ORDINANCE NO. 6129 ---=-==-----
AN ORDINANCE AlVIENDING ARTICLE II OF CHAPTER 34 OF THE
CODE OF ORDINANCES OF THE CITY OF LUBBOCK BY Al\.1ENDING SEC-
TION 34-52 T~REOF P~OVID~NG FOR PRO-RATA CHARGES FOR WATER
AND/OR SEWER SERVICE; AMENDING SECTION 34-65 PROVIDING FOR
UNIT PRICES USED IN CALCULATING COSTS OF EXTENSIONS; PROVID-
ING A SAVINGS CLAUSE AND PROVIDING FOR PUBLICATION.
WHEREAS, the City Council has determined that the changes in chargE s
for services as shown below ar~ in the best interest of the citizens of the City
of Lubbock; NOW THEREFORE:
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
SECTION 1. THAT Section 34-52 of the Code of Ordinances of the Citlr
of Lubbock, BE and is hereby amended by amending sub-paragraphs (a) and
(b) thereof, relating to charges, to read as follows:
11(a.) $2. 00 per front foot of lot or tract of land to which sewer
service is to be provided; and
(b.) $2. 50 per front foot of lot or tract of land to which water
service is to be provided; and as more specifically pro-
vided herein. 11
SECTION 2. THAT Section 34-65 of the Code of Ordinances of the Cit,.,.
of Lubbock, BE and is hereby amended to read as follows:
Sec. 34-65. Unit Prices used in Calculating Costs of Extensions
The following prices shall be used as unit prices in calculating the
costs of extensions of water or sewer mains and appurtenances
under the terms of this article:
Water mains and appurtenances installed:
For 3 11
For 3 11
For 4 11
For 4 11
For 6 11
For 6i1
For 8 11
For 811
For 10!1
Asbestos cement,. class 150 water pipe per lin. ft.
Cast-iron class 150 water pipe per line ft.
Asbestos cement class 150 water pipe per !in. ft.
Cast-iron class 150 water pipe per lin. ft.
Asbestos cement class 150 water pipe per lin. ft.
Cast-iron class 150 water pipe per lin. ft.
Asbestos cement class 150 water pipe per lin. ft.
Cast-iron class 150 water pipe per lin. ft.
Asbestos cement class 150 water pipe per lin. ft.
$ 1. 40
1. 75
1.70
1. 97
2.52
2.74
3.10
3.40
4.21
u
For 1011 Cast-iron class 150 water pipe per lin. ft. 4.66
For 1211 Asbestos cement class 150 water pipe per lin. ft. 5. 25.
For 1211 Cast-iron class 150 water pipe per lin. ft. 5.50
For 211 Gate valves and valve box @ :47.00
For 311 Gate valves and valve box @ 60,00
For 4 11 Gate valves and valve box @ 76.00
For 6 11 Gate valves and valve box @ 98.00
For 8 11 Gate valves and valve box @ 128.00
For 1011 Gate valves and valve box @ 190.00
For 1211 Gate valves and valve box @ 255,00
For Fire Hydrant @ 260.00
For Fittings per pound @ 0.30
Wet tie-in @ 150,00
Move machinery @ 100.00
Paving repair-2 course asphalt per lin. ft. 2.00
4 course asphalt per lin. ft. 5. 00
Tapping Sleeve and Valve for C. I. or A. C.
6x3 @ 131. 85
6x4 @ 148, 05
6x6 @ 183.90
8x3 @ 135.80
8x4 @ 164. 17
8x6 @ 199.17
8x8 @ 262. 97
10x3 @ 205.00
10x4 @ 219.00
10x6 @ 235.47
10x8 @ 297.40
12x3 @ 191. 00
12x4 @ 261. 00
12x6 @ 287,00
12x8 @ 303. 11
12xl0 @ 405.67
The unit prices above are inclusive of all items not specifically
listed herein which may be necessary to complete the project,
except engineering. The installation of a tapping valve, or tying
to an existing cross or tee fifty feet (50') from the nearest valve
shall be considered a wet tie-in. All wet tie -ins shall be made
by city forces and shall include flushing and sterilizing all water
lines.
Sanitary sewer mains and appurtenances, installed:
For 611 glazed vitrified clay sanitary sewer pipe:
0' -4' per lin. ft. 1.43
4! - 6 I per lin. ft. 1. 50
6' -8' per lin. ft. 1. 58
8' -10 ' per lin. ft. 1.73
101 -12 per lin. ft. 1. 95
12' -141 per lin. ft. 2.33
For 811 glazed vitrified clay sanitary sewer pipe:
0' -4' per lin. ft. 1. 95
4' -6' per lin. ft. 2.03
6' -8' per lin. ft. 2. 10
8 ' -101 per lin. ft. 2.25
10' -12' per lin. ft. 2.48
12 1 -141 per lin. ft. 2. 91
14 1 -16' per lin. ft. 3.53
16' -18' per lin. ft. 4. 14
For 1011 glazed vitrified clay sanitary sewer pipe:
0' -41 per lin. ft. 2.45
4' -6' per lin. ft. 2.52
6' -8' per lin. ft. 2.60
8' -101 per lin. ft. 2,75
10' -12' per lin. ft. 2.97
121 -14' per lin. ft. 3.42
14' -16' per lin. ft. 4.02
16' -18' per lin. ft. 4.77
For 1211 glazed vitrified clay san~tary sewer pipe:
0 1 -4 1 per lin. ft. 2.93
4' -6' per lin. ft. 3.00
6 I -8' per lin. ft. 3. 08
8' -10' per lin. ft. 3.23
10' -12' per lin. ft. 3.45
12' -14' per lin. ft. 3.90
14' -16' per lin. ft. 4.50
16l -18 1 per lin. ft. 5.25
For Manhole Standard @
For Manhole Drop @
For E. V. F. Std. @
For extra vertical ft. drop @
Move Machinery @
Tie to Std. M, H. @
Tie to drop M. H. or -6 1 (6 11 & 8 11) @
Tie to drop M. H. 0 1 -6 1 (1011 & 1211) @
E. V. F. drop tie-in over 6 1 @
For 6 x 4 Wyes complete with plug @
For 8 x 4 Wyes complete with plug @
For 10 x 4 Wyes complete with plug @
For 12 x 4 Wyes complete with plug @
For 6 11 clean out @
For 4 11 V. C. T. riser pipe @
For 6 11 V. C. T. plug @
For 8 11 V. C. T. plug @
For 10" V. C. T. plug @
For 12 ~1 V. C. T. plug @
Paving repair:
2 course asphalt per ~ifn, ft.
4 oour_se asphalt per lin. ft.
Move Machinery per each
The unit prices above are inclusive of all items not specifically
listed herein which may be necessary to produce a complete job
except engineering charges.
130.0
145.0
25.0
28.0
100.0
30.0
45.0
47.0
10.0
2.5
4.0
5.0
6.2
60.0
o. 7
o. 7
0. g
1.1
1. 4
2.0
5. 0
100.0
SECTION 3. THAT should any section, paragraph, sentence, clause,
phrase or word of this Ordinance be declared unconstitutional or invalid for
any reason, the remainder of this Ordinance shall not be affected thereby.
SECTION 4, THAT the City Secretary is hereby authorized to cause
publication of the descriptive caption of this Ordinance as an alternative me-
thod provided by law.
AND IT IS SO ORDERED.
Passed by the Council on first reading this -C-,.=#'-H-
Passed by the Council on second reading th·
Lave
197.
197.