ORDINANCE NO. 6604 -----
AN ORDINANCE AMENDING ARTICLE II OF CHAPTER 34 OF THE COD
OF ORDINANCES OF THE CITY OF LUBBOCK BY AMENDING SECTION 34 ... 52
THEREOF PROVIDING FOR PRO-RATA CHARGES FOR WATER AND/OR SEWER
SERVICE; AMENDING SECTION 34-65 PROVIDING FOR UNIT PRICES USED IN
CALCULATING COSTS OF EXTENSIONS; PROVIDING A SAVINGS CLAUSE; PRO ..
VIDING AN EFFECTIVE DATE AND PROVIDING FOR PUBUCATION.
WHEREAS, the City Council has determined that the changes in charges
for services as shown below are in the best interest of all citizens of the City of
Lubbock; NOW THEREFORE:
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
SECTION 1. THAT Section 34 ... 52 of the Code rof Ordinances of the City of
Lubbock, BE and is hereby amended by amending sub ... paragraphs (a) and (b)
thereof, relating to charges, to read as follows:
"{a) $2. 25 per front foot of lot or tract of land to which sewer
service is to be provided; and
{b) $2. 80 per front foot of lot or tract of land to which water
service is to be provided; and as more specifically pro-
vided herein. "
SECTION 2. THAT Section 34 ... 65 of the Code of Ordinances of the City of
Lubbock, BE and is hereby amended to read as follows:
11Sec. 34 ... 65. Unit Prices Used in Calculating Costs of Extensions
The following prices shall be used as Wlit prices in calculating the
costs of extensions of water or sewer mains and appurtenances under
the terms of this article:
Water Mains and Appurtenances Installed:
For 311
For 3"
For 4"
For 411
For 6"
For 611
For 8"
FGr a"
For 1011
For 1011
For 12"
For 12"
Asbestos cement class 150 water pipe per lin. ft.
Cast ... iron class 150 water pipe per lin. ft.
Asbestos cement class 150 water pipe per lin. ft.
Cast ... iron class 150 water pipe per lin. ft.
Asbestos cement class 150 water pipe per lin. ft.
Cast ... iron class 150 water pipe per lin. ft.
Asbestos cement class 150 water pipe per lin. ft.
Cast ... iron class 150 water pipe per lin. ft.
Asbestos cement class 150 water pipe per lin. ft.
Cast-iron class 150 water pipe per lin. ft.
Asbestos cement class 150 water pipe per lin. ft.
Cast ... iron class 150 water pipe per lint_' ft.
$ 1. 40
1. 75
.1. 75
2. 25
2. 52
2.80
3.10
3.40
4. 30
5. 45
5. 25
6.40
KJ:kr
For 311
For 411
For 611
For 811
For 10"
For 12u
For
For
Gate valves and valve box @
Gate vlaves and valve box @
Gate valves and valve box @
Gate valves and valve box @
Gate valves and valve box @
Gate valves and valve box @
Fire hydrant @
Fittings per pound @
Wet tiewin @
Move Machinery
Paving Repair .. 2 course asphalt per lin. ft.
4 course asphalt per lin. ft.
75.00
91.00
na. 00
161.00
270.00
294. 00
279.00
0.30
150.00
175.00
2.00
5.00
The unit prices above are inclusive of all items not specifically listed
herein, except as hereinafter provided, which may be necessary to
complete the project, except engineering. The installation of a tapping
valve, or tying to an existing cross or tee fifty feet (501) from the
nearest valve shall be considered a wet ti.ewin. All wet tie ... ins shall
be made by city forces and shall include flushing and sterilizing all
water lines.
Tapping Sleeve and Valve for C. I. & A. C.
6 X 3
6x4
6 X 6
8x3
ax4
a X 6
axa
10 X 3
10 X 4
10 X 6
10 X a
12 X 3
12 X 4
12 X 6
12 X a
12 X 10
Sanitary sewer mains and appurtenances, installed:
For 611 vitrified clay sanitary sewer pipe:
or .. 4r per lin. ft.
4r ... sr per lin. ft.::
6r ... at per lin. ft.
ar .. 1or per lin. ft.
wt -12r per lin. ft.
12' .. 14t per lin. ft.
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
160.00
la7. 00
215.00
170. 00
205.00
225.00
265.00
227.00
240.00
260.00
321.00
250.00
267.00
292;00
31a. 00
425.00
1. 50
1. 75
1. a7
1. 9a
2.39
2.73
KJ:kr
For 8" vitrified clay sanitary sewer pipe:
or ... 4t per lin. ft.
4f .. 6' per lin. ft.
6t ... 8t per lin. ft.
81 "" lot per lin. ft.
lOt ... 12t per lin. ft.
121 ... 141 per lin. ft.
141 ... 161 per lin. ft.
u;r ... 18f per lin. ft.
181 ... 201 per lin. ft.
For 1011 vitrified clay sanitary sewer pipe:
or-41 per lin. ft.
4t ... Gt per lin. ft.
61 -8r per lin. ft.
81 ... lOt per lin. ft.
121 .,. 141 per lin. ft.
14t ... 161 per lin. ft.
16t ... 181 per lin. ft.
181 ... 201 per lin. ft.
For 1211 vitrified clay sanitary sewer pipe:
0 1 .... 41
41 ... 61
61 ... sr
s1 -1ot
lQf -12f
121 ... 141
14f .,. 16f
161 ... 181
lBt ... 20t
For Manhole Standard
~or Manhole Drop
For E. V. F. Std.
per lin. ft.
per lin. ft.
per lin. ft.
per lin. ft.
per lin. ft.
per lin. ft.
per lin. ft.
per lin. ft.
per lin. ft.
For E. V. F. Std. M. H. Adjustment
For Extra Vertical Ft. Drop
Move Machinery
Tie to Std. M. H.
Tie to Drop M. H. or ... 61 (611 & 8 11)
Tie to Drop M. H. or ... 61 (10 II & 12 11)
E. V. F. Drop Tie ... in Over 611
For 6 x 4 Wyes Complete with Plug
For 8 x 4 Wyes Complete with Plug
1. 95
2.03
2. 23
2. 47
2.78
3.25
3.80
4.20
4.70
2. 45
2. 52
2.60
3.44
4.00
4.45
5.20
5.,70
3.10
3. 30
3.,50
3.88
4.13
4.52
4.90
5. 65
6.15
160.00
184. 00
25.00
25.00
29.00
175. 00
47.50
60.00
70.00
20.00
4.,50
7.00
KJ:kr
For 10 x 4 Wyes Complete with Plug
For 12 x 4 Wyes Complete with Plug
For 6" Clean Out
For 4'' v. C. T. Riser Pipe
For 6" V. C. T. Plug
For 811 v. c. T. Plug
For 10" V. c. T. Plug
For 12" V. C. T. Plug
Gravel Embedment to 1/4 Pt. per lin. ft.
Gravel Embedment to mid pt. per lin. ft.
Paving Repair:
2 course asphalt
4 course asphalt
per lin. ft.
per lin. ft.
9. 50
12.00
60.00
1. 05
1. 25
2.00
2.50
3. 00
o. 75
1. 00
2. 00
s. 00
The unit prices above are inclusive of all items not specifically
listed herein, except as hereinafter privided, which may be
necessary to priduce a complete jab, except engineering charges.
Water main and sanitary sewer main installations which require
mains and appurtenances of a size and kind not listed above, shall
be estimated by the city engineer with the cost thereof to be based
on current prices of labor and material.
SECTION 3. THAT the charges listed :in Sections 1 and 2 above shall be ...
come effective on June 1, 1973.
SECTION 4. THAT should any section, paragraph, sentence, clause,
phrase or word of this Ordinance be declared unconstitutional or invalid for any
reason, the remainder of this Ordinance shall not be affected thereby.
SECTION 5. THAT the City Secretary is hereby authorized to cause pub-
lication of the descriptive caption of this Ordinance as an alternative method pro ..
vided by law.
AND IT IS SO ORDERED.
Passed by the CoWlcil on first reading this 12th day of __ A~pr_i_l=--=------'' 1973.
Passed by the Council on second reading this 26th day of April ., 1973.
tt. ... ~.~ ..... ATTEST:
v~h;~ £2. MORRIS W. TURNER, MAYOR
Lavenia 4owe, City Secretary ... Treasurer
APPROVED AS TO FORM: Q ~&.~ r Fred 0. Sente;;Jr.~~