HomeMy WebLinkAboutOrdinance - 2024-O0148 - North Park Development Area As Tax Increment Reinvestment Zone No. 4 - 12/03/2024First Reading
November 12, 2024
Item No. 6.2
Second Reading
December 3, 2024
Item No. 6.14
ORDINANCE NO. 2024-00148
AN ORDINANCE OF THE CITY OF LUBBOCK, TEXAS, DESIGNATING
A GEOGRAPHIC AREA WITHIN THE CITY AS A TAX INCREMENT
REINVESTMENT ZONE PURSUANT TO CHAPTER 311 OF THE TEXAS
TAX CODE, TO BE KNOWN AS REINVESTMENT ZONE NUMBER
FOUR, CITY OF LUBBOCK; DESCRIBING THE BOUNDARIES OF THE
ZONE; CREATING A BOARD OF DIRECTORS FOR THE ZONE;
ESTABLISHING A TAX INCREMENT FUND; ESTABLISHING THE
DURATION OF THE ZONE; CONTAINING FINDINGS RELATED TO
THE CREATION OF THE ZONE; PROVIDING THAT THE ZONE TAKE
EFFECT IMMEDIATELY UPON PASSAGE OF THE ORDINANCE;
PROVIDING A SEVERABILITY CLAUSE; AND PROVIDING AN
EFFECTIVE DATE.
WHEREAS, the City of Lubbock, Texas (the "City"), pursuant to Texas Tax Code Chapter
311, as amended, known as the Tax Increment Financing Act (the "Act"), may designate a
geographic area within the City as a tax increment reinvestment zone if the City Council determines
that development or redevelopment in the area would not occur solely through private investment
in the reasonably foreseeable future and the area satisfies the requirements of the Act; and
WHEREAS, in accordance with § 311.005(a)(4) of the Act, on September 16, 2024, the
City received a petition (the "Petition") from owners of certain real property, such owners being
Slide North Apartments, L.L.C., a Texas limited liability company; Slide North Townhomes,
L.L.C., a Texas limited liability company; North Loop 289, Ltd., a Texas limited partnership;
Northpark 289 DE, LLC, a Delaware limited liability company; North Park Lubbock Development,
Inc., a Texas corporation; North park Lubbock Development, Ltd., a Texas limited partnership; and
Brentwood Loop Realty, Ltd., a Texas limited partnership, (the "Petitioners") requesting the City
to establish a reinvestment zone encompassing an area of land described by metes and bounds in
the petition, being approximately 332.8 acres located within the municipal limits of the City of
Lubbock; and
WHEREAS, the Petitioners represented to the City in their Petition that they own more
than more than fifty percent (50%) of the appraised value of the property in the area described in
the Petition and satisfy the requirements of § 311.005(a)(4) of the Act; and
WHEREAS, the City Council, on September 24, 2024, approved a resolution finding that
the Petitioners represented more than percent (50%) of the appraised value of the property in the
area described in the Petition, satisfied the requirements of § 311.005(a)(4) of the Act, scheduled a
public hearing on the creation of the reinvestment zone and directed the City Manager, or his
designee, to develop a preliminary reinvestment zone financing plan for the area described in the
Petition as required by § 311.003 of the Act; and
WHEREAS, the City Council held a public hearing on October 8, 2024, on the creation
of a reinvestment zone for the area described in the Petition allowing any interested person speak
for or against the creation of the reinvestment zone, its boundaries, or the concept of tax increment
financing; and
WHEREAS, notice of the aforementioned public hearing was published in The Lubbock
Avalanche Journal, a newspaper having general circulation in the City, more than seven days before
the date of the hearing; and
Page 1 of 5
WHEREAS, representatives of the Petitioners and citizens offered testimony and evidence
in favor of creating the reinvestment zone while there was no evidence presented against the
creation of the zone; and
WHEREAS, the City has taken all actions required to create the reinvestment zone,
including but not limited to, all actions required by the Act, the Texas Open Meetings Act, and all
other laws applicable to the creation of the zone; and
WHEREAS, the City Council believes it would be in the best interest of the City of
Lubbock to create the reinvestment zone as described in this ordinance, establish a board of
directors for the reinvestment zone, establish a tax increment fund for the reinvestment zone and
make further findings relating to the creation of the reinvestment zone as further described in this
ordinance; NOW THEREFORE,
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK, THAT:
SECTION 1. The recitals and findings outlined above are found to be true and correct and are
hereby incorporated and adopted herein as though set forth fully herein.
SECTION 2. Findings.
(a) The proposed reinvestment zone meets the requirements of §311.005 ofthe Act in that:
(i) The Petitioners represent more than percent (50%) of the appraised value of the
property in the area described in the Petition and satisfy the requirements of
§3 l 1.005(a)(4) of the Act; and
(ii) Development or redevelopment in the area would not occur solely through private
investment in the reasonably foreseeable future.
(b) The proposed zone is in a geographic area completely within the City's corporate limits
or extraterritorial jurisdiction.
(c) The improvements in the proposed zone will significantly enhance the value of all the
taxable real property in the zone and will be of general benefit to the municipality.
(d) The proposed zone is being designated pursuant to Texas Tax Code §311.005(a)(4).
(e) The total appraised value of taxable real property in the proposed zone and in existing
reinvestment zones does not exceed 25 percent of the total appraised value of taxable
real property in the City of Lubbock and in the industrial districts created by the City
of Lubbock.
(f) The City has prepared a preliminary reinvestment zone financing plan as required by
Texas Tax Code § 311.003(b), such plan being attached hereto as Exhibit A.
SECTION 3. Name and Boundaries. The proposed zone shall be identified as "Reinvestment
Zone Number Four, City of Lubbock" (the "Zone" or "Reinvestment Zone") whose boundaries
shall constitute a geographic area completely within the City's corporate limits and more
particularly described by metes and bounds in the survey attached hereto as Exhibit B.
Page 2 of 5
SECTION 4. Board of Directors.
(a) Membership. There is established a board of directors for the Zone (the "Board") that
shall consist of nine members. Six members shall be appointed to the Board by the
City Council to Places 1,2,3,4,5 and 6. Place 7 of the Board shall be appointed by
Commissioners Court of Lubbock County, Texas (the "County") if the County has
approved the payment of all or part of the tax increment produced by the County into
the tax increment fund for the Zone. If the County fails to approve the payment of all
or part of the tax increment produced by the County into the tax increment fund for the
Zone, the Commissioners Court shall be deemed to have waived its right to appoint a
member to Place 7 and Place 7 shall be appointed by the City Council. Place 8 of the
Board shall be reserved for the state senator, or their designee, in whose district the
Zone is located. Place 9 of the Board shall be reserved for the state representative, or
their designee, in whose district the Zone is located. The members of the Board for
Places 1-7 shall be appointed by resolution of the respective governing bodies within
sixty (60) days of the passage of this ordinance or within a reasonable time thereafter.
All members appointed to the Board, except for the ex officio members, shall own real
property in the Zone or be an employee or agent of a person that owns real property in
the Zone and meet the eligibility requirements set forth in the Act.
(b) Term. Places 1-7 of the Board shall serve staggered terms of two years with the
initial terms of Places 1, 2, 3 and 7 being one year. The City Council shall designate a
member of the Board to serve as the chairman of the Board and the Board shall elect
from its members a vice chair and other officers as it sees fit. The chairman shall serve
a term as chairman for a term of one (1) year beginning on January I" and is eligible
for reappointment.
(c) Duties. The Board shall make recommendations to the City Council concerning
the administration of the Zone. It shall prepare and adopt a project plan and a
reinvestment zone financing plan for the zone ("Project and Finance Plan") as required
by the Act and shall submit the Project and Finance Plan to the City Council for
approval. The Board may enter into agreements as the Board considers necessary or
convenient to implement the Project and Finance Plan and reimburse such costs
associated with implementing the Project and Finance Plan ("Project Costs") from the
TIRZ Fund established pursuant to Section 8 of this Ordinance. The Board shall
possess all powers necessary to prepare, implement and monitor such Project and
Finance Plan as the City Council considers advisable including the submission of an
annual report on the status of the Zone.
(d) State Senator/State Representative Waiver of Service on Board. In the event a state
senator or state representative, who is an ex officio member of the board of the directors
of the Zone, after receiving notice and following the provisions outlined in Texas Tax
Code § 311.0092, elects not to serve on the board or designate another individual to
serve in their place, they shall not be counted as a member of the board for voting or
quorum purposes.
SECTION 5. Effective Immediately/Duration of the Zone. The Zone shall take effect
immediately upon passage and approval of this Ordinance. The Zone shall terminate on December
31, 2054 (with final year's tax due by January 31, 2055), unless otherwise terminated in accordance
with this section or applicable state law. The City shall have the right to terminate the Zone prior
to the expiration of its stated term if all of the Project Costs have been paid in full. If upon
Paee 3 of 5
expiration of the stated term of the Zone, the Project Costs have not been paid, the City and/or the
County, shall have not obligation to pay any shortfall.
SECTION 6. Tax Increment Base. The "tax increment base" for purposes of calculating the City
TIRZ Increment, and if the County participates in the Zone the County TIRZ Increment, means the
total appraised value of all real property in the Zone that is taxable by the City and/or the County,
respectively, as of January 1, 2024.
SECTION 7. Captured Appraised Value. The "captured appraised value" for purposes of
calculating the annual City TIRZ Increment, and if the County participates in the Zone the County
TIRZ Increment, means the total real property value taxable (including increases in tax values
attributable to changes in use) by a taxing unit for a year and located in the Zone for that year less
the tax increment base of the unit.
SECTION 8. Tax Increment Fund. There is hereby created and established a tax increment fund
(the "TIRZ Fund") for the Zone which may be divided and maintained into such subaccounts as
necessary and convenient to carry out the purposes of the Act. The City TIRZ Increment and the
County TIRZ Increment shall be deposited into the TIRZ Fund as of the effective date of the Zone.
The TIRZ Fund and all subaccounts shall be maintained at the depository bank of the City and shall
be secured in the manner prescribed by law for funds of Texas cities. Prior to the termination of
the Zone, funds shall be disbursed from the TIRZ Fund only to pay Project Costs.
The TIRZ Fund shall consist of the following:
(i) the percentage of the tax increment, as defined by Texas Tax Code § 311.012(a),
that each taxing unit which levies real property taxes in the Zone, other that the
City, has elected to dedicate to the TIRZ Fund under an agreement with the City
as authorized by Texas Tax Code § 311.013(f); and
(ii) one hundred percent (100%) of the City's tax increment as defined by Texas Tax
Code § 311.012(a) (the "City TIRZ Increment"), subject to any binding agreement
executed at any time by the City that pledges a portion of such tax increment or an
amount of other legally available funds whose calculation is based on receipt of
any portion of such tax increment.
SECTION 9. Repealed. All other terms and provisions of the Code of Ordinances, City of
Lubbock, not in conflict herewith and not hereby amended shall remain in full force and effect.
SECTION 10. Effective Date. This Ordinance shall take effect immediately upon its passage as
provided by law with the effective date being the date of passage on its second reading.
SECTION 11. Severability. If any provision, section, subsection, sentence, clause or the
application of same to any person or set of circumstances for any reason is held to be
unconstitutional, void or invalid or for any reason unenforceable, the validity of the remaining
portions of this ordinance or the application thereby shall remain in effect, it being the intent of the
City Council of the City of Lubbock, Texas in adopting this ordinance, that no portion thereof or
provision contained herein shall become inoperative or fail by any reasons of unconstitutionality
of any other portion or provision.
Page 4 of 5
ccdocs]
SECTION 12. Publication. The City Secretary of the City of Lubbock is hereby authorized
and directed to cause publication of the descriptive caption of this Ordinance as an alternative
method provided by law.
AND IT IS SO ORDERED.
Passed by the City Council on first reading this 12th day ofNovember 2024.
Passed by the City Council on second reading this 3rd day of Decembe! 2024.
A EST:
TA
Courtney Paz, City Secretary
APPROVED AS TO CONTENT:
Bill How on, Deputy City er
APPROVED AS TO FORM:
Matt ew L. Wade, City Attorney
Park TIP Ordinance
RK W. MCBRAYER, M YOR
Page 5 of 5
kool City of
Lubbock � 5
NORTH PARK REINVESTMENT ZONE,
CITY OF LUBBOCK, TEXAS
PRELIMINARY PROJECT AND FINANCE PLAN
NOVEMBER 12, 2024
0
4 City of 'I
Lubbock
TEXAS
TABLE OF CONTENTS
Tableof Contents..........................................................................................................................................1
.............................
Section 1: Definitions............................................................................................... ........2
Section2: Introduction.................................................................................................................................4
Section 3: Description and Maps.................................................................................................................. 5
Section 4: Proposed Changes to Ordinances, Plans, Codes, Rules, and Regulations...................................6
Section 5: Relocation of Displaced Persons..................................................................................................
Section6: Non -Project Costs.........................................................................................................................
6
Section 7: Public Improvements...................................................................................................................6
Section8: Project Costs.................................................................................................................................
6
Section9: Feasibility Study...........................................................................................................................7
Section 10: Estimated Bonded Indebtedness...............................................................................................7
Section 11: Appraised Value........................................................................ ...............................................
..7
Section 12: Method of Financing..................................................................................................................8
Section 13: Duration of the Zone, Termination............................................................................................8
Listof Exhibits.............................................................................................................................................10
ExhibitA — Map of the Zone........................................................................................................................11
ExhibitB — Non -Project Costs.....................................................................................................................12
ExhibitC — Project Costs..............................................................................................................................13
Exhibit D — Estimated Timeline of Incurred Costs.......................................................................................14
ExhibitE — Feasibility Study.........................................................................................................................15
Exhibit F — Legal Description of the Zone....................................................................................................16
Exhibit G — Map of the Public Improvements.............................................................................................17
NORTH PARK REINVESTMENT ZONE, CITY OF LUBBOCK, TEXAS 1
PRELIMINARY PROJECT AND FINANCE PLAN
SECTION 1: DEFINITIONS
Capitalized terms used in this Preliminary Plan shall have the meanings given to them in Section
below unless otherwise defined in this Preliminary Plan or unless the context in which a term is
used clearly requires a different meaning. Unless otherwise defined, a reference to a "Section,"
or an "Exhibit," shall be a reference to a Section of this Preliminary Plan or an Exhibit or Appendix
attached to and made a part of this Preliminary Plan for all purposes.
"Act" means Chapter 311, Texas Tax Code, as amended, "Tax Increment Financing Act".
"Administrative Costs" means the actual, direct costs paid or incurred by or on behalf of the City
to administer the Zone, including planning, engineering, legal services, organizational costs,
publicizing costs, or implementations costs paid by or on behalf of the City that are directly
related to the administration of the Zone.
"Appraisal District" means the Lubbock Central Appraisal District.
"Board" means the Board of Directors for the Zone.
"Captured Appraised Value" means the new taxable value generated in addition to the Tax
Increment Base on a parcel -by -parcel basis for each year during the term of the Zone, as
calculated and confirmed annually by the Appraisal District.
"City" means the City of Lubbock, Texas.
"City Council" means the governing body of the City.
"County" means Lubbock County, Texas.
"Creation Ordinance" means Ordinance No. adopted by the City Council on November,
2024.
"Developer" means North Park Development, Inc. and its successors or assigns.
"Feasibility Study" means the economic feasibility study as evaluated over the term of the Zone
and focused only on direct financial benefits, as shown on Exhibit E.
"Final Plan" means the future !North Park Reinvestment Zone, City of Lubbock Final Project and
Finance Plan.
"Interlocal Agreement" means an agreement entered into between the City and the County
under which the County agrees to participate in the Zone.
NORTH PARK REINVESTMENT ZONE, CITY OF LUBBOCK, TEXAS 2
PRELIMINARY PROJECT AND FINANCE PLAN
"Non -Project Costs" means those certain costs that will be spent to develop in the Zone, but will
not be financed by the Zone, and will be financed by private funds, as described in Section 6, and
shown on Exhibit B.
"Preliminary Plan" means the North Park Reinvestment Zone, City of Lubbock Preliminary Project
and Finance Plan.
"Project Costs" means the total project costs in the Zone, including the actual costs of the Public
Improvements, and the Administrative Costs.
"Projects" means those Public Improvements anticipated to be funded from the Property of the
Zone and any programs administered by the Board pursuant to Chapter 380 of the Local
Government Code, as authorized by Section 311.010 of the Tax Code, as amended.
"Property" means 332.8 acres of land as depicted on Exhibit A and identified on Exhibit F.
"Public Improvements" means the proposed public improvements to be financed by the Zone,
which includes landscaping, trails, drainage, stormwater, public amenities, entryways, artwork,
signage, sitework, paving, erosion control, lighting, construction management and soft costs
related thereto, as depicted on Exhibit G, and detailed on Exhibit C.
"Tax Increment Base" means total appraised value of taxable real property in the Zone at the
time of creation of the Zone, as calculated and certified by the Appraisal District.
"TIF Agreement" an agreement by and between the Developer, the City, and the Board, entitled
"North Park Reinvestment Zone Reimbursement Agreement," relating to the implementation of
the Final Plan.
"TIF Fund" means the tax increment fund created by the City and segregated from all other funds
of the City.
"TIF Increment Receipts" means one hundred percent (100%) of the City's ad valorem real
property taxes collected and received by the City on the Captured Appraised Value in the Zone,
and one hundred percent (100%) of the County's ad valorem real property taxes collected and
received by the County on the Captured Appraised Value in the Zone.
"Zone" means North Park Reinvestment Zone, City of Lubbock, as depicted on Exhibit A, and
described on Exhibit F.
NORTH PARK REINVESTMENT ZONE, CITY OF LUBBOCK, TEXAS 3
PRELIMINARY PROJECT AND FINANCE PLAN
I SECTION 2: INTRODUCTION I
2.1 Authority and Purpose
The City has the authority under the Act to designate a contiguous or noncontiguous geographic
area within the corporate limits or extraterritorial jurisdiction of the City as a tax increment
reinvestment zone to promote development or redevelopment of the area because the City
Council determined that development or redevelopment would not occur solely through private
investment in the reasonably foreseeable future, that the Zone is economically feasible, and that
creation of the Zone is in the best interest of the City and the property in the Zone. The purpose
of the Zone is to facilitate such development or redevelopment by financing the costs of public
works, public improvements, programs, and other projects benefiting the Zone, plus other costs
incidental to those expenditures, all of which costs are authorized by the Act.
2.2 Eligibility Requirements
Section 311.005(4) of the tax code states an area is eligible under the Act to be designated as a
tax increment reinvestment zone if the area:
4) is in an area described in a petition requesting that the area be designated as a
reinvestment zone, if the petition is submitted to the governing body of the City by the
owners of property constituting at least fifty percent (50%) of the appraised value of the
property in the area according to the most recent certified appraisal roll for the county in
which the area is located.
The City cannot, however, designate a zone if more than thirty percent (30%) of the property in
the proposed zone, excluding property that is publicly owned, is used for residential purposes, or
if the total appraised value of taxable real property in the proposed zone and in existing
reinvestment zones exceeds fifty percent (50%) of the total appraised value of taxable real
property in the City and in industrial districts created by the City.
2.3 The Zone
The Property within the Zone is described in a Petition submitted to the City by the owners of
property constituting at least 50% of the appraised value of Property within the Zone according
to the 2024 Lubbock Central Appraisal District.
2.4 Preliminary Plan and Hearing
Before the City Council adopts the Creation Ordinance, the City Council must prepare a
Preliminary Plan in accordance with the Act and hold a public hearing on the creation of the Zone
and its benefits to the City and to the Property, at which public hearing interested persons shall
be given the opportunity to speak for and against the creation of the Zone, the boundaries of the
NORTH PARK REINVESTMENT ZONE, CITY OF LUBBOCK, TEXAS
4
PRELIMINARY PROJECT AND FINANCE PLAN
Zone and the concept of tax increment financing, and at which hearing the owners of the
Property shall be given a reasonable opportunity to protest the inclusion of their Property in the
Zone. The requirement of the Act for a preliminary reinvestment zone project and finance plan
is satisfied by this Preliminary Plan, the purpose of which is to describe, in general terms, the
development of the Zone, and the economic incentive that would be undertaken by the Zone. A
description of the uses of the Property is located in Exhibit E, and confirmed by the adoption of
this Final Plan.
2.5 Creation of the Zone
Upon the closing of the above referenced public hearing, the City Council shall consider the
Creation Ordinance and the following findings:
1) that a Petition has been submitted to the City by the owners of property constituting at
least 50% of the appraised value of Property within the Zone,
2) that improvements in the Zone will significantly enhance the value of all the taxable real
property in the Zone and will be of general benefit to the City, and
3) that the Zone meets the requirements of Section 311.005 of the Act.
Among other provisions required by the Act, the Creation Ordinance shall appoint the Board.
2.6 Board Recommendations
After the creation of the Zone, the Board shall review the Final Plan and recommends its approval
to the City Council pursuant to which the City shall contribute the TIF Increment Receipts into the
TIF Fund to pay a portion of the Project Costs benefiting the Zone.
SECTION 3: DESCRIPTION AND MAPS
3.1 Existing Uses and Conditions
The Property is currently zoned as per Exhibit _ (attach zoning map). It is intended to be
developed with mixed uses. The Property is partially developed, and is lacking public
improvements that: (1) the City could not provide, and (2) would not be provided solely through
private investment in the foreseeable future.
3.2 Proposed Uses
The proposed uses of the Property in the City include a mixed -use project, as shown on Exhibit
F.
NORTH PARK REINVESTMENT ZONE, CITY OF LUBBOCK, TEXAS 5
PRELIMINARY PROJECT AND FINANCE PLAN
SECTION 4: PROPOSED CHANGES TO ORDINANCES, PLANS, CODES, RULES, AND
REGULATIONS
The Property is wholly located in the corporate limits of the City and shall be subject to the City's
zoning regulations. The Property is currently zoned as shown on Exhibit _(attach zoning map).
The City has exclusive jurisdiction over the Property, design, construction, installation, and
inspection of water, sewer, drainage, roadway, and other public infrastructure. No proposed
changes to zoning ordinances, comprehensive plan, building codes, or other municipal
ordinances are planned.
SECTION 5: RELOCATION OF DISPLACED PERSONS
No persons will be displaced and in need of relocation due to the creation of the Zone or
implementation of the Final Plan.
SECTION 6: NON -PROJECT COSTS
Non -Project Costs are costs that will be spent to develop in the Zone but will not be financed by
the Zone, and will be financed by private funds. The list of Non -Project Costs is shown on Exhibit
B and are estimated to be approximately $104,374,139.
SECTION 7: PUBLIC IMPROVEMENTS
7.1 Categories of Public Improvements
All Public Improvements shall be designed and constructed in accordance with all applicable City
standards and shall otherwise be inspected, approved, and accepted by the City. At the City's
option, the Public Improvements may be expanded to include any other category of
improvements authorized by the Act.
7.2 Locations of Public Improvements
The estimated locations of the proposed Public Improvements are depicted on Exhibit G. These
locations may be revised, with the approval of the City, from time to time without amending the
Final Plan.
SECTION 8: PROJECT COSTS
8.1 Project Costs
The total costs, including Public Improvements, Administrative Costs, and financing and interest
expenses are estimated to be $3,621,900, as shown on Exhibit C. It is anticipated that additional
NORTH PARK REINVESTMENT ZONE, CITY OF LUBBOCK, TEXAS
6
PRELIMINARY PROJECT AND FINANCE PLAN
Public Improvements may be constructed in the future and the City Council may amend the Final
Plan to include those additional Public Improvements and their costs.
8.2 Estimated Administrative Costs
The Administrative Costs will be calculated each year by the City of Lubbock. The Administrative
Costs shall be paid each year from the TIF Fund before any other Project Costs are paid.
8.3 Maintenance Costs
The Final Plan shall allow provide for maintenance costs to be paid by the City TIF Increment
Receipts.
8.4 Estimated Timeline of Incurred Costs
The Administrative Costs will be incurred annually through the remaining duration of the Zone.
It is estimated the costs for constructing the Public Improvements will be incurred between 2024
and 2025, as shown on Exhibit D.
SECTION 9: FEASIBILITY STUDY
The Feasibility Study focuses on only direct financial benefits (i.e. ad valorem tax revenues from
the development of Public Improvements in the Zone). Based on the Feasibility Study attached
as Exhibit E, during the term of the Zone, new development is estimated to generate
approximately $48,077,342 in total new real property tax revenue for the City, and approximately
$40,761,470 in total new real property tax revenue for the County.
One hundred percent (100%) of all taxing revenues generated for taxing entities, other than the
City and the County, by the new development within the Zone will be retained by the respective
taxing entities. Based on the development and revenue projections, the feasibility of the Zone
has been demonstrated.
SECTION 10: ESTIMATED BONDED INDEBTEDNESS
No tax increment reinvestment zone bonds or public indebtedness by the City secured by the
tax increments pursuant to the Act is contemplated.
SECTION 11: APPRAISED VALUE
11.1 Tax Increment Base
The Tax Increment Base is estimated to be $88,709,973 and shall be confirmed by the Appraisal
District. Each year, the Appraisal District shall confirm the Captured Appraised Value of the Zone.
NORTH PARK REINVESTMENT ZONE, CITY OF LUBBOCK, TEXAS 7
PRELIMINARY PROJECT AND FINANCE PLAN
11.2 Estimated Captured Appraised Value
It is estimated that upon expiration of the term of the Zone, the total Captured Appraised Value
of taxable real property in the Zone will be approximately $610,581,201 as shown on Exhibit E.
The actual Captured Appraised Value, as certified by the Appraisal District each year, will be used
to calculate the TIF Increment Receipts pursuant to the Final Plan.
SECTION 12: METHOD OF FINANCING
12.1 TIF Fund Contributions
The Final Plan shall obligate the City to deposit the City TIF Increment into the TIF Fund beginning
in 2025. The Final Plan shall also allow the City to use TIF Increment Receipts for maintenance.
The Interlocal Agreement shall obligate the County to deposit the County TIF Increment into the
County Project Subaccount of the TIF Fund beginning in 2025.
The funds deposited into the City Project Subaccount and the County Project Subaccount of the
TIF Fund shall be prioritized and allocated as follows:
1. For the reasonable Administrative Costs of the Zone, estimated to not exceed $10,000
per year as shown in Exhibit E; then
2. For reasonable maintenance costs; then
3. For the payment to the Developer of actual costs of the Project Costs; then
4. Any excess revenue may be used in any other matter as authorized by the City and
allowed pursuant to the Act; then
5. After all eligible Project Costs have been paid, any excess County Project Subaccount
of the TIF Fund revenue shall be returned annually to the General Fund of the County.
The City may amend the Final Plan in compliance with the TIF Agreement, including but not
limited to what is considered a Project Cost.
SECTION 13: DURATION OF THE ZONE, TERMINATION
13.1 Duration
The stated term of the Zone shall commence upon the execution of the Creation Ordinance and
shall continue until December 31, 2054, with the last payment being due by January 31, 2055,
unless otherwise terminated in accordance with the Creation Ordinance.
NORTH PARK REINVESTMENT ZONE, CITY OF LUBBOCK, TEXAS
$
PRELIMINARY PROJECT AND FINANCE PLAN
13.2 Termination
The Zone shall terminate on the earlier of (i) December 31, 2054, or (ii) at such time that the
obligations of the Zone, including all Project Costs, have been paid in full. Nothing in this Section
is intended to prevent the City from extending the term of the Zone in accordance with the Act.
NORTH PARK REINVESTMENT ZONE, CITY OF LUBBOCK, TEXAS
PRELIMINARY PROJECT AND FINANCE PLAN
1171F4/ City of
Lubbock
LIST OF EXHIBITS
Unless otherwise stated, all references to "Exhibits" contained in this Preliminary Plan shall mean
and refer to the following exhibits, all of which are attached to and made a part of this Preliminary
Plan for all purposes.
Exhibit A
Map of the Zone
Exhibit B
Non -Project Costs
Exhibit C
Project Costs
Exhibit D
Estimated Timeline of Incurred Costs
Exhibit E
Feasibility Study
Exhibit F
Legal Description of the Zone
Exhibit G
Map of the Public Improvements
NORTH PARK REINVESTMENT ZONE, CITY OF LUBBOCK, TEXAS 10
PRELIMINARY PROJECT AND FINANCE PLAN
City of
Lubbock
I EXHIBIT A — MAP OF THE ZONE I
NORTH PARK REINVESTMENT ZONE, CITY OF LUBBOCK, TEXAS it
PRELIMINARY PROJECT AND FINANCE PLAN
1J
LL
[:]
]3TIIS1111[1-1
mpg
I f \ I I I[ lfflkr-�
TH
EXI IIB1T OF
NORTH PARK TIF PARCEL,
SCALE: 1' = 600'
160' 600'
D' 30V 1200'
NOTES:
HEAVY LINES INDICATE LIMITS OF PARCEL.
THIS DRAWING IS FOR LOCATION PURPOSES
ONLY.
NO PORTION OF THIS DRAWING REPRESENTS
AN ACTUAL SURVEY MADE ON THE GROUND.
STREETS NAMES DERIVED FROM LUBBOCK
COUNTY APPRAISAL DISTRICTS PARCEL
VIEWER MAP
(GIS.BISCLI E NT.COMAUBBOCKCAD).
LINEWORK DERIVED FROM CRY OF LUBBOCK
GIS SHAPE FILE
(CI.LUBBOCK.TX.USIDEPARTMENTSI
GIS-DATA-SERV ICESIPUBLIC-DATA).
SHEET 1 OF 4
DESCRIPTION ATTACHED AS SHEETS 2-4 OF 4 '..
City of
Lubbock
TEXAS
NORTH PARK REINVESTMENT ZONE, CITY OF LUBBOCK, TEXAS
12
PRELIMINARY PROJECT AND FINANCE PLAN
Non -Project Costs[b]
per Unit/
Units/
Description
Sq.Ft.fal
Sq.Ft.
Total
Lot Type:
Comm/Retail1
491,000
$
49.70
$
24,404,255.75
Comm/Retail2
175,000
$
38.12
$
6,671,101.44
Office
25,000
$
36.47
$
911,694.72
Professional Medical
290,000
$
36.63
$
10,622,912.64
Multi -Family
668
$
38,581.83
$
25,772,663.68
Comm/Retail3
165,000
$
42.95
$
7,087,072.26
For Sale SFD
50
$
10,232.00
$
511,600.00
Rental TH
240
$
42,551.36
$
10,212,326.40
Rental TH 2
195
$
45,843.57
$
8,939,495.95
Student Housing
234
$
39,491.52
$
9,241,015.68
Total
$
104,374,138.52
Footnotes:
[a] Represent preliminary 2024 estimates provided by the developer. Actual amounts subject to change.
[b] Represent estimated direct lot costs not associated with the Project costs.
North Park TIRZ 2024-11-04.xlsx
"'�City of
�Lubbock
I EXHIBIT C — PROJECT COSTS I
NORTH PARK REINVESTMENT ZONE, CITY OF LUBBOCK, TEXAS 13
PRELIMINARY PROJECT AND FINANCE PLAN
Description
Total Costs [a]
Park / Landscaping / Pond
Sculptures
$
$
1,482,113.12
1,717,886.88
Subtotal
$
3,021,900.00
Soft Costs & Construction Mgt
Contingency (10.0%)
$
$
300,000.00
300,000.00
Total Project Costs
$
3,621,900.00
Footnotes:
[a] Represent estimates only and are subject to change. Costs may be increased or decreased.
North Park TIRZ 2024-11-04.xlsx
EXHIBIT D -- ESTIMATED TIMELINE OF INCURRED COSTS
NORTH PARK REINVESTMENT ZONE, CITY OF LUBBOCK, TEXAS
14
PRELIMINARY PROJECT AND FINANCE PLAN
Total Project Costs [a]
TIF
Year
Year
Annual[b]
Cumulative
0
Base Year
[1]
1
2025
$
1,810,950.00
$
1,810,950.00
2
2026
$
1,810,950.00
$
3,621,900.00
3
2027
$
3,621,900.00
4
2028
$
3,621,900.00
5
2029
1
1 $
3,621,900.00
Total
1 $
3,621,900.00
Footnotes:
[a] Does not include administrative costs or financing and interest costs, which
shall be incurred annually.
[b] For illustrative purposes only. Subject to change.
North Park TIRZ 2024-11-04.xlsx
EXHIBIT E - FEASIBILITY STUDY
NORTH PARK REINVESTMENT ZONE, CITY OF LUBBOCK, TEXAS 15
PRELIMINARY PROJECT AND FINANCE PLAN
Land Use Category
Comm/Retail 1
Comm/Retail2
Office
Professional Medical
Avg.
Avg.
Avg.
Avg.
TIF
Bldg
Value
Bldg
Value
Bldg
Value
Bldg
Value
Year
Year"'
Sq.Ft.l'l
per Metriclbi
Value
Sq.Ft.1'1
per Metriclbl
Value
Sq.Ft.l'l
per Metric lbl
Value
Sq.Ft.l'l
per Metric IN
Value
0
Base Year
-
$ 248.52
$ -
-
$ 190.60
$ -
-
$ 182.34
$ -
-
$ 183.15
$
-
1
2025
-
$ 248.52
$ -
-
$ 190.60
$ -
-
S 182.34
$ -
-
$ 183.15
$
-
2
2026
-
$ 248.52
$ -
-
$ 190.60
$ -
-
$ 182.34
$ -
-
$ 183.15
$
-
3
2027
-
$ 248.52
$ -
-
$ 190.60
$ -
-
$ 182.34
$ -
-
$ 183.15
$
-
4
2028
-
$ 248.52
$ -
-
$ 190.60
$ -
-
$ 182.34
$ -
-
$ 183.15
$
-
S
2029
-
$ 248.52
$ -
-
$ 190.60
$ -
-
$ 182.34
$ -
-
S 183.15
$
-
6
2030
34,000
$ 248.52
S 8,449,580,00
-
$ 190.60
$ -
-
$ 182.34
$ -
10,000
$ 183.15
$
1,831,500.00
7
2031
34,000
$ 248.52
$ 8,449,680.00
-
$ 190.50
$ -
$ 182.34
$ -
10,000
$ 183.15
$
1,831,SDO.00
8
2032
34,000
$ 248.52
$ 8,449,690.00
-
$ 190.60
$ -
-
$ 182.34
$ -
10,000
$ 183.15
$
1,831,500.00
9
2033
34,000
$ 248.52
$ 8,449,680.00
-
$ 190.60
$ -
-
$ 182.34
$ -
10,000
$ 183.15
$
1,831,SDO.00
10
2034
34,000
$ 248.52
$ 8,449,680.00
-
$ 190.60
$ -
-
$ 182.34
$ -
10,000
5 183.15
$
1,931,500.00
11
2035
39,200
$ 248.52
$ 9,741,984.OD
10,000
$ 190.60
S 1,906,000.00
-
$ 182.34
$ -
30,ODO
$ 183.15
$
5,494,500.00
12
2036
39,200
$ 248.52
$ 9,741,984.OD
10,000
$ 190.60
$ 1,906,000.DO
-
$ 182.34
$
30,000
S 183.15
$
5,494,500.00
13
2037
39,200
$ 248.52
$ 9,741,984.OD
10,00D
$ 190.60
S 1,906,000.DO
-
$ 182.34
$ -
30,000
$ 183.15
$
5,494,SDO.00
14
2038
39,200
$ 248.52
$ 9,741,984.00
10,00D
$ 190.60
S 1,906,000.00
-
$ 182.34
$ -
30,000
$ 183.15
$
5,494,SDO.00
15
2039
39,200
$ 248.52
S 9,741,984.OD
10,000
$ 190.60
5 1,906,000.00
-
$ 182.34
$ -
30,000
$ 183.15
$
5,494,500.00
16
2040
25,000
$ 248.52
$ 6,213,000.00
25,OOD
$ 190.60
5 4,765,000.DO
5,000
$ 18234
$ 911,7DO.00
18,000
$ 183.15
$
3,296,700.00
17
2041
25,000
5 248.52
$ 6,213,000.00
25,OOD
$ 190.60
5 4,765,000.DO
5,ODO
$ 182.34
$ 911,7DO.00
18,000
$ 183.15
$
3,296,700.00
18
2042
25,000
$ 248.52
$ 6,213,000.00
25,000
$ 190.60
S 4,765,000.DO
5,ODO
$ 182.34
$ 911,7DO.00
18,000
$ 183.15
$
3,296,70D.00
19
2043
25,000
$ 248.52
$ 6,213,000.00
25,000
$ 190.60
$ 4,765,OD0.DO
5,ODO
$ 182.34
$ 911,7DO.00
18,OOD
$ 183.15
$
3,296,700.00
20
2044
2S,000
5 248.52
$ 6,213,000.00
25,000
5 190.60
$ 4,765,000.DO
5,ODO
$ 182.34
$ 911,700,00
18,00D
$ 183.15
$
3,296,700.00
21
2045
-
$ 248.52
$ -
$ 190.60
$
-
$ 182.34
$ -
-
$ 183.15
$
-
22
2046
-
$ 248.52
$ -
-
$ 190,60
$ -
-
$ 182.34
$ -
-
S 183.15
$
-
23
2047
-
$ 248.52
$ -
-
$ 19D.60
$ -
-
$ 182.34
$ -
-
$ 183.15
$
-
24
2048
-
$ 248.52
S -
-
$ 19D.60
$ -
-
$ 182.34
$ -
-
$ 183.15
$
-
25
2049
$ 248.52
S -
-
$ 190.60
$ -
-
$ 182.34
$ -
-
$ 183.15
$
-
26
2050
-
$ 248.52
$ -
-
$ 190.60
$ -
-
$ 182.34
$ -
-
$ 183.15
$
-
27
2051
-
$ 248.52
$ -
-
$ 190.50
$ -
$ 182.34
$ -
-
$ 183.15
$
-
28
2052
-
$ 248.52
$ -
-
$ 190.60
$ -
$ 182.34
$ -
-
$ 183.15
$
-
29
2053
-
$ 248.52
$ -
-
$ 190.60
$ -
-
$ 182.34
$ -
-
$ 193.15
$
-
30
2054
-
$ 248.52
$ -
-
$ 190.60
$ -
-
$ 182.34
$ -
-
$ 183.15
$
-
31
2055
-
$ 248.52
$ -
-
$ 190.60
$
-
$ 192.34
$ -
-
$ 183.15
$
-
Total
491,000
$122,023,325.00
175,000
$ 33,355,000AO
25,000
$ 4,558,500.01)
290,D00
$ 53,113,500.00
Footnotes:
[a] Estimated absorption per developer. For illustration purposes only and is subject to change.
[b] Represents the weighted average value per metric by land use type. Assumes 0.0% annual inflation.
[c] Represents the estimated TIF term. Subject to change pending discussion with City.
North Park 71R2 2024-11-04.xlsx
Land Use Category
Multi -Family
Comm/Retail3
For Sale SFD
RentalTH
Avg.
Avg.
Avg.
Avg.
TIF
Value
Bldg
Value
No. of
Value
No. of Value
Year
Year"'
No. of Units(')
per Metrici6i
Value
Sq.Ft?)
per Metricibi
Value
Units (a) per Metricibi
Value
Units 1-1 per Metricib)
Value
0 Base Year
-
$ 192,909.16
$ -
-
$ 214.76
$ -
- $
51,160.00
$ -
- $ 212,756.80
$ -
1
2025
68
$ 192,909.16
$ 13,117,822.88
$ 214.76
$
10 S
51,160.D0
S 511,600.00
48 $ 212,756.80
$10,212,326.40
2
2026
-
$ 192,909.16
$ -
-
$ 214.76
$ -
10 S
S3,160.00
$ 511,600.00
48 $ 212,756.80
$10,212,326,40
3
2027
-
$ 192,909.16
$ -
-
$ 214.76
$ -
30 $
51,160.00
$ 511,600.00
48 $ 212,756.80
$10,212,326.40
4
2028
-
$ 192,909.16
$ -
-
$ 214.76
$ -
10 $
51,160.00
$ 511,600.00
48 $ 212,756.80
$10,212,326.40
5
2029
-
$ 192,909.16
$ -
-
$ 214.76
$ -
30 S
51,160.00
S 511,600.00
48 $ 212,756.80
$10,212,326.40
6
2030
60
$ 192,909.16
$ 11,574,549.60
-
$ 214.76
$ -
- $
51,160.00
$ -
- $ 212,756.80
$ -
7
2031
60
$ 192,909.16
$ 11,574,549.60
-
$ 214.75
$ -
- $
51,160.00
$ -
- $ 212,756.80
$ -
8
2032
60
$ 192,909.16
$ 11,574,549.60
$ 214.76
$
$
51,160.00
$
$ 212,756.80
$
9
2033
60
$ 192,909.16
$ 11,S74,S49.60
-
$ 214.76
$ -
- $
51,160.00
S -
- $ 212,756.80
$ -
10
2034
60
$ 192,909.16
$ 11,574,549.60
-
$ 214.76
$ -
- $
51,160.00
S -
- $ 212,756A0
$ -
11
2035
60
$ 192,909.16
$ 11,574,549.60
33,000
$ 214.76
$ 7,087,080.00
- $
51,160.00
5 -
- 5 212,756.80
$ -
12
2036
60
$ 192,909.16
$ 11,574,549.60
33,OD0
$ 214.76
$ 7,087,030.00
- $
51,160.00
$ -
- $ 212,756.80
$ -
13
2037
60
$ 192,909.16
$ 11,574,549.60
33,000
$ 214.76
$ 7,087,080.00
- $
51,160.00
$ -
- $ 212,7S6.80
$ -
14
2038
60
$ 192,909.16
$ 11,574,549.60
33,0D0
$ 214.76
$ 7,087,080.00
- $
51,160.00
S -
- $ 212,756.80
$ -
15
2039
60
$ 192,909.16
$ 11,574,549.60
33,000
$ 214.76
$ 7,087,080.00
- $
51,160.00
$ -
- 5 212,756.80
$ -
16
2040
-
$ 192,909.16
$
-
$ 214.76
$ -
- $
51,160.00
$ -
- $ 212,756.90
$ -
17
2041
-
$ 192,909.16
$
-
$ 214.76
$ -
- $
51,160.00
$ -
- $ 212,756.80
$ -
18
2042
-
$ 192,909.16
$ -
-
$ 214.76
$ -
- $
51,160.00
$
- $ 212,756.80
$ -
19
2043
-
$ 192,909.16
$ -
-
$ 214.76
$ -
- $
51,160.00
$ -
- $ 212,756.80
$ -
20
2044
-
$ 192,909-16
S -
$ 214.76
$ -
- $
S1,160.00
$ -
- $ 212,756.80
$ -
21
2045
-
$ 192,909.16
$ -
-
$ 214.76
$ -
- $
51,160.00
$ -
- $ 212,756.80
$ -
22
2046
-
$ 192,909.16
$ -
-
$ 214.76
$ -
- $
51,160.00
$ -
- $ 212,756.80
$ -
23
2047
$ 192,909.16
$
$ 214.76
S
$
51,160.00
$
$ 212,756.8D
$
24
2048
$ 192,909.16
$ -
-
$ 214.76
$ -
- $
51,160.00
$ -
- $ 212,756.80
$ -
25
2049
$ 192,909.16
$ -
-
$ 214.76
$ -
- $
51,160.00
$
- $ 212,756.80
$ -
26
2050
-
$ 192,9D9.16
$ -
-
$ 214.76
$ -
- $
51,160.00
$ -
- $ 212,756.80
$ -
27
2051
-
$ 192,909.16
$ -
-
$ 214.76
$ -
- $
51,160.00
$ -
- $ 212,756.80
$ -
28
2052
-
$ 192,9159.16
$ -
-
$ 214.76
$ -
- $
51,160.00
$ -
- $ 212,756.80
$ -
- 29
2053
-
$ 192,909.16
$ -
-
$ 214.76
$ -
- $
51,160.00
$ -
- $ 212,756,80
$ -
30
2054
$ 192,909.16
5
$ 214.76
$
$
51,160.00
$
$ 212,756.80
$
31
2055
-
$ 192,909.16
$ -
-
$ 214.76
$ -
- $
51,160.00
$ -
- $ 212,756.80
$ -
Total
668
$128,863,318.88
165,600
$35,435,403.00
50
$2,558,000.00
240
$51,061,632.00
Footnotes:
[a] Estimated absorption per developer. For illustration purposes only and is subject to change.
[bj Represents the weighted average value per metric by land use type. Assumes 0.0% annual inflation.
[c] Represents the estimated TIF term. Subject to change pending discussion with City.
North Park TIRZ 2024.11.04.xlsx
Land Use Category
Rental TH 2
Student Housing
Avg.
Avg.
TIF
Value
No. of Value
Total
Year
Year'`'
No. of Units("
per Metric lb)
Value
Units", per Metric[b]
Value
Value
0
Base Year
-
$ 229,217.84
$ -
- $ 197,457.60
$ -
$ -
1
2025
39
$ 229,217.84
$ 8,939,495.76
234 $ 197,457.60
$46,205,078.40
$ 78,986,323.44
2
2026
39
$ 229,217.84
$ 8,939,495.76
- 5 197,457.60
$ -
$ 19,663,422.16
3
2027
39
$ 229,217.84
$ 8,939,495.76
- $ 197,457.60
$ -
$ 19,663,422.16
4
2028
39
$ 229,217.84
$ 9,939,495.76
- $ 197,457.60
$ -
$ 19,663,422.16
5
2029
39
5 229,217.84
$ 8,939,495.76
- $ 197,457.60
$ -
$ 19,663,422.16
6
2030
$ 229,217,84
$ -
- $ 197,457.60
$ -
$ 21,855,729.60
7
2031
-
$ 229,217.84
$ -
- $ 197,457.60
$ -
$ 21,855,729.60
8
2032
$ 229,217.84
$
$ 197,457.60
5
$ 21,855,729.60
9
2033
$ 229,217.94
$ -
- $ 197,457.6D
$ -
$ 21,855,729.60
10
2034
$ 229,217.94
$ -
- $ 197,457.60
$ -
$ 21,855,729.60
11
2035
-
$ 229,217.84
$ -
$ 197,457.60
$ -
$ 35,804,113.60
12
2036
-
$ 229,217.94
$ -
- $ 197,457.60
$
$ 35,804,113.60
13
2037
-
$ 229,217.94
5 -
- $ 197,457.60
$ -
$ 35,804,113.60
14
2038
-
$ 229,217.84
$ -
- $ 197,457.60
$ -
$ 35,804,113.60
15
2039
-
$ 229,217.84
$ -
- $ 197,457.60
$ -
$ 35,804,113.60
16
2040
-
$ 229,217.94
$ -
- $ 197,457-60
$ -
$ 15,186,400.00
17
2041
-
$ 229,217.84
$ -
- $ 197,457.60
$
$ 15,186,400.00
18
2042
-
$ 229,217-94
$ -
- $ 197,457.60
$ -
$ 15,186,400.00
19
2043
-
$ 229,217.84
$ -
- $ 197,457.60
$ -
$ 15,186,400.00
20
2044
-
$ 229,217.84
$ -
$ 197,457.60
$ -
$ 15,186,400.00
21
2045
-
$ 229,217.84
$ -
- $ 197,457.60
$ -
$ -
22
2046
-
$ 229,217.94
$ -
- $ 197,457.60
$ -
$ -
23
2047
$ 229,217.94
$
$ 197,457.60
$
$
24
2048
-
$ 229,217.84
$ -
- $ 197,457.60
$ -
$ -
25
2049
-
$ 229,217.84
$ -
- $ 197,457.60
$ -
$ -
26
2050
-
$ 229,217.84
$ -
- $ 197,457,60
$ -
5 -
27
2051
-
$ 229,217.84
$ -
- $ 197,457.60
$ -
5 -
28
2052
-
$ 229,217.84
$ -
- $ 197,457.60
$ -
$ -
29
2053
-
$ 229,217.84
$ -
- $ 197,457.60
$ -
5 -
30
2054
$ 229,217.84
$
$ 197,457.50
$
$
31
1055
-
$ 229,217.84
$ -
- $ 197,457.60
$
Total
195
$44,697,478.80
234
$46,205,078.40
$521,871,228.08
Footnotes:
[a] Estimated absorption per developer. For illustration purposes only and is subject to change.
[b] Represents the weighted average value per metric by land use type. Assumes 0.0% annual inflation.
[c] Represents the estimated TIF term. Subject to change pending discussion with City.
North Park TIR2 2024-11-04.xlsx
1. Incremental
Value
Value
Total
Less: Existing
TIF
Taxable
Additionsas
Taxable
Base Year
Incremental
Year[f]
Year
Inflationlal
Value
of January 11b1
Value
Valuelcl
value
0
Base Year
0.0%
$ - $
-
$ 88,709,973.00 $
(89,709,973.00) $
-
1
2025
0.0%
88,709,973.00
-
88,709,973.00
(88,709,973.00)
-
2
2026
0.0%
88,709,973.00
78,986,323.44
167,696,296.44
(88,709,973.00)
78,986,323.44
3
2027
0.0%
167,696,296.44
19,663,422.16
187,359,718.60
(88,709,973.00)
98,649,745.60
4
2028
0.0%
187,3S9,718.60
19,663,422.16
207,023,140.76
(88,709,973.00)
118,313,167.76
5
2029
0.0%
207,023,140.76
19,663,422.16
226,686,562.92
(88,709,973.00)
137,976,589.92
6
2030
0.0%
226,686,562.92
19,663,422.16
246,349,985.08
(88,709,973.0D)
157,640,012.08
7
2031
0.0%
246,349,985.08
21,855,729.60
268,205,714.68
(88,709,973.00)
179,495,741.68
8
2032
0.0%
268,205,724.68
21,855,729.60
290,061,444.29
(88,709,973.00)
201,351,471.28
9
2033
0.0%
290,061,444.28
21,855,729.60
311,917,173.88
188,709,973.00)
223,207,200.88
10
2034
0.0%
311,917,173.88
21,855,729.6D
333,772,903.48
188,709,973.00)
245,062,930.48
11
2035
0.0%
333,772,903.48
21,855,729.60
355,628,633,08
(88,709,973.00)
266,918,660.08
12
2036
0.0%
355,628,633.09
35,804,113.60
391,432,746-.68
(88,709,973.00)
302,722,773.68
13
2037
0.0%
391,432,746.68
35,804,113.60
427,236,960.29
188,709,973.00)
338,526,887.28
14
2038
0.0%
427,236,860.28
35,804,113.60
463,040,973.88
(88,709,973.00)
374,331,000.88
15
2039
0.01/
463,040,973.88
35,804,113.60
498,845,087.48
(88,709,973.00)
410,135,114.48
16
2D40
0.D%
498,845,087.48
35,804,113.60
534,649,201.08
(88,709,973.00)
445,939,228.08
17
2D41
0.01A
534,649,201.08
15,186,400.00
549,835,601.08
(88,709,973.00)
461,125,628.08
18
2D42
0.01A
549,835,601.08
15,186,400.00
565,022,001.08
(88,709,973.00)
476,312,028.08
19
2D43
0.0%
565,022,001.08
15,186,400.00
580,208,401.08
(88,709,973.00)
491,498,428.08
20
2044
0.0%
580,208,401.08
15,186,400.00
595,394,801.08
(88,709,973.00)
506,694,828.08
21
2045
0.0%
595,394,801.08
15,186,400.00
610,581,201.08
(88,709,973,00)
521,871,228.08
22
ZD46
0.0%
610,581,201.08
-
610,581,201.08
(88,709,973.00)
521,871,228.08
23
2D47
0.0%
610,581,201.08
-
610,581,201.08
(98,709,973.00)
521,871,228.08
24
2048
0.0%
610,581,201.08
-
610,581,201.08
(88,709,973.00)
521,871,228.08
25
2049
0.0%
610,581,201.08
-
610,581,201.08
(88,709,973,00)
521,871,228.08
26
2050
0.0%
610,581,201.08
610,581,201.08
(88,709,973,00)
521,871,228.08
27
2051
0.0%
510,581,201.08
-
610,581,201.08
(88,709,973.00)
521,871,228.08
28
2052
0.0%
610,581,201.08
-
610,581,201.08
(88,709,973.00)
521,871,228.08
29
2053
0.0%
610,581,201.08
-
610,581,201.08
(88,709,973,00)
521,371,228.08
30
2054
0.0%
610,581,201.08
-
610,581,201.08
(88,709,973.00)
521,871,228.08
3!
2055
0.0%
-
-
-
-
-
Total
$ 610,581,201.08 $
521,871,228.08
$ 610,581,201.08
$
521,871,228.08
Footnotes:
[a] Estimate for illustration purposes only.
[b] Assumes value additions are reflected on tax rolls the year following construction.
[c] Represents the property's 2024 taxable value per LOAD and developer.
[d) Represents 2023 property tax rates.
[e] Estimate only. Funds also available for maintenance casts. Actual amount to be approved by City.
North Park TIRZ 2024-11-04.xlsx
II. City Tax Increment Revenue
III. County Tax Increment Revenue
City Ad Valorem Revenues
Revenues to TIF
County Ad Valorem Revenues
Revenues
Total
TIF
Incremental
Revenues to City
Project Costs
Revenues to County
to TIF
TIF Project Cost
Year[f]
Year
Value
($0.4802)[d] (0%)[e]
(100%)[e]
($0.347S)[d] (0%)[e]
(100%)[g)
Contribution
0
Base Year
$ -
$ - $ - $
$ - $ - $
-
$ -
1
2025
-
- -
-
-
-
-
2
2026
78,986,323.44
379,263.99 -
379,263.89
274,483.00
274,483.00
653,746.89
3
2027
98,649,745.60
473,680.56
473,680.56
342,814.77 -
342,814.77
816,495.34
4
2028
118,313,167.76
568,097.24 -
568,097.24
411,146.54 -
411,146.54
979,243.78
5
2029
137,976,589.92
662,513.91 -
662,513.91
479,478.31 -
479,478.31
1,141,992.22
6
2030
157,640,012.08
756,930.S9 -
756,930.59
547,810.08
547,910.08
1,304,740.66
7
2031
179,495,741.68
961,873.93 -
861,873.93
623,760.27 -
623,760.27
1,485,634.20
8
2032
201,351,471.28
966,817.28
966,817.29
699,710.46 -
699,710.46
1,666,527.74
9
2033
223,207,200.88
1,071,760.62 -
1,071,760.62
775,660.65 -
775,660.65
1,947,421.27
10
2034
245,062,930.48
1,176,703.97 -
1,176,703.97
851,610.84 -
851,610.84
2,029,314.81
11
2035
266,918,660.08
1,281,647.31 -
1,281,647.31
927,551.03
927,561.03
2,209,208.34
12
2036
302,722,773.68
1,453,565.78 -
1,453,565.78
1,051,982.83 -
1,051,982,83
2,505,548.61
13
2037
338,526,887.28
1,625,484.24 -
1,625,484.24
1,176,404.63 -
1,176,404.63
2,801,888.87
14
2038
374,331,000.88
1,797,402.71
1,797,402.71
1,300,826.43
1,300,826.43
3,098,229.14
15
2039
410,135,114.48
1,969,321.17 -
1,969,321.17
1,425,248.23 -
1,425,248,23
3,394,569.40
16
2040
445,939,228.08
2,141,239.64 -
2,141,239.64
1,549,670.03 -
1,549,670.03
3,690,9D9.67
17
2D41
461,125,628.08
2,214,159.I6 -
2,214,159.26
1,602,443.84 -
1,602,443.84
3,816,6133.10
18
2D42
476,312,028.08
2,287,078.89 -
2,287,078.89
1,655,217.64 -
1,6S5,217.64
3,942,296.53
19
2043
491,498,428.08
2,3S9,998.51 -
2,359,998.51
1,707,991,44 -
1,707,991.44
4,067,989.9E
20
2044
$06,684,828.08
2,432,918.14 -
2,432,918.14
1,760,765.25 -
1,760,765.25
4,193,683.38
21
2045
521,871,228.08
2,SD5,837.76 -
2,505,837.76
1,813,539.05 -
1,813,539.05
4,319,376,81
22
2046
521,871,228.08
2,SOS,837.76 -
2,50S,837.76
1,813,539.05 -
1,813,539.05
4,319,376.81
23
2047
521,871,228.08
2,505,937.76 -
2,50S,837.76
1,813,539.05 -
1,813,539.05
4,319,376.81
24
2048
521,871,228,08
2,505,837.76
2,505,937.76
1,913,539.05 -
1,813,539.05
4,319,376.81
25
2049
521,871,228.08
2,505,837.76 -
2,505,837.76
1,913,539.05 -
1,813,539.05
4,319,376.81
26
2050
521,871,228.08
1,813,539.05
1,813,539.05
2,505,837,76
2,505,837.76
4,319,376.81
27
2051
521,871,228.09
1,813,539.05 -
1,813,539.05
2,505,837.76 -
2,505,837.76
4,319,376.81
28
2052
521,871,228.08
1,813,539.05 -
1,813,539.05
2,S05,837.76 -
2,505,837.76
4,319,376.81
29
2053
521,871,228.08
1,813,539.05 -
1,813,539.05
2,505,837.76 -
2,505,837.76
4,319,376.81
30
2054
521,871,228.08
1,813,539.05 -
1,813,539.05
2,505,837.76 -
2,505,837.76
4,319,376.81
_
31
205S
-
- -
-
- -
-
-
Total
$ 5 11,871,228.08
$ 48,077,341.71 $ - $
49,077,341.71
$ 40,761,470.32 $ - $
40,761,470.32
$ 88,838,812.D3
[f) Assumes a TIF term of 30 years. Assumes tax increment is collected and available the year after it is reflected on the tax rolls,
with final collections in year 31. Subject to negotiation with City.
[g) Estimate per prior City approved tax Increment zones.
[h] Assumes eligible costs, including interest, and maintenance available to be reimbursed with TIF revenues.
[i] Estimate only. Actual amount and timing subject to change.
North Park TIRZ 2024-11-04.xlsx
IV. TIF Contribution Available for Project Costs
V. Developer Project Cost Reimbursement
VI. Remaining TIF Allocation _
Total
TIF
Project
Add:
Less:
Outstanding
Total
Remaining
Remaining
TIF
Contribution
Administrative
Remaining for
Costs
Interest Accrued
TIF
Reimbursable
Remaining
TIF
TIF
Year[f] Year
Avallableln
Costsix]
ProjectCostslh)
Incurredlil
@7.50% ]
Reimbursement
Balance
TIF
toCity lk)
to County
0 Base Year
$ -
$ -
$ -
$ 2,173,140.00
$ 2,173,140.00
$ -
1 2025
-
1,448,760.00
162,985.50
-
3,784,885,50
-
-
2 2026
-
-
-
-
283,866.41
-
4,068,751.91
-
-
-
3 2027
653,746.89
(40,000.00)
613,746.89
-
305,156.39
613,746.89
3,760,161.41
-
-
-
4 2029
816,495.34
(10,000.00)
806,495.34
-
282,012.11
806,495.34
3,235,678.18
-
-
-
5 2029
979,243.78
(10,000.00)
969,243.78
-
242,575.86
969,243.78
2,509,110.27
-
-
6 2030
1,141,992.22
(10,000.00)
1,131,992.22
-
188,183.27
1,131,992.22
1,565,301.32
-
-
-
7 2031
1,304,740.66
(10,D00.00)
1,294,740.66
-
117,397.60
1,294,740.66
387,958.25
-
-
-
8 2032
1,485,634.20
(10,D00.00)
1,475,634.20
-
29,096.87
417,055.12
-
1,058,579.08
614,122.72
444,456.36
9 2033
1,666,527.74
(10,000.00)
1,656,527.74
-
-
-
-
1,656,527.74
961,015.89
695,511.84
10 2034
1,947,421-27
(10,000-00)
1,837,421.27
-
-
-
-
1,837,421.27
1,065,959.24
771,462.03
11 2035
2,028,314-81
(10,000.00)
2,018,314.81
-
-
-
-
2,018,314.81
1,170,902.58
847,412.23
12 2036
2,209,208.34
(10,000.00)
2,199,208.34
-
-
-
2,199,2DB.34
1,275,845.93
923,362.42
13 2037
2,505,548.61
(10,000.00)
2,495,548.61
-
-
-
-
2,495,548.61
1,447,764.39
2,047,784.22
14 2038
2,801,888.87
(10,000.00)
2,791,888.87
-
-
-
2,791,898.87
1,619,682.86
1,172,206.02
15 2039
3,098,229.14
(10,000.00)
3,088,229.14
-
-
-
-
3,088,229.14
1,791,601.32
1,296,627.82
16 2040
3,394,569.40
(10,000.00)
3,384,569.40
-
-
-
3,384,569.40
1,963,519.78
1,421,049.62
17 2D41
3,690,909.67
(10,000.00)
3,680,909.67
-
-
-
-
3,680,909.67
2,135,438.25
1,545,471.42
18 2042
3,816,603.10
(10,000.00)
3,806,603.10
-
-
-
-
3,806,603.10
2,209,357.87
1,598,245.22
19 2D43
3,942,296.53
110,000.00)
3,932,296.53
-
-
-
-
3,932,296.53
2,281,277.50
1,651,019.03
20 2D44
4,067,989.95
(10,000.00)
4,057,989.95
-
-
-
-
4,057,989.95
2,354,197.12
1,703,792.83
21 2D45
4,193,683.38
(10,000.00)
4,183,683.38
-
-
-
-
4,183,683.38
2,427,116.75
1,756,566.63
22 2046
4,319,376.81
(10,000.00)
4,309,376.81
-
-
-
4,309,376.81
2,500,036.38
1,809,340,44
23 2047
4,319,376.81
(10,000.00)
4,309,376.81
-
-
-
-
4,309,376.81
2,500,036.38
1,809,340.44
24 2048
4,319,376.81
110,000.00)
4,309,376.81
-
-
-
-
4,309,376.81
2,500,036.38
1,8D9,340.44
25 2049
4,319,376.81
(10,00D.00)
4,309,376.81
-
-
-
-
4,309,376.81
2,500,036.38
1,809,340.44
26 2050
4,319,376.81
(10,000.00)
4,309,376.81
4,309,376.91
2,500,036.38
1,809,340.44
27 2051
4,319,376.81
(10,000.00)
4,309,376.81
-
-
-
4,309,376.81
1,809,340.44
2,500,036.38
28 2052
4,319,376.81
(10,000.00)
4,309,376.81
-
-
-
4,309,376.81
1,809,340.44
2,5D0,036.38
29 2053
4,319,376.81
(10,000.00)
4,309,376.91
-
-
-
-
4,309,376.81
1,809,340.44
2,500,036.39
30 2054
4,319,376.81
(10,000.00)
4,309,376.81
-
-
-
-
4,309,376.81
1,809,340.44
2,500,036.38
31 2055
4,31%376.81
(10,000.DO)
4,309,376.81
v
-
_
-
-
4,309,376.81
1,809,34644
2,500,036.38
Total
$ 88,839,812.03
$ (320,000.00)
$ 89,518,812.03
$ 3,621,900.00
$ 1,611,374.01
$ 5,233,274.01
$ 83,285,538.01
$ 44,863,686.27
$ 38,421,851.75
[j] Assumes a 7.50% interest rate payable on the outstanding balance.
[k] Amounts available, at City's discretion, to fund other costs (e.g. Lopez and Frankford parks).
North Park TIR2 2024-11-04.xlsx
EXHIBIT F - LEGAL DESCRIPTION OF THE ZONE
NORTH PARK REINVESTMENT ZONE, CITY OF LUBBOCK, TEXAS 16
PRELIMINARY PROJECT AND FINANCE PLAN
CIA AMD Engineering and Surveying
DESCRIPTION FOR A TIF DELINEATION REQUEST IN
SECTION 1, BLOCK JS, E.L. AND R.R. RR. CO. SURVEY, ABSTRACT NO.281 AND
SECTION 22, BLOCK A, T.T. RR. CO. SURVEY, ABSTRACT NO'S. 1543 AND 1544,
LUBBOCK COUNTY, TEXAS
(Sheets 7-4 of 4, Exhibit attached as Sheet I)
Description of a tract of land prepared for TIF Delineation purposes only and being located in
Section 1, Block JS. E.L. and R.R. RR. Co. Survey, Abstract No. 281, Lubbock County, Texas
and in Section 22, Block A. T.T. RR. Co. Survey, Abstract No. 1543 and 1544, Lubbock
County, Texas, said tract being approximately 332.8 acres being further described by metes and
bounds as follows:
BEGINNING at a point that bears S. 88' 06' 33" E. approximately 2,032.8 feet and S. 01 ° 49'
18" W. approximately 55.0 feet from the northwest comer of said Section 1;
THENCE S. 880 06' 33" E. an approximate distance of 1525.09 feet to a point for a corner of
this tract;
THENCE S. 830 58' 14" E. an approximate distance of 200.23 feet to a point for a comer of
this tract;
THENCE S. 880 01' 40" E. an approximate distance of 216.46 feet to a point for a comer of
this tract;
THENCE N. 880 10' 43" E. an approximate distance of 195.17 feet to a point for a corner of
this tract;
THENCE S. 880 19' 33" E. an approximate distance of 765.26 feet to a point for a corner of
this tract;
THENCE S. 01 ° 54' 10" W. an approximate distance of 1148.28 feet to a point for a comer of
this tract;
THENCE southerly along a curve to the left an approximate arc distance of 342.32 feet, said
curve having a radius of approximately 530.13 feet, a delta angle of 36° 59' 49", an approximate
chord length of 336.40 feet and a chord bearing of S. 16° 36' 02" E. to a point for a corner of
this tract;
THENCE S. 350 05' 56" E. an approximate distance of 922.99 feet to a point for a corner of
this tract;
THENCE S. 540 48' 37" W. an approximate distance of 2007.10 feet to a point for a corner of
this tract;
THENCE S. 580 41' 28" W. an approximate distance of 166.77 feet to a point for a comer of
this tract;
THENCE S. 540 50' 34" W. an approximate distance of 82.80 feet to a point for a comer of this
tract;
THENCE S. 520 47' 46" W. an approximate distance of 242.42 feet to a point for a comer of
this tract;
6515 6V Street, Suite 300 TBPE Reg. # F-9197 Office: (806) 771-5976
Lubbock, Texas 79424 TBPELS Reg- #I01785-00 Fax: (806) 771-7625
Page 2 of 4
AMD Engineering and Surveying
THENCE S. 540 53' 22" W. an approximate distance of 1847.19 feet to a point for a comer of
this tract;
THENCE S. 600 40' 52" W. an approximate distance of 628.30 feet to a point for a corner of
this tract;
THENCE westerly along a curve to the right an approximate arc distance of 110.00 feet, said
curve having a radius of approximately 215.00 feet, a delta angle of 290 18' 46", an approximate
chord length of 108.80 feet and a chord bearing of S. 77' 1 1' 3 1 " W. to a point for a corner of
this tract;
THENCE N. 880 09' 06" W. an approximate distance of 68.70 feet to a point for a corner of
this tract;
THENCE N. 01 ° 50' 54" E. an approximate distance of 554.96 feet to a point for a corner of
this tract;
THENCE S. 880 08' 53" E. an approximate distance of 30.65 feet to a point for a corner of this
tract;
THENCE N. 010 5l' 10" E. an approximate distance of 1979.61 feet to a point for a corner of
this tract;
THENCE N. 320 14' 56" W. an approximate distance of 110.85 feet to a point for a corner of
this tract;
THENCE N. 01 ° 50' 54" E. an approximate distance of 545.96 feet to a point for a corner of
this tract;
THENCE N. 880 09' 15" W. an approximate distance of 462.53 feet to a point for a comer of
this tract;
THENCE S. 01 ° 36' 44" W. an approximate distance of 560.76 feet to a point for a comer of
this tract;
THENCE N. 880 08' 15" W. an approximate distance of 933.45 feet to a point for a corner of
this tract;
THENCE westerly along a curve to the left an approximate arc distance of 248.53 feet, said
curve having a radius of approximately 314.97 feet, a delta angle of 45' 12' 37", an approximate
chord length of 242.14 feet and a chord bearing of S. 690 28' 22" W. to a point for a corner of
this tract;
THENCE S. 460 52' 03" W. an approximate distance of 68.00 feet to a point for a corner of this
tract;
THENCE N. 430 26' 15" W. an approximate distance of 154.07 feet to a point for a corner of
this tract;
THENCE N. 880 07' 43" W. an approximate distance of 123.11 feet to a point for a corner of
this tract;
6515 681h Street, Suite 300 TBPE Reg. # F-9197 Office: (806) 771-5976
Lubbock, Texas 79424 TBPELS Reg.#101785-00 Fax: (806) 771-7625
Page 3 of 4
AMD Engineering and Surveying
THENCE N. 010 56' 49" E. an approximate distance of 889.40 feet to a point for a corner of
this tract;
THENCE S. 880 06' 32" E. an approximate distance of 1881.74 feet to a point for a corner of
this tract;
THENCE S. 010 50' 53" W. an approximate distance of 30.00 feet to a point for a corner of this
tract;
THENCE S. 880 07' 03" E. an approximate distance of 1524.60 feet to a point for a corner of
this tract;
THENCE easterly along a curve to the right an approximate arc distance of 178.07 feet, said
curve having a radius of approximately 481.94 feet, a delta angle of 21 ° 10' 12", an approximate
chord length of 177.06 feet and a chord bearing of S. 770 15' 02" E. to a point for a comer of
this tract;
THENCE S. 660 23' 35" E. an approximate distance of 154.54 feet to a point for a corner of
this tract;
THENCE northeasterly along a curve to the right an approximate arc distance of 379.38 feet,
said curve having a radius of approximately 1635.03 feet, a delta angle of 13° 17' 41", an
approximate chord length of 378.53 feet and a chord bearing of N. 29' 25' 26" E. to a point for a
comer of this tract;
THENCE N. 530 54' 45" W. an approximate distance of 336.23 feet to a point for a corner of
this tract;
THENCE N. 010 47' 48" E. an approximate distance of 370.53 feet to a point for a corner of
this tract;
THENCE N. 880 06' 28" W. an approximate distance of 1066.68 feet to a point for a corner of
this tract;
THENCE N. 010 37' 35" E. an approximate distance of 930.12 feet to a point for a corner of
this tract;
This description was prepared for purposes of a TIF Delineation request and does not represent
a survey made upon the ground.
Prepared for: North Park Development, Inc.
August 23, 2024
230621- North Park TIF Parcel-Desc
6515 681 Street, Suite 300 TBPE Reg. # F-9197 Office: (806) 771-5976
Lubbock, Texas 79424 TBPELS Reg.#101785-00 Fax: (806) 771-7625
Page 4 of 4
EXHIBIT G - MAP OF THE PUBLIC IMPROVEMENTS
NORTH PARK REINVESTMENT ZONE, CITY OF LUBBOCK, TEXAS
PRELIMINARY PROJECT AND FINANCE PLAN 17
' AMD ENGINEERING, LLC
TAX INCREMENT FINANCING
ENGINEER'S REPORT
Prepared by:
September 23, 2024
TBPE Reg. No. F-9197
TBPELS Reg. No. 10178500
TAX INCREMENT FINANCING ENGINEER'S REPORT
September 23, 2024
Introduction:
Playa Lake Park (working title, the actual name of the park is to be designated by the City of
Lubbock) is a proposed public park and lake consisting of landscaping, irrigation, walking
trails/sidewalks, a constant level pond with fountain, and a statue of Quanah Parker on
approximately 16.03-acres of land. This park is located at the southeast corner of North Slide
Road and Auburn Street in the City of Lubbock, Texas. This park development will be constructed
in a single phase of construction.
This report includes the supporting documentation for the formation of the Tax Increment
Financing (TIF) and the financing of this project by the Petitioner to finance the public
infrastructure items listed below that are necessary for the buildout of the park.
The 16.03-acre park is located within the TIF boundary of approximately 332.8 acres. The
boundary of the TIF is shown on the attached Appendix 1.
Development Improvements:
• Demolition: This includes the demolition and haul -off of the existing concrete drainage
flume at the east end of the intersection of North Slide Road and 2"d Drive. This drainage
flume consists of reinforced concrete installed with the North Slide Road construction
project. This flume will be replaced by rock gabions and landscaping.
• Sculpture: This includes the artist's fees and materials for the completion of a bronze
statue of Quanah Parker and a large arrow, two separate sculptures. The sculptor is Eddie
Dixon.
• Earthwork: This includes the cutting of the existing playa lake to reshape the drainage
flume area off Slide Road to beautify the area with natural landscaping and reduce erosion.
This also includes the earthwork efforts necessary to raise the statue and surrounding
area above the 100-year flood elevation while maintaining the playa lake's storm water
holding capacity. This item also includes fine grading around the landscaping features.
• Landscaping and Hardscape: Improvements include a lined pond with two fountains,
large decorative boulders and rocks to mimic the caprock escarpment, concrete
PLAYA LAKE PARK -TAX INCREMENT FINANCING ENGINEER'S REPORT 1
sidewalks, decorative gravel, decorative retaining walls, gabion mattresses and blocks,
pedestrian bridges, accessible handrailing, limestone blocks, flagstone pathways
(mortared in), pedestrian and decorative lighting, park benches, trash receptacles,
decomposed granite hardscaping features, native seeding, sod, irrigation, and various
native plantings and trees.
• Soft Costs: This includes costs related to designing, constructing, installing, and financing
the park. This includes surveying, engineering, landscape architectural design, soils
testing, construction management, legal fees, consulting fees, inspection fees, District
Formation Costs, and other TIF costs incurred and paid by the Developer.
Development Costs:
An Engineers' Opinion of Probable Cost has been prepared for Playa Lake Park as described
above and is included as the Tax Increment Financing Cost Estimate. The Opinion of Probable
Cost is based on contractor pricing and AMD Engineering, LLC's reasonable professional
judgement and experience and does not constitute a warranty, expressed or implied, that the
actual cost will not vary.
Development and Construction Schedule:
• Begin June 2024 — Complete December 2025
PLAYA LAKE PARK -TAX INCREMENT FINANCING ENGINEER'S REPORT 2
APPENDIX 1
TIF BOUNDARY
PLAYA LAKE PARK -TAX INCREMENT FINANCING ENGINEER'S REPORT
EXIIIIIIIIIIIII
� LI 1=111 111 �11 fl Q� �ME
E ONE
1� � - ��► �����
J
:
�- -- -- - -
Eff
■/IIn1■/ - - ME
MM IIIIIII■■ + - -
■IIIn1■111■ r� - � - 111
�111111 11■ 2 +
■IIIII/��� � -- --
n1 � _ 1 IIIIIIn■I p � +
11 logoIII■
■ IIII �i/I■
�1I11►� �I��I� % min II , ♦ �� 1,
IIII 1��i���i��i■ ■11111111► ��i�11/�
11 NINE
■IIn111►���j ��111■
II" IIIII/►�; Ij�I I ■IIIIl1I��; ��, n111
■11 1 )� �� /IIII ■11 II�� ��
■IIII/� �1��1■IIII ■IIIII �I��1111111 '
111►�j���111111 ■n 1� ���iliillll
III IIII//n ■In ► �I/1/11111 '
MINIMUM1 IIIII■ ■00101111111111111111
■f111I1 n111111f■ n111111 111 1 IIIII■
Fj�� F-1 F
a !
/ 4p
4117j
4TII STREET
,T� ---q F--L=- P q- 9
V--=H PF
EXIIIBIT OF
NORTH PARK TIF PARCEL,
SCALE: 1' = 600'
150' 600'
0' 300' 12D0'
NOTES:
HEAVY LINES INDICATE LIMITS OF PARCEL
THIS DRAWING IS FOR LOCATION PURPOSES
ONLY.
NO PORTION OF THIS DRAWING REPRESENTS
AN ACTUAL SURVEY MADE ON THE GROUND.
STREETS NAMES DERIVED FROM LUBBOCK
COUNTY APPRAISAL DISTRICTS PARCEL
VIEWER MAP
(G IS.BISCLIENT.COMILUBBOCKCAD).
LINEWORK DERIVED FROM CITY OF LUBBOCK
GIS SHAPE FILE
(CI
.LU BBOCK.TX.0 Sf DEPARTMENTS/
GIS-DATASE RVICESIPUBLIGDATA).
SHEET 1 OF 4
DESCRIPTION ATTACHED AS SHEETS 2-1 OF 4
APPENDIX 2
SITE LOCATION MAP
PLAYA LAKE PARK -TAX INCREMENT FINANCING ENGINEER'S REPORT
QUANAH PARKER PARK
[•yr9:axelL1vILeill !
WN E
S
HORIZONTAL SCALE:
0 125' 250' 50
.
ci�
CIVIL ENGINEERING
LAND PLANNING
AMD Engineering. LLC
Phone: 806.771-5976
6515 681h Street, Suite 300
Fax: BD6.771-7625
Lubbock, TX 79424
TBPE Reg. # F4197
Accuracy - Efficiency - Inlegrity
APPENDIX 3
OPINION OF PROBABLE COST
PLAYA LAKE PARK -TAX INCREMENT FINANCING ENGINEER'S REPORT
ENGINEERS OPINION OF PROBABLE COST
for
PLAYA LAKE PARK
September 20, 2024
This estimate is preliminary based on schematic designs, historical contractor pricing, landscape architect
?stimates, and engineer estimates. The quantities and pricing are subject to change based on final scope
tnd bid prices at the time of bidding.
ITEM
NO.
DESCRIPTION
ESTIMATED PRICE
1
Site I earthwork I concrete removal and disposal / fine grading, complete and in place:
$ 765,000.00
2
Gabion mattresses and blocks, including all materials necessary, complete and in place:
$ 52,000.00
3
Concrete sidewalks and pathways, including all materials necessary, complete and in place:
$ 168,000.00
4
Decorative retaining walls, pedestrian bridges, and handrail systems, including all materials
$ 106,000.00
necessary, complete and in place.
5
Large landscaping boulders, furnished and installed, complete and in place:
$ 102,500.00
6
Trees and plantings, as per the landscape plan, furnished and installed, complete and in place:
$ 98,000.00
7
Irrigation system with controls, complete and in place as per the landscape irrigation plan,
$ 85,000.00
plumbed to a well:
8
Cut limestone 2'x2'x5' blocks, furnished and installed, complete and in place:
$ 132,000.00
9
Flagstone pathways as per the landscape plan, furnished and installed, complete and in place:
$ 28,000.00
10
Low voltage lighting package as per the landscape plan, furnished and installed, complete and in
$ 35,000.00
place:
11
Park benches as per the landscape plan, furnished and installed, complete and in place:
$ 9,000.00
12
Trash receptables, furnished and installed, complete and in place:
$ 6,200.00
13
Various grades of decomposed granite as per the landscape plan, furnished and installed,
$ 8,700.00
complete and in place:
14
Sod as per the landscape plan, furnished and installed, complete and in place:
$ 19,000.00
15
Black steel edging as per the landscape plan, furnished and installed, complete and in place:
$ 5,000.00
16
Native trail seed drill/hydromulch as per the landscape plan, furnished and installed, complete
$ 39,000.00
and in place:
17
Native seed wetland mix drill/hydromulch as per the landscape plan, furnished and installed,
$ 3,500.00
complete and in place:
18
7.5-horse water well, including drilling and all electircal and apurtenances necessary, complete
$ 45,000.00
and in place:
19
Pond liner system, complete and in place:
$ 75,000.00
20
Decorative water fountains (2). including all materials, pumps, and electrical, complete and in
$ 40,000.00
place:
21
Statue of Quannah Parker and Arrow, including artist fees and concrete foundations, complete
$ 1,200,000.00
and in place:
22
Soft costs and Construction management
$ 300,000.00
23
Contingency
$ 300,000.00
PROJECT TOTAL $ 3,621,900.00
APPENDIX 4
PARK RENDERING - STATUE
PLAYA LAKE PARK -TAX INCREMENT FINANCING ENGINEER'S REPORT
No Text
/.\:j,21►191LAP
PARK RENDERING - LANDSCAPE/HARDSCAPE
PLAYA LAKE PARK -TAX INCREMENT FINANCING ENGINEER'S REPORT
PLAYA LAKE PARK I SITE PLAN ENLARGEMENT
aRll
qnnnnnn
APPENDIX 6
EARTHWORK LIMITS
PLAYA LAKE PARK -TAX INCREMENT FINANCING ENGINEER'S REPORT
QUANAH PARKER PARK
EARTHWORK LIMITS
WN E
S
HORIZONTAL SCALE:
0 125' 250' 500'
Qm.
CIVIL ENGINEE•RTNG
LAND PLANNING
AMD Engineering. LLC
Phone: 806-771-5976
6515 68th StreeL Suite 300
Fax: $06-771-7625
Lubbock TX 79424
TBPE Reg. A F-9197
Accuracy - Effidency - Integrity
I'' 111111 MEMN !
11
m
LI,-gy_... �1 .�����=HF--Tl F--]-= R Off
EXHIBrr OF
NORTH PARK TH% PARCEL,
SCALE: 1"= 600'
150, 600'
0' 300' 12W
NOTES:
HEAVY LINES INDICATE LIMITS OF PARCEL
THIS DRAWING IS FOR LOCATION PURPOSES
ONLY.
NO PORTION OF THIS DRAWING REPRESENTS
AN ACTUAL SURVEY MADE ON THE GROUND.
STREETS NAMES DERIVED FROM LUBBOCK
COUNTY APPRAISAL DISTRICT'S PARCEL
VIEWER MAP
(GIS. BISCL IENT.COMILUBBOCKCAD).
LINEWORK DERIVED FROM CITY OF LUBBOCK
GIS SHAPE FILE
(CI. LUBSOCK.TX.USIDEPARTM ENTS!
GI S-DATA-SERVICE&PUBLIC-DATA).
SHEET 1 OF 4
DESCRIPTION ATTACHED AS SHEETS 21 OF 4
491 .
CIVIL ENGINEERING
LAND SURVEYING
AMD Engineering, LLC
Phone: 806.771-5976
6515 581h Street, State 300
F— 808.771.7525
Lubbock, Tx 79424
TBPELS Reg.# 10178500
Accuracy - Efficiency - Integrity
4K 7-hk*AMD Engineering and Surveying
DESCRIPTION FOR A TIF DELINEATION REQUEST IN
SECTION 1, BLOCK JS, E.L. AND R.R. RR. CO. SURVEY, ABSTRACT NO.281 AND
SECTION 22, BLOCK A, T.T. RR. CO. SURVEY, ABSTRACT NO'S. 1543 AND 1544,
LUBBOCK COUNTY, TEXAS
(Sheets 2-4 of 4, Exhibit attached as Sheet 1)
Description of a tract of land prepared for TIF Delineation purposes only and being located in
Section 1, Block JS, E.L. and R.R. RR. Co. Survey, Abstract No. 281, Lubbock County, Texas
and in Section 22, Block A, T.T. RR. Co. Survey, Abstract No. 1543 and 1544, Lubbock
County, Texas, said tract being approximately 332.8 acres being further described by metes and
bounds as follows:
BEGINNING at a point that bears S. 88' 06' 33" E. approximately 2,032.8 feet and S. 01 ° 49'
18" W. approximately 55.0 feet from the northwest corner of said Section 1;
THENCE S. 880 06' 33" E. an approximate distance of 1525.09 feet to a point for a corner of
this tract;
THENCE S. 830 58' 14" E. an approximate distance of 200.23 feet to a point for a corner of
this tract;
THENCE S. 880 01' 40" E. an approximate distance of 216.46 feet to a point for a comer of
this tract;
THENCE N. 880 10' 43" E. an approximate distance of 195.17 feet to a point for a comer of
this tract;
THENCE S. 88e 19' 33" E. an approximate distance of 765.26 feet to a point for a comer of
this tract;
THENCE S. 01 ° 54' 10" W. an approximate distance of 1148.28 feet to a point for a corner of
this tract;
THENCE southerly along a curve to the left an approximate arc distance of 342.32 feet, said
curve having a radius of approximately 530.13 feet, a delta angle of 36° 59' 49", an approximate
chord length of 336.40 feet and a chord bearing of S. 16' 36' 02" E. to a point for a corner of
this tract;
THENCE S. 350 05' 56" E. an approximate distance of 922.99 feet to a point for a comer of
this tract;
THENCE S. 540 48' 37" W. an approximate distance of 2007.10 feet to a point for a corner of
this tract;
THENCE S. 58e 41' 28" W. an approximate distance of 166.77 feet to a point for a corner of
this tract;
THENCE S. 540 50' 34" W. an approximate distance of 82.80 feet to a point for a corner of this
tract;
THENCE S. 520 47' 46" W. an approximate distance of 242.42 feet to a point for a corner of
this tract;
6515 68th Street, Suite 300 TBPE Reg. # F-9197 Office: (806) 771-5976
Lubbock, Texas 79424 TBPELS Reg. #101795-00 Fax: (906) 771-7625
Page 2 of 4
4rii�* AMD Engineering and Surveying
THENCE S. 540 53' 22" W. an approximate distance of 1847.19 feet to a point for a corner of
this tract;
THENCE S. 600 40' 52" W. an approximate distance of 628.30 feet to a point for a corner of
this tract;
THENCE westerly along a curve to the right an approximate arc distance of 110.00 feet, said
curve having a radius of approximately 215.00 feet, a delta angle of 29' 18' 46", an approximate
chord length of 108.80 feet and a chord bearing of S. 77' 11' 3 1 " W. to a point for a corner of
this tract;
THENCE N. 880 09' 06" W. an approximate distance of 68.70 feet to a point for a corner of
this tract;
THENCE N. 010 50' 54" E. an approximate distance of 554.96 feet to a point for a corner of
this tract;
THENCE S. 880 08' 53" E. an approximate distance of 30.65 feet to a point for a corner of this
tract;
THENCE N. 010 51' 10" E. an approximate distance of 1979.61 feet to a point for a comer of
this tract;
THENCE N. 320 14' 56" W. an approximate distance of 110.85 feet to a point for a corner of
this tract;
THENCE N. 010 50' 54" E. an approximate distance of 545.96 feet to a point for a corner of
this tract;
THENCE N. 880 09' 15" W. an approximate distance of 462.53 feet to a point for a comer of
this tract;
THENCE S. 010 36' 44" W. an approximate distance of 560.76 feet to a point for a corner of
this tract;
THENCE N. 880 08' 15" W. an approximate distance of 933.45 feet to a point for a corner of
this tract;
THENCE westerly along a curve to the left an approximate arc distance of 248.53 feet, said
curve having a radius of approximately 314.97 feet, a delta angle of 450 12' 37", an approximate
chord length of 242.14 feet and a chord bearing of S. 69' 28' 22" W. to a point for a comer of
this tract;
THENCE S. 460 52' 03" W. an approximate distance of 68.00 feet to a point for a corner of this
tract;
THENCE N. 430 26' 15" W. an approximate distance of 154.07 feet to a point for a corner of
this tract;
THENCE N. 880 07' 43" W. an approximate distance of 123.11 feet to a point for a corner of
this tract;
6515 681h Street, Suite 300 TBPE Reg. # F-9197 Office: (806) 771-5976
Lubbock, Texas 79424 TBPELS Reg. #101785-00 Fax: (806) 771-7625
Page 3 of 4
F' AMD Engineering and Surveying
THENCE N. 010 56' 49" E. an approximate distance of 889.40 feet to a point for a corner of
this tract;
THENCE S. 880 06' 32" E. an approximate distance of 1881.74 feet to a point for a corner of
this tract;
THENCE S. 010 50' 53" W_ an approximate distance of 30.00 feet to a point for a corner of this
tract;
THENCE S. 880 07' 03" E. an approximate distance of 1524.60 feet to a point for a corner of
this tract;
THENCE easterly along a curve to the right an approximate arc distance of 178.07 feet, said
curve having a radius of approximately 481.94 feet, a delta angle of 21 ° 10' 12", an approximate
chord length of 177.06 feet and a chord bearing of S. 77° 15' 02" E. to a point for a corner of
this tract;
THENCE S. 660 23' 35" E. an approximate distance of 154.54 feet to a point for a corner of
this tract;
THENCE northeasterly along a curve to the right an approximate arc distance of 3 79.3 8 feet,
said curve having a radius of approximately 1635.03 feet, a delta angle of 13° 17' 41", an
approximate chord length of 378.53 feet and a chord bearing of N. 29' 25' 26" E. to a point for a
comer of this tract;
THENCE N. 530 54' 45" W. an approximate distance of 336.23 feet to a point for a corner of
this tract;
THENCE N. 010 47' 48" E. an approximate distance of 370.53 feet to a point for a comer of
this tract;
THENCE N. 880 06' 28" W. an approximate distance of 1066.68 feet to a point for a corner of
this tract;
THENCE N. 010 37' 35" E. an approximate distance of 930.12 feet to a point for a corner of
this tract;
This description was prepared for purposes of a TIF Delineation request and does not represent
a survey made upon the ground.
Prepared for: North Park Development, Inc.
August 23, 2024
230621- North Park TIF Parcel-Desc
6515 68" Street, Suite 300 TBPE Reg. # F-9197 Office: (806) 771-5976
Lubbock, Texas 79424 TBPELS Reg. #101785-00 Fax: (806) 771-7625
Page 4 of 4