality Assurance/Quality Control (QA/QC) review prior to each submittal to the
City.
City of Lubbock � Milwaukee Ave. Reconstruction ���
Scope of Services
Project Schedule
The proposed timeline for completion of the major tasks of the Scope of Work is as follows:
� Milwaukee End Limit � 6.0
Durations are estimated from Task NTP.
E
City of Lubbock � Milwaukee Ave. F2econstruction ���
Scope of Services
Exhibit B
Milwaukee Ave. Reconstruction
Budget
CITY and ENGINEER have established a fee of $58,000 to complete the scope of services for
Contract Amendment 002, as shown below by task. This amount will supplement the Contract
Fee for an amended not-to-exceed of $1,594,002
Milwaukee End Limit
, Total
3
ENGINEER agrees to complete these services as delineated above. Should a change in Scope
of Services or Time of PerFormance be necessary, an amendment to this contract shall be
negotiated at that time. The following table summarizes the fee estimated to be required to
complete the above scope of services.