HomeMy WebLinkAboutResolution - 2024-R0196 - Change Order No. 1, Contract 17341, With ACME Electric Company - 04/09/2024Resolution No. 2024-R0196 Item No. 6.38 Apri19, 2024 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Change Order No. 1 to that certain Contract No. 17341, by and between the City of Lubbock and ACME Electric Company for Electrical Grounding and Generator Upgrade at the Lubbock Preston Smith International Airport, and related documents. Said Change Order No. 1 is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. APPROVED AS TO CONTENT: Kelly Campbell, Director of Aviation APPROVED irst Assistant City Attorney ccdocs IIIRGS.ChgOrd-ACME Electric March 13, 2024 Passed by the City Council on A rn il 9, 2024 Office of Purchasing and Contract Management Change Order Contract No: 17341 Contractor: ACME Electric Company Change Order No: 001 Contract Title: LBB Electrical Grounding and Generator Upgrade Bid/RFP No: ITB 23-17341-TF Project No: 253.92770 "Change Order" means a written order to a Contractor, executed by the Owner, in accordance with the Contract authorizing an addition to, deletion from, or adjustment or revision of the requirements of the Contract documents, or an adjustment to the compensation payable to the Contractor, or to the time for performance of the Contract and completion of the project, or a combination thereof, which does not alter the nature of project and is an integral part of the project objective. Adjustments to "Estimated Quantities" to a line time in a Unit Price Contract do not require a Change Order. All work that alters the nature of the construction or that is not an integral part of the project objective must be let out for public bid. Description of Change (alteration, deviation, addition, or deletion) caused by conditions encountered during construction not covered by the anU UrawlnEs o( tne aroiect (attachetl aUUrtional pages rs Change Order Items: Item #1: Replace One 2 Megawatt Generator with Two 1.1 Megawatt Generators Contractor Proposal Document: Field Bulletin #1 Cost: $243,001.63 Description: Due to extremely long lead times for the 2 megawatt generator(120 weeks), the single generator will be replaced with two 1.1 megawatt generators to with a much shorter lead time(46-48 weeks). This change includes additional conduit and wiring to accommodate the additional feeder connection to the second generator, and additional concrete for a larger housekeeping pad to accommodate the second generator. This change will greatly reduce the construction duration. The lead times for the 2 megawatt generator increased after bid award. Item #2: Relocate new emergency Automatic Transfer switch from new electrical room to existing electrical room. Contractor Proposal Document: Field Bulletin #1 Credit: $191,894.76 Description: During field investigation it was discovered that there would be enough space in the existing electrical room to install the new automatic transfer switch(ATS). This resulted in the reduction in the required lengths and quantities of conduit and conductors to connect the generators and main electrical switchgear. Item #3: Install Bus Duct in lieu of multiple conduits and feeders to connect the main electrical switchgear and main electrical disconnect. Contractor Proposal Document: Field Bulletin #1 Cost: $10,446.72 Description: The design drawings called for multiple individual conduits and feeders to connect the main electrical disconnect switch to the main electrical switchgear. This change to utilize a bus duct in lieu of multiple conductors will reduce the space required for routing of the connection between the disconnect and the switchgear reducing the disruption to existing ceilings, walls and other utilities in the area. These disruptions and space conflicts were unknown prior to construction. Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs, including material quantities, material costs, taxes, insurance, employee benefits, other related costs, profit and overhead. Where certain unit prices are contained in the initial Contract, no deviations are allowed in computing negotiated change order costs. ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM. ITEM DESCRIPTION AMOLJNT A. ORIGINAL CONTRACT VALUE: $ 6 405 600.00 B. AMOUNT OF THIS CHANGE ORDER: Note: Council a roval re uired if (+/_) g50,000 $61 553.59 COST CENTER: 253.92770 ACCOUNT: 9251.30000 C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER B/A 0.96% D. AMOUNT OF PREVIOUS CHANGE ORDERS: $0.00 E. TOTAL AMOUNT OF ALL CHANGE ORDERS B+D $61,553.59 F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS E/A : 25% maximum) 0.96% G. NEW CONTRACT AMOLJNT A+E : $6,467,153.59 PUR-45 (Rev 0812018) n a aa� ynee aw IMe rboMe �e.a�a. �ne � dp�e ac�a�,.. �heaeN, as a� to�a b!�b c�aAp o�da ooaaiaea naf cm�ea.nba ro me �awadmr rar �+d d�a�a a d» Cw�e.cter..rAelber eaea. aosNequ�K1 or oiAa+r&e. In .sywar iaei0e�a ea o� �•t�� at e� or ewwlri� eed�r• Aron� t1e wak pedamed er �nod�iad fq ibt Oaa�elot wda dib C6r�e dda � 4/�9e/2024 �� ��� Apri19,2024 �a�e� �� f .3 Q a��see w: 2024-R0196__ nne.,s c� ov�ou, _ � ACME ELECTRIC r- r-, r-Y-, r-, � .-,. , v v� � ■ �i�w ■ ■ � Proposed Change Order la TITLE: PCO #001a - FB-001 Item 1- Two 1.1MW Generators DATE: PROJECT: LPSIA - Terminal Renovations JO6: TO: RS&H ATTN: Keith Nix PCO #001a - FB-001 Item 1- Two 1.1MW Generators 2/9/2024 1540 Project Manager 0.00 $ 65.69 $ - Superintendent 0.00 $ 30.00 $ - Superintendent OT 0.00 $ 45.00 $ - Foreman/lourneyman 555.20 $ 30.00 $ 16,656.03 Foreman/Journeyman OT 0.00 $ 45.00 $ - Labor Burden $ 16,656.03 35% $ 5,829.61 Total Labor $ 22,485.64 Materials $ 30,645.35 Equipment $ 5,000.00 Cat 2 MW Gen $ (974,600.00) Cat (2) 1.1 MW Gen $ 1,160,800.00 Teinert NC $ - Teinert (Concrete) $ 1,948.00 Schedule Discount $ (20,000.00) Lighting $ 2,700.00 Deduct Seismic Testing NC $ (12,400.00) Subtotal $ 216,578.99 OH/Profit 10.00% $ 21,657.90 Bond 2.00% $ 4,764.74 Total $ 243,001.63 Robby Brown Date: Date: _ � ACn/IE ELECTRIC � r„-,�, r, �--� r,., ..., _. . . . � ,.,. . . � Material Qty Mat Lab 2 MW Generator (1.00) (95.00) 1.1 MW Generator 2.00 170.00 Pl 1.00 2.40 CMP - Blue Cable U/UTP Category 5e 1,000.00 $ 440.00 9.00 1" Conduit - EMT 10' lengths 1,800.00 $ 3,486.78 91.08 1/2" Conduit - PVC 40 10' Lengths 10.00 $ 6.24 0.39 3/4" Conduit - PVC 40 10' Lengths 32430 $ 236.09 16.22 1" Conduit - PVC 4010' Lengths 762.80 $ 826.65 38.14 4" Conduit - PVC 40 10' Lengths 356.44 $ 2,045.82 24.42 1" Conduit - RMC Galvanized 10' Lengths 10.00 $ 57.12 0.78 3/4" x 12" Nipple - RMC Galvanized 2.00 $ 7.32 0.49 1" x 12" Nipple - RMC Galvanized 10.00 $ 50.40 2.85 4" x 12" Nipple - RMC Galvanized 4.00 $ 260.56 4.90 3/4" Elbow 90 Degree - EMT 4.00 $ 16.96 1.00 1/2" Elbow 90 Degree - PVC 40 1.00 $ 0.99 0.20 1" Elbow 90 Degree - RMC Galvanized 10.00 $ 106.50 4.00 4" Elbow 90 Degree - RMC Galvanized 4.00 $ 509.04 9.70 1" Coupling - EMT Compression Steel 179.00 $ 176.89 24.61 1" Coupling - RMC Galvanized 10.00 $ 35.50 4" Coupling - RMC Galvanized 4.00 $ 142.72 1" Connector - EMT Compression Steel 18.00 $ 7.19 3.51 1" Bushing Insulated - Malleable 150 Degree 2.00 $ 3.12 0.07 3/4" Female Adapter - PVC Socket to Threaded 8.00 $ 2.15 0.96 1" Female Adapter - PVC Socket to Threaded 2.00 $ 0.80 0.30 1" Female Adapter - PVC Socket to Threaded 30.00 $ 12.05 4" Female Adapter - PVC Socket to Threaded 8.00 $ 18.80 2.00 1" Field Bend No Cut Labor - RMC Galvanized 2.00 1.35 #4/0 Green Wire THHN / T90 - Copper 1,150.00 $ 4,927.75 28.03 #400 Black Wire THHN / T90 - Copper 3,800.00 5 30,137.80 150.10 #500 Black Wire THHN / T90 - Copper (4,000.00) $ (32,872.16) (175.00) #12 Black Wire THHN / T90 - Copper Solid 2,118.91 $ 303.00 12.71 #12 Blue Wire THHN / T90 - Copper Solid 118.91 $ 17.00 0.71 #12 Green Wire THHN / T90 - Copper Solid 356.73 $ 51.01 2.14 #12 Red Wire THHN / T90 - Copper Solid 118.91 $ 17.00 0.71 #12 White Wire THHN / T90 - Copper Solid 356.73 $ 51.01 2.14 #2 Wire Splice Compression for Copper - Copper 1.00 $ 1.81 0.21 6" W Tape Underground Warning Detectable - 1000' Roll Red' 0.25 $ 35.24 0.19 1" 2-Piece Strut Clamp - Universal Steel Zinc Plated Break-A, 200.00 $ 377.74 14.00 Custom Spacers - Plastic Sheets (4x8) 6.22 $ 1,555.00 9.33 Generator Leveling 1.00 8.00 Generator Put Into Place 1.00 32.00 Generator Receive and Unload 1.00 16.00 Generator Testing 1.00 40.00 _ � ACME ELECTRIC Company 25' H x 5.90> 2.40" Pole Round Tapered - Steel 1.00 $ 250.00 7.00 Anchor Bolt Template - 4 Hole to 1" Bolts 1.00 0.88 24" q5 Re-Bar Ring 5.00 $ 175.00 2.50 24" Pole Base Auger (Linear Foot) 8.00 $ 1,200.00 2.00 24" Sono Tube (Linear Foot) 2.50 $ 187.50 0.56 #S Re-Bar (Linear Foot) 40.00 $ 60.00 2.50 Concrete 3000 Lb (Cubic Yard) 58.29 $ 8,160.46 51.00 Excavation (Cubic Yard) 138.22 $ 2,073.33 Pole Base Auger Setup 1.00 0.38 Setup Concrete Pour - Per Pole Base 1.00 0.50 Waste / Haulage (Cubic Yard) 82.93 $ 829.33 #2 Wire Bare - Copper 15.00 $ 23.97 0.26 3/4" Ground Rod Copper Clad 10' 1.00 $ 38.48 1.25 3/4" Ground Rod Clamp w/ Hex Head Screw 1.00 $ 4.05 0.19 NLP #29 Cable 77.72 $ 505.34 1.55 Belden Cable (Generator) 1,000.00 $ 3,526.00 23.00 NLP #1250 - 3/4"x10' Ground Rod 2.00 $ 110.00 2.00 NlP #TR-1 1.00 $ 450.00 5.00 $ 30,645.35 555.20 � BORDER � STATES Border States - LBT 520 East 50th Street Lubbock TX 79404 Phone: 806-765-5741 ACME ELEC—NON TAX 108 E 82ND ST LUBBOCK TX 79404-7018 Cust Item Item Material MFG - Description 000010 - Type P1 - Pole and fixture Quantity Quote Page: 1 of 1 Quote: 27388145 Sold-To Acct #: 56317 Valid From: 02/07/2024 To: 02/14/2024 PO No: Airport Type P1 Payment Terms: 1.0 % 10th prox net 25th (25) Created By: .��sh��a Rar � Tel No: 806-712-1006 Fax No: Inco Terms: FOB ORIGIN Ship-to: ACME ELECTRIC 108 E 82ND ST LUBBOCK TX 79404-7018 Price Per UoM 1 EA 2,700.00 / 1 Total $ State Tax $ 0.000 % County Tax $ 0.000 % Local Tax $ 0.000 % Other Tax1 $ 0.000 % Other Tax2 $ 0.000 % Other Tax3 $ 0.000 % Tax Subtotal $ 0.000 % Net Amount $ To access Border States Tertns and Conditions of Sale, please go to htt ps://w w w. borderstates. com The quoted sales tax is an estimate only based upon the information provided in this quote and will be finalized at the time of Invoice based upon the material purchased, quantity purchased, and delivery location. Shipping and handling fees in this quote are an estimate only and will be finalized at the time of Invoice. EA 0.00 0.00 0.00 0.00 0.00 0.00 Value 2,700.00 2,700.00 0.00 2,700.00 All clerical errors contained herein are subject to correction. In the event of any cost or price increases from manufacturers or other suppliers, caused by, but not limited to, currency fluctuations, raw material or labor prices, fuel or transportation cost increases, and any import tariffs, taxes, fees, or surcharges, Border States reserves the exclusive right to change its pricing at the time of shipping and will provide notice of any such change to its customers prior to costs being incurred. TEINERT COMMERCIAL BUILDING SERVICES 1402 Crickets Ave Lubbock, Texas 79401 (806) 744-2801 FAX (806) 744-2401 PROJECT: 21046 LPSIA - Electrical/Generator Upgrades PROPOSAL REQUEST NO. PROPOSED CHANGE ORDER DATE: 02/O9/24 DESCRIPTION OF WORK TO BE PERFORMED: PCO If1CIUd@S COSt t0 fUffllSh afld if1St811 f8VIS8d COf1C�@t@ P8d 8fld f@If1fOfClf19 St881 P@f Field Bulletin #1. Item Concrete & Rebar for Generator Pad Original Generator Pad Quote included in GMP Payroll burden Subtotal Overhead & Pro�t Unit I Labor l Labor I Material I Material I Sub I Sub I Total 1 Is 1 Is 38.00% 10.00% 14, 375.00 14, 375.00 14, 375 7,150.00 7,150.00 7,150 0 TOTAL *To be funded from Chanqe Order APPROVED: 7,225 723 7,948 DATE: Brad Onischuk From: qholder rentfroconstruction.com <qholder@rentfroconstruction.com> Sent: Friday, February 9, 2024 11:48 AM To: Brad Onischuk Subject: Re: 20231874012_LBB_Elect Grounding & Generator Upgrades Field Bulletin #1 Original Pad quoted 21' x 47' _$7,150.00 Pad on ES111 24' x 58' _$10,000 Double pad to new dimensions 24-2 x 82-2 =$14,375 So difference from original $7,225 Is that how you want it to be shown? Thankyou, Qwynn Holder Vice President � I RENTFRQ PO BOX 1175 � Shallowater, TX 79363 J 806.632.2136 From: Brad Onischuk <bonischuk@teinert.com> Sent: Monday, February 5, 2024 10:36 AM To: qholder rentfroconstruction.com <qholder@rentfroconstruction.com> Subject: FW: 20231874012_LBB_Elect Grounding & Generator Upgrades Field Bulletin #1 Qwynn, See attached revised drawing for the Generator Pad. Original Pad size was 24'-0" by 58'-0" shown on ES111, Revised pad size shows 24'-2" by 82'-2". Please provide pricing for revised pad size and rebar needed to complete. Thank you, Brad Brad Onischuk Project Manager �TEINERT / Teinert Construction 1402 Crickets Ave 1 Lubbock, TX 79401 806.744.2801 Office I 806.744.2401 Fax I 806.317.4511 Cell www.teinert.com From: Robby Brown <robbv@acmeelect.com> Sent: Friday, February 2, 202410:38 AM To: Brad Onischuk <bonischuk@teinert.com> Cc: Barry Brown <bbrown@acmeelect.com> Subject: Fwd: 20231874012_LBB_Elect Grounding & Generator Upgrades Field Bulletin #1 Brad, Can you get me a price on the additional concrete work associated with the attached PCO? Sent from my iPhone Begin forwarded message: From: "Nix, Keith" <Keith.Nix@rsandh.com> Date: February 2, 2024 at 10:34:25 AM CST To: Barry Brown <bbrown@acmeelect.com>, Robby Brown <robby@acmeelect.com> Cc: Kelly Campbell <kcampbell@mylubbock.us>, cfarina@mail.ci.lubbock.tx.us, "Neph, Elliot" <Elliot.Neph@rsandh.com>, "Chitwood, Drew" <Drew.Chitwood@rsandh.com>, "Westerbeke, Steve" <Steve.Westerbeke@rsandh.com>, "Barnett, Hunter" <Hunter.Barnett@rsandh.com> Subject: 20231874012_LBB_Elect Grounding & Generator Upgrades Field Bulletin #1 Barry & Robby, Please see attached for Field Bulletin #1 and associated revised documents to reflect the changes that we have been discussing regarding the two 1.1 MW generators, ATS switch relocation, and use of Bus Duct for the MSB-1 connections. Please prepare a PCO to reflect the cost changes associated with these revisions. Feel free to give me a call with any questions. Thanks Keith Keith Nix, PE, LEED AP Vice President O 904-256-2424 � M 404-276-0695 Keith.Nix@rsandh.com rsandh.com � Facebook � Twitter � Linkedln � Blog Stay up-to-date with our latest news and insights. �ARREN � POWER SYSTEMS DIVISION 15 N Meridian Ave • Oklahoma Ciry, OK 73107 •(405) 947-6771 • Fax (405) 945-3486 8 FEB 23 Warren Cat is pleased to offer the following proposal for your consideration: Two new Caterpillar diesel-fueled, standby generator set, equipped as follows: • Powered by Caterpillar diesel engine operating at 1800 RPM ■ EPA Certified • 1000 kW at site with de-rate, 277/480 VAC, 3 phase, 60 Hz (1100 kW before de-rate for altitude) • Weather protective, sound-attenuated enclosure, 85 dBA @ 23 feet • 48-hour fuel tank, subbase, dual wall fuel tank, UL listed • EMCP 4.4 electronic control panel, on-board paralleling controller • Anti-condensation alternator heater • Electronic governor system • Digital voltage regulator • Engine jacket water heater • Battery charger, UL, 10 amp • Engine starting batteries, with rack and cables • Mainline circuit breaker, UL 100%-rated 1600 amp. E.O. • Remote annunciator panel (shipped loose installed by Others) • Remote emergency stop button (shipped loose installed by Others) • Initial fill of oil and coolant • Caterpillar 5-year platinum standby warranty • Factory .8 PF load test • Engine literature kit (O&M) • Factory required standard startup inspection • NFPA-110 load bank test, 2-hour • IBC Seismic certification • IBC Seismic vibration isolators ��ARREN �POWER SYSTEMS DIVISION 15 N Meridian Ave • Oklahoma City, OK 73107 •(405) 947�771 • Fax (405) 945-3486 Automatic Transfer Switches: � �� Ta At�vm�c Tre�er 5wi�h, ZT5 T�Series, �SA0080PS1517F9SXlI 81701�, Open Transitinn, 4 Pde, 440-480V 3 Ph System Vafp�e, Switdred Neutral, lyema 1 Endogure Me�1�im1 lugs -(3) p8-1/0 AWG Ground Bar TijiC embedded rne[enng (ZTS/levd 4) l�Acx�s RTU + Etherr�et�IP Comrnurtiwtio� 5a�ces On BvtRam UL lOpe lis�ed � To 480VAiC at 50/60Hz 5eisr�sc c�d To IEEE�33-2005 at HTGH levd Wrth 2_5 amQliTirr�on fat�ar 5eesngc �erotied To i�C �015 at Ip=15 F� rjh less tha� Or �qua1 To 1 Miuvprucetxar auifrated 41Aair�ained test switch PrQgramrrea6le �cerds�r daily, 7-14-2&365 days user- 5elecrable, wdh or w�tlraut bad E+�ent log oi last 250 ev�ms i.� for 5nuroe i& Sour�e -2 - Position ind'ication LIDfar 5ourne 1 and 5u��ce 2- Source avaifabiliry indicatinn �ne s[art timer -adjusrable up to 60sec Phase r�aan ser� af Source 1& Souroe 2 UnderfDv+er rdtag�e sensing 3-phase Snurce i& Scurce 2 Adp�tadlr pver/under fre�ency sensor-5aurce 2�and 5aurce 1 Frequericy hdic�an - on the canvoller In Phase �AnniEor between Source 1 and 5aauce 2 to allow transfer�►itt► �ejdisa6le M�roproce�sor acdrrated Caetvnit/no cammit on transf�ringto 5ource 2�vith enal�IeJdsabie Adj�a[able �ime delay on vansfer to Sour�e 2-��tabletime delay on retrar�fer to 5aurce 1 Engine sta�/[ad �ljustable cpal down timer Voitage imhalan�e between pF�es-applies to 3-phase only 8y�s irar� timer Tun[tion-soti switch in cpntroller Pad�age F-�irx 2 NU and 2 NC Sl pasioun a�nc cornacts 2 NO and 2 HC S2 pnsitiun a�nc contacts 3 d�i[a1 ir�rts, �r�eprcgammed: remooe test on loa�peak shave input, remau manuat re�arffifer input, load shed ATS input 3 d�ita! ir�puts, reserved: if'selector svrntd�' op[ion not ind�ded these are tree #or �aer 4[f�ita! o�uls, preprogarnmed: Sl avadable output S2 arailable ou��t. eleyamr pre-trar�sfer output, mo[or pre-Vansfer output 1 d�gital ou�ur, res�rrred: if'Transier Alarm' option not included tf�e are free for user Utt�er Options: lCeyed Sdettar 5witch (Start jAuto/Off/Test) -�ARREN �POWER SYSTEMS DIVISION 15 N Meridian Ave • Oklahoma City, OK 73107 •(405) 947�771 • Fax (405) 945-3486 Automatic Transfer Switch, ZT5 TSeries, IS�lD1�IIP�5i51Tp�%]i 1200 A, Open Traruition, 4 Pole, 4A0-48�V 3 Ph 5ys[e� Vdr,�ge, �+�Frl�e4 Neutral, Herrtia 1 Enclosure Mec�cal Eugs - (3) �&1/OAWG Ground 8ar Tl/fC em�aedded metenrig [�'SJI�.ve14) Mo�us R1U + Ethemet/IP Commuiticatior�s Saurces On Battom UL 1{]t� listed up To 48(fVAC at Sq/60FIz 5eis�ic certified To IEEE-fi93-20U5 at HlGH ievd With 25 ampli�ica[ion factof 5eisrnic terdFied To IBC-2015 at Ip=15 Far rf h less [han Or equaf To 1 IMicropracessar aeti�rated fM�irsrained test swiuh P►�pgrammable ex�dser daily, 7-142&3fi5 �s user- sde[ta�te, w�th ar wnthotst load Event {og of last 250 events lID f� 5aurce 1& Source -2 - Pwsition indE�tion lEp for Saurce 1 and S�rce 2- Source availabiCtty indicatinr� E�ne start tim� -adjusiable up to GOsec PF�ase romtion sensing of 5ource 1& 5aircx 2 Under/Over voltage sensing 3-phase Sn�uce 18� Sasae 2 �tahle wer/und� irequency sensor-Soiace 2,aru3 So�e 1 Frequency Ir�dication - on the coMrdler In Ph�e Mw+itor between Source 1 and Sa�ce 2 to al+uw vansfer-vrit�� er�abfe/�sable 1V!'�rrqprocessor activated Cnnvs►it/no cammit on transferring to Snurce 2-with �at�disabte Adjus[able time delay on transfer ta 5nurce 2- Ac�«ta61e tirnc delayt on retrdns€er to Source 1 Er�se stop/caol adjustable cool down timer Valtage imbalante beiween phases-applies to 3�i�aae only �ypass trarn,ier tim� fun�an-scii# switch in cormoller �adtagP F-Flex 2 HU and 2 P1C Sl position a�nc contatEs 2!YO asu12 PiC S2 �sition ainc conta[ts 3 digitaf ir�u[s, preprogammed: remote test on load�peah sf�ar►e input, rem�e manual retransfer input, load shed ATS input 3�gitaf ir�pufiz, reserved: if'selector swrtd+' option nat in[luded tl� are frce for uscr 4 d�ira! outputs, preprogammed: Si avatlable ou�u� 52 av�aiiabte ou� elevator pre-transFer output, mo[or pr�vansfer ou[put 1 d�gira! output, reserved: if'Transfer Alarm' ap�ian rw� indpded Tt�ese are iree far us� Other O�orw: Keyed Selector Switch (StartjAuto/O!f/Test] �ARREN �POWER SYSTEMS DIVISION 15 N Meridian Ave • Oklahoma City, OK 73107 •(405) 947�771 • Fax (405) 945-3486 Docking Station: ftem Qty Oeuription Total Price 1 1 Im8Di30980rFMlFCM[.Ip[ 3200A, 480Y/277V, 3R14W, 6�ptr, 45kNC CON57RUCf10lt TYI'E 3A (NON-WAUFIN) SERVICE EMHI1WfF RAl'E4 NO INCOMING IYPE MWl7H� �AN BUSBAIt MATEAIAL SLLVER-WASF�p OPPApt AOCES58lLrtY: FROIir ACCiSSON1Y OR�xTATION: �NCOMING ON IfFT AUGNMEHT: FROIli/IIEAR GROUND RATIN(i: FIIILY MTFDP6t 1A891 aeurwu w►nwc: � rruu� PAINf COLDX:1W4f 61 C7tAY, 9AOO!}I eanr�Ens e��a sEcnoNs: ve� uia9i RODfM BARRIER: NO �IRMEPLATE DETAIIS: PER IPIATiLi' S!D INCOMING FffD� 607TbM TECFiMCJ1LlWTES: This unit shal I be a lA 891 Cert'died �ent Sw4di6aa�d.11ydess spedfied all �cuit breakers sAall be 8096 rated, 3 pole, faed mwnt�, and rated (w the fu0 SCCR d the ewitr.i�boaid. Deuioes equipped with an ac Ya�dt ma"�e switcfi are in compl'wnce wRh NEC 2020 Artide 290. W. TOT/LL SECilONS / SHIPPING SPLfTS: 2 OVFRAIl FOO'iPq1XT: 90'71:72"W � 42"D SECTION 1: 90"H x 36• W x 42'D - 320[IA BNFi1�(i 1lVft}f MALE CAMS/LU(iS SECTION 2: 90"H x 36'1N x 42'D - 3TOQA BREAi�R HIIIH FEMALE GMS/Lk763 PLE0.SE PIOTE f(1q7PRINf ABOVE pOES NOi Ii1L'I.UOE TYPE 3p EKIENSION HEQUFRED PDR OUIp60R- RATED UNIiS FWAiFqp7PqlNf TO BE t7�{'EpMiAED DURING DETAIIED EWGINEERING DEYICES- (I) 3200A Main Breaker, ABB EMA14 lA 1066, 8ectronic Trip Unit, LSIG, Arc MaiMenance Switdy Sh�mt Trip 120VAC, Campression lugs {oovided pei Sales draw6�gs (I) 3200A Main Breaker, ABB ��1Nf, lA 1066, 6ecannk Trip Unit LSlfi, Arc Mal�nemnce Swhd�, Campressim Lug prwided per Sa1es erarirKs ADDff10N/LL FEANR�.S: GENERATOR CONNEC1iUN DEfA1L5 (i) LOT OF MAf.E p1Af-LOG( RFCfPfAIXFS �8) SETS OF BROWN/ORAXGE/YEil(1W PHASE RHiPf�, �,s AND WHITE NEVfRA1 RECEPTq!]�5 QF APPLIU�BkE) (4) GREEN GROuI� RECEPtAqF3 LOAD BANK OOPlNECIION DEfA¢S (1) l0T OF FEMALE CJIM-IOCK RECEPTACtFS (8) SEiS OF BROWNjiYItAfIGE�YFiIQW PFIASE RECEPTAClfS, AND WHITE NEFliAA1 RECEPTACEES QF APPLICJIBLE) (4) GREEN GROUIm RECEPFACLFS -�ARREN 15 N Meridian Ave • Oklahoma City, OK 73107 •(405) 947-6771 • Fax (405) 945-3486 2- 1000 kW (at site with de-rate) gensets amount 1-1200A and 2— 800A ATS amount ................... Docking station amount ......................................... ............................................................ . $1.100. 000. 00 .. .. ....... .. ....... ... ...... ....... ... ........ .... .. ... .... ..... . $45. 200. 00 . ..... ....... .......... ......... ... ..... ....... . ..... ... .... ..... . $94. 000. 00 Options: OPTION COSTS: 1) Platforms with Steps and Handrails add Each generator ...........................................$30,400.00 • If 3rd Party Seismic Certification is needed for both enclosures ..............................$15,000.00 • If 5-year warranty is needed for the enclosure for both enclosures ........................$21,400.00 Comments: • NETA Testing by Others • IR Testing by Others • Factory-witnessed load bank test not included. .8 PF load test report will be provided. Supply chain constraints have severely limited factory witness testing. Lead times: Submittals take 4-6 weeks. After Release to Order: Generator: From Release to Order: 42 - 45 weeks for open generators. Ship to the jobsite: Late Q1 2025 to Early Q2 2025. ATS's: 12 weeks Generator tap box: 24 weeks FOB: Jobsite Terms: Net 30 days with approved credit DOES NOT INCLUDE INSTALLATION, WIRING, FUEL, OFFLOADING, OR ANY APPLICABLE TAXES Quote is valid for 30days Our equipment proposal is described in its entirety above and includes no material or services that are not specifically stated. -�ARREN I�POWER SYSTEMS DIVISION 15 N Meridian Ave • Oklahoma City, OK 73107 •(405) 947�771 • Fax (405) 945-3486 Steve �arsons Electric Power Sales Representative Warren CAT (405) 694-5959 Steve.Parsons(c�warrencat.com TERMS AND CONDITIONS 1. AGREEMENT. Warren Power & Machinery, Inc. doing business as Warren Cat ("Seller') offers to sell the products and materials (the "Goods") indicated on the face of this Sales Agreement, Sales Order or Sales Quotation (the "Order") to the purchaser or buyer ("Buyer") indicated on the Order in accordance with these Terms and Conditions. Submittal of a purchase order for the Goods by Buyer, execution of the Order by Buyer, or any other express acknowledgement of the Order by Buyer constitutes acceptance of this offer, which offer and acceptance constitute a legally enforceable agreement ("AgreemenP') between Seller and Buyer. Any additional or different term or condition on Buyer's purchase order or acknowledgement fortn, or otherwise communicated in writing or orally by Buyer in accepting this offer, is deemed to be a material alteration of this offer and is objected to and rejected by Seller. 2. PRICE. The prices wntained in this offer are firm for thirty (30) days from the date of this offer. The prices are exclusive of all sales, use, excise and other similar taxes. 3. TERMS OF PAYMENT. Unless othenvise stated on the face of the Order, Buyer shall pay Seller for the Goods and all applicable taxes within thirty (30) days from the date of Seller's invoice. Any unpaid amount bears interest at a rate equal to the lesser of (a) 18°% per annum, or (b) the maximum rate permitted by applicable law. 4. DELIVERY. Delivery of the Goods is Ex Works (Incoterms 2010) Seller's facility indicated on the face of the Order. Any delivery date on the face of the Order is approximate, and Seller has no liability for failure to deliver the Goods by the delivery date. 5. DISCLAIMER OF WARRANTIES. EXCEPT FOR THE WARRANTY OF TITLE, SELLER MAKES NO WARRANTIES OF WHATSOEVER NATURE, EXPRESS OR IMPLIED, CONCERNING THE GOODS, IT BEING THE INTENTION OF SELLER AND BUYER TO NEGATE EXPRESSLY AND TO EXCLUDE ALL WARRANTIES, INCLUDING ANY IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR ANY PARTICULAR PURPOSE, WARRANTIES CREATED BY ANY AFFIRMATION OF FACT OR PROMISE OR BY ANY DESCRIPTION OF THE GOODS AND ANY OTHER WARRANTIES WHATSOEVER CONTAINED IN OR CREATED BY THE UNIFORM COMMERCIAL CODE OR SIMILAR LAW AS ADOPTED IIV THE STATE OF TEXAS OR ANY OTHER JURISDICTION. BUYER WAIVES ANY CLAIM IT HAS AGAINST SELLER FOR ANY LOSS, DAMAGE OR EXPENSE CAUSED BY THE GOODS OR BY ANY DEFECT IN THE GOODS, USE OR MAINTENANCE OF THE GOODS OR SERVICING OR ADJi1STMENT TO THE GOODS, AND PURCHASES THE GOODS AS-IS. Seller will provide commercially reasonable assistance to Buyer in enforcing any manufacturer's warranty. 6. FORCE MAJEURE. Seller may suspend perfortnance under this Agreement during the occurrence of a delay arising from causes or events beyond Seller's reasonable control, including acts of God, fire, war, strike, loss or shortage of transportation, lockout or commandeering of raw materials or products or plants or facilities by a govemmental authority. 7. PATENT INDEMNITY. Seller shall, at its own expense, defend any suit or cause of action against Buyer for alleged infringement of patent rights arising from the sale or use of the Goods and indemnify and hold Buyer harmless from any damages, liabilities, claims, losses and expenses (including reasonable attomeys' fees) paid or incurred by Buyer in connection with the suit or cause of action. 8. CANCELLATION. If Buyer desires to cancel or change any portion of the Order, Buyer may request same in writing to Seller. Seller may, in its sole discretion, accept or reject any request and may charge Buyer a reasonable fee and any costs Seller incurs related to the change or cancellation as a condition to accepting any cancellation or change. 9. GOVERNING LAW, JURISDICTION AND VENUE. This agrcemcnt is govcmcd by and construcd in accordancc with thc laws of thc statc of Tcxas applicablc to agrecmcnts madc and to bc performcd cntircly within that statc. This agrccmcnt is performablc in Midland County, Texas, and buycr waivcs thc right to bc sucd clscwhcrc. Without cxcluding any othcr jurisdiction, buycr agrccs that thc statc and fcdcral courts of Tcxas locatcd in Midland, Tcxas havc jurisdiction ovcr any procccdings in conncction with this agrccmcnt and submits with respcct to itsclf and its property to thc jurisdiction of any likc court for thc purposc of any suit, action, procccding or judgmcnt rclating to or ansing out of this agrcemcnt. 10. LIMITATION OF LIABILITY. NOTWITHSTANDING ANY PROVISION OF THIS AGREEMENT TO THE CONTRARY, NEITHER PARTY (NOR THE OFFICERS, DIRECTORS, EMPLOYEES OR AGENTS OF EITHER PARTY) IS LIABLE HEREUNDER TO THE OTHER IN ANY ACTION OR CLAIM FOR CONSEQUENTIAL, INCIDENTAL, INDIRECT, EXEMPLARY, PUNITIVE OR SPECIAL DAMAGES, WHETHER THE ACTION M WHICH RECOVERY OF THE DAMAGES IS SOUGHT IS BASED ON CONTRACT, TORT (INCLUDING SOLE, CONCURRENT OR COMPARATIVE NEGLIGENCE), GROSS NEGLIGENCE, INTENTIONAL OR WRONGFUL ACTS OR STRICT LIABILITY. EXCEPT TO THE EXTENT PROHIBITED BY LAW, ANY STATUTORY REMEDIES INCONSISTENT WITH THESE TERMS ARE WAIVED BY THE PARTIES. �ARREN OW_ER _S_YS_TEMS DIVISION 15 N Meridian Ave • Oklahoma Ciry, OK 73107 •(405) 947�771 • Fax (405) 945-3486 I I. IIVDEMNITY. BUYER SHALL PROTECT, DEFEND , INDEMNIFY AND HOLD HARMLESS SELLER AND ITS AGENTS, AFFILIATES, EMPLOYEES AND ASSIGNS ("SELLER GROUP") AGAINST ANY AND ALL CLAIMS, DEMANDS, AND CAUSES OF ACTION OF EVERY KIND AND CHARACTER WHATSOEVER, INCLUDING ATTORNEY'S FEES, ARISING IN FAVOR OF ANY PERSON, INCLUDING EMPLOYEES OF BUYER, ON ACCOUNT OF PERSONAL INJURY OR DAMAGE TO PROPERTY OCCURRMG, GROWING OUT OF, INCIDENT TO, OR RESULTING FROM THE SELECTION, PURCHASE, OWNERSHIP, DELIVERY, USE, OPERAT[ON, MAINTENANCE, REPAIR, OR RETURN OF THE EQUIPMENT WHETHER SUCH LOSS, DAMAGE, OR INJURY OR LIABILITY ARISES WHOLLY FROM OR IS CONTRIBUTED TO BY THE NEGLIGENCE OF THE SELLER GROUP AND WHETHER CAUSED OR CONTRIBUTED TO BY IMPERFECTIONS OR DEFECTS OF THE GOODS, WHETHER LATENT OR PATENT, OR FROM ANY OTHER CAUSE WHATSOEVER. 12. DESTINATION CON'CROL STATEMENT. If exported, these commodities, technology or software were exported from the United States in accordance with the Export Administration Regulations. Diversion contrary to U.S. law is prohibited. This includes the use of these goods in the support of exploration or production for deep water, Arctic offshore, or shale oil projects that have the potential to produce oil in the Russian Federation or in maritime area claimed by the Russian Federation and extending from its territory. -�ARREN �POWER SYSTEMS DIVISION 15 N Meridian Ave • Oklahoma Ciry, OK 73107 •(405) 947�771 • Fax (405) 945-3486 6 SEP 23 Warren Cat is pleased to offer the following proposal for your consideration: One new Caterpillar diesel-fueled, standby generator set, equipped as follows: • Powered by Caterpillar diesel engine operating at 1800 RPM ■ EPA Certified • 2000 kW at site with de-rate, 277/480 VAC, 3 phase, 60 Hz • Weather protective, sound-attenuated enclosure • 48-hour fuel tank, subbase, dual wall fuel tank, UL listed • EMCP 4.3 electronic control panel • Anti-condensation alternator heater • Electronic governor system • Digital voltage regulator • Engine jacket water heater • Battery charger, UL, 10 amp • Engine starting batteries, with rack and cables • Mainline circuit breaker, UL 100%-rated 3000 amp • Remote annunciator panel (shipped loose installed by Others) • Remote emergency stop button (shipped loose installed by Others) • Initial fill of oil and coolant • Caterpillar 5-year platinum plus standby warranty • Factory .8 PF load test • Engine literature kit (O&M) • Factory required standard startup inspection • NFPA-110 load bank test • IBC Seismic certification • IBC Seismic vibration isolators • 1 st years routine maintenance services • Spare filters and fuses •�ARREN �POWER SYSTEMS DIVISION 15 N Meridian Ave • Oklahoma City, OK 73107 •(405) 947�771 • Fax (405) 945-3486 Automatic Transfer Switches: q[y 1)esr�+ptior+ To Autcnnetic Trensfer Sw�ch. Ii5 T�eries, ISAOQ80P51SiTF95XlI $QO A, Open Transiti�n, 4 Pole, 44�48W 3 Ph 5rrstem Ynit�g�e, Sw� Neutral, Nema 1 Endps�'e IIM1e�hardol I�s -(3) A8-1/0 AWG Graund 8ar T�FiC errs�edded metennG (ZTS/levei 4) Mo�es RTlJ + Ethemet/IP Commurucatiaris Saurces On Bottam UL 1008 listed up To 480VAC at 50/fiOFlx Seisrruc rerti�ied To IEEE-69�-2005 at HIGH te�rai WRh 25 ampli�ation factar 5eisrrac oertified To 16C 2015 at Ip=15 For r/h 6ess than Or equa! To 1 Microprocessor activated Mair�i►�edtest swiuh Pr�o$ramvr�able exerds�r daily, 7-142&365 daSrs user- sde�table, w�h or ►nritt�out bad Cvrnt log of last 754 everits EIDfor Source i& Source -2 - Position ind'ication LED far Spurce 1 and Sps�rce 2- Sauce availabiffty indimtinrfi 6�gine start timer -adjustable up to 60sec Phase rotation sens'u�g of Source 1& Soiane 2 Un�1er/�ver voltage ser�sir� 3-phase 5o�uce 1� Sauroe 2 Adj�a[able over/under frequency sensor-Saurce 2�and 5ouroe 1 Frequer+cy tndication - on the caamoller In Phase Morotor 6etwe�n Source 1 and 5rnxce 2 W afiaw uansfer-with enat►le/disa6fe Microprocessar activated Commit/nocommit on �ar�sferringto Sauroe 2-with ena6le/disable Adju�hle t�me delay on vans#er to 5purce 2-�usrabletirr�e deWy on retransFer to Source 1 Cx�ne stap/coad adjustable c�l ciown timer Voitage imbalance between phases-applies to 3-phase onJy Bypass tr.�rofer timer fun[tion-soFt switch in cdrstrol]er Pad�ge F-Flex 2 NO ar►d 2 IdC Si position a�nc conta�ts 2 HO and 2 PIC S2 position a�nc contacrs 3�itaf ir�uts, preprngammed: remo�e test on 8pat!/p�k shave �np�a, remoRe mar�l re�ransfer input, toad shed ATS �nput 3�gitaf inpu#s, reserved: if 'selector s�n►itdti' option noi induded these are free for user 4 d�giRaf outputs, preprogammed: Sl ava�able ou�� 52 auaila6te outpait, ele�tor pr�trar�s€er ou[put, m�tur preiraruie� au[put 1 t�gital output, reserved: if 'Tra�uier Narm' opt�on not in8uded tt�ese are Tr�e� for user Other �a�s: Keyed Sdector 5witch (Start�Auto/(Nf�est] -�ARREN �POWER SYSTEMS DIVISION 15 N Meridian Ave • Oklahoma Ciry, OK 73107 •(405) 947-6771 • Fax (405) 945-3486 Automatic Tr�ts�er 5w�t,ccfy �i�'a T�eries, ZSAOIZpPS3S17F9SXX 1200 A, Open Trargi�i�n, 4 Pale, iW448U'l13 Ph 9ystern Vdr�ge, Sw�he[1(tleutral. Nefita 1 Er�clos�se Mecharncal lu�s -(3) �1/0 A1MG Ground 6ar Ti/fC emhedded rnetenr� Rl�teuH �j Modbus RTU + Etherr�IP Commu�a�ar� Saurces On BuRtarn UL 10�8 listed � To 480VIUC at SD�fiOF�e Seismic certified To fEEE�20Q5 at HiGH 6evd N� 25 amplification factor Seismic certified To IBC 2015 at 1�15 For z/h {�ss than Or eQual To 1 Micropracessar ataraterl lll�iru�ir� Cest sr�itrir Programmable e�rdser daily 7-142&365 days user- selert�ble, wit�� or wittwist ioad Ev�t log of {ast 25� evcn[s LED for 5aurce 1& Source 2- Pa�ikian indir.ation LED for Spuroe 1 and Sar�ce 2- Sa�r,e ava.i�abifity indiatifln Engine s[art timer -adjus�aWe up to FQset Phase ro�tion sensi�g aF SoRroe 18� Sa�a� 2 Under/Over vo�tage sensing 3-pFr�se Source 1& Sa�ace 2 Adj�table over/und� Trequer�cy sensar-5n�rce 2-and 5n�rc� 1 Frequenry Indiwtipn - on the �dler In Phase Maniror he[vreen Souroe 1 and Sc�ce Z ou a�low �ansfer�th c�ble/dsabte Microprocessor activated Carmsit/no commit onirar�ferringto Source 2-with enable/dsable Ad�ustable time delay on uansfer to Souroe 2- A�justable time delay on retrar�r ta 5uurce 1 Er�ne s[op/cqd adJus[able 000l rfnwntimer Voftage imbalar�e between �-appiies to 3�phase only Bypass transfer timer fun�tion-saft switch in ca�roller Padcage F-flex 2 NO and 2 PIC S3 pasition ainc oo�rtat� 2 NO and 2 NC S2 position ainc contacu 3 d�ital Inputs, preprpgammed: rrmute tes[ on fqw�p�rah shave ia►put, remoie manual reuansfer input, load shed ATS irput 3 dgital inpu[s, reserved: if'selector swiod�' option na[ induded th�e are free for user 4 dgital outputs, preprogamme� 51 araaable o�q►ut $,'t available output, elevat� pr�[ransFer ou[put rnotor pre-vartsfer output 1 dgital output reserved: if'Tra�ufer 1Uarm" op�an not iriciuded these are free for user Other Upt#ons: Keyed Selectnr 5wrtch (Start�Auto�af€/Test) •�ARREN � POWER SYSTEMS DIVISION 15 N Meridian Ave • Oklahoma City, OK 73107 •(405) 947�771 • Fax (405) 945-3486 Docking Station: ftem Qty Desuiptipn Totel Price 1 1 IID6nFr3ui8fIM-�IRkfC1Y1C-Iu[ 320W44S01'/2TJV. 3PrNW, 6p� 65WC COTp7iillCflfllt iYPE 3R (NON-WAII(-IN) SfRY�CE E7YfBANCE NA7E]! q0 INCOMIMG 7YPE MULfTPLE MA�i BUS6AR MATtllIAL SILY�A-WASMED OOPPER Ap�&UIY: fiOpNTACCESS ONLY ORIENTATION: INCOMING ON IEFT Rl.1Gf141ElIf. Ffiq7fi/RE/1R GR01NIf] R/1T1NG: f1ALY qAFEQ PER lA 891 NEU7RAl RATIPlG: ]�[!!i PFIASE PAqff COkAR: NL5161 i+71AY, SM�TH BA)iR1FRS BEiWEH/ SECT1pNS. PER UL 891 ROOf.P(f eIiRR�t NO NAMFPIATE DEfA1LS: PFR %WITOS STD INCt}MING fgi]' 6QTT�1 TECFII�CJIL IIGIPS: 7Ais �sut sAaf! be a 1R 891 Certfied pcadtrmt Swrtdiboard. Unless speaHed all maiii breakers �nfl hel�: r,e�rt►, 3 pole. {ccad mwaueQ and rated for tl�e fup SCCR d tlK �ri[d�6�i� 6criaes eq��ped with an arc fauk mae�oena�xe switdi are u� compfianQ wi1� NEC ZO7D Artxye 240.87. TOTAL SECiY1l6 / SI�WNG SPlJiS: 2 OYERALL �7Pp1Nfi- 90"H x 72"W r 42"D 5£Cf10l11. 90^H x 36"W a 42'D - 3200A BREAKfR WIfH MALE CAMS�F.UIiS SECROh 2: �'H x 36'1N x 42'D - 3200A BRE/11�R W n'FI FEMALE CAMS/LUQS RiASf NOTf FdOtMItIHfABOVE DOES NOT INCLUDE TYPE 3R EKi£NSION REQUIRED FOR Ul,ffflqqR- RATED UNSTS. F3�1A1iUOTPpINT TO BE DETENMINED {IUqING DEfACFA3 EHp�EFRpIG DEVIC6- (1) 32ppA blaa� 9�a, �9B F7IAl1]{, UL 1pF6, Electronic Trip Unit,1510, Arc Maintenance Swi[d�, 5in�t Trip 1201/AC, Cempsession L�s warided per Sales drawmgs (I) 37LIY1 Mau� !lre�cv, lIBB FMA1� UL 1066, Bectrank hip Unh, LyG, Arc MalMemnce Switdy Cqmpresian Lug prorided per Sales dra�.i�s ADDiIlOIiAt FEATURES: GE71E(1AT4R fibPfECfIOq DETAIlS �I) LOT OF ARILLE ['J5M-LOClC RECE�ACLES �8) 5EISOF �LOWM/�ORIINGE/YELLOW PFIKSE RECEPTACtFS, AND WHITE NEUTRAL RECEPTA�S (1F Ap1�L{G494E} (4) GNEEN GRa14A RECfP'fApES LOAD 6AMIf COXIIELTION DETNIS �1) LDT OF FEMMf CJIM-Lpp[ RECEPTan cs (B) 5ET30F �LLOW PHASE RECEPTAEiFS, AND WHITE NEUINAL RELEPTA[],FS [FF APPLICR6i�} 141 taYl€EN GROuwp xECEP7ACLE5 ��ARREN �POWER SYSTEMS DIVISION 15 N Meridian Ave • Oklahoma City, OK 73107 •(405) 947�771 • Fax (405) 945-3486 2000 kW (at site with de-rate) genset amount ........................................................................... .$944,200.00 1— 1200A and 2— 800A ATS amount ......................................................................................... .$45.200.00 Dockingstation amount ............................................................................................................... .$94.000.00 Options: OPTION COSTS: 1) Platforms with Steps and Handrails add .................................................................$30,400.00 2) 3rd Party Seismic Certification for the enclosure ......................................................$12.400.00 Comments: • NETA Testing by Others • IR Testing by Others • Factory-witnessed load bank test not included. .8 PF load test report will be provided. Supply chain constraints have severely limited factory witness testing. Lead times: Submittals take 4-6 weeks. After Release to Order: Generator: 123 weeks for an open generator + 6-8 weeks for enclosure and fuel tank packaging. ATS's: 10 weeks Generator tap box: 24 weeks FOB: Jobsite Terms: Net 30 days with approved credit DOES NOT INCLUDE INSTALLATION, WIRING, FUEL, OFFLOADING, OR ANY APPLICABLE TAXES Quote is valid for 30days Our equipment proposal is described in its entirety above and includes no material or services that are not specifically stated. Steve �arsons Electric Power Sales Representative Warren CAT (405) 694-5959 Steve. Parsons(a�warrencat.com =�ARREN �POWER SYSTEMS DIVISION 15 N Meridian Ave • Oklahoma City, OK 73107 •(405) 947�771 • Fax (405) 945-3486 TERMS AND CONDITIONS l. AGREEMENT. Warren Power & Machinery, [nc. doing business as Warren Cat ("Seller") offers to sell the products and materials (the "Goods") indicated on the face of this Sales Agreement, Sales Order or Sales Quotation (the "Order") to the purchaser or buyer ("Buyer") indicated on the Order in accordance with these Terms and Conditions. Submittal of a purchase order for the Goods by Buyer, execution of the Order by Buyer, or any other express acknowledgement of the Order by Buyer constitutes acceptance of this offer, which offer and acceptance constitute a legally enforceable agreement ("Agreement") between Seller and Buyer. My additional or different term or condition on Buyer's purchase order or acknowledgement form, or otherwise communicated in writing or orally by Buyer in accepting this offer, is deemed to be a material alteration of this offer and is objected to and rejected by Seller. 2. PRICE. The prices contained in this offer are firm for thirty (30) days from the date of this offer. The prices are exclusive of all sales, use, excise and other similar taxes. 3. TERMS OF PAYMENT. Unless otherwise stated on the face of the Order, Buyer shall pay Seller for the Goods and all applicable taxes within thirty (30) days from the date of Seller's invoice. Any unpaid amount bears interest at a rate equal to the lesser of (a) 18°�o per annum, or (b) the maximum rate permitted by applicable law. 4. DELIVERY. Delivery of the Goods is Ex Works (Incoterms 2010) Seller's facility indicated on the face of the Order. My delivery date on the face of the Order is approximate, and Seller has no liability for failure to deliver the Goods by the delivery date. 5. DISCLAIMER OF WARRANTIES. EXCEPT FOR THE WARRANTY OF TITLE, SELLER MAKES NO WARRANTIES OF WHATSOEVER NATURE, EXPRESS OR IMPLIED, CONCERNING THE GOODS, IT BEING THE INTENTION OF SELLER AND BUYER TO NEGATE EXPRESSLY AND TO EXCLUDE ALL WARRANTIES, INCLUDING ANY IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR ANY PARTICULAR PURPOSE, WARRANTIES CREATED BY ANY AFFIRMATION OF FACT OR PROMISE OR BY ANY DESCRIPTION OF THE GOODS AND ANY OTHER WARRANTIES WHATSOEVER CONTAINED IN OR CREATED BY THE UNIFORM COMMERCIAL CODE OR SIMILAR LAW AS ADOPTED IN THE STATE OF TEXAS OR ANY OTHER JURISDICTION. BUYER WAIVES ANY CLAIM IT HAS AGAINST SELLER FOR ANY LOSS, DAMAGE OR EXPENSE CAUSED BY THE GOODS OR BY ANY DEFECT IN THE GOODS, USE OR MAMTENANCE OF THE GOODS OR SERVICING OR ADJl1STMENT TO THE GOODS, AND PURCHASES THE GOODS AS-IS. Seller will provide commercially reasonable assistance to Buyer in enforcing any manufacturer's warranty. 6. FORCE MAJEURE. Seller may suspend performance under this Agreement during the occurrence of a delay arising from causes or events beyond Seller's reasonable control, including acts of God, fire, war, strike, loss or shortage of transportation, lockout or commandeering of raw materials or products or plants or facilities by a govemmental authority. 7. PATENT INDEMNITY. Seller shall, at its own expense, defend any suit or cause of action against Buyer for alleged infringement of patent rights arising from the sale or use of the Goods and indemnify and hold Buyer harmless from any damages, liabilities, claims, losses and expenses (including reasonable attorneys' fees) paid or incurred by Buyer in connection with the suit or cause of action. 8. CANCELLATION. If Buyer desires to cancel or change any portion of the Order, Buyer may request same in writing to Seller. Seller may, in its sole discretion, accept or reject any request and may charge Buyer a reasonable fee and any costs Seller incurs related to the change or cancellation as a condition to accepting any cancellation or change. 9. GOVERNING LAW, JURISDICTION AND VENUE. This agrccmcnt is govcrncd by and construcd in accordancc with thc laws of thc statc of Texas applicablc to agrccments madc and to bc performcd entircly within that statc. This agrecmcnt is performablc in Midland County, Tcxas, and buycr waivcs thc right to bc sucd clscwhcrc. Without excluding any othcr jurisdiction, buycr agrccs that thc statc and fcdcral courts of Tcxas locatcd in Midland, Tcxas havc jurisdiction ovcr any procccdings in conncction with this agrccmcnt and submits with respcct to itsclf and its property to thc �unsdiction of any likc court for thc purposc of any suit, action, procceding or judgment rclating to or arising out of this agrccmcnt. 10. LIMITATION OF LIABILITY. NOTWITHSTANDING ANY PROVISION OF THIS AGREEMENT TO THE CONTRARY, NEITHER PARTY (NOR THE OFFICERS, DIRECTORS, EMPLOYEES OR AGENTS OF EITHER PARTY) IS LIABLE HEREUNDER TO THE OTHER IN ANY ACTION OR CLAIM FOR CONSEQUENTIAL, INCIDENTAL, INDIRECT, EXEMPLARY, PUNITIVE OR SPECIAL DAMAGES, WHETHER THE ACTION IN WHICH RECOVERY OF THE DAMAGES IS SOUGHT IS BASED ON CONTRACT, TORT (INCLUDING SOLE, CONCURRENT OR COMPARATIVE NEGL[GENCE), GROSS NEGLIGENCE, INTENTIONAL OR WRONGFUL ACTS OR STRICT LIABILITY. EXCEPT TO THE EXTENT PROHIBITED BY LAW, ANY STATUTORY REMEDIES INCONSISTENT WITH THESE TERMS ARE WAIVED BY THE PARTIES. 1 I. INDEMNITY. BUYER SHALL PROTECT, DEFEND , INDEMNIFY AND HOLD HARMLESS SELLER AND ITS AGENTS, AFFILIATES, EMPLOYEES AND ASSIGNS ("SELLER GROUP") AGA[NST ANY AND ALL CLAIMS, DEMANDS, AND CAUSES OF ACTION OF EVERY KIND AND CHARACTER WHATSOEVER, INCLUDING ATTORNEY'S FEES, ARISING IN FAVOR OF ANY PERSON, INCLUDING EMPLOYEES OF BUYER, ON ACCOUNT OF PERSONAL INJURY OR DAMAGE TO PROPERTY OCCURRING, GROWING OUT OF, iNCIDENT TO, OR RESULTING FROM THE SELECTION, PURCHASE, OWNERSHIP, DELIVERY, USE, OPERATION, MAINTENANCE, REPAIR, OR RETURN OF THE EQUIPMENT WHETHER SUCH LOSS, DAMAGE, OR INNRY OR LIABILITY ARISES WHOLLY FROM OR IS CONTRIBUTED TO BY THE NEGLIGENCE OF THE SELLER GROUP AND WHETHER CAUSED OR CONTRIBUTED TO BY IMPERFECTIONS OR DEFECTS OF THE GOODS, WHETHER LATENT OR PATENT, OR FROM ANY OTHER CAUSE WHATSOEVER. . �' . . l-: � POWER SYSTEMS DIVISION 15 N Meridian Ave • Oklahoma City, OK 73107 •(405) 947�771 • Fax (405) 945-3486 12. DESTINATION CONTROL STATEMENT. If exported, these commodities, technology or software were exported from [he Uni[ed States in accordance with the Export Administration Regulations. Diversion contrary to U.S. law is prohibited. This includes the use of these goods in the support of exploration or production for deep water, Arctic offshore, or shale oil projects that have the potential to produce oil in the Russian Federation or in maritime area claimed by the Russian Federation and extending from its territory. _ � ACME ELECTRIC Company Proposed Change Order TITLE: PROJECT: TO: ATf N: PCO #OOib - FB-001 Item 2- Relocate ATS LPSIA - Terminal Renovations RS&H Keith Nix PCO #OOib - FB-001 Item 2- Relocate ATS DATE: JOB: ib 2/9/2024 1540 Project Manager 0.00 $ 65.69 $ - Superintendent 0.00 $ 30.00 $ - Superintendent OT 0.00 $ 45.00 $ - Foreman/Journeyman -1136.55 $ 30.00 $ (34,096.62) Foreman/Journeyman OT 0.00 $ 45.00 $ - Labor Burden $ (34,096.62) 35% $ (11,933.82) Total Labor $ (46,030.44) Materials $ (124,998.76) Equipment NC $ - Cat 2 MW Gen NC $ - Cat (2) 1.1 MW Gen NC $ - Teinert NC $ - Teinert (Concrete) NC $ - Misc NC $ - Lighting NC $ - Gear NC $ - Subtotal $ (171,029.20) OH/Profit 10.00% $ (17,102.92) Bond 2.00% $ (3,762.64) Tota Robby erown Date: Date: _ � ACME ELECTRIC Company Material Qty Mat Lab CMP - Blue Cable U/UTP Category 5e 600.00 $ 264.00 5.40 1" Conduit - EMT 10' Lengths 1,650.00 $ 3,196.22 83.49 3" Conduit - EMT 10' Lengths (1,584.63) $ (13,755.38) (186.19) 3" Conduit - EMT 10' Lengths (2,197.52) $ (19,075.57) (258.21) 3" Elbow 90 Degree - EMT (21.00� $ (884•69) (15.75) 1" Coupling - EMT Compression Steel 164.00 $ 162.06 22.55 3" Coupling - EMT Set Screw Steel (398.00) $ (2,625.45) (59.70) 1" Connector - EMT Compression Steel 18.00 $ 7.19 3.51 3" Connector - EMT Set Screw Steel (76.00) $ (220.70) (26.60) 3" Bushing - Plastic 105 Degree (76.00) $ (18.63) (7.98) 3" Measure Cut & Ream Labor - EMT (7.00) #1/OGreen WireTHHN/T90-Copper (1,629.63) $ (2,950.54) (28.93) #3/0 Green Wire THHN / T90 - Copper (2,257.52) $ (6,353.20) (53.05) #300 Brown Wire THHN / T90 - Copper (1,629.63) $ (7,956.31) (56.63) #300 Gray Wire THHN / T90 - Copper (1,629.63) $ (7,956.31) (56.63) #300 Orange Wire THHN / T90 - Copper (1,629.63) $ (7,956.31) (56.63) #300 Yellow Wire THHN / T90 - Copper (1,629.63) $ (7,956.31) (56.63) #350 Brown Wire THHN / T90 - Copper (2,257.52) $ (12,906.33) (88.89) #350 Gray Wire THHN / T90 - Copper (2,257.52) $ (12,906.33) (88.89) #350 Orange Wire THHN / T90 - Copper (2,257.52) $ (12,906.33) (88.89) #350 Yellow Wire THHN / T90 - Copper (2,257.52) $ (12,906.33) (88.89) 1" 2-Piece Strut Clamp - Universal Steel Zinc Plated Break-Apart 184.00 $ 347.52 12.88 3" 2-Piece Strut Clamp - Universal Steel Zinc Plated Break-Apart (379.00) $ (1,756.63) (59.69) Belden Cable (Generator) 600.00 $ 2,115.60 13.80 $ (124,998.76) (1,136.55) _ � ACME ELECTRIC Company Proposed Change Order ic TITLE: PCO #OOic - FB-001 Item 3- Bus Duct PROJECT: LPSIA - Terminal Renovations TO: RS&H ATTN: Keith Nix PCO #OOic - FB-001 Item 3- Bus Duct DATE: JOB: 2/9/2024 1540 Project Manager 0.00 $ 65.69 $ - Superintendent 0.00 $ 30.00 $ - Superintendent OT 0.00 $ 45.00 $ - Foreman/Journeyman -107.69 $ 30.00 $ (3,230.61) Foreman/Journeyman OT 0.00 $ 45.00 $ - Labor Burden $ (3,230.61) 35� $ (1,130.71) Tota) Labor $ (4,361.32) Materials $ (21,927.87) Equipment NC $ - Cat 2 MW Gen NC Cat (2) 1.1 MW Gen NC Teinert NC $ - Teinert (Concrete) NC $ - Misc NC $ - Lighting NC Gear $ 35,600.00 Subtotal $ 9,310.81 OH/Profit 10.00% $ 931.08 Bond 2.00% $ 204.84 Tota) $ 10,446.72 Robby Brown Date: Date: _ � ACME ELECTRIC Material 4" Conduit - EMT 10' Lengths 4" Elbow 90 Degree - EMT 4" Coupling - EMT Compression Steel 4" Connector - EMT Compression Steel 4" Bushing - Plastic 105 Degree #400 Brown W ire TH H N/ T90 - Copper #400 Gray Wire THHN / T90 - Copper #4000range WireTHHN/T90-Copper #400 Yellow W ire TH H N/ T90 - Copper #500 Green Wire THHN / T90 - Copper 4" 2-Piece Strut Clamp - Universal Steel Zinc Plated Break- 4000A Busway 3-Phase 3-Wire Feeder Indoor-Aluminum 4000A Busway Cable Tap Box End 3-Phase 3-Wire - Aluminum 4000A Busway Vertical Elbow Up 3-Phase 3-Wire-Aluminum 4000A Busway Floor Flange 4000A Buswav Haneer Vertical Fixed Company rt Mat Lab -423 $ (4,969.19) -72.46 -12 $ (871.43) -12 -55 $ (1,378.67) -28.875 -423 $ -423 $ -423 $ -423 $ -423 $ -43 $ 50 2 2 2 7 $ 750. 750. 750. 750. 228. 7 -18.612 -18.612 -18.612 -18.612 -20.516 -9.138 50 26 16.25 8.75 8.75 -107.687 Life Is Un ScF�neider Eieccrle Prepared By: W. Ross Valigura Schneider Electric USA, Inc Executive , Sales Senior 6502 Slide Road Suite 306 Lubbock,TX 79424 ross.valigura@se.com M:+1 8069282503 Proposal Name: WRV TEST 2021 Quote Name: Airport Busway Add Proposal Number: P-171224-70596 Quote Number: Q-4727047 Quote Date: 02/03/2024 Through Addenda Number: 0 Sales Representative: W. Ross Valigura Conditions of Sale This Quotation is subject to Coordinated Project Terms. See https://www.se.com/us/en/download/document/0100PL0043/ Quoted price in currencies other than U.S. Dollars is per the annual Schneider Electric exchange guidance. Quote is valid for 30 days. Quoted lead times are approximate and subject to change. Schneider Electric reserves the right to amend, withdraw or otherwise alter this submission without penalty or charge as a result of any event beyond its control arising from or due to the current Covid-19 epidemic or events subsequent to this epidemic / pandemic including changes in laws, regulations, by laws or direction from a competent authority. Internal Anna 1 nf Life Is Un ScF�neider Electrlc Proposal Name: WRV TEST 2021 Quote Number: Q-4727047 Quote Name: Airport Busway Add Quote Date: 02I0312024 Seq # Qty Product Description 1 1 Designation : 4000 AL Product Details: 1 - I-LINE BUSWAY-I-LINE BUSWAY CONSISTING OF 4000A Aluminum/Tin Busway 480Y/277V 3Ph 4W 60Hz Ground Bus Reqmt: Aluminum Integral Ground (Std) 150kA RMS Symmetrical Short Circuit Rating Date Configured: 2/3l2024 4:30:14 PM Indoor Segment Run Consisting of: 41 Feet of Feeder Busway 2 End Cable Tap Box 2 90 Degree Elbows 7 Indoor Fixed Hangers 2 Wall or Floor Flanges 1 Assembly Tools Seq # Qty Product Descr#ption 2 1 Designation : 4000 CU Product Details: 1 - I-LINE BUSWAY-I-LINE BUSWAY CONSISTING OF 4000A CoppedSilver Busway 480Y/277V 3Ph 4W 60Hz Ground Bus Reqmt: Aluminum Integral Ground (Std) 150kA RMS Symmetrical Short Circuit Rating Date Configured: 2/3/2024 4:29:12 PM Indoor Segment Run Consisting of: 41 Feet of Feeder Busway 2 End Cable Tap Box 2 90 Degree Elbows 7 Indoor Fixed Hangers 2 Wall or Floor Flanges 1 Assembly Tools $eq # Qty Product Description 3 1 Designation : BUSWAY TESTING Product Details: 1- SRVSQDSER-Startup Services - Straight Time The following startup scope of work is Schneider Electrics manufacturer recommended scope of work for Startup Services. Schneider Electric will perfortn the Scope of Work per Schneider Electric document 1910D81302-120213 Scopes of Work for Electrical Acceptance Testing. Work will be performed during Straight Time (any scheduled 8 hour period between 06:00 and 18:00 hours Monday thru Friday). Startup scope of work includes Schneider Electric technician supervision during energization of equipment. Quote price is based on energization during final day of inspection and testing. Schneider Electric services must be contacted prior to 2 weeks from the required date of service to avoid additional charges. AnnA 7 �+f Life Is ('Un SC�'tekler Electric Proposal Name: WRV TEST 2021 Quote Number: Q�727047 Quote Name: Airport Busway Add Quote Date: 02/0312024 tAf4l�fft�+tt#iiiiftir+�fff1�*ir�R�lfffttl�tifiR Following user entered devices included in startup: None 12 month complimentary extended warranty. Schneider Electric Services is pleased to offer a complimentary 12 month warranty extension above and beyond our standard warranty and any purchased extended warranties. The 12 month warranty extension only applies to equipment that is successfully tested, started up, invoiced by SE, and paid in full by the customer. Qty 1 - I-Line Busway Designation: 4000 CU 1 - 12MTHEXTWARRWSTUP-SIBS 12 MO Schneider Electric Services is pleased to offer a complimentary 12 month warranty extension above and beyond our standard warranty and any purchased extended warranties. The 12 month warranty extension only applies to equipment that is successfully tested, started up, invoiced by SE, and paid in full by the customer. EXTENDED WARRANTY W/STARTUP P�rtP '2 ..f FW: Lubbock Airport Joshua Berry <jberry@borderstates.com> Mon 2/5/2024 8:37 AM To:Barry Brown <bbrown@acmeelect.com>;Robby Brown <robby@acmeelect.com> Cc:Josh Villarreal <Joshv@acmeelect.com> �J 1 attachments (39 KB) Airport Busway Add_Q-4727047-PD-001_BOM_Unpriced.pdf; Barry/Robby, Please see below and attached. Thanks. ]osh Berry Account Manager Border States Electric (BSE) 520 E SOth St. Lubbock, TX 79404 806-765-5741 - Phone 806-712-1006 - Direct 806-782-9928 - Cell 806-744-4263 — Fax jberry@borderstates.com www.borderstateselectric.com � BORDER � STATES From: W. Ross Valigura <ross.valigura@se.com> Sent: Saturday, February 3, 202411:27 AM To: Joshua Berry <jberry@borderstates.com> Subject: Lubbock Airport * EXTERNAL - Use caution with links and attachments * Acme wants to revisit the 4000 amp busway. Josh and I measured it on Thursday. Attached is the quote. 4000 amp aluminum busway - $35,600.00 4000 amp copper busway - $50,000.00 Busway leadtimes are 24-26 weeks right now. Ross Valigura 7008 Salem Ave Suite 114 Sales Executive M 8069282503 Lubbock, Texas Lubbock Sales Office E ross.valigura@se.com United States Partner Business Customer Care 18887782733 Square D by Schneider Electric by Sehnelder E i e c t r i c General Life is Un Schneider �Electric FIELD BULLETIN To From ACME Electrical Contractors RS&H, Inc. Project: LBB Electrical Grounding & Generator Upgrades Reference: Subject/Title: Contract Drawing: Specification: Shop Drawing: Other: RS►� FB - 001 Date: 02/01 /2024 A/E File No: 2231874.012 ES111, EP101-A, EP101-D, EP602, EP602.1, EP702 Generator Revisions, ATS Location Revision Contract Document Clarification/Supplement Descriqtion: Item 1: The basis of design 2 MW Generator has an excessive product lead time. Coordination and research with equipment manufacturers has identified that smaller capacity generators have a much shorter lead time. This revision will replace the single 2 MW generator with two 1.1 MW generators. Item 2: The bid documents indicated the location for automatic transfer switches ATS-1 S and ATS-2s in the new electrical room. This revision will locate the new ATS switches in the existing main switchgear room. Item 3: The bid documents originally indicated a series of conduits and conductors to connect MSB-1 Main with MSB-1 Distribution. This revision indicates the connection between these two sections can be made with bus duct instead of conduits/conductors. ..��w.n...ro.•«�o=.rwr+�»u..w-.r��...e•».wwnwrr��...........o...... ,,...n�w...�� � � � ����� ��E � : � ` 4 °a �" � �� 3 �� a �� � :� � -i . ,Y � �i � � -- �^+ k:.: y gg g �^' '��`�', G�� 9�4e� � . A �=' ��� ���� � :�,. �: ;, �� � � ., - ��;� - ,� --- t I� �� D����. � � �� ��il� �•..� �� � � ��� � �� � �� u, � Y . i � F ! �r �! F w : i( o' {� � �i �, 11 .A,,....,..:.�......,�..�.,..,...A.._..,,_.,...,..4�,...�,�.a..��,..�. �,.a,.�„�, � ����Dt � ��! i �� . � �� � q �;�p � �,{,{F �� 6Q � �� �e 6 � � � �� �g � fra � € �� �� �3Q� � � t�ffi �L ��� � � v � � � � . 0 � � ��� � �B � 88� Y ; #ei � �;a i ��� i � �e� k � �€�� ��� ¢s��t� � � ¢� � ���g $} ��i �t����`�e`'°o p a � ��6� � �� ��y �����$��s�gxe tr.�a�$r�������� Q' � ��°�� � g � ���� rO ----- i b $q I m � LI'_'—__ ��O �� � Sg � � �-------, I �t ^J % I I I I i g i � � I i' I � �s � � � �l ��}'p I �;"� I � 3�iY � � ��.J � �e I +�. I � I ''� F o I � �, ;� �aI I 51 ��,.� o, - N I �e I � � }� �Q �� i �'�1 � ` :L-------� �'�!:':..; ';!��:1]:�, ��'� ���� ���� �I L L .. - --• ���i p_ �; 9 b � = 4 ,���k� � � � � .,�§$...... .'a � 4 �y A rr.:.,t.s�t o � � 6� �� ; �' � - � . � �� p� W �9z...<<IS�ies ; � t � � @..�Ssasstba 4 �y� �i � !l�499 o ° �� �q � �p g� z q 6 ya•,`atiiiiii 4 �� �p � �' .r. .+ � e� �9 �� y..cnasee�RH r �e , �. �� e I .. � r-------� � � � � � I le��� � � '�� � � �' I f;sl i �� I I�, i '' �c 3ii � ���. �R�, i �i;T1 �'i �e �; i�� � � �� ! .t�. . : . i.� � i . . � i �� �i� ' �f� a�l e@�g I '�a I 'I I 5 E9�1 � �R •� � �i e �i I li V.f€� , �'1t' 3� � �—}� I I e�$�i �, .I � I �: �t: I •-�• � 33 ya —ga ��i`��_ $�� I I �i � i � p �e I' y_ z, ��� g I . .�.��3 a�� �j3i8 �e j � � � � Y , sy��i �� �I � •-i--� � �e � k'f_' �� i�y�Y� ;�� � L - — - — - — - J �� ��§;; i ..�� � ; � �: �. �:i � I ' '—�le �g� � � �Y �t ij � Fg 3�� —'--�r � jd�9 �� I i� �"a. �,�l�l -�� �- , � o L------J C� -- �- - --� 0 �------� I I n. I �; I I ��—t— —y� 3 I �' I 'sf�x I �o—�I °'�R� i i i ----� �:E§i E���� _ � w�o �z� y� ��� ^' D'{_ %L � � � z ��..5 UpV r � i �� i �: ��: i r l � �-3i ; i �s i �� o� . � � � ," wi �O� � ai �f9 �; I �� � o --0 Fi � � i � �yL_—_—_—_J �-------� ��I� �� � � ��� �Q i n,� � � ' �3 8y: � �� ?. �z „ :� §3 N9 I V $j � �� �y� N 8 � � � w $�� �4�6: ���— —;� a�� �� �� § � ;L-------� = i&� :�o�� i ---� -.�—� ;: �a �;� i�§ < L.� q � -e'�e' � �.€3 �9 . : Ka� � :���3 ia i '�� 4 >���� ��� i� � � � r� � C - :; •—i-� �a a����; a.ca�;� I . I 9 °�Yk� � �' i `�—€d ��� � �k� —�� ��i I I � v Y�£�x � �l �1 �_� � : f�Y � °�� L------ J i6i�� .. i3 i�� �� �� a�� � ga 4d1 �' �< `' � � r � �- =a _ i �� i � �3 �h�` B.e-.� I • •—t�-�� @d� i : �a� 3e��� i �? � � fs� �a= i _3a g�� j � � - � �� �Ya ��3 _ �, i— , �� � �= � I �i I 6 � � � �Qg I '�i3? �ji I 5" a: $ � �i d i3 �. : �s5 �k � a: � � '�i I� fg k� � �" € I I I's` �s= i m �, 3 j �; �B, ��: d c,��- -k� s. �a � �� � � tY. £. � " � ' i9� �p F � �� ��- ��: b r-j -k � I �' . !g �=3 ��i ' '��s e 3. g_ �3 I �4 I �i 3��. ��—;a -b� I I � �..�_ � �, e I ' d I:'' $!: e9�B ����� � �! �� : j �3�' d� a 9 L. 4� � � �i �' � 's� Rjl �' �i S � I ' '�"'_����� a� �w I�$ g �' jy,"s� ��i o � z �: �{.,_€ s i! 5 k. � —' � 1p "s�' aa i fi�3 �e �� t• k. � � �l �l : .�a�::�� L'_'_'_'J._ � 0 w 2 J W Z 0 U � w� - � e � � �-------� i �� i I g' � I �o � � e 9�� p � a i �9.—�— �! � �. !i� •I I N� . �,� ., irS �I � iH a �'�Ig�I �� � =L-------� wmltiwM�.ro n� ej� ��� �e g# kei k �r � . '�d' p�t ��� �'s g� ��i r�i 3 3; „ Ed �t�� Slt 4 gt �R3 i �f 53 ��-�'� 9F � �a ak= � i � € ^ �: � Da �g�� ��s ��i 3I �a �f $R�# 1 tlTnw��nrot��M�O��M W tlftitv�.�. � ����� 6� F� � �� e ti p �� �� � s� ��3'� a �� ��� ��ffi� � � f � � y a � � 4 � e R ° � �p� �� ��� �4 �� � � �`'� � � EE � � i �� �i ��� �� ��� � a E �� � iaR�1 � " ° A � � i �4 �' ;1 �x�� .:F-�-------•-�--�.... " i ^Y �� � c G��� �9'_�� . �l�i� z c� -t n? � 06 � �� w< WS � N ��g � � G3 � a �� w • � r_—'_'—'� �� '�� ��� �� €� g ����� a� f �:�p�� 3 �� � � � i �� � a �f� �(�� �z� ��� �$!� i���� i�����; l�g����� i�ipj �j� ,� . . �5 ��— i $ €� d¢ e� Pp �g��g1� � � � �@ f � 5 � � !�� ���a �V �'�� A l!E fi�ie9�� �e����l1 e� �� ��� �: � `�-�� $�'� g.Ek� ;�� ;�p, ���� �.$ �t�Et ���i� ��e�E���t �9E� ��� ��E�� ��s � : � ��o � �. z: sb��� � �t Vqq 9g � a�E A i@iaZaiil�i�F ���a�I�i�l��$� ��� � a �-; — � �-- Ee& Y� ��i�3 0 "t?f • � a j j 3 � 3 7.x : . � :aaa :aa s �: .a�: :aaoo o: oe:54 :�� . I � '�'v + . ���--�—�--.._.._.._.._..—• ---- � . :wj � �-�—l—OS • � �f}1 ._.._. ' Id' 9� i ��,,.,,. 3 r'�-----',�I .�i �: I ; �-------� � �3 = � �:� ;���I�� �� � ��� ; �� ; i ,�. ,��i . _ .. � i i i i i . � �-------J i ,ia� ; �� � i � , �_ �i ; �at�� � a =! � � � i � � . �-----, i �•€ i 2��� ; � �•' ,�� �-�� : i ��; i. arii � � i � i �a . i �Q �_ :i i _ 4_ i� r . . _ . � ! �& � i �� �1 �1 �`� ' �e • i i � �y��"I---i. --i--� '--r�i ' , § = -� i : �i ag �a i �' i � _ F � � i �i �+ i . .i i . : x. �I •g• y.y.��i,; . j ��.� L�j ��� � � 9 �i.' j I d§ �js. fl�i I E� L4 J �I !i. _r��� � � � .�-L "' "' _" J ;ve� I 9C �n � i �I �`o�_�� �gi �Q � . . x' g ,----- . � � � �L' . . � • ---±--�� �, ! Y i 9± ag s' �; Y ' '� " i ' '�4ai — . : -� i i i 7 r�. T�; 8�i � — - � — � ;�� � ��i�v �'� ' 8; I!�4 :, v. a n� � � ' 1 � '� �' I I $ � '� " � : .�g: �;�— —s� �a� �� i�� � �' ' � L-=------� �:.�ke . . � � � p •. . � . �i F� � i . : i�3e� • � . . — - � — � - — _� :-- . : _ �. Ji � � � �� ��3: §�f � � W ��os �� ; i �� . . . � � � �� ��—,� '�� � �. � . g r:,.� T . � �; .A�z � � I I � I � I � Y � �3? Ai13 . �1 �I �I . ' I .'r�l� 19 1 � �' � --� I 1 � � �L J� J �I � • � �� �r� - - . -� � ����4Y $ti L �: . _ :-_ : :�� : I �; ;��I_I= � � . ��y : r-- _�- �� � � � : •-.-r—� �; : �°�bq 3 r. ! i �4'!; � � ��36� ! ¢ i �ey : ' J i j �; jl i L �• _ _ i i . - �; ! ;:a ±q� �t �� a�� I 6 .� . � � � � ~�� g� 1 • � �H .� � �t � �' a � . t ��� . - - �• ¢ �' • �e �� �9� . • �! $ �_ ��f 4. e°� I� � pd:��19a ..,.I � — �: � �-�T; � l � i� a�� {i3 a4�, � ��' �e �� . . — - - — - . i>r :a �� J 5�a I n I�ll6is�$ �4 IL�. I_.....'_ J `_...J :Q� � �, �����—__,.. ;; ' , ; _ � �I,I _- � . � ���� � — . _ ,�; F; , r � �:�. �� ��: � . � :� s�, �' ;s �9s-- ��; i! � i' L�-_-�� I i=I �'�- '� �? e �: r :�. I r••- ,�, .. ���� p ; ._.._. � .._ � i� '''-i i _ , _ , .��� � ; �� ;_ ,� �; ' �L�- . _ - J � _<��� . q , , �. , 6$$R3 'r, � j �°,. �. � L �. J_� I 5� a`� p<rk, � i �e :•�[�Jt� d`i , �; ��� .,�# if a�-,�S.-��—_.'�: a�i �-- ] � Y i � � :� . � � �e � :6�#) I I '�i I t.. x iL . . - . . _ . �'_ . . J � �i -I!-^!� �, ` P'?sq �� e �3. `� { I o � —$; $�€' � •. I ._t �� � 3�t:,si --- 7 �� �'� I�' �� � �� i � R �� �e •,'' It_ k: _" 'I �4�"rf_9� ��3 Q . . � 'M'�5i ��1 y . . 'B � ��x �� � � C4 • �� �� ��y_ 3: '� �P � 2 8 . � ^ .�' � 'S' ��� b �--�-.--�;3 B-s i � ' ' �d = , . i •I : I : � j �; . � s,. �' �s ' '4 k: � i g . � � y�;-a;4 ea �e • _ �-' --------%:i^�.' �II - e'i�-F�� ��i WI �:"�.�.��e�i'� � � I �" • �' � i'g €: •I �e_ ,'' I. �L'f = wl i .�y 'j��s� ��i �� ''J�T� � ��3 � 9 . I • . � . �"I�'' r._--.',I . I•3 dl �� �� . I e'. II �,' 't_ a ��e � �� �r �.1I L4_ ,�� yl i i s .I �. ",�..Li' �px . i � , � 1' ; '3� 3 � � '��8�♦ i a f '4 d �� � t T �'e ' � '� w� . � � -�t"j-1?2 $a3 z ���! �il'� � �! '''�l ��# � � j �� '• i •�� ��' �� ; • � � �I �ff' '�13_ i�� r-------� �:j �e I��j 'X €� . � `' -}� •I• ' ��--��' �� � �: i i !i -'�-��r�s� �a� � I i�fl Y� � � ' ��1y .II .e•-l� 1-�j? $q3 � �: � • � �i : _ .� _ . . �- - kE I '�: �- �� �.� • � —�- 3 �' 3 � tF �'�—%' f�-=1 I_»� _�� ; q �F ;� , �p §: I �T— 3a ���—g4 �-3 . � 4.. I :� — - - 3` _ � J :f � � ' rA �� i,__.�3 � -i! R �' � � �ie �L�. . J � � • � � ' I :I"o_ I '�;iz - - . . � . . � � • := g�� ��- 03 � - — - �! � �:;.-�! ! !$� i �' ii - �k� r �� �9ia� i �e� �i i ;�: �, �; ' � _ �� � � ' � ' I b-il I �e+--.-.� < � �i �. � � ks �— -Y3 , _ i' �I I . � �i . �I e•-1-i—i�� I �w I ,�j�� L_� � ,��r �j; �� a �:�� , �'I �a '�j � I 5 � ��i� � . . — • I �e . �� I •f. k= � � � � t I' ..� � , �S � i�v �� ' � �I�9Y�i �ie•,I���d I � �'_o I y, �d � ' n ,� I �S ���,I,I �_�. � � �: �L--:----J �� �_o_�� . ��t : - i aqT �F i y i�..-. �J ;I �I �_ �; r�.i I ----� �;fta � 4�i • � � •'� i �32 �rj �� � :I �k� 5 �' �i_ .��q� ��l �' Y a.s z i � a �a I:I ?:y; p, o �� �a� ; � �- � s �: k { -�-�,- �� � - Z : � ; �� �i • I: � 'Y• a. a $p «— --_�; 8k� � �{ I "li�� . .�--�=s `3�l � �° � c.> �� .I I.� _� . _ ; _�3 ` a �� � �iOIiI ' J��raa� � �� '_� � � W, !{ w � Ei �L:__�J � �t �� nmlw�hsrot�reoe+fMna��.�iw�Mere�M��9onrfnn�r.aaveo�+nr lunw�ww�� � � 4 '��_fi s� � ��f,� �'� 6p 7 � �� �q�� ��y� �} @�� �� � � �� e$ } �" g � p �{ � � °�d � � �e� f � ��e � ¢ ��� e ��a � i�c� ��''6 i8s� g'����8 S� 8 3 �� a B � e � ;n ���� $� �� ; � €g� =y��8��� �� � z �� �1������ �� �3 e�6 { E�����b �¢ i �p€$� ���������a�� ����s � �� i� �as � �� �� �i �¢ �� r--;. , � �� $�� � ��� _ �.. . . . . . , . r . . . . . . . - -- ° H ��� ��� yz� - � �� S D'P �-' � °� w �o --� ����� ..� w esy y � 3f3E �4p1 j ` 6�� ❑- ' cf � � � 4�� ________ __�______ _ tiii- aiitiit titiaici � _• � 'F `f .. .... ta.�nY __';r___""""""___ � �+ :I -�U- -- -- �� 2� .. � �y �"r '� i ° �y � :. � �'i �� �5 i i ��r 2 }='3 ��� (-) 1Sd�r rij�� - Q'�' _'__"'__"'� '__' _'___' 't � � r_ � ___1_ ___ ______ __' _ . • � .• � __ __________________ p'r,!_ _ _____________ �__ i I 1 -'_Y_________ , �i � � I S.�J___________� k�y � �" �'r����_ I�s x _ _ __ ______ __. __`__ _________ ___ � i i P=- r�-- P� , ag �. i i ' � : �� Fi P� .� , � ' ` r l.�l ' I I . � - i - II �"'�'"_" „�, _"""""""" '""""' - '� I I . �M I I ' �,� f I I � I I I 1 I I I n I � $ �2 L_----J ��°e � � � ecr�_� p � a w � � � U K 1�- w W Si Y � �k+� o � E, � � C� w � � � 7 ..mlw�w�..�or�rroo.nYrhiw��rsan...r�e�o�Y�+ion�rttn.n.mua....v �uwn�.xwc� ����; �`�` �p��� � � ��t � a �� � � �� ��� ��Q �r ��� €��� v � �� �4��T�RpSRS�Rxi}}4� � r �r� � ■ � ■' �B �� M � �� �� � g44ygpg ag!��4y $�$��$�$����$ Sai,e333. �r( Wj��g ?SI999.°SF88Si3iEiCPi1� 1. 6 9 � g � � � � � � � � , - :'R;'t': a'a•s i : i� 1.i �i ,_ a,,,, , ,_,; , , , . . . . ' G F x t t�R���i t���II � 98 ... .............• �; €8 s ;;;; aa �i „ � � 8���������B���H�� 9 �i�i S SI9g��S33�,g9�93,9��3. yG��� @ � i K'RRRRRRRRRRRRRLRFR FI�E : � � " "'"""'"""}'""'"'"' � R { 1a' fef � '�f ���R � t .. a� 's1`p� Y � � �r .. " .... ev R =tl�:,� x ��} .�� r��-�� : : : �_�� • - $ '= � ��� �° '�'� 1 �'�_ °l 1'� _°I_ ;a.�; ,_ . 9 H � R Y L lRRR1tRRRRCR1tLL4y�.q. ..... � J ?¢ 8 7 � � ° �i �� � 88�88flH8888�� 4 � � �_$: 8 S gF�g�'�gF���S% � w= 4��� ' 3 9 : F59§3?§a§§333� .�y?t pg a�� .'�l':1.��_...-s:c�a'e'v;;a'A'cx'�' �9!. IY� "_ii'� — .� t p F�R�R�R�a iitla 9�7 • • . . . �! .. ..""""""" i -....... �� 3 43<. � $ x�c�e„ � ?i ? � ��?����$��$g��$� � ���� $ 8S8BF$S4�YBSgBS� Y �6k5 � ��g��a��a��������4 5� .� ' R RRRRRLRRRRRRLRLR[R� F E � .. ____�___________�� �-•••• • 2.r , I i ! i a: � +.� ` �c�=�3 ° j`� '��' �� i�L I _. k9? ' e �g� ', a. ' ''.� tl �..�.,.,.., ���¢ ,v - --'--a'--------' :�pF� � ^ v -�y�"19 � R 9 RRRRRWRRR0.RR,RR9R9�40F I �75 � � . �a�_�r 3 � � ���������3?$�$.�$ � ����� Y 4 Y4f9Y94lYY4YYYI4R4� Z�8 9 9 6:9:96S�9:BA96�898t � Q _____:,C�tCR:w:11�CA�:� g� p d , ������� � . , 4 4 ,. ,. �� a:�. . - . s -- ; ; Y �'. i �� � � ;.�`�-. � � � � T � `,,, i p; - - a���� ,, - - r�-<.�-4�-,.-�.<�-- 1 " .....•-�.RRZ.FAt� Y L :i � .. �, �4 � �� ����i�o: � gz�:! s" g$�`�$�' f !. � Y°�1ii. �.2 � ���C 8 e��AiIf�EY.i�C ss s � � R 9RRRR � � � . . � \ '_�___��_�_�_� ��� < ]�1' 1e <a ' ' �, � ,; ^y:�PYj� � �!! ��. �• :7YLCYE6 .. �e�e - � � �, '��� :!i : 5 •! Eaa '� � a �2: -- �' ��� �------------I--.-��l���.�E... � .lRRR[RCR....... � ' " S� e ��p�� i S,� ��y_ �e��a�� 94445.�45oe n� �� �aa�as aaes�eaa � �� !gea-���i�4 � 1w�� �s$e�,�e[lE.4��,t� � h6�E�� �•.....:..._.".FR%GR" g����5� 4 4.-� �.� �:i::� � :� ;�::�,.�..� �. , � , �YFRtRA�Axtt�R�� 3a,... � . . ........�' 3 s; �� $���8��$�g �a3�g�1a��g; 4,1��E�4 �YF�EF�:;���ii�Ei�fZi �iyPy � 9.3.9359 �RARRRRLRRRRRt �� RE F � �"""_'"'"'"_"""""'".-._ . ...... � t f>> �' � f ' .�g j x � � '3 � �+ �= � ,4...... i k8� '�,� �� � �; ; `" ;=,_ =;.1 1=1 I�'!• 1 i': � e ! �'� -- ------------=�=--.=,-}--'a9#�■■� i a �RARRR1tR1tRRRRR •I .. . . . �SE . . .. . f y'p� 1 5 � f �i ��88fl��8�fl8 e��$���� g r FFi�B�gF! � ���;s��� � K F ! w$��� '�93:§��§?��.�CEC��CYE 9! � � �@ i i . . . ..: :.�,'.�R�Ct��a11C�R�.. 9!� . �: �.'�R S R R�R�9�c x A�f�4�: . . . �$ ..""""ii•"""'"""_"..i.. 3 ;' g! i k �'�=c... aa g 3r �'$?��$���g�� ��e�� i �f��6 �Y�@�3�i�Y3�i; i 4 i� i�iC���y a ������ lRRRRRRRRARRRRRRR����• �'�G E �------------------ .._ �.. ...... } T? _ ' 7 � �tQ �Jr7 �7^ :a 6e �i7 7 :y6.. . �.. ��� �=--'---: -'- :'-: -'------��1� a I,WRRRR996RMRRRRMR..�.. i..... .. fg � � 9�a�� o�c�:'e� ��g$g����g�� �,> > � Jg g 444�4f4444�iii�ii���� W ��� 3:9:S�S9°8:1:l� �E�i �y� `�� - -:.9t�G�R�.at:�0�= .9.� � d.. � .... . . . � S� O �� x d � K �� � w �� w� � g, d �a��i , }� �������z"��� 1�� 7 � �Y999@�ff4��.. ....... ; . � -.-.. ; �9p $ .,:,a�s: a�: �..,.. #€4 f._....�_ l....... �$Eaa j . '........ a8 .... _�� j5� w� 4 W ���. °�� ����� i 1�1l� 1 1 11 1 1� � ! � � �. '�������� ��'�■�� �:. ei����E�� t � t Y �} i( �i 8{ �� ..vy�-.....,�..:w......eo+r.r,�»,.nm..:.«.--a.....eo,,..rnn,-.mr,aa.�... �.n.,�.m„��