Loading...
HomeMy WebLinkAboutResolution - 2024-R0396 - K 18219, West Infrastructure Const., LLC, North Overton TIF Dist. Boundary - 08/27/2024Resolution No. 2024-R0396 Item No. 6.26 August 27, 2024 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Public Works Contract No. 18219 for the 2024 North Overton streets rebuild in concrete as per ITB 24-18219-TF, by and between the City of Lubbock and West Infrastructure Construction, LLC of Lubbock, Texas, and related documents. Said Contract is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on August 27, 2024 � MARK W. MCBRAYER, MA R ATTES : Courtney Paz, City Secretary APPROVED AS TO CONTEN"f: �Z. - - Erik Rejino, Assistant City Manager APPROVED AS TO 1jORM: � � e11i Leisure, Senior Assistant City Attorney ccdocslRES.Public Works Contract 18219 N. Overton streets 8.2.24 BID SUBMITTAL FORM UNIT PRICE BID CONTRACT DATE: �—� �— Z� -- .....�._. PR4JECT NUMBER: ITB 24-18219-TF, 2024 North Overton Streets Rebuild in Concrete Bid of �5'�" �1�►��}'�L.�'11� C���r��i vv� l.�.L . _. (hereinafter called Bidder) To the Honorable Mayor and City Council City of Lubbock, Texas (hereinafter called Owner) Ladies and Gentlemen: The Bidder, in compliance with your Invitation to Bid for the construction of the referenced project, having carefully examined the plans, specifications, instructions to bidders, notice ta bidders and all other related contract documents and the site of the intended work, and being familiar with all of the conditions surrounding the construction of the intended project including the availability of materials and labor, hereby intends to furnish all labor, materials, and supplies; and to construct the project in accordance with the plans, specifications and contract documents, within the time set forth therein and at the price stated. The bidder binds himself on acceptance of his bid to execute a contract and any required bonds, according to the accompanying forms, for performing and completing the said work within the time stated and for the prices stated. Bidder hereby agrees to commence the work on the above project on a date to be specified in a written "Notice to Proceed" of the Owner and to substantially complete the project within 65 consecutive calendar days with flnal completion of the project within 70 cansecuNve calendar days as stipulated in the specification and other contract documents. Bidder hereby further agrees to pay to Owner as liquidated damages in the svm of $1,Z04.28 for each consecutive calendar day after substandal compleNon and liquidated damages in the sum of $1,204.28 for each consecutive calendar day after f nal completion set forth herein above for completion of this project, all as more fully set forth in the General Conditions of the Agreement. Bidder understands and agrees that this bid submittal shall be completed and submitted in accordance with instruction number 29 of the General Instructions to Bidders. Bidder understands that the Owner reserves the right to reject any or all bids and to waive any formality in the bidding. The Bidder agrees that this bid shall be good and may not be withdrawn for a period of 60 calendar days after the scheduled closing time for receiving bids. The undersigned Bidder herehy declares that he has visited the site of the work and has carefully examined the plans, speci6cations and contract documents pertaining to the work covered by this bid, and he further agrees to commence work on or before the date specified in the written notice to proceed, and to substantially complete the work on which he has bid; as provided in the contract documents. Bidders are required, whether or not a payment or performance bond is required, to submit a cashier's check or certified check issued by a bank satisfactory to the City of Lubbock, or a bid bond from a reliable surety company, payable without recourse to the order of the City of Lubbock in an amount not less than five percent (5°Io) of the total amount of the bid submitted as a guarantee that bidder will enter into a contract, obtain all required insurance policies, and execute all necessary bonds (if required) within 10 business days after notice of award of the contract to him. City of Lubbock, TX Street Maintenance ITB 24-18219-TF 2024 North Overton Streets Rebuild in Concrete West Infrastructure Construction, LLC of Lubbock, TX # Items Base Sid Concrete Paving, 8" Class "C" Concrete (3600 PSI @ 28 Days) Reinforced (ref. section 8.7.12 for specifications for # 1-1 Reinforcement Information); Including labor, equipment, removal and disposal of Existing materials, subgrade prep, saw cut joints, complete and in Place. (All Millings will go to the 30" Curb & Gutter, Class B Concrete (3,000 psi @ 7 days), #1-2 30" wide separate gutter or saw-tooth curb & gutter; including labor, equipment, removal and disposal of existing materials, # 1-3 Brick Crosswalk repair, including brick, sand, and labor, Type I Thermoplastic pavement marking .125 Mi124" white #1-4 stop line (TX DOT DMS 8220). Including labor, equipment, and preparation of existing surface. Complete and in place. QTY Unit +/- U/M Cost 5450 SY 136.51 250 LF 62.04 400 SY 74.28 72 LF 110.42 Extended Cost 743,979.50 15,510.00 29,712.00 7,950.24 #1-5 Mobilization 1 EA 74,035.41 74,035.41 Total (Item 1-1 through 1-5): $ 871,187.15 Enclosed with this bid is a Cashier's Check or Certified Check for Dollars ($ or a Bid Bond in the sum of �� ����„__ Dollars ($ �q.3b , which It is agreed shall be collected and retained by the Owner as liquidated damages ia the event the bid is accepted by the Owner and the undersigned fails to execute the necessary coatract documents, insuraace certittcates, and the required bond (if any) wlth the Owner within 10 business days after the date of receipt of wrttten notiflcation of acceptance of said bid; otherwise, said check or boad shall be returned to the undersigned upon demand. Bidder understands and agrees that the contract to be executed by Bidder shall be bound and include all contract documents made available to him for his inspection in accordance with the Notice to Bidders. Pursuant to Texas L.flcal Covernment Code 25Z.043(g), a Date: � �+ 2-� _ competitive sealed bid that has been opened may not be � changed for thc purpose of correcting an error iu tde btd prlce. THEREFORE, ANY CORRECTlONS TO THE B1D PRICE Aut rized Signa e MUST SE MADE ON THE BID SUBMlTTAL FORM PRIOR � D TO BID OPENING. {Printed Typed Name) tl� �5� � s"nrv�v�� .� � . (Seal if Bidder is a Corporation) A7TEST: Secretary Bidder acknowledges receipt of the following addenda: Addenda No. Date Addenda No. Date Addenda No. Date Addenda No. Date M/WBE Firm: com a y _'�.�3L� G�vi s R� Ad_�+(�}�JOC.� _ OL�U City, � Co �c _ , ���� State � Zip C,Qd� n Telephone: � - �1 � • Lj`1�,�� Fax: �� - �i • FEDERAL TAX ID or SUCIAL SECURITY No. � . �2��0�3 EMAIL: •d�¢(1� Wt,S}"lll�li�s'4:�� • � � � i� yF � STATE OF TEXAS COUNTY OF LUBBOCK Contract 18219 THIS AGREEMENT, made and entered into this 27"' day of August, 2024 by and between the City of Lubbock, County of Lubbock, State of Texas, acting by and through the Mayor, City of Lubbock, thereunto authorized to do so, hereinafter referred to as OWNER, and West Infrastructure Construction, LLC of the City of Lubbock, County of Lubbock and the State of Texas hereinafter termed CONTRACTOR. WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned, to be made and �performed by the OWNER and under the conditions expressed in the bond bearing even date herewith (if any) the CONTRACTOR hereby agrees with OWNER to commence and complete the construction of certain improvements described as follows: � ITB 24-18219-TF 2024 North Overton Streets Rebuild in Concrete and all extra work in connection therewith, under the terms as stated in the contract documents and at his (or their) own proper cost and expense to furnish all materials, supplies, machinery, equipment, tools, superintendence, labor, insurance �and other accessories and services necessary to complete the said construction in accordance with the contract documents as defined in the General Condition of Agreement. West Infrastructure Construction, LLC's bid dated AuEust 1. 2024, is incorporated into and made a part of this agreement. � � � � _ � � The CONTRACTOR hereby agrees to commence work within ten days after the date written notice to do so shall have been given to him and to substantially complete same within the time specified in the contract documents. The OWNER agrees to pay the CONTRACTOR in current funds for the performance of the contract in accordance with the bid submitted therefore, subject to additions and deductions, as provided in the contract documents and to make payment on account thereof as provided therein. IN WITNESS WHEREOF, the parties to these presents have executed this agreement in Lubbock, Lubbock County, Texas in the year and day first above written. CONTRACTOR: West Infrastructure Construction, LLC � � By: PR] TIT � � -�� i� � COMPLETE ADDRESS: West Infrastructure Construction, LLC 2836 Clovis Rd Lubbock, TX 79415 ATTEST: Corporate Secretary — ITY OF L CK, XAS (OWNER): B: � Mark McBrayer, Mayor ATTEST: Courtney Paz, City Secretary OyED AS TO C T: Department Representative �y� a�l'�vh_ �. ��. 2oz�- Name (Printed) � � Date A PROVED S TO FORM: elli Leisure, Senior Assistant City Attorney