HomeMy WebLinkAboutResolution - 2024-R0311 - Contract 18165, With W.R. Construction, Inc., LPSIA - 07/09/2024Resolution No. 2024-R0311
Item No. 6.14
July 9, 2024
RESOLUTTON
B� IT RCSOLVED I3Y TII� CITY COUNCTL O�' TTiL' CITY O�' LUBBOCK:
THAT the Mayor of the City of Lubbock is hercby authori�ed and dirccted to execute
for and on behalf of the City of Lubbock, Service Contract No. 18165, and in doing so,
ratifying all acts undertaken for �mergency Repairs to the Lubbock Preston Smith International
Airpori Rental Car Facility, per Sourcewell rZIQC Contract No. TX-PII-GC-101619-WRC, by
and between the City of Lubbock and W.R. Construction, Inc., and related documcnts. Said
Contract is attached hcrcto and incorporated in this resolution as if fully set forth herein and
shall bc included in thc minutcs of thc City Council.
Passed by thc City Council on July 9, 2024
� � -- � --
� -�
�MARK M IZn ER, AYOR
AT1'ES"I':
C rtney Yaz, . ity Sccrctary
AYI'ROVrD AS "1'O CON"fl;N"1':
Kelly Campbell, �xecutive Dircctor of Aviation
AYPR( , � ' 1� ORM:
M Sa ter itc, l�irst Assistant City �lttorney
ccdocs IIIRL'S.Contract 18165-W.IZ.Construction, Inc.
June 24, 2024
Resolution No. 2024-R0311
Contract 18165
G�R D IAN�
Work Order 8lgnature Document
Sourcewell EZIGC Contract No.: TX-PH-GC•101679-WRC
QN�w Wotk Order � Modify an Existing Work Orde�
Work OMer Pfumber.� 130378.00 Wak Order Date: 08f07l2024
Work Orde� Title: City of Lubbodc Airport• Enterprise Bldg, Vapor Barrter Install
Owner Neme: SOUTHWEST - Cily of Lubbock CoMradw Name: W.R. Conetrucdon, Inc.
Contact: Charles Farina Cor�tacl: Jayson Robinson
Phone: 6067752036 Phone:
Work to be Performed
Wd1c to be perfortned as per Ihe Final Deteiled Soope of Work Atteched and e8 per the oerms and conditions of
5ouroewell EZIQC Contract No 7X-PH-GC-10181&1NRC.
�rief IMcAc Order Desalolion:
Vapor barcie� instell
Tlme oi Parformance Estimeted Start Date:
Estimated Completion Date�
Liquldated Damaeas Will apply: ❑ WNI not e �
Work O�der Ftrnt Fixed Prke: i113,878.23
Owner Pu►cl►ase Order Number
Approvals
CITY OF LUBBOCK
_ IY � � '
N]ark McBrayer, Mayor
AT ST:
Courtney Paz, City Secretary
APPROVED AS TO CONTENT:
Kelly Campbell, Executive Director of Aviation
CONTRAC
BY:
A ' ed Representative
�—
�
.n. 4��►
Print ame
� l �Od
Address
�d�1 � � �� �l�P
City, State, zip Code
Sourcewell :e
G�R D IAN �
D�tail�d Scope ot Work
To: Jayson Robinson From: Charles Farina
No Data Input SOUTMNEST • CAy of Lubbod�
No Data Input 5401 N Ma►tin L King BMd,
No Data Input. Lubbodc,'i'X 79401
rro oese in�,� eosrr�o3s
Dal� Prinad: June OT, 2024
Work Ord�r Numb��: 130378.00
Worlc Ord�r TitN: City of LubDOdc AirpoR- Enterprise Bldg, Vapor Bartier InstaO
Briei 8cop�: Vapor barrier instap
� Prellminary � Ravls�d � Find
The tollowing iEems detail the sCope of work as diatusled et fhe site. All �uiremenis neoessary b aoCamplish the
items set foAh below ahall De considered paA ot this soope of wak.
Cut out old joints seafards. i�stall new sealants. Apply SI►emian WNtiams ConFlex Sherlestk Elastomeric Coatin9 on all
exterior bridc. Replace 60R ol black oove base.
Subjed to tl� lerms and oond'Aions oi JOC Contract TX.PII.GC•10161g WRC.
sni2o2a
aa oate --
' s (l�
f ��0!
Gi►�r�s �p� �
sooPe a worY P+o. t a 1
ennozs
Contractor's Price Proposal - Summary
Date: June 07, 2024
Re: IQC Master Contract #: Tx-PH-GC-�o�s�s-wRC
Work Order #:
Owner PO #:
Title:
Contractor:
130378.00
City of Lubbock Airport- Enterprise Bldg, Vapor Barrier Install
W.R. Construction, Inc.
Proposal Value: $��3,a7a.23
Section - 01 $2,848.84
Section - 07 $110,699.50
Section - 09
$329.89
Proposal Total $713,878.23
Thisl total represents the correct total for the proposal. Any discrepancy belween line totals,
sutrtotals and the proposal total is due to rounding
The Percentage of NPP on this Proposal: 97.21%
Contractor's Price Proposal - Summary Page 1 of 1
sm2oza
Contractor's Price Proposal - Detail
Date: June 07, 2024
Re; IQC Master Contract #:
Work Order #:
Owner PO #:
Title:
Contractor:
Proposal Value:
TX-PH-GC-101619-WRC
130378.00
City of Lubbock Airport- Enterprise Bldg, Vapor Barrier Install
W.R. Construction, Inc.
$113,878.23
Sect. Item Mod. UOM Description Line Total
Labor Equip. Material (Exctudes)
Section - 01
1 01 22 23 00 0006 WK 40' Engine Powered, Telescoping Boom Man Lik With Plalform $2,051.97
Quantity Unit Price Factor Total
Installation � 00 x 1,622.24 X 1.2649 2,051.97
2 01 74 19 00 0015 EA 30 CY Dumpster (4 Ton) "Construction Debris"Includes delivery of dumpster, $796.87
rental cost, pick-up cost, hauling, and disposal fee. Non-hazardous material.
Quantiry Unit Price Factor Total
Installation � 00 X 629.99 X 1.2649 796 8�
Subtotal for Section - 01 $2,848.84
Section - 07
3 07 00 00 00 2222 1 Wet Seal Block and windows $710,899.50
Quantity Unft Price Factor Total
NPP Installation � 00 X 89,044.00 X 1.2432 110,889.50
Subtotal for Section - 07 $110,699.50
Section - 09
4 09 65 13 13 0003 LF 4" High, 1/8" Thick, Type N Thermoplastic Vinyl Wall Base, All Colors $329.89
Quantity Unit Price Factor Total
Installation g0.00 X 3.26 x 1.2649 329 $9
Subtotal for Section - 09
Proposal Total
This total represents the correct total for the proposal. Any discrepancy belween line totals,
sulrtotals and the proposal total is due to rounding.
The Percentage of NPP on this Proposal: 97.21%
$329.89
$113,878.23
Contractor's Price Proposal - Detail Page 1 of 1
snizoza