Loading...
HomeMy WebLinkAboutResolution - 2024-R0071 - Change Order No. 4, For Credit, Contract 15431, Archer Western Construction LLC - 02/13/2024Resolution No. 2024-R0071 Item No. 5.17 February 13, 2024 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute � and on behalf of the City of Lubbock, Change Order No. 04 to that certain Contract No. 15431 and between the City of Lubbock and Archer Western Construction, LLC, for the Low Head Pump Station as per RFP 20-15431-JM, and related documents. Said Change Order No. 04 attached hereto and incorporated in this resolution as if fully set forth herein and shall included in the minutes of the City Council. Passed by the City Council on February 13, 2024 TRAY ,, M OR A1 TEST: Cou ey az, City Secretary APPROVED AS TO CONTENT: � � .. Erik Rejino, Assistant City Manager APPROVED AS TO FORM: elli Leisure, Senior Assistant City Attorney ccdocslRES.ChgOrd#4-Contract 15431 Archer Western 1.8.24 Office of Purchasing and Contract Management Change Order Contract No: 15431 Contractor: Archer Western Change Order No: 004 Contract Title: Low Head C Pump Station Bid/RFP No: 20-15413-JM Project No: 92450.924130000 "Change Order" means a written order to a Contractor, executed by the Owner, in accordance with the Contract authorizing an addition to, deletion from, or adjustment or revision of the requirements of the Contract documents, or an adjustment to the compensation payable to the Contractor, or to the time for performance of the Contract and completion of the project, or a combination thereof, which does not alter the nature of project and is an integral part of the project objective. Adjustments to "Estimated Quantities" to a line time in a Unit Price Contract do not require a Change Order. All work that alters the nature of the construction or that is not an integral part of the project objective must be let out for public bid. Description of Change (alteration, deviation, addition, or deletion) caused by conditions encountered during construction not covered by the CO-004 Reconciliation Change Order includes: • Reconciliation of contract, see attached list of overruns and underruns, total net addition this change order $29,204.64 • CP-001 Modifications to YP-2 and YP-3 CAV manholes: ($4,989.00) • CP-001 Modify service power and miscellaneous electrical: ($126,605.00) • CP-001 Control power to LHC and GEN-SWBD: $33,103.64 • CP-002 YP-2 additional steel pipe: $9,944.00 • CP-003 Sanitary sewer modification: $4,000.00 • CP-004 Electrical room cable tray supports: $20,344.00 • CP-006 Fence at slide gate: $5,603.00 • CP-007 Two 2-inch conduits from PB-1 to cable tray: 18,949.00 • CP-008 Fan weather hood modification: $8,427.00 • CP-010 Temporary power connection generator to PS 14: $20,384.00 • CP-011 Switchboard communication: $2,633.00 • CP-012 Slide gate modifications: $32,272.00 • CP-014 Bollards at GEN-SWBD and pump room electrical stub-ups: $5,139.00 • CP-015 Disinfection and dish head removal: $21,175.00 • CP-016 Pressure switches: $2,705.00 • CP-017 Electrical room doors: $9,178.00 • Unused Bid Items: ($121,300) • Reconciliation Pay Application #31: Work completed 07/25/2023 to 09/25/2023 and Release of Retainage, total of $455,380.42 to be paid upon fnal completion. Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs, including material quantities, material costs, taxes, insurance, employee benefits, other related costs, profit and overhead. Where certain unit prices are contained in the initial Contract, no deviations are allowed in computing negotiated change order costs. ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM. ITEM DESCRIPTION AMOUNT A. ORIGINAL CONTRACT VALUE: $8,540,415.00 B. AMOUNT OF THIS CHANGE ORDER: Note: Council a roval re uired if +/-) $50,000 $59 550.36 COST CENTER: ACCOUNT: C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER B/A 0.80% D. AMOUNT OF PREVIOUS CHANGE ORDERS: $00.00 E. TOTAL AMOLJNT OF ALL CHANGE ORDERS B+D $59,550.36 F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS EIA : 25% maximum 0.80% G. NEW CONTRACT AMOUNT A+E : $8 480,864.64 [t is mutually agreed that the above dollar amount and the time extension, as applicable, as set forth in this Change Order constitutes full compensation to the Contractor for all costs, expenses and damages to the Contractor, whether direct, consequential or otherwise, in anyway incident to, or arising out of, or resulting directly or indirectly; from the work performed or modified by the Contractor under this Change Order. This ChanQe Order is not valid without the followinQ si¢natures (please sipn in order and return 3 oripiieals with the Contract Cover Sheet to Purchasin� and Contract ManaPeneent denartneent): PUR-45 (Rcv 08/2018) ���.�_ � (1) Contractor r (3) Owner' (5) Capital Project �,/� 12 / 5/ 2 0 2 3 ��,��NI 12/04/2023 Date ( ) Pro�ect ArchitecdEngineer Date 2/11/2023 I'�� Date (4 ire r of Purchasing & Contract Date • n meli ° �! � r ~� Date (6) ity ttorney Date hair e Orders over $SO 000.00 re uire a Contract Cover Sheet and the ollowi si /�- 2/13/2024 (7) Mayor Date (8) `it Council Date: ebTuary 13, 2024 Agenda [tem #: 5.17 `� 2/13/2024 Date Reso►ut�on #: 2024-R0071 PUR-45 (Rcv 0812018) Project: Low Head C Pump Station Project Number: Owner: City of Lubbock 92450.9241.30000 Contracto�: Archer Western Engineer: Freese and Nichols, Inc. LU619278 Change Order No.: 004 Date: 12/04/2023 Make the following additions, modifications, or deletions to the Work described in the Contract Documents: Contract Modifications Item Description of Item Change Proposals Modify YP-2 & YP-3 CAVs CP-001 Manholes CP-001 Modify Service Power CP-001 & Misc. Electrical Control Power to LHC, Gen CP-001 SWBD CP-002 YP-2 Additional Steel Pipe CP-003 Sanitary Sewer Modification Electrical Room Cable Tray CP-004 Supports CP-006 Fence at Slide Gate Two 2" Conduits from PB-1 CP-007 to Cable Tray Fan Weather Hood CP-008 Modification Temporary Connection of CP-010 Generator CP-011 Switchboard Communication CP-012 Slide Gate Modifications CP-014 Bollards Disinfection and dish head CP-015 removal CP-016 Pressure Switches CP-017 Electrical Room Doors Unused Bid Items 1D Extra 1500 PSI Concrete 1E Extra Course Gravel 1F Extra Flowable Fill iG 24" Line Stop Service Excavate/Assist Sub/Backfill 1G Pipe 1H 30" Line Stop Service Excavate/Assist Sub/Backfill 1H Pioe Reconciliation CO-004 Bid Value I Value Credit I Addition 00 00 33,103.64 $4,000.00 $20,344.00 $8,427.00 $20,384.00 $2,633.00 $32,272.00 21,175.00 $2,705.00 $9,178.00 $17 $19 1 NET Deduct Project: Low Head C Pump Station Project Number: Owner: City of Lubbock 92450.9241.30000 Contractor: Archer Western Engineer: Freese and Nichols, Inc. LU619278 The compensation in this Change Proposal is the full, compleie, and final compensation for all costs the Contracior may incur as a result of or relating to this change wheiher said costs are known, unknown, foreseen, or unforeseen at this time, including without limitation, any cosi for delay, extended overhead, ripple or impact cost, or any other effect on changed or unchanged Work as a result of this Contract Amendment. The changes in Contract Times are the complete and final adjustments for direct impacts to the ability of the Contractor to complete the Work within the Contract Times and are the only adjustments to which the Contractor is entitled. a Original Contract Price $8,540,415.00 b Previously Approved Change Order Amounts $0.00 c Adjusted Contract Price ( a+ b) $8,540,415.00 d Change Order Amount ($59,550.36) e Revised Contract Price ( c+ d) $8,480,864.64 f Percent Change to Date: -0.70% g Change in Days this Change Order: 0 Completion Dates: Original Previous Current Substantial h 03/16/2022 i 03/04/2023 j OS/13/2023 Final k 05/05/2022 I 04/23/2023 m 07/02/2023 Recommended by: �RE�SE-AND NICHOLS, INC. �/%{� 12/04/2023 ame Date Approved by: ARCHER WESTERN Approved by: CITY OF LUBBOCK ��zf��. ��� 12/5/2023 Name Date Name Date r� ����o� Change Proposal PROJECT OWNER BUILDER DESIGNER CM CP No. CP Description Specification Drawing / Detail Low Head C Pump Station City of Lubbock Archer Western Contractors Freese and Nichols, Inc. Bret Calvert CP-001 See attached cost proposal from Builder. PROJECT NUMBER 92450.9241.30000 NOTIFICATION BY BUILDER The Builder proposes to make the additions, modifications, or deletions to the Work described in the Contract Documents, as shown in Attachment and requests that you take the following action: Purpose of Change Proposal Requested Action Basis of Compensation Required Documentation Total Change Proposal Amount Adjustment in Contract Time Attachment Response to RCP Issue a Work Change Directive or Change Order for the described change Unit Prices - Detailed cost breakdown attached showing labor, materials, equipment, and all other costs for this change $ -98,490.00 0 days CP-001-ModificationstoManholesandElectricalMods.-Jane Jenks-Pending.pdf Submitted By Jane Jenks Date 07-12-2021 CONSTRUCTION MANAGER'S RESPONSE Recommended Basis for Compensation: Lump Sum calculated using Cost of Work provisions in General Conditions paragraph 13.01 Authorization to proceed with changes must be approved by the Owner through Change Order in accordance with the Contract Documents. Status Recommended for Approval Action Final Distribution Comments Will be added to future CO-001 Attachments CP-001-ModificationstoManholesandElectricalMods.-Jane Jenks-Pending.pdf Response By Bret Calvert Date 07-12-2021 Change Proposal Project Lubbock Lowhead C Pump Station Project Number Owner City of Lubbock Contractor Archer Western Construction 220149 Construction Manager Freese and Nichols Design Professional Freese and Nichols Change Proposal No. 1 Description RCP 001 & RCP 002.1 Specification Drawing No. Detail Description Modifications to Manholes and Electrical Modifications. Reference Document 001 & � Request for a Change Proposal No. 002.1 ❑ Request for Information No. O Shop Drawing Deviation Request No. ❑ Field Order No. Contractor proposes the following modifications to the Contract Documents: See attached Cost Proposals. Basis of Compensation ❑ Unit Prices � Lump Sum calculated using Cost of Work provisions in the Contract � Time and Materials using Cost of Work provisions in the Contract The compensation offered for this Change Proposal is the full, complete, and final compensation for all costs Contractor may incur because of or relating to this change whether said costs are known, unknown, foreseen, or unforeseen at this time, including without limitation, any cost for delay, extended overhead, ripple or impact cost, or any other effect on changed or unchanged Work because of this Change Proposal. Requested changes in Contract Times are the complete and final adjustments for impacts to the ability of Contractor to complete the Work within the Contract Times and are the only adjustments to which Contractor is entitled. All terms and provisions of the Contract Documents remain in effect except as specifically modified by this Change Proposal. Proposed Net Change in Cont�act Price this Change Proposal $ -98,490.00 Proposed Net Change in Contract Times this Change Proposal 0 days Required Documentation � Detailed cost breakdown attached showing labor, materials, equipment, and all other costs for this change ❑ Schedule attached to show impacts and justification for requested change in Contract Times Reason for the Change Proposal Request of Owner. Change Proposal Page 1 of 2 Change Proposal Attachments RCP 001 & RCP 002.1 Requested Action ❑ Issue a Field Order � Issue a Work Change Directive or Change Order for the described changes Requested by Frank Etier Date 7/7/2021 Action by Owne�'s Project Team Change Proposal No. ❑ Accepted ❑ Not Accepted - Revise and Resubmit ❑ Cancelled Comments Response by Date Change Proposal Page 2 of 2 Modify CAV & Man Holes Project Name: Project Owner: Consultant Project No. Contractor: Attention Low Head C Pump Station Project No: City of Lubbock Initiated By: Archer Western Construction, Ltd. Date: The following change in the contract on this project is proposed • Work shall not commence until authorized by the OWNER. Description of the Proposed Change: Modify CAV at STA 1+05 and Man Hole at STA 1+85 All work shall be in accordance with the terms, stipulations, & conditions of the original Contract Documents. If the work herein provided for is Approved by Change Order, the time of completion will be: ❑ Increased Q Decreased Q Unchanged by 0 calendar days This change will: Q Add � Deduct a Not Change Comments: ($4,989) �: ��.3 �lr;� �, �;. �. GENERALCONTRACTOR I 4/5/2021 DATE Frank Etier BY 220149 Q Owner Engineer Contractor 4/5/2021 UTRWD a Accepted ❑ Rejected BY (Consultant Name): DATE Owner's Action: ❑ Accepted ❑ Rejeded BY (Owner) Date • 3 c A v� D 3 m x o� 5 n n N W C »� � �-� °•W p � m c� � = vm 3c.��O �n' O N 5 z m m m D �m' �� ��Om '"t � � n � Z � r O° o�i � �Zil z� � Q O • C � � S: o> 3 � :o � O � f/l o � D� n N � � (�j � `� � �N 3 =��� � • N �Q°c v o m� o s � � � o x . o r. m `� : � � z m (� o � � � 2 z o v v o � . c m m � � � � � � v D N'° N � �� � . .. � . '�' o m o Q� w � p �n (j � D � m� o 0 0 � � � � o � � � � o 0 0 0 < — mm rrrr rrrrr v,� � � � yy cncncncn cn�cn(ncn �O a. ° ti � pp 2222 C D o p m � y � �1 �1 �7 :0 � � � nP o� $ � � � � o� H � o o �^ e (P� (�e cn . � a°' m��� N w a C � '^"' � �°. 8, °, � o iv ��» En v� a �» cs� ts► ei tf► �» w w a w cn .i � � (p� c� D� r- �- � o000 oo�ooao cnoocn � c� cn y � O� Q v O O O O O O�l O O O O O O � � o y ,7� O O O O O O O O O� I C O O O O O O = O N O O O O O O � r v � o� o 0000 0000 o D 0 0000 0 0 0 0 0 + � N (� ba A A p A w m � N W A N 7 pp N CT CJ1 � O IV fD y f0 N � � 69 Efl W W � N N O O�I O� Oo 01 a A O O V(�O O � � m D ' o 0 0 0 � a ^' o � o 0 o m v 3 � o � � c o N � � � � c v 0 0 0 o C C 0 0 0 � ID ID 00 0 0 0000 0� N N � .. .. �o �D 0 0000 o aa A y^q A A N W A � ^� `TJ - C�O i�0 (fl W N(A tA Hi lfl N EA (A Gf: Gf; (A ffl 69 EA b9 � W W d9 EA 69 EA N A U ,�J � ON 000000 OD 000 0000 OO�IOOOD 0000 � tp -1.L •• 00 IJ O(O W 0000 W 000 0000 00�100 0000 ���' •N AON NO000� 000 0000 00�1f00 0000 �� Page: 1 Oldcastle Infrastructure'" Contract & Proposal � A CNM COMPANV Quote No..........: S118249-5 1100 Heritage Parkway Telephone..: 817-477-2914 oldcastleinfrastructure.com Mansfield, TX 76063 Fax .............: 817-453-4007 Quote To ...: Archer Western Construction LLC 1411 GREENWAY DR IRVING, TX 75038 2410 Reference.: K le Shrell 972-589-1688 Contact: Order No Date Customer No Terms S118249 2/10/2021 000031 Net 30 Days Ship To...: Lubbock Low Head C Pump Station 7310 MILWAUKEE AVE LUBBOCK, TX 79424 0625 Phone: Cash discount Delivery terms Quote valid foi FOB Job Site 30 days Group: a �Qt i Unit Item Description Mark Unit price Amour 1.00 Ea 9024000 6' DIA. TEMPORY TEST PLUG 6' TEST PLUG 2,957.33 2,957.3 TYPE 2 MH X 7.29' Depth. CIP Tee Base by Others. 1.00 Ea 1105040 MH 72"x5' Riser 1.00 Ea 1105430 MH Lid/Groove 72"x13 w/30" Con 1.00 Ea 1102206 Grade Ring 30" Dia. X 6" 1.00 Ea 1102205 Grade Ring 30" Dia. X 4" 1.00 Ea 7106617 Ring & Cover - 30 Dia. CI V1430 "CITY OF LUBBOCK Group: b-1 � Unit Item 1.00 Ea 9024000 1.00 Ea 1105050 1.00 Ea 7200366 Description 6' DIA. 6" CAV TYPE 2 MH X 5'-9" Ave. Depth. CIP Tee Base by Others. MH 72"x5'-9" Riser 72" ID Special Galvanized Steel Cover Plate w/ Access. Mark Unit price Amour 6' CAV 5,095.00 5,095.0 Increase of $2,617.77 � Unit Item Description Mark Unit price Amour 1.00 Ea 9024000 6' DIA. 6" CAV TYPE 3 MH X 5'-0" 6' CAV 2,477.23 2,477.2 Ave. Depth. CIP Tee Base by Others. Kyle, Please see below: 1105050 MH 72"x5'9" Riser $1810 7200366 72" ID Special Galvanized Steel Cover Plate w/ Access $3,285 1105020 MH 72"x3'1/2" Riser $135723 1105430 MH Lid/Groove 72"x13 wl30" Con 5715 1102206 Grade Ring 30" Dia. X 6" S60 7106617 Ring & Cover 30Dia. CI V1430"CITY OF LUBBOCK LOGO WATER" $345 Let us know if there's anything else you need. Thanks, /'w Lane Fife Page: 2 Oldcastle Infrastructure'° Contract & Proposal ° ACRMCOMPANV Quote No..........: S118249-5 1100 Heritage Parkway Telephone..: 817-477-2914 oldcastleinfrastructure.com Mansfield, TX 76063 Fax .............: 817-453-4007 Quote To ...: Archer Western Construction LLC 1411 GREENWAY DR IRVING, TX 75038 2410 Reference.: K le Shrell 972-589-1688 Contact: Order No Date Customer No Terms S118249 2/10/2021 000031 Net 30 Days �Qt � Unit 1.00 Ea 1.00 Ea 1.00 Ea 1.00 Ea Ship To...: Lubbock Low Head C Pump Station 7310 MILWAUKEE AVE LUBBOCK, TX 79424 0625 Phone: Cash discount Delivery terms FOB Job Site Item Description Mark 1105020 MH 72"x3'-1/2" Riser 1105430 MH Lid/Groove 72"x13 w/30" Con 1102206 Grade Ring 30" Dia. X 6" 7106617 Ring & Cover - 30 Dia. CI V1430 "CITY OF LUBBOCK LOGO-WATER" Group: c � Unit Item 1.00 Ea 9024000 1.00 Ea 1105650 1.00 Ea 1105620 1.00 Ea 1106315 2.00 Ea 1102206 1.00 Ea 7106617 Group: d � Unit Item 4.00 Ea 9024000 4.00 Ea 1105620 4.00 Ea 1105650 Description 7' DIA. 6" SAMPLE OUTLET TYPE 2 MH X 9' Depth. CIP Tee Base by Others. MH Riser 84"x5' Riser MH Riser 84"x2' Riser MH Lid 84"x13" w/30" Conc Grade Ring 30" Dia. X 6" Ring & Cover - 30 Dia. CI V1430 "CITY OF LUBBOCK LOGO-WATER" Description 7' DIA. 36" BFV VAULT TYPE 1 MH X 17' Depth. CIP Base by Others. MH Riser 84"x1'-6" Riser MH Riser 84"x6' Riser w/48"x46" Unit price Mark Unit price 7' SAMPLE OUl 5,274.27 Mark Unit price 7' SAMPLE OUl 10,775.18 Quote valid foi 30 days Amour Amour 5,274.2 Amour 43,100.7 Page: 3 Oldcastle Infrastructure'u Contract & Proposal � A CNH COMPANV Quote No..........: S118249-5 1100 Heritage Parkway Telephone..: 817-477-2914 oldcastleinfrastructure.com Mansfield, TX 76063 Fax .............: 817-453-4007 Quote To ...: Archer Western Construction LLC 1411 GREENWAY DR IRVING, TX 75038 2410 Reference.: K le Shrell 972-589-1688 Contact: Order No Date Customer No Terms S118249 2/10/2021 000031 Net 30 Days � Unit Item 4.00 Ea 1105650 4.00 Ea 1105646 4.00 Ea 7200366 Group: e �Qt i Unit 1.00 Ea Ship To...: Lubbock Low Head C Pump Station 7310 MILWAUKEE AVE LUBBOCK, TX 79424 0625 Phone: Cash discount Delivery terms FOB Job Site Description Doghouse MH Riser 84"x5' Riser MH Riser 84"x4'6" Riser w/Flat Joint 84" ID Special Galvanized Steel Cover Plate w/ Access. Item Description 9024011 NOTES: 1. ALL STEPS OR LADDERS TO BE PROVIDED AND INSTALLED BY OTHERS. 2. SSMH COVER INFLOW PROTECTION INSERT AND/OR JOINT WRAP EXCLUDED. Mark 7' (16") BOV Mark NOTES Unit price Quote valid foi 30 days Amour Unit price Amour DESIGN NOTES: Precast structures to be designed per ASTM C478 & C913 specs. Precast structures quoted exclude any and all coatings, liners, or admixtures unless expressly written above. MATERIAL ON HAND: All structures with special, non-stock pieces will be invoiced in full at 60 days after their production date and subject to monthly storage fees of 2.5% thereafter. When disposal is required, a disposal fee of 20% will be applied. RETURNS: All returns will require prior approval before arrival. Un-damaged stock items will be subject to a 25% restocking fee plus any incurred freight charges. Page: 4 Oldcastle Infrastructure'" Contract & Proposal ' A CRM COMPANY Quote No..........: S118249-5 1100 Heritage Parkway Telephone..: 817-477-2914 oldcastleinfrastructure.com Mansfield, TX 76063 Fax .............: 817-453-4007 Quote To ...: Archer Western Construction LLC Ship To...: Lubbock Low Head C Pump Station 1411 GREENWAY DR 7310 MILWAUKEE AVE IRVING, TX 75038 2410 LUBBOCK, TX 79424 0625 Reference.: K le Shrell 972-589-1688 Contact: Order No Date Customer No Terms S118249 2/10/2021 000031 Net 30 Days Phone: Cash discount Delivery terms Quote valid foi FOB Job Site 30 days Acceptance of returned material will be at Quality Control team's final discretion. Special, non-stock items are non-refundable and will be subject to any incurred freight charges plus a disposal fee. EXPEDITING: All prices listed above are based on current standard production lead times. The expediting of any orders, when possible, will b subject to additional expediting fees to be defined on a case-by-case basis. ENGINEERING: Any precast structures requiring engineering review & approval will not be put into production until receipt of approved submittals. PLAN REVISIONS Initial precast engineering and CAD design work are included in pricing above. Any design changes or plan revisions requiring engineering beyond initial scope of work will be subject to additional engineering fees. TxDOT SIMP DESIGN PROGRAM: All structures bid under TxDOT SIMP design program are priced assuming thinwall knockout per the TxDOT design. Requeste< pre-formed blockouts require an additional fee of $200 per structure. DELIVERY: Pricing includes delivery in full truckloads with contractor off-loading upon arrival. Demurrage fees of $125/hour will begin 2 hours after arrival at site. Deliveries less than 40,000# will be subject to an additional short-load fee. Page: 5 Oldcastle Infrastructure`" Contract & Proposal � A CRM COMPANY Quote No..........: S118249-5 1100 Heritage Parkway Telephone..: 817-477-2914 oldcastleinfrastructure.com Mansfield, TX 76063 Fax .............: 817-453-4007 Quote To ...: Archer Western Construction LLC Ship To...: Lubbock Low Head C Pump Station 1411 GREENWAY DR 7310 MILWAUKEE AVE IRVING, TX 75038 2410 LUBBOCK, TX 79424 0625 Reference.: K le Shrell 972-589-1688 Contact: Order No Date Customer No Terms S118249 2/10/2021 000031 Net 30 Days Phone: Cash discount Delivery terms Quote valid foi FOB Job Site 30 days All products and services listed on this Quotation are provided under the Standard Terms and Conditions located at https://oldcastleinfrastructure.com/customer-support/terms-conditions/material-sales/ QUOTATION TOTAL US 58,904.55 IMPORTANT: This proposal is based on standard terms and conditions. Items and quantities shown are the basis for the quotation, and we are not responsible for any discrepancies between this list and actual items or quantities. (Accepted by) Sales Person: Lane Fife Telephone: By: (Position) (Date) Etier, Jr, Frank From: Brady Shipman <bls@VALVEANDEQUIPMENT.COM> Sent: Friday, March 5, 2021 11:18 AM To: Shrell, Kyle Subject: RE: [EXTERNAL] Submittal has been rejected with status of Approved as Noted CAUTION: This email originated from outside the organization. Do not click links or open attachments unless you are expecting them and know the content is safe. Kyle, 1. I have sent the release to the factory. 2. The unit price to deduct for the 1- 6" Air Valve is $4,238.00 net each. Please let me know if you have any questions. Thank you, Brady Shipman Direct: 281-324-I500 x 1 http:l�'www. valveandequipment.com� NOTICE: Due to a global supply chain disruption from Covid-19, all lead times are estimated and could change. Valve & Equipment Consultants, Inc. cannot be held liable for extended delivery dates during this period. Your understanding is appreciated during this unique time. NOTICE: This communication is covered under the United States Federal Electronic Communications Privacy Act (ECPA), and the Communications Assistance to Law Enforcement Act (CALEA). Any unauthorized interception of this communication is strictly prohibited by law. If you are not the intended recipient of this message, you are hereby notified that any dissemination, distribution, or copying of this communication is strictly prohibited. If you have received this communication in error, please notify the sender immediately by email and delete the message and associated attachments if any. We will not hesitate reporting to the proper authorities any infringement of these rights under the laws of the United States of America. ***DO 1VOT ACCEPT CHANGES TO BANKING ACCOUNT INFORMATION***** ***Important notice to all our customers re�ardin� information securitv*** We will never ask you via ema.il to change bank details for a payment, in the unlikely event that you receive an email purporting to come from this company which asks you to amend payment details, please do not act upon it. Contact us by phone or fax (phone number purposely not typed here for security reasons) to verify the information From: Shrell, Kyle <kshrell@walshgroup.com> Sent: Tuesday, March 02, 2021 1:17 PM To: Brady Shipman <bls@VALVEANDEQUIPMENT.COM> Subject: FW: [EXTERNALJ Submittal has been rejected with status of Approved as Noted Please send me the deduct amount associated with the Air Valve. Thank you, Kyle Shrell Assistant Project Manager Archer Western 14ss Greenway Drive Irving, Texas, 75038 C: 972.589.1688 From: Brady Shipman <bls@VALVEANDEQUIPMENT.COM> Sent: Tuesday, February 23, 2021 11:21 AM To: Shrell, Kyle <kshrell@walsh�roup.com> Subject: RE: [EXTERNAL] Submittal has been rejected with status of Approved as Noted CAUTIdN: This email originated from outside the organization. Do not click links or open attachments unless you are expecting them and know the content is safe. Kyle, please find the attached revised 3" Air Valve submittal and revised equipment list. Please note: Engineers comment stafes the VMIDOST w/ VMC-SDPT would be accepted, but with the VMGSOPT installed on the top of the valve you wou/d not be able to rouie the drain line to the floor drain. Please let me know if you have any questions or concerns before resubmitting. Thank you, BradY Shipman Direct: 281-324-1500 x 1 http:!�'v�nvw. valveandequ ipment. comr NOTICE: Due to a global supply chain disruption from Covid-19, all lead times are estimated and could change. Valve & Equipment Consultants, Inc. cannot be held liable for extended delivery dates during this period. Your understanding is appreciated during this unique time. NOTICE: This communication is covered under the United States Federal Electronic Communications Privacv Act (ECPA), and the Communications Assistance to Law Enforcement Act (CALEA). Any unauthorized interception of this communication is strictly prohibited by law. If you are not the intended recipient of this message, you are hereby notified that any dissemination, distribution, or copying of this communication is strictly prohibited. If you have received this communication in error, please notify the sender immediately by email and delete the message and associated attachments if any. We will not hesitate reporting to the proper authorities any infringement of these rights under the laws of the United States of America. ***DO NOT ACCEPT CHANGES TO BANKING ACCOUNT INFORMATION***** ***Important notice to all our customers re�ardin� information security*** We will never ask you via email to change bank details for a payment, in the unlikely event that you receive an ema.il purporting to come from this company which asks you to amend payment details, please do not act upon it. Contact us by phone or fax (phone number purposely not typed here for security reasons) to verify the information RCP 002 Modifications to Service Power Project Name: Project Owner: Consultant Project No.: Contractor: Attention Low Head C Pump Station Project No: City of Lubbock Initiated By: Archer Western Construction, Ltd. Date: 7he following change in the contract on this project is proposed • Work shall not commence until authorized by the OWNER. Description of the Proposed Modifications to Electrial Service Per RCP 002 issued by Freese and Nichols. All work shall be in accordance with the terms, stipulations, & conditions of the original Contract Documents. If the work herein provided for is Approved by Change Order, the time of completion will be: ❑ Increased ❑ Decreased � Unchanged by 0 calendar days This change will: ❑ Add ❑✓ Deduct ❑ Not Change Comments: ($93,501) GENERALCONTRACTOR DATE Frank Etier 220149 ❑� Owner ❑ Engineer ❑ Contrador 7/1/2021 BY City of Lubbock ❑ Accepted ❑ Rejected BY (Consultant Name): DATE Owner's Action: ❑ Accepted ❑ Rejected BY (Owner) Date � 3 vv� A 3 m��v� D '-� ° o n v � m ddc�i � m ca3�o ?m o N r aai 3 y `°m'�� ��Om '� � �r Q • m �`�° �° -Zi �� °' O m m z � C o�io�iA m 3 ��AO .� 1 y O j D T(7 N 0 � j Q n � � 0 ( � m ^ 2 y �. A ai 3 � — � • y � N A G° c £ z � m� � 0 `� m �. �o x . ov m" . � =m � z crt'i n , o � � N Q, m ... z � o v �' � 0 m m 0° � � � r c - � a' � � o � (� A D �a � � �a� � . ..3 . � �O O a � � m fJ =� n v � °' � � � o � r o00 ���� o0000 0000 � m �, � o � m° DD triltri)tri)tri) �Tcri1N� 2222 C � Z a p m y y c� ��� A � m mga - � a� �my� ; ^ � e�c� e� °' � c cn a a �.aoca'n � m m ;e e e c � v,viv��» ^� �°. �. � v+ u+ cn Fn Fn F» En �n Fn a w u� � � m n a'�-�r o000 0000o cnoocn � u„°, maPc o000 00000 0000 �� e y ^ O O O O O O O O O O O O O O O O .11 n � tn tn 5ri tn tn � 0 0 000o d o0 o O O O O O EA (A EA W Q N p � O O O O O O O O O � fp O O O O O N N d `� � O O O d T o O O � N y O � O O 0000 O N fn y — N a O O O O O O � g a c � c � Q ? o 0 0 o p a m ty o� b�o b 3 v, —� N 0 O O � � � ' � C O ' � N f�0 t�0 y� � V A f�D [�O fn W N A d� � o� b� A� � C C o � � °' m ao fn fn w o -� �D N � o 0 oovcn � � � 0 0 0 0000 o aa 0 0000 „ „ � � b9 t«O tND 1«D W N p �� A O� � � W OI fA fA OI EA fA d! EA OI 69 Ki 69 fA EA W O fA fA EA fA fA fA fA fA EA N W� W Oo O O OD O O O O OD O O O O O V(li O O O O O O O O O O� � W O O O C O O O O C O O O O O O O O O O O O O O O O J� T O O O O O O O O O O O O O O O O O O O O O O O O O Job # B20-071 June 30, 2021 Frank Etier Archer Western 1411 Greenway Drive Irving, Texas 75038 972-457-8500 fet ier�ri �walshgrouecom ELECTRIC RE: Request for change proposal No. 002 Below is a breakdown of the request mentioned above. 1. Modifv Service Pox�er Change incoming service routing and include tap from TR-01 Deduct from contract amount 2. Control power circuit to "LHG GEN-SWBD " Proposed lump sum 3. 120V Cable Trav Clari �catron Reviewed and verified This item was already taken under consideration based on original plans and proposal (ref: sheet E-10 of conformed drawings) Contract Amount - Deduct — Item 1 Addition, Item 2 New Grand Total Sincerely, Jimmy Sledge -$126,605.00 $34,937.00 no change $2,144,936.00 - $ 126,605.00 $ 34,937.00 $2,053,268.00 Regulated by The Texas Department of Licensing and Regulation, P. O. Box 12157, Austin, Texas 7871 l, 1-800- 803-9202, 512-463-6599; website: www.license.state.tx.uslcomnl PO Box 12741 7540 N. Andrews Hwy Odessa Tx 79768 432-362-4326 �i►��� POovElrAg BuSiRESS WOrld��ndE Detail Bill of Material Project Name: LHCPS - ATS Negotiation No: BOCG0714XOK1 General Order No: Alternate No: 0002 Item No. Qtyr Product Description 1 Automatic Transfer Quote Date: 5/12/2021 Switches Product Family: Wall Mount Switch Type: Automatic Contactor 40A thru 1600A 120v, 60hz, 1 Phase, 2 Wire, 2 poles Transition Mode: Open Controller Type: ATC-900 Continuous Current: 40 Amps Withstand: 50kA spc/30kA (0.05 sec) Normal Source Terminals: (1) #14-2/0 CU/AL Emergency Source Terminals: (1) #14-2/0 CU/AL Load Side Terminals: (1) #14-2/0 CU/AL Neutral Terminals: No Neutral Bar Standard Features:1b, 1c,1d, 2a, 3b, 3c, 3d, 4b, 5, 5k, 6b, 7a, 8e,10b, 10d,12c,12d,12g,12h, 14e, 14f, 15e, 15f, 23m, 26j, 26k, 32a, 42, 48f, 48u, 49c, Optional Features: 29g, Catalog No ATC9C3X20040ADU Qty 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 List of Materials ATC9C3 2 Poles 40 Amps Enclosure - Type-4X (304 Steel) 1 b. Time Delay Normal to Emergency Adj. 0-9999 sec 1c. Time Delay Normal Disconnect Adjustable 0-10 Sec 1 d. Time Delay Normal Reconnect Adjustable 0-60 Sec 2a. Time Delay Engine Start Adj. 0-120 sec 3b. Time Delay Emergency to Normal Adj. 0-9999 sec 3c. Time Delay Emergency Disconnect Adjustable 0-10 Sec 3d. Time Delay Emergency Reconnect Adjustable 0-10 Sec 4b. Time Delay Engine Cool-off Adj. 0-9999 sec 5j. Emergency (S2) Sensing Under Voltage/Under Freq 5k. Emergency (S2) Sensing Over Voltage/Over Freq 6b. Test Pushbutton 7a. Time Delay Engine Fail Adj. 0-6 sec 8e. Bypass All Timers 10b. Source Selector - Utility to Utility or Utility to Gen 10d. Source Selector - Generator to Generator 12c. LED Indicator Normal Position 12d. LED Indicator Emergency Position 12g. LED Indicator Normal Source Available 12h. LED Indicator Emergency Source Available 14e. Normal (S1) Source Available (1 Form C) 14f. Emergency (S2) Source Available (1 Form C) 15e. Normal (S1) Position Indication (1 Form C Micro Switch Outputs) 15f. Emergency (S2) Position Indication (1 Form C Micro Switch Outputs) 22. Ground Bar 23m. Auto Plant Exerciser Selectable-DisabledlDaily/Calendar Dates, 0- 600 min, Load/No Load w/Fail Safe 26j. Normal (S1) Sensing Under-voltagelUnder-frequency 26k. Normal (S1) Sensing Over-voltage/Over-frequency 29g. Selector Switch for Auto or Non-Auto Operation 32a. Time Delay Neutral Adjustable 0-120 seconds 42. IBCICBC Seismic Qualified 48f. MODBUS Communication 48u. USB Port for Memory Stick 49c. Multi-Tap Transformer E:��N Paevering 8vsiriess WorJdviide Eaton Selling Policy 25-000 applies. Detail Bill of Material Project Name: LHCPS - ATS Negotiation No: BOCG0714XOK1 General Order No: Alternate No: 0002 All orders must be released for manufacture within 90 days of date of order entry. If approval drawings are required, drawings must be returned approved for release within 60 days of mailing. If drawings are not returned accordingly, andlor if shipment is delayed for any reason, the price of the order will increase by 1.0% per month or fraction thereof for the time the shipment is delayed. Seller shall not be responsible for any failure to perform, or delay in perFormance of, its obligations resulting from the COVID-19 pandemic or any future epidemic, and Buyer shall not be entitled to any damages resulting thereof. � � � � 4 � b � 0 O � 0 � 0 � 0 �+ o $ N � N O Y N D 1 � � N O O A O D O C i B y z � � r 2 n V � D � � >� mman aionn mm� y or�+cmQ�r u�c mw u ru�v Vn/nn m o«cmrmna� } .a�omp �oou uaw � � o0 � ur � �.a Y 9l1 �' 11]6 � �cn G � �y3 8 � ii� £ —_ �� 3g o.ro b im �re �.e lia � inss hsi, � is�� �w� xe �$ y�s sG� ,r.. „�o � � �i-_ ___ _ -�i� � � V �A a € 63� � � � ieo � ��'` § � ��� � �� � ,i� d �g�`� � � >8 _N � N x� � �� � i I: > � �� ian Nnl � ii.� Ini] � $ � � � m • � * o • �, -a; a 4�������a; ��� �� � � a � �a� �� �� �� � � ; a�� �� � � � ; ��� �� � � � � ; ��� � � ��� �a S � g I � �� � � i ��� � 5 � YS i6 �V y'�'��' a a� � g� g r�� FREESE �NICHOLS Change Proposal PROJECT OWNER BUILDER DESIGNER CM CP No. CP Description Specification Drawing / Detail Low Head C Pump Station City of Lubbock Archer Western Contractors Freese and Nichols, Inc. Bret Calvert PROJECT NUMBER 92450.9241.30000 CP-002 Install additional 24" & 30" steel pipe to make connections to existing valves. NOTIFICATION BY BUILDER The Builder proposes to make the additions, modifications, or deletions to the Work described in the Contract Documenis, as shown in Attachment and requests that you take the following action: Purpose of Change Proposal Requested Action Basis of Compensation Required Documentation Total Change Proposal Amount Adjustment in Contract Time Attachment New Change Proposal Issue a Work Change Directive or Change Order for the described change Lump Sum calculated using Cost of Work provisions in General Conditions paragraph 13.01 - Detailed cost breakdown attached showing labor, materials, equipment, and all other costs for this change $ 9,944.00 0 days CP-002-YP-2AdditionalSteelPipe-Kyle Shrell-Pending.pdf Submitted By Kyle Shrell Date 10-07-2021 CONSTRUCTION MANAGER'S RESPONSE Recommended Basis for Compensation: Authorization to proceed with changes must be approved by the Owner through Change Order in accordance with the Contract Documents. Status Recommended for Approval Action Final Distribution Comments will be added to future change order Attachments CP-002-YP-2AdditionalSteelPipe-Kyle Shrell-Pending.pdf Response By Bret Calvert Date 12-07-2021 Change Proposal Project Low Head C Pump Station Project Number Owner City of Lubbock 92450.9241.30000 Contractor Archer Western Construction Co. LLC. Construction Manager Design Professional Freese and Nichols, Inc. Change Proposal No. 1 Description YP2 Extra Pipe Speci�cation Drawing No. C-16 Detail Description 1& 2 Reference Document � Request for a Change Proposal No. 004 ❑ Request for Information No. ❑ Shop Drawing Deviation Request No. ❑ Field Order No. Contractor proposes the following modifications to the Contract Documents: Install additional 24" & 30" steel pipe to make connections to existing valves. Basis of Compensation ❑ Unit Prices � Lump Sum calculated using Cost of Work provisions in the Contract ❑ Time and Materials using Cost of Work provisions in the Contract The compensation offered for this Change Proposal is the full, complete, and final compensation for all costs Contractor may incur because of or relating to this change whether said cosis are known, unknown, foreseen, or unforeseen at this time, including withour limitation, any cost for delay, extended overhead, ripple or impact cost, or any orher effec[ on changed or unchanged Work because of this Change Proposal. Requested changes in Contract Times are the complete and final adjustments for impacts ro the ability of Contractor to complete the Work within the Contract Times and are the only adjustments to which Contractor is entitled. All terms and provisions of the Contract Documents remain in effect except as specifically modified by this Change Proposal. Proposed Net Change in Contract Price this Change Proposal $ 9,944.00 Proposed Net Change in Contract Times this Change Proposal 0 days Required Documentation � Detailed cost breakdown attached showing labor, materials, equipment, and all other costs for this change ❑ Schedule attached to show impacts and justification for requested change in Contract Times Reason for the Change Proposal Existing valves are located north of coordinates provided in the contract documents; see attached drawing C-16. Change Proposal Page 1 of 2 Change Proposal Attachments Requested Action ❑ Issue a Field Order � Issue a Work Change Directive or Change Order for the described changes Requested by Date Action by Owner's Project Team Change Proposal No. ❑ Accepted ❑ Not Accepted - Revise and Resubmit ❑ Cancelled Comments Response by Date Change Proposal Page 2 of 2 ��x WMu,�ww�cv�vsi n<oxxe.,� Ia��5awa9llWmrols�.w SavMerma �� L � �� I I __"___ � �- ��_��__ _______________ i � - �� <n � � a �Z_ _ Z Nl'S0'IPE � � Z 0 D � � N�3�.�. � ��„ `m P . r��„g gV � a iP oa - ��y�, � .. •i . � r__F___�___ 1 ��1 ___le__��I__�__ sy f� �v:s m y� g�op s �$m m m 9 ����►���►�►����►�� C 0 v i � A Cn y O Z � e � � � �� D� D9T � �g �p� g 0 'P ��x o mo ;s �Zy N o,�.� Tm �Sc <� ' m�^ < m s; �Oa x fi yaF T sf "os � oP n� $Oi �= m� ;�� R p;=;a=== ��se -.a � ;T >^y m o0 00� � N"g � o gT -� a:S! m mi g�� '�o �°° K$� ➢ a� t'�°- 0 �o i �s W� �o �zo � �s ;� `� ' � io Ti omi i'o �gc mi mo A� � �m � mm my�� i `o 0 ao N s o om � - o� � � = c � 'm°'D^ i � gm � "� o �s� z 3 � i y _ ° E � o a z ~ i s � 9 � � 0 � s �Z Z � � Z v � D � N 0 • Z Z � O 2 v � D � O o' `s �— .�� 0 mpo �o Z= .. ^gg Fg ^g mpp :o �o ^vTD �� n og� oF - 7�z Do mQ z p 3 '� ~ S :N� �N oi� a� i 6�^ "_� =oo �� �o� _� a i�n�N p s om� - � io � z�£ ; p 0 �� o � i< A = �m � a � i �� s "y3 - o �n - Go m�S a � � CITY OF LUBBOCK, TEXAS LOW HEAD C PUMP STATION � , „ ,� , � �, � � �� , � �� � � „ ,� � �, �, � , „ �, �� � � ,� , , �� � �� , ; 11 1 I I I � � u 3 W 11 � 1 I N�� 11 �o� I I �� I I wg� II I 1 I I � � II NI 1 I 11 II 1 1 I II I 1 �l 1 I 11 I � I I � � �� I � II 1 I 11 I _�� i i fi-'31 -_F__�___J l__ � _ �I I�v�J _ __ __ +1L = _ _ _ _ _ _ ii � n �� � i II g �� m�w� �� � �; � s n �N. 11 ^wm� � ii gV�� _ ,� T �, �� �� 11 11 u u II 11 n - u u n u n — — — �;-- — — _ -- _ � _II-- �. _ _ -� _ Nl' — _ _ 11 -- - �f.— — — — — _— — � �n�E w���,� �, 0 1 tM Me1.Nluttfr�4 � NAST.Y ,YP-2 Additional Pipe i Project Name: Project Owner: Consultant Project No. Contractor: Attention Low Head C Pump Station Project No: City of Lubbock Initiated By Archer Western Construction, Ltd. Date: 220149 Q Owner Engineer Contractor 10/7/2021 The following change in the contract on this project is proposed • Work shall not commence until authorized by the OWNER. of the Fabricate and Install additional 24" & 30" steel pipe for tie-in to existing valves. Location of existing valves are located North of coordinates provided in the contract documents. Frank Etier BY City of Lubbock All work shall be in accordance with the terms, stipulations, & conditions of the original Contract Q ACCepted ❑ Rejected Documents. If the work herein provided for is Approved by Change Order, the time of completion will be: Q Increased ❑ Decreased � Unchanged by 0 calendar days This change will: � Add Q Deduct a Not Change Comments: $9,944 GENERALCONTRACTOR DATE BY (Consultant Name): DATE Owner's Action: Q Accepted ❑ Rejected BY (Owner) Date . y ��� aD �x�oW o� ci m n d� 3� 3 a d �� 1 m O pl r Z � m �.D �nri � � � ��Om '~' • � � o� �'� O° o'� �mz� � 0 n n � � � Ommz 0 C � m m 'm 3 ���0 .a U! O j D T(j N n A � � y 3 =v, o � �1 m fD — • y �1 {+° c v o m�z�,o � �o x � �. . my 0 0 � • � � Z � � Q° 2 z � v o 0 � � c n � � � � -+ v D (O/1 a (O/1 N � D � . ..3 . � o d m o �' Q � � �m O n � n � � Z � � m r o00 0000 � 0000� rnrnrnao �� "' a �" m m ��� N a r r r r r T? Z � o � m g DD d v�Ttntncn 2222 � � o Q m y y cm :U ��1 :U � � m '� � 01 g m� a m � � c^m'^ � �a � " ae ��(P�(� y a $ � �. aa o "' v� � �Do` � ,c � d�'� e\' C v d ^� S�-�. -�n N fA fA fR ffl � Fp fp !fl fA fq O FA fq 69 fq fA A W N V � O N n a m�� O 0000 O 00000 (7100(71 �j < p �„H �Q o 0000 0 00000 0000 � a �y ogg o 0000 0 00000 000o aW _. w � o � � � ��� N � .y.. � � p W� p� GH fA Hi di � N� p�D � p ��p p NOAD 00 Q �j � W o 0 OO OO 0 0 O O O O � »� O O O O � O O O O O O O �� n O (p y) O .. M n N o N a � � � d 3� N � � � f �o � � FA ER fR fA OD �. 7 O tQn p�p � O O OOOOT N ?� O O O O O O O N X Q O O O O O O y > > N � � cn �+ m � cn ,,`^„ N v � � o`� D w u < rm.� .°v° o 0 0 0 o m N a 3 � � o o p � � G O 0 0 � � C N .. fA .�i O w �+ � � � a � 0 0 0 � O O .�-. X N ID O O O O O O O n j. �� 0 0000 � � aa � .. .. � m (� u� cn xr t� w �+ �+ 0 0/ � �o 0o rn �,q m^ fD � *k � V N AO�i�N? t0 (n Oc V A O�DT (p A V1 OD OI � W� W Oo fA EA W fA fR FA fR O iN V/ W V1 OD N 00 O O N � � , A i0 O W OI O O O O O/ O O O O O O O O O O O O� O O O O <O O • t0 A O A O O O C O O O O O O O O C O O O O O C O O O O �� •(D O O O O O O O O O O O O O O O O O O O O O O O O O O r� NICHOLES Change Proposal PROJECT OWNER BUILDER DESIGNER CM CP No. CP Description Specification Drawing / Detail Low Head C Pump Station City of Lubbock Archer Western Contractors Freese and Nichols, Inc. Bret Calvert CP-003 Sanitary Sewer Changes per RCP 003 issued by FNI. PROJECT NUMBER 92450.9241.30000 NOTIFICATION BY BUILDER The Builder proposes to make the additions, modifications, or deletions to the Work described in the Contract Documents, as shown in Attachment and requests that you take the following action: Purpose of Change Proposal Requested Action Basis of Compensation Required Documentation Total Change Proposal Amount Adjustment in Contract Time Attachment Response to RCP Issue a Work Change Directive or Change Order for the described change Lump Sum calculated using Cost of Work provisions in General Conditions paragraph 13.01 - Detailed cost breakdown attached showing labor, materials, equipment, and all other costs for this change $ 4,000.00 0 days CP-003-RCP-003SanitarySewerModifications-Frank Etier, Jr.-Pending.pdf Submitted By Frank Etier, Jr. Date Ol -27-2022 CONSTRUCTION MANAGER'S RESPONSE Recommended Basis for Compensation: Authorization to proceed with changes must be approved by the Owner through Change Order in accordance with the Contract Documents. Status Recommended for Approval Action Final Distribution Comments No final comment. Attachments CP-003-RCP-003SanitarySewerModifications-Frank Etier, Jr.-Pending.pdf Response By Bret Calvert Date 02-23-2022 RCP 003 Sanitary Sewer Service. Project Name: Project Owner: Consultant Project No. Contractor: Attention Low Head C Pump Station Project No: City of Lubbock Initiated By Archer Western Construction, Ltd. Date: The following change in the contract on this project is proposed • Work shall not commence until authorized by the OWNER. Description of the Modifications to Sanitary Sewer Per RCP 003 issued by Freese and Nichols. All work shall be in accordance with the terms, stipulations, & conditions of the original Contract Documents. If the work herein provided for is Approved by Change Order, the time of completion will be: ❑ Increased Q Decreased Q Unchanged by 0 calendar days This change will: �,Add Q Deduct Q Not Change Comments: $4,000 , Q�"L GENERALCONTRACTOR 1/27/2022 DATE Frank Etier 220149 Q Owner Engineer Contractor 1/27/2022 BY City of Lubbock Q Accepted ❑ Rejeded BY (Consultant Name): DATE Owner's Action: ❑ Accepted Q Rejected BY (Owner) Date . 3 � � m � 3 m x o� S n �i n � 'c m� `•m�^°m�W Z � O c� m� a m n 3� O � m p N 5 z �' m � y � m'� p �� O m '� . � • z � °' � �� O° 'm -nimz'i � 0 C � m d 3 ��� O � V! N O j D T(i N 1 �' nN� � Vi m �1 S �' 0 A Q� 3 � m � � co • y � �7 Q° c v `� � m � o �� Q � tn o x . o � m `" v o o A . p m � Z � � Q° 2 z � 0 o a w � c °' -�+ -�i v � � Om O a � �v � . .. 3 . � � O o a a � � � p � A � av �' r- o00 0000 -� o000o mo<n� �_{ m„ N p � ag mm rrrr a rrrrr v, = m y y cn cn cn cn d t� T tn cn cn o Z � o m em ���� � m a �� o' z o� �� a Q � c v> � � m � a � C i ^� C� fA fA fR fA (fl EA fR fR fR A W t�li V � N a� r O O O O O O O O O f 71 O O N n' � � y m o� O O O O O O O O O O O O O � � e y > O O O O O O O O O O O O O O A n V1 �q N GN � � N w N � A fA ffl fA fA � O J �' A N� OOO(NJI O W pD a (Nj� � p 0000 H 1p 00 00 C a v u+ fn � a � � 3 T ao � � �, �, �, w � 0 0 C A o O O Ni 6i1 fN :A (11 7• H H J O O O O O O O N N Ot a O O O O O O 7Q N ? � m s al � c�ii `_^, w � o a � � c°�i� '^ � o � � 3 y a D N �� oo g � 3 vo � o o � � � N .► � A A 0 0 0 � a o b o '^ A � 0 0 0 0000 � � � 0 0000 ° a a .. .. A a a a o � fA t0 C�/� A�vA W O�i W WNt�/i d �� • � w v+ � � rn m m Fn v+ v> cn v+ v+ cn ao v+ v+ v+ v+ ui rn o cn n> N ? p _w aorn �<ou� o00 0000 0 00000 000cn o00 � V O 001 A NIV O 000 0000 O 00000 0000 � Of t0 O A N O N O O O O O O O O O O O O O O O O O O O W r•��NICNO�S Change Proposal PROJECT OWNER BUILDER DESIGNER CM CP No. CP Description Specification Drawing / Detail Low Head C Pump Station City of Lubbock Archer Western Contractors Freese and Nichols, Inc. Bret Calvert CP-004 Changes per RCP-004 issued by FNI. PROJECT NUMBER 92450.9241.30000 NOTIFICATION BY BUILDER The Builder proposes to make the additions, modifications, or deletions to the Work described in the Contract Documents, as shown in Atfachment and requests ihat you take the following action: Purpose of Change Proposal Requested Action Basis of Compensation Required Documentation Total Change Proposa) Amount Adjustment in Contract Time Attachment Response to RCP Issue a Work Change Directive or Change Order for the described change Lump Sum calculated using Cost of Work provisions in General Conditions paragraph 13.01 - Detailed cost breakdown attached showing labor, materials, equipment, and all other costs for this change $ 20,344.00 3 days CP-004-RCP-004EIectricalRoomCableTraySupports-Frank Etier, Jr.-Pending.pdf Submitted By Frank Etier, Jr. Date Ol -27-2022 CONSTRUCTION MANAGER'S RESPONSE Recommended Basis for Compensation: Authorization to proceed with changes must be approved by the Owner through Change Order in accordance with the Contract Documents. Status Recommended for Approval Action No Action Required Comments CM has no issue with the CP. Attachments CP-004-RCP-004EIectricalRoomCableTraySupports-Frank Etier, Jr.-Pending.pdf Response By Matthew Weaver Date 02-16-2022 RCP 004 Electrical Room Cable Tray Project Name: Project Owner: Consultant Project No. Contractor: Attention Low Head C Pump Station Project No: City of Lubbock Initiated By: Archer Western Construction, Ltd. Date: The following change in the contract on this project is proposed • Work shall not commence until authorized by the OWNER. of the Supply and Installation of Electrial Room Cable Tray Supports Per RCP 004 issued by Freese and Nichols. Frank Etier 220149 � Q Owner ❑ Engineer ❑ Contractor 1/27/2022 BY City of Lubbock All work shall be in accordance with the terms, stipulations, & conditions of the original Contract Documents. If the work herein provided for is Approved by Change Order, the time of completion will be: � Increased ❑ Decreased 0 Unchanged by 3 calendar days This change will: 0✓ Add ❑ Deduct ❑ Not Change Comments: $20,344 f'i�Gvnr� � ��CJ� ' GENERALCONTRACTOR 1/27/2022 DATE ❑ Accepted ❑ Rejected BY (Consultant Name): DATE Owner's Action: ❑ Accepted ❑ Rejeded BY (Owner) Date ; �y �m c�3 m��v � n m—a,W a,c om-D�1 �•m`" °' Z � O m �� a� \�� 3a��A �Z O U! . r cnZ rm D`D � ��' y ��Om '� • c� x� �a O� o�i -�II�f1Z � � � � c� m m m O � d mm y � nd � � DTnO � � o � a � n�`7 o V! m v; �, x y°, a at 3 � m � r co � • y 2 � �A°c m � � ? v N m7� ' (i " � o �c • O �7 N O fD o A • p > > Z n a o � d N � � � Z n v o 0 � N r C � � � '{ O n n O �� � � �a � . .. 3 � lA O O v � w � p � � � � J � (� �C A N C � m r� O O O O O O 00 � O O O� � O OD A A � U P jil�n rrr= f rrrrr N Z � a �° DD cnV)U)p � Cn�1CntAln 2522 C d 0 0 m e° � ��� A � m � � (P� m p C� N > > ty ^ � O V n �, u � m a m � 1D ^� � � � c�i� v+ f» f» f» � o a. �n Fn Fn o fn v+ <» o f» a w<n v " � r- o000 00000 <noocn � m � y 0 Q O O O O O O O O O O O O O � � � y � o O O O O O O O O O O O O O Q O EA fA fA 3 � � <J1 � t0 � � � y y 0 � V V O p� p p O N (l1 � O O O O O O O -I (JI 00 00 � � � � C � � � � 'O � W V � � y 'O � W a (71 U1 fA fA EA O� �. N N O v pp pp O O O O Cl� N W p� O O 0000 OD � Q V O O O O O � .Z7 � m n u' '^ � D � f" W a W c o 'o a � $ o $ w p n� � � � �� � � � � vo 0 0 � � � a � � � .'G .'0 � � � �' a a �� o o v+ � m c c 0 p� o 0 0000 01 fD �.N. � O1 N N 0 0000 ° n a a z � s o �i � fA � fA � � y� y� � N y� t0 N V � N y.� W i0 A A�O) 01 O�D W (�7�0 AN W � N TF' - t0 A EA V V O1 � 0o fA EN fA fA EA EA O OD EA EA fA O 01 EA A O O N � O OD N O fT O V V tJl 000 0000 O 0000 N 0000 W O - f0 A G? C N O CD 000 000 C C 0000 OD 00 C C �� N O N O O O O O O O O O O O O O O O O O O O O O W • - 8c MA1 N Bid Proposal for 4" (4.5" OD) Sch 40 Thrd Galv Pipe - Low Head C ARCHER WESTERN CONSTRUCTION 1411 GREENWAY DRIVE IRVING, TX 75038 Contact: Frank Etier (T) 817-825-6716 fefier@walshgroup.com Job 4" (4.5" OD) Sch 40 Thrd Galv Pipe - Low Head C Lubbock, TX Bid Date: 01/21/2022 05:00 pm Bid #: 2160671 Sales Representafive Jeff McCord (M) 817-876-1151 (T) 469-498-1880 (F) 844-756-6513 Jeff.McCord@coreandmain.com Core & Main 6135 Second Street NW Albuquerque, NM 87107 (T) 505-344-0223 CORE & MAIN IS NOT LIABLE FOR DELIVERY DELAYS, CANCELLATIONS OR PRICE INCREASES RESULTING FROM ANY CAUSE BEYOND OUR CONTROL. THESE INCLUDE BUT ARE NOT LIMITED TO: MANUFACTURERS' SHORTAGES, AVAILABILITY OR TIMELtNESS OF TRANSPORTATION, MATERIAL, FUELS, OR SUPPLIES 01/21/2022 - 1:51 PM THIS QUOTE IS NOT A CONTRACT TO SUPPLY MATERIAL OR GUARANTEE OF PRODUCT AVAILABILITY. PagE 1 Of Actual taxes may vary • - 8c MAIN 4 Bid Proposal for 4" (4.5" OD) Sch 40 Thrd Galv Pipe - Low Head C ARCHER WESTERN CONSTRUCTION Core & Mai Job Location: Lubbock, TX 6135 Second Street NV Bid Date: 01/21/2022 05:00 pm Albuquerque, NM 8710 Core & Main 2160671 Phone: 505-344-022 Fax: 505-344-035 Seq# Qty Description Units Price Ext Price DUE TO CURRENT SUPPLY CHAIN DISRUPTIONS, MATERIALS ARE SUBJECT TO PRICING AT TIME OF SHIPMENT. MATERIAL AVAILABILITY AND TIMELINESS OF SHIPMENTS CANNOT BE GUARANTEED. THIS TERM SUPERSEDES ALL OTHER CONTRACTUAL PROVISIONS. This project is being bid in accordance with AIS requirements 10 AIS MATERIAL 20 252 4 SCH40 GALV STL PIPE T&C USA USA MATERIAL THREADED ENDS WITH COUPLINGS FOR THREAD PROTECTION FREIGHT INCLUDED 80 12 4 GALV MI CPLG USA CLASS 150 COUPLINGS FREIGHT INCLUDED FT 38.58 EA 111.91 Sub Total Tax Total 9,722.1E 1,342.9i 11,065.Of 0.0C 11,065.08 Branch Terms: Please understand all material pricing and availability is unstable at this time. If you are the successful bidder, please inform Core & Main as soon as possible to secure pricing. Delivery will need to be taken when available. We cannot be responsible for storage of material. This is strictly on the Contractor and Owner to secure a location for stored materials. If delivery cannot be taken, pricing is subject to change to market price at time of delivery. We apologize for this inconvenience but it is currently out of our control. UNLE55 OTHERWISE SPECIFIED HEREIN, PRICES QUOTED ARE VALID IF ACCEPTED BY CUSTOMER AND PRODUCTS ARE RELEASED BY CUSTOMER FOR MANUFACTURE WITHIN THIRTY (30) CALENDAR DAYS FROM THE DATE OF THIS QUOTATION. CORE & MAIN LP RESERVES THE RIGHT TO INCREASE PRICES TO ADDRESS FACTORS, INCLUDING BUT NOT LIMITED TO, GOVERNMENT REGULATIONS, TARIFFS, TRANSPORTATION, FUEL AND RAW MATERIAL COSTS. DELIVERY WILL COMMENCE BASED UPON MANUFACTURER LEAD TIMES. ANY MATERIAL DELIVERIES DELAYED BEYOND MANUFACTURER LEAD TIMES MAY BE SUBJECT TO PRICE INCREASES AND/OR APPLICABLE STORAGE FEES. THIS BID PROPOSAL IS CONTINGENT UPON BUYER'S ACCEPTANCE OF SELLER'S TERMS AND CONDITIONS OF SALE, AS MODIFIED FROM TIME TO TIME, WHICH CAN BE FOUND AT: https://coreandmain.com/TandC/ 01/21/2022 - 1:51 PM THIS QUOTE IS NOT A CONTRACT TO SUPPLY MATERIAL OR GUARANTEE OF PRODUCT AVAILABILITY. P8g2 Z Of Actual taxes may vary Request for a Change Proposal Project Low Head C Pump Station Project Number Owner City of Lubbock Contractor Archer Western Construction Manager Freese & Nichols, Inc. Design Professional Freese & Nichols, Inc. LUB19278 Request for Change Proposal No. 4 Description Cable Tray Supports in Electrical Room Specification Drawing No. Detail Description Reference Document ❑ Request for a Change Proposal No. ❑ Work Change Directive No. ❑ Shop Drawing Deviation Request No. ❑ Contract Document Owner requests a Change Proposal for the following modifications to the Contract Documents: Provide galvanized 3.5" diameter standard pipe (4" OD and 0.23" wall thickness) above electrical room cable trays in accordance with attached sketch. Couplings need to be located within 4ft of a support location (+/-zft). Owner requests that Contractor prepare a Change Proposal for the changes in the Contract Documents described in this Request for a Change Proposal. The compensation offered for this Change Proposal is to be the full, complete, and final compensarion for all costs Contractor may incur because of or relating to this change whether said costs are known, unknown, foreseen, or unforeseen at this time, including without limitation, any cost for delay, extended overhead, ripple or impact cost, or any oiher effect on changed or unchanged Work because of this Change Proposal. Requested changes in Contract Times are to be the complete and final adjustments for impacts to the ability of Contractor to complete the Work within the Contract Times and are the only adjustments to which Contractor will be entitled. All Lerms and provisions of the Contract Documents remain in effect except as specifically modified by this Change Proposal. Authorization to proceed with changes must be approved by the Owner in accordance with the Contract Documents. Reason for the Change Proposal Provide method of hanging cable trays in electrical room. Attachments Description of Modification Sketch Requested by Matt Weaver Date 1/19/2022 Follow Up Action by Owner's Project Team Change Proposal No. ❑ Accepted ❑ Not Accepted - Revise and Resubmit ❑ Cancelled Request for a Change Proposal Page 1 of 1 Description of Modifications Page 1 of 1 �a C� N K 0� O C �C.�.N TN ym O �,ya.. �'O-nfCf < AD���' �d� w �� fD � C � X y = N M O fl �A y � „y. SV1S0 ~7 N' M d � � (O O O � � 7 �7d pC. = 7 �; � r. �� � n _� �j 7 Jp0 Kp. � � � � ^� Oi Q O a� �a a y � m A � F � �� �o � � � o � o, 0 — --. r��NICHOLS Change Proposal PROJECT OWNER BUILDER DESIGNER CM CP No. CP Description Specification Drawing / Detail Low Head C Pump Station City of Lubbock Archer Western Contractors Freese and Nichois, Inc. Bret Calvert CP-006 PROJECT NUMBER 92450.9241.30000 Gate and Fence modifications per RCP #006. AWC will remove existing, additional, fence. Titan will install new, additional, fence. Sheet C-15 NOTIFICATION BY BUILDER The Builder proposes to make the additions, modifications, or deletions to the Work described in the Contract Documents, as shown in Attachment and requests that you take the following action: Purpose of Change Proposal Requested Action Basis of Compensation Required Documentation Total Change Proposal Amount Adjustment in Contract Time Attachment Response to RCP Issue a Work Change Directive or Change Order for the described change Lump Sum calculated using Cost of Work provisions in General Conditions paragraph 13.01 - Detailed cost breakdown attached showing labor, materials, equipment, and all other costs for this change $ 5,603.00 0 days CP-006-FenceatSlideGate-Kyle Shrell-Pending.pdf Submitted By Kyle Shrell Date 05-20-2022 CONSTRUCTION MANAGER'S RESPONSE Recommended Basis for Compensation: Authorization to proceed with changes must be approved by the Owner through Change Order in accordance with the Contract Documents. Status Action Comments Attachments Response By Recommended for Approval Final Distribution Approved. M. McBee 06.09.2022 CP-006-FenceatSlideGate-Michael McBee-Pending.pdf CP-006-FenceatSlideGate-Kyle Shrell-Pending.pdf Matthew Weaver Date 06-09-2022 RCP 006 Slide Gate Fence Modifications Project Name: Project Owner: Consultant Project No.: Contractor: Attention Low Head C Pump Station Project No: City of Lubbock Initiated By: Archer Western Construction, Ltd. Date: The following change in the contract on this project is proposed • Work shall not commence un[il authorized by the OWNER. of the Proposed Change: 220149 Q Owner Engineer Contractor 5/10/2022 Gate and Fence modifications per RCP tt006. AWC will remove existing, additional, fence. Titan will install new, additional, fence. Frank Etier BY City of Lubbock All work shall be in accordance with the terms, stipulations, & conditions of the original Contract � ACCepted � RejeCted Documents. If the work herein provided for is Approved by Change Order, the time of completion will be: �Increased ❑ Decreased Q Unchanged by 0 calendar days This change will: Q Add ❑ Deduct ❑ Not Change Comments: $5,603 GQi �/(�%�'PiGG GE RAL CONTRACTOR 5/10/2022 DATE ��i��l � BY (Consultant Name): 6/9/2022 DATE Owner's Action: � Accepted ❑ Rejected BY (Owner) Date . 3 �c p 3 mFo �S C� ii y �� C 1 �— m �� � � � m � � � 3 a d�� � Z O VI r Z m D ?°r'' o3i �G�Om � • S � � r �° 'm �mz� � m n � ,� Ommz p � � m 3 � � � O 4/ O j D T Ci N O m n � � � N 3 = A � � � • y .Zm1Q°� v � � �� o � �o x • � mN : v � Z .Z1 n m n � � m Q° c Z ^ v v � � � � � v c� c� D �a � ln ln a ln = adm °x � D >>� w ol� d n - 9 � T � � m r O O O O O-� O O O O O 0 D 0 0 N j j O y JN"� � g DD V�f% N m (r/�TN C �� Z � cD 2222 � p m� F :V:V:O� � o � � � m � " a � (e p1 o' a Q sN � > > m� w c y ^� ��. En v+ � Fn vi vi �' w v�'"i � � m n 3 m o00 00o cnoocn � a,�°, � o00 000 0000 �D n �y S o00 000 0000 v � a � � � (y 0 A W N W� N A� d � A O Q � � A cno 0000 ° D co � �� o00o n f, tn vi � m W o 0 o d 3 0 0 � o y O o � � O O O d � j O O O O X a O O O O �j � m `� m � o 0 0 0 � a a m � o g o �, 3 ^ a D N �O � p fp � � � � o Oo � N d C "' — c N � H » En �n c � 70 � � � 'a�o 'aWo � o � a a w "p� o 0 o cr� vi � w � eCD 1CD 0 0 000 � F �� 0 000 � = a a � .. .. � m d � � � u� u� w vi o `D FA N 6f1 GA N fA A W fA V1 V1 y F d► � O � f0 OD ' fA A(�� fA fH fA 41 FA (�O EA fR EA fA fA A O U1 N N O ,(O N A W A O A O O O O O O O O O O O O O O O O O � OD Ol N� IJI O(ll C G O O O O O O O O O O O O O (J1 OD O 00 O O O O O O O O O O O O O O O O O O �:/� � � ���� FENCE AND SUPPLY CO. Date: 301 South Highway 377 Crossroads, TX 76227 Phone:940-365-9999 Fax:940-365-9952 Change Submitted To: Name / Work Order Number: Phone / Fax: Email: Job Name: Job Location: Date of Plans: Archer Western 5/9/2022 Lubbock Low Head C Pump Station [saac Spencer 1 Frank Etier 972-457-8500 Lubbock Low Head C Pump Station 7310 Milwaukee Avenue Lubbock TX 79424 Request for change Fence at Slide Gate 1 dated 5/2/2022 PROPOSED CHANGES: Add fence section to close gap in opening at slide gate. Additional labor and material required to add fence secNon at slide gate opening. Width of opening to be field verified. Includes approx. 5-10 linear feet of fence section to close gap from 20' gate opening. * Includes 8' high custom ornamental steel fence section to match slide gate * Includes 3" SQ. posts * All materials black powder coated ontract Add: $3,890.00 Contract Add: matcrials is guarantccd to bc as spccificd. All work to bc complctcd in a workmanlikc manncr according to standard practiccs Any altcration o� iation from spccifications - involving cxtra costs will bc cxccutcd only upon writtcn ordcrs, and will bccomc an cxtra chargc ovcr and abovc thc matc. All agrccmcnts contingcnt upon strikcs, accidents of dclays bcyond our control. Owncr to carry firc, tomado and othcr ncccssar} iranca Cusbmcr agrces to add valuc to contract valuc all vcrifiablc matcrial pricc incrcascs during thc hfc of thc contract. Sorcnscn Industrics . m Fcncc & Supply Company w�ll not bc hcld liablc in any way for dclays causcd by matcrial shortagcs $3,890.00 Phillip Coit 972-977-7726 pcoitna.titanfen ce. com � 11 • � r-� ����o� Change Proposal PROJECT OWNER BUILDER DESIGNER CM Low Head C Pump Station City of Lubbock Archer Western Contractors Freese and Nichols, Inc. Bret Calvert PROJECT NUMBER 92450.9241.30000 CP No. CP-007 CP Description Re-routing conduits per RCP-007. AWC will remove and replace concrete sidewalk. Denard to complete remainder of work per the attached quote. Note - density testing and/or concrete testing will be owner furnished. Specification Drawing / Detail E-5,12,23 NOTIFICATION BY BUILDER The Builder proposes to make the additions, modifications, or deletions to the Work described in the Contract Documents, as shown in Atfachment and requests that you take the following action: Purpose of Change Proposal Requested Action Basis of Compensation Required Documentation Total Change Proposal Amount Adjustment in Contract Time Attachment Response to RCP Issue a Work Change Directive or Change Order for the described change Lump Sum calculated using Cost of Work provisions in General Conditions paragraph 13.01 - Detailed cost breakdown attached showing labor, materials, equipment, and all other costs for this change $18,949.00 0 days CP-007-Two2-inchconduitsfromPB-1toCableTray-Kyle Shrell-Pending.pdf Submitted By Kyle Shrell Date 06-24-2022 CONSTRUCTION MANAGER'S RESPONSE Recommended Basis for Compensation: Authorization to proceed with changes must be approved by the Owner through Change Order in accordance with the Contract Documenfs. Status Action Comments Attachments Response By Recommended for Approval Final Distribution Approved CP-007-Two2-inchconduitsfromPB-1toCableTray-Kyle Shrell-Pending.pdf Matthew Weaver Date 07-05-2022 RCP 007 Conduit Change Project Name: Project Owner: Consultant Project No. Contractor: Attention Low Head C Pump Station Project No: City of Lubbock Initiated By Archer Western Construction, Ltd. Date: The following change in the contract on this project is proposed • Work shall not commence until authorized by the OWNER. Description of the Proposed Change: 220149 Q Owner Engineer Contractor 6/22/2022 Re-routing conduits per RCP-007. AWC will remove and replace concrete sidewalk. Denard to complete remainder of work per the attached quote. Note - density testing and/or concrete testing will be owner furnished. Frank Etier BY City of Lubbock All work shall be in accordance with the terms, stipulations, & conditions of the original Contrect � qCtepted ❑ Rejected Documents. If the work herein provided for is Approved by Change Order, the time of completion will be: ❑ Increased ❑ Decreased Q Unchanged by 0 calendar days This change will: Q Add ❑ Deduct ❑ Not Change Comments: $18,949 /� �e �'�i�e�� G ERALCONTRACTOR 06/28/2022 DATE ��.�Gh�/ /v I C� BY (Consultant Name): 06/27/2022 DATE Owner's Action: ❑ Accepted ❑ Rejeded BY (Owner) Date 3 vv, m c�D mFo 0 5 � � � o p ' y � pCp C �� c- m � Oo p m ac� � � m 3 n� � O ?m o tR � O .y �� � �� A Z � ,.� . � mz m D �d d �G�Om . z .."�.� � wr �o � �mZ� � � �� � d 3 A��o � v, � o � D�c�N O =i � n m'7 o y 3 3 x�°� C� . N ,Zm)Q°c O � � Z Q m � � �. � N x • m � O � Z �1 n n � �I y � � � Z O � � ] C � � � � � � n n D Na � � �o � O � p y 2 � A N ^. � w ol, � � � � �� S � � � �`O o00 00� o oow ornrnw �� �, x m m rrr f rrn �� Z �O $ � D vi a� Vl m in �t � y n. y'� � N 2222 C O 5 � O � a�o � �1 ,�1 �1 � � � in � m � m � m ol'� o'� c o°° �� °� 3 g N � � � an �n ;� � o cd'i+ � F» cn <n v o 0 0 3 m o0 00o ui000i � � � �y �S o0 000 0000 �� 'm n v+ a n�i ��' (q �Zf N t` W N N AO�DN d N N b V V 0 000 N � �' � 7 Q � N � O O O O O � O O O O O y� 7 d a > fA y! O �. „° � � � N � � N � N � d O v o � a. n � N � 0 � 000 d N�D Q o O O 000 fp 7 � N C1 N m � � f� N � O O O O C � N O. 0 0� �g � o � � f �' 3 N � � \ O O 7 � x d C ~ m O N w t» tn c � .'0 .'G �� w w � � � d � m A a A a w � �n �' C C c0 co A .+ 7 O Ip Ip v (n N ry � V' O O O O(71 f1 a O .y► �► O O Ip ID � o00 ° � a a m � m m n � � � � t j o o3i � 00 V Of f.1 7a �� W N�(�j� W p�D tl1 A N A�W N � •• � V V V N N O fA fA EA fA H1 t0 fA df N� O fA OD O N N � � O �l AA V OJ O 000 00tJ� O 000 OOOtn T 10 O � in �vm �o.i o 000 000 0 000 000o A • f T N� N O N O O O O O O O O O O O O O O O �� V Job # B20-071 (RCP007 PB-1) June 2, 2022 Kyle Shrell-Assistant Project Manager Archer Western 1411 Greenway Drive Irving,Texas 75038 C: 972.589.1688 kshrell@walsh�roup.com ELECTRIC RE: City of Lubbock Low Head C Pumps Station - RCP007 (PB-1) Dennard electric proposes to provide materials labor and equipment, using standard rates working (5) 8-hour days M-F for the City of Lubbock Low Head C Pump Station. RCP007 -(2) 2" for conduits from PB-I to Cable Tray. Scope of Work: Excavate from existing Pull Box (PB-1) to Pump Station Building and core drill (2) 2" holes in pull box and Pump Station Building exterior wall. Fabricate and install rebar cage, base spacers and concrete blocks for ne�v duct bank. [nstall (2) 2" PVC sch-40 conduits with PVC coated Aluminum 90`elbows from pull box to building. Install stainless steel conduit supports on interior wall of pump station as required and wall penetration seals at exterior wall. Complete installation of exposed (2) 2" aluminum conduits from underground conduit stub-ups to existing cable-tray. [nstall pull string and pour cement for completion of duct bank. Backfill ditch with previously removed spoils and meet with Archer Westem on job completion. Pricing as follows: Materials Concrete and associated materials: $ 675.00 Conduits and associated fittings: $ 5,400.00 Equipment Mini Excavator and associated equipment: $ 1,910.00 Trucks and tools: $ 485.00 Labor Electricians: $ 5,025.00 Total: $13,495.00 ExcepNons: Pricing does not include Sales Taxes or Bonding costs. The terms and conditions outlined in this proposal are valid for 30 days. An authorized signature below constitutes acceptance of this offer by company. Company shall be responsible for any additional costs caused by changes. Sincerely, Signature: Troy Owen Print: _ Estimator Title: Regulated by The Texas Department of Licensing and Regulation, P. O. Box 12157, Austin, Texas 78711, 1-800- 803-9202, 512-463-6599; website: www.license.state.tx.uslcomnl PO Box 12741 7540 N. Andrews Hwy Odessa Tx 79768 432-362-4326 r•� NICHO�S Change Proposal PROJECT Low Head C Pump Station PROJECT NUMBER OWNER City of Lubbock 92450.9241.30000 BUILDER Archer Western Contractors DESIGNER Freese and Nichols, Inc. CM Bret Calvert CP No. CP-008 CP Description Modify weather hoods per RCP-008. Furnish and install (4) welded aluminum wall-sleeve extensions, to accommodate the physical attachment of the weather hood to the extension, and the extension to the wall housing, for complete, attached enclosures on all 4 supply fans, as requested. Install required anchors, at required spacing, as directed. Backer rod, caulking and/or grout will be completed by Titus and/or AWC. Specification Drawing / Detail 2/M-4 & 2/A-3 NOTIFICATION BY BUILDER The Builder proposes to make the additions, modifications, or delefions to the Work described in the Contract Documents, as shown in Attachment and requests that you take the following action: Purpose of Change Proposal Response to RCP Requested Action Issue a Work Change Directive or Change Order for the described change Basis of Compensation Lump Sum calculated using Cost of Work provisions in General Conditions paragraph 13.01 Required Documentation - Detailed cost breakdown attached showing labor, materials, equipment, and all other costs for this change Total Change Proposal Amount $ 8,427.00 Adjustment in Contract Time 0 days Attachment CP-008-FanWeatherHoodModification-Kyle Shrell-Pending.pdf Submitted By Kyle Shrell Date 07-05-2022 CONSTRUCTION MANAGER'S RESPONSE Recommended Basis for Compensation: Lump Sum calculated using Cost of Work provisions in General Conditions paragraph 13.01 Authorization to proceed with changes must be approved by the Owner fhrough Change Order in accordance with the Contract Documents. Status Action Comments Attachments Response By Recommended for Approval Final Distribution To be included in future CO CP-008-FanWeatherHoodModification-Kyle Shrell-Pending.pdf Matthew Weaver Date 07-18-2022 RCP 008 Fan Weather Hood Modifications Project Name: Project Owner: Consultant Project No. Contractor: Attention Low Head C Pump Station Project No: City of Lubbock Initiated By: Archer Western Construction, Ltd. Date: The following change in the contract on this project is proposed • Work sha// not commence until authorized by the OWNER. Description of the Proposed Change: 220149 Q Owner Engineer Contractor 6/30/2022 Modify weather hoods per RCP-008. Furnish and install (4) welded aluminum wall-sleeve extensions, to accommodate the physical attachment of the weather hood to the extension, and the extension to the wall housing, for complete, attached enclosures on all 4 supply fans, as requested. Install required anchors, at required spacing, as directed. Backer rod, caulking and/or grout will be completed by Titus and/or AWC. Frank Etier BY City of Lubbock All work shall be in accordance with the terms, stipulations, & conditions of the original Contract � ACCepted � Rejetted Documents. If the work herein provided for is Approved by Change Order, the time of completion will be: �Increased ❑ Decreased Q Unchanged by 0 calendar days This change will: Q Add ❑ Deduct ❑ Not Change Comments: $8,427 /� �e �'�i�e�� G ERALCONTRACTOR 6/30/2022 DATE v��tG%�'/ C BY (Consultant Name): 07/04/2022 DATE Owner's Action: � Accepted ❑ Rejected BY (Owner) Date 3 ��� m 3 m���� � N •�, c Q y � �co a � � n m c��C� � r^ �fl-��� �Z O �O/! � c =z m � � nri � 3 ��Om '� . m � v � � � p° v -nimz� � � '� � � ���0 � f/1 3 O 7 D T n N � � ! n N � � N 3 D =m°� � • y .im1Q°c Q � �� o • � �o � . �. . m `� . � � z n o � � N � � C Z � v v o' � ' � m m r c � � -ni v � � c� O Om p r -�I c -NI ln (n v cn . ..? aoc°'iom o c�i3ofl-v� � � p o-� ��� � ~ � o- c�i -�I nP � �,, o00 0�� o 000 0000w c�i �d 30 � o �� DD cracri�cri� � (ri��cra 2222 3`� �� o Z � c � � o m � �7 :U �J :U -' � m � �- � � (F� � a v, � cn � n c'� t�/� � ('� � QO \ � � C y p7 � O 7 O o Gy � 7 ���� fQ � C ^� � c� Efl �� b9 Efl EA A W C�T� v �� O n'� �� r O�1N 000 U700(T �j 7� 30 � y � p� O O O O O O O O O O � �' N� O�o o y � O O O O O O O O O O O O= j A ,. � 69 69 fA ffl �'� O 3 .C. � ,a�o O C�fl (�T� N N Q � `< � � pNp � �I V O 000(NJ� 0—y �� � cn cno 000o m��' a � o 0 0 o y?_ �y��. � � � � � m� Qv a o 0 0 °� m� � � � �- g y o � � � o00 � N o oi ,�'Qsm a Q o 000 ={� � fD � � N � v c m � � ai � � o 0 0 0 ���� 3 Q- � � N o � �� � o m D��� a D 0 0 0 =��-�-� � o 0 o n v� � d C n � N y � � a � � � � � n � 3 � .Q Q � N O O � � O y (A (D = _ W �l V � O� fD N �O � � � 7 CD N� O O �� N n � O(�/i, �y-► •y-► C �D �D cC°i, o00 � � �3 a �- a m u, v n�i o � d = n � � en v+ a► ��» o co c 69 � f!� fA v 69 v �� N N � N N' �� •• � ONf lWJ� O t~O bH UNi �A EA EA !A Efi �� Efl fA Efl 69 fA A(fl N y cn �p � Q CT � W Oo i00CT A 000 O V N O 000 OOOCT rA O N O D C O� V O� I O O O O O O O O O O O O O O O �' A � C fl� N O( T O O O O O O O O O O O O O O O � O y Q i Titus Caulking & Waterproofing, LLC 817 S. Bryan Amarillo, TX 79106 Description Lubbock Pump Station Change Order #1 - Seal perimeter of louvers per Contractor's request Change order includes travel Q u ote Date Quote # 6/30/2022 488 Rep Project Qty Total l ,917.00 Total $1,917.00 HEATING AND AIR CONaITi�NING TACLA26904E CONSTRUCTION — COMMERCIAL — RESIDENTIAL HVAC DFW Expert Air Conditioning & Heating Company - Family owned and operated since 1952 (972) 278 -3500 � 2113 5. Garland Ave. Garland, TX, 75041 � www.�arlandheatin�andair.com RCP-008 Fan Weatherhood Modifications Date: 05/31/2022 City of Lubbock / Freese & Nichols Project: Lubbock low Head C Pump Station — Lubbock, TX We propose to furnish and install (4) welded aluminum wall-sleeve extensions, to accommodate the physical attachment of the weather hood to the extension, and the extension to the wall housing, for complete, attached enclosures on all 4 supply fans, as requested. We will also add all required anchors, at required spacing, as directed. Total Change Price - $5,162.00 Please feel free to contact me any time with any questions or concerns. Thanks for the opportunity. Garland Heating and Air Cell 214-837-8122 tor a Cha Project Low Head C Pump Station Project Number Owner City of Lubbock Contract #15431 Contractor Archer Western 92450.9241.30000 Construction Manager Freese & Nichols, Inc. Design Professional Freese & Nichols, Inc. LUB19278 Request for Change Proposal No. 8 Description Fan Weather Hood Modifications Specification 2/M-4 & Drawing No. 2/A-3 Reference Document Detail Description ❑ Request for a Change Proposal No ❑ Shop Drawing Deviation Request No. ❑ Work Change Directive No. ❑ Contract Document a� Owner requests a Change Proposal for the following modifications to the Contract Documents: In reference to the fan housing and weather hoods (details 2/M-4 & 2/A-3): 1) Add duct extensions matching material and gauge of fan housing. 2) Duct extensions to be fastened to fan housing and weather hood. 3) Screw type and spacing to match existing/ manufacturer recommendations. 4) Seal sides and bottom of weather hood with backer rod in the center, caulk on the interior, mortar on the exterior. S) Weep holes above the louver not to be covered. Owner requests that Contractor prepare a Change Proposal for the changes in the Contract Documents described in this Request for a Change Proposal. The compensation offered for this Change Proposal is to be the full, complete, and final compensation for all costs Contractor may incur because of or relating to this change whether said costs are known, unknown, foreseen, or unforeseen at this time, including without limitation, any cost for delay, extended overhead, ripple or impact cost, or any other effect on changed or unchanged Work because of this Change Proposal. Requested changes in Contract Times are to be the complete and final adjustments for impacts to the ability of Contractor to complete the Work within the Contract Times and are the only adjustments to which Contractor will be entitled. All terms and provisions of the Contract Documents remain in effect except as specifically modified by this Change Proposal. Authorization to proceed winc �hanges must be approved by the Owner in accordance with the Contract Documents. Reason for the Change Proposal The fan body does not reach the weather hood due to the depth of the wall cavity. The exterior wall relief/ brick pattern creates gaps between wall and weather hood. Appropriate anchoring method of weather hoods needed. Attachments Email correspondence Requested by Matt Weaver Date 5/31/2022 Request for a Change Proposal Page 1 of 2 for a Follow Up Action by Owner's Project Team Change Proposal No. O Accepted ❑ Not Accepted - Revise and Resubmit ❑ Cancelled Request for a Change Proposal Page 2 of 2 r� NICHO�S Change Proposal PROJECT OWNER BUILDER DESIGNER CM CP No. CP Description Specification Drawing / Detail Low Head C Pump Station City of Lubbock Archer Western Contractors Freese and Nichols, Inc. Bret Calvert CP-010.4 Modified PROJECT NUMBER 92450.9241.30000 NOTIFICATION BY BUILDER The Builder proposes to make the additions, modifications, or deletions io the Work described in the Contracf Documents, as shown in Attachment and requests that you fake the following action: Purpose of Change P�oposal Requested Action Basis of Compensation Required Documentation Total Change Proposal Amount Adjustment in Contract Time Attachment New Change Proposal Issue a Work Change Directive or Change Order for the described change Time and Materials using Cost of Work provisions in General Conditions paragraph 13.01 - Detailed cost breakdown attached showing labor, materials, equipment, and all other costs for this change $ 20,384.00 0 days CP-010.4-CP003TemporaryConnectionofGenerator-Kyle Shrell-Pending.pdf Submitted By Kyle Shrell Date 10-06-2022 CONSTRUCTION MANAGER'S RESPONSE Recommended Basis for Compensation: Authorization to proceed with changes must be approved by the Owner through Change Order in accordance with the Contract Documents. Status Recommended for Approval Action Final Distribution Comments Attachments CP-010.4-CP003TemporaryConnectionofGenerator-Matthew Weaver-Recommended for Approval.pdf CP-010.4-CP003TemporaryConnectionofGenerator-Kyle Shrell-Pending.pdf Response By Matthew Weaver Date 10-26-2022 Change Proposal Project Low Head C Pump Station Project Number Owner City of Lubbock 15431 Contractor Archer Western 92450.9241.30000 Construction Manager Freese & Nichols, Inc. LU619278 Design Professional Freese & Nichols, Inc. Change Proposal No. 010 Description Temporary Connection of Generator Specification Drawing No. Detail Description Reference Document ❑ Request for a Change Proposal No. ❑ Request for Information No. ❑ Shop Drawing Deviation Request No. O Field Order No. Contractor proposes the following modifications to the Contract Documents: Temporary power was established from the generator to Pump Station 14 at the City's request. Basis of Compensation ❑ Unit Prices ❑ Lump Sum calculated using Cost of Work provisions in the Contract � Time and Materials using Cost of Work provisions in the Contract The compensation offered for this Change Proposal is the full, complete, and final compensation for all costs Contractor may incur because of or relating to this change whether said costs are known, unknown, foreseen, or unforeseen at this time, including wiihout limitation, any cost for delay, excended overhead, ripple or impact cost, or any other effect on changed or unchanged Work because of this Change Proposal. Requested changes in Contract Times are the complete and final adjusiments for impacts to the ability of Contractor to complere the Work within rhe Coniract Times and are ihe only adjustments ro which Contractor is entitled. All terms and provisions of the Contract Documents remain in effect except as specifically modified by this Change Proposal. Proposed Net Change in Contract Price this Change Proposal $ 20,384.00 Proposed Net Change in Contract Times this Change Proposal 00 days Required Documentation � Detailed cost breakdown attached showing labor, materials, equipment, and all other costs for this change ❑ Schedule attached to show impacts and justification for requested change in Contract Times Reason for the Change Proposal A potential power outage required powering PS14 from the generator to reduce power usage. Power from the generator to PS14 was not available because the new generator switchboard was not in service. The credit refers to conduit highlighted on Sheet E-4. Change Proposal Page 1 of 2 Change Proposal Attachments Archer Western Change Proposal (2 pages), itemized costs (2 pages), invoices (7 count), Plan Sheet E-3 Requested Action ❑ Issue a Field Order � Issue a Work Change Directive or Change Order for the described changes Requested by Matthew Weaver Date 10/13/2022 Action by Owner's Project Team Change Proposal No. 010 f� Accepted ❑ Not Accepted - Revise and Resubmit ❑ Cancelled Comments All material used to establish temporary power will become the City's property. Response by oate 10/19/2022 Change Proposal Page 2 of 2 CP � Temporary Connection of Generator 010 Project Name: Project Owner: Consultant Project No.: Contractor: Attention Low Head C Pump Station Project No: City of Lubbock Initiated By: Archer Western Construction, Ltd. Date: The following change in the contract on this project is proposed • Work shall not commence until authorized by the OWNER. of the Proposed Change: Connect the Generator to PS 14 with temporary wires as requested by City of Lubbock. All work shall be in accordance with the terms, stipulations, & conditions of the original Contract Oocuments. If the work herein provided for is Approved by Change Order, the time of completion will be: �Increased ❑ Decreased Q Unchanged by 0 calendar days This change will: Q Add ❑ Deduct ❑ Not Change Comments: $20,384 /� �e S�i�e�� GE ERALCONTRACTOR 10/11/2022 DATE Frank Etier 220149 Q Owner Engineer Contractor 10/11/2022 BY City of Lubbock � Accepted ❑ Rejected ��%�"��/ C BY (Consultant Name): 10/19/2022 DATE Owner's Action: Q Accepted ❑ Rejected BY (Owner) Date 3 v� m 3 m���5 n � 0o c � � °• o� � • m �n � m 3a�.��-.� Zm O � . r mZ m D��'�� ��O`m 7 • Z �� � r O° n'i -�1 m Z� �D m �� � � Ommz C o'� v � ���o � u� o � D 'n (� ry � _� n c��u � � � m = w o A � 3 m � � �o O . �' � s» � tn o m� o � . �, �o � — . _ • o .. m �' o � � � � Z m n � � � N z o v v o ? � � � � � � � � v O Da � � �a � . .. 3 . � '�' o m o � w � p fD n � � � � � � � m� o00 00� o 000 000w mO y ` � ° DD �(rA(rA � �T� 2222 C � Z ; p � 0 � �1 �1 �1 �1 3 N _ � � ^ o � ° " �, o (�P o � °. N � � � vg m� o� � �n '��'' � �� v> v> � v> <» va a w c�i, � � � (�p c� D � ooA o0o cnoocn � "'" 1D � oocNn o00 0000 � �� o fn � � � � �' F^ c�'"o w rn yi � o w w w o o �o 0 0 0 °' Q � � o 0 0 0 0 0 0 0 � .z 0 0 0 � 0 0000 m m d � 0 0 0 0 � m 0 0 o m � yO � O O O O O 01 � d O O O O � a O O O O a Q c m n D � o 0 0 0 ' S �7 C. N o� �� � 0 3 o n'D 0 0 � o\° p p 7 c C p O O Q � C n N M GH GH � ?� � � � � � n � � 0� o O O 00 � C= � � A A y� yq � N N! fAA A� I V N O O A n �� CJ� CT rn oocNi, ° a a w u► v+ c� n � a o�o ao � o � - c�"'o otOo o w `�Oa � w� Fn �» cs� v� �» � cs� �» en �» �» cs� �» o N � ( O A O( O A O O A O O O O O A O O O O O O O O W� •• � A V Cn IJOO IV 000 OON O 000 0000 � - co o> �o <noo vi o00 oocn o 000 0000 o A � 0 � � z : �, o c � � � n �- � fD U O � Q � � fl- L v�i (D � Z � � � n � � -�, < �• Q � � m � � c a _ -� r�p v`�+ r (D 7 r+ C � � oS, n ii — � - � � � n O � L � S � O �e (D = C � Q n °rt', � n a ' a � Z � Q C � � C � fD = ni� y � � � u C �' °i �' i rt � � � o rr �p (D ' �, < � S m , < �� : Q n � -a - m � -� s n � � \ �ii i� � � c � -n m' Q 3 (D N C (D 3 � _ � � �� �c000 vrn cn�wiv� N� � . . . . . . . . . m u�i C o C�� � d c �� ��= lN'� n m Z o 0o co rt rt c� � rt � m n�__= 3 D� O � f1 �. �. o�i 3 � � c� �� Z O O � �'i � Z N Ol � � � � O- N v� r N �� � � 7 7 7 � � 0-Co � C g� � a�i w � z � Q° � Qo Qo � a n � v � p -i -� �- � � � D n n � r � � 3 fD � � � � � � N (D (D O = = O � m � �ln ti► �n t/� �* tn tn tn v► v� �ln tn f1 I-� F-� N N N 1--� l�J'� I-� l0 � Q1 O N N V7 lf7 N V7 N A Ol W 00 O� u'i ln O O O O O l0 N O O N O O O O O O O O O O� o0 2 2 2 2 2 2 0 T T� S S C 7o z � 70 70 70 � �� 2O Z Z Z C 7�0 � � v v � v �v ry N i-�+ u� u� .A o u, U'i U'i U'i U'i U'� O I� 01 N O O O T T T T T C �i �i � � � Z � � � � � � � � � � � � � C � o0 � � � 0�1 O�l N N I-�-� U�i 1�17 QNl W A A 00 � N N ln ln O O N .A V 01 00 O D ln ln O O O O O A N W O N r O O O O O O O O O N.A �-i s � 0 � W � � 0 cn tn tn m 0 0 o Z \ o \ i/f V► Vf i/► N y/► i/� t/� y/► i/� y/: t!1 � �/1 t/� �/► i/► C F' 1-' 1-' W 00 N C1 rF+ �--� 1--• � 00 � w �+ u� u� N N N N m ry v+ � p Yf U'� �O U'� N 01 Q1 00 00 01 l!� U'� 01 W A A 00 � �O lD �O al tA N N V V V7 O N A V Q1 00 O D N lD W N O U'� lJ'� U'i ln O O O � N W O F� r V� O V� ln O O O O O O O O O O N A A C � � C U c a � � � C n � � -i n r n O D 3 O C Z � � � -� � r n a m G � N � �n Q � � a m � 0 � o m � N � �� 0 � a � �D I-� � O O � � a Q c c '+ '+ � � � � O y � 3 D � � 3 � � n o v � 7G X rr ' O � n 7 Ol aq � N (D � r+ � � � N � � � —. O � D r+ � S N m � �o n — � �o � � � ? n' oi � O 0 � O � Q � 0 l C. 4 � 0 � �� � c r ID 3 � S .-. �' 00 N ` N 1� V l� i/� �/1 �/1 'l/1 O H � I--� 1--� U'� W N N O O O O O O O O �{/f i/f i/� f+ � O Oo � I�+ A N A V1 O N O O V+ O o i/� i/f� t/� w N N O W A 00 O O O O O O H C W � O � a r � Pecos (117), 166 Raul Florez Blvd. , Pecos, TX 79772 Phone:432-445-1472 Fax:432-445-1474 Invoice #: 117-19456-01 Invoice Date: 06l01/2022 PO / Jo6 Name: 5223 Freight: Prepaid Shipped From: Pecos on 06/01/2022 Sales Contact: Abel 0 Gabaldon Via: Pickup [Signed by: AARONSj Billing Address: DENNARD ELECTRIC INC - ODESSA P O BOX 12586 OQESSA, TX Remit to: PO Box 206524, Dallas, TX 75320 Qty B10 Shipped 300 0 �LLIOTT ELECTRI� S UPPLY Catalog # Description PVC1 SCH 40 1" 1t]' PVC CONOUIi (f paid by 07/10I2022 Deduct 54.81 Shipping Address: DENNARD ELECTRIC INC TX Vendor Unit Price PVC �160.28 / Hundred Extended �480.84 T Total $480 Tax S39.67 Ss2 . This is the original invoice. You will not receive an invoice in the mail. Please pay from this document. For Terms And Conditions of Sale, please visit: http:/lwww.elliottelectric.com/terms � ELLIOTT ELE�TRIC SUPPLY Odessa (66), 5617 Andrews Hwy , Odessa, TX 79762 Phone:432-366-0008 Fax:432-366-6045 Envoice #: 66-13410-01 lnvoice Date: 06/0312022 PO / Job Mame: 5226 Freight: Prepaid Shipped From: Odessa on 06/03/2022 Via: Wi{I Call - Pickup [Signed by� RICARDO ZUNIGA] Sales Contact: Jesse L Cervantes Billing Address: OENNARO ELECTRIC INC - OOESSA P O BOX 12586 ODESSA,TX Remit to: PO Box 206524, Daltas, TX 75320 Qty S�� Catalog # Shipped Description 4000 0 PVC4 SCH 40 4" 10' PVC CONDUIT 90 0 s�a•x�o� cu cRouNo Roo 3 0 31107 ���9 ATEC RED P Shipping Address: DENNARO ELECTRIC INC TX Vendor Unit Price PVC $948.04 / Hundred CDW $3,335.10I�pdxa�— MIL $71.50! Extended �37,921.60 $333.S1 r otai S38,4&9. Tax 50.00 If paid by 07l10/2022 Deduct 5382.56 538,469, 7his is the original invoice. You will not receive an invoice in the mail. Please pay from this document. For Terms And Conditions of Sale, please visit: http:l/www.elliottelectric.com/terms --------- �-r-..� 3 E�.�,lo��r E�,�c�r�zc �u���,� Andrews (70), 1201 West Broadway , Andrews, TX 79714 Phone:432-523-2423 Fax:432-523-2428 :� , t 1. �%1' Invoice #: 70-88612-01 Invoice Date: 06I16/2022 PO 1 Job Name: 5248 Freight: Prepaid Shipped From: Andrews on 06/16/2022 Via: Pickup Sales Contact: Eliab Ortiz :�f��.� �a�� 1,11!I �. �a�� � :. ,'( i�i�1i � � ( � 1�� Bi(fing Address: DENNARO ELECTRIC INC - ODESSA �� P O BOX 12586 ODESSA,TX Remit to: PO Box 206524, Daltas, TX 75320 Qty B�� Catalog # Shipped Description 1 0 K6HXTP #10 ANCFiOR KIT HEXIPHIL/S 'LUU U EM'f1 7/2" EMT COND 100 0 EMT34 3/4" EMT CONOUIT 6 0 TP403 4SQ 2-1/8D BX W/11283/4 6 0 7P472 4SQ FLT BX CVR 500 THHN12STGN500 THHN 12 STR GREEN 500' 500 0 THHN12S7RD500 THHN 12 STR RED 500' 500 12STBK500 THHN 12 STR BL 500 0 THHN12STWH500 � WHI7E 500' Shipping Address: DENNARD ELECTRIC INC TX Vendo� Unit Price DOT 511.05 / Each CON S69.81 / H S123.59 / Hundred S S159.84 / Hundred CRS �43.49 red COP S193.00 / Thousand COP 5193.00 / Thousand COP 5193.00 / Thousan�� Sub TotaT Tax If paid by 07/10l2022 Deduct S6.73 � This is the originai invoice. You wilf not recelve an invoice in the mail. Please pay from this document. For Terms And Conditions of Sale, ptease visit: http:!lwww.elliottelectric.com/terms Extended �139.62 T �u123.59 T �9.59 T �2.61 T _......",� 596.50 T 6.50 T $96.50 7 5727 _.�- Certified ���1BEN `�' 1Y�omen's Biuiness Enterprise , � . . #WBE-1800953 CONNECT/NG YpL! TO THE i/1/ORLp 70:11mmy Sledge COMPANY: Apple Electric June 23 2022 Copper @4.00Ib Alum @i.421b 100 Wire Way Orive (P.O. Box 612} Alabaster AL 35137 Kevin Shelton 205.380.6542 Delivery: Stock Freight: PPD & Allow Priung adjustoble Jo� CU time of PO refeose Stock is subject to prior sole My materla/ returned must have on RMA IQO% Poymenr Nec30 Doys -p+5% Lenyth Tolerance Thanks for this Opportunity �----- ... � CONNECT/NG YOU TO THE W�RLO TO: limmy Sledge COMPANY: Apple Etectric Juty 20 2022 Copper @3.351b Atum @1.151b Prictng odjustobfe jor CU fime of PO releose Stock is subject to prror sole My meterio! returned musi hove on RMA 1009b Paymen[, Net 30 Days -O+S:o Length Toferonce Certified ��� ,�.�' Women's Business Enterprise pWBE-1600953 100 Wire Way D►iue (P.O. Box 612) Nabaster AL 35137 Kevin Shelton 205.380.6542 Delivery: Stodc Freight: PPD & Allow Thanks for this Opportunity .: H �Rentals`" 27500 Rrverview Center Blvd SuHe 700 8onita Springs, FL 34134 For eonespondonee only (no payme�ts) BILL TO: DENNARD ELECTRIC PO BOX 12586 ODESSA, TX 79768 f�l� ct ¢� �;� , It�b ���;�- �'` � t ���/ !� '�1Iti��~I.� .�� ������� f':i!' Ltl:t Z. FINAL INVOICE YNVOICE NO." INVOICE DA 32850134-003 07/29/2022 $ 6338.26 CUSTOMER N 3043873 USD Due Upon Receipt Ficiaty's Bank: Wells Fargo ABA#: 121000248 k: a217127869 Ficiarv's Name: Herc Rentals HERC RENTALS INC, I �'�CONTROL P.O. Box 936257 Py��,�,�,�•, Atlanta, GA 31193 To ensure accurate and timely posting, detach and send top portion with your payment PO� #f •. ' _ RES UOTE � � CUSTOMER # SALFS REP ' 5125 3043873 COL7EN SMITH ' . '; ORDERED BY< . .:' DELT1/ERED"BY- ` ' :' SIGNED SY ` CIOSED BY . . �ui 1-LOW fY = ' EQUIPMENT # HRS7MINIMI . TELEHANDLER 10000LB 42-44FT UFf ROPS 8/ 652.00 IC#: 800254494 CAT/Class:4601060 Make: SKY)ACK Model: SJ1044 TH Ser #: 8721Q147 Hours Free: HR OUT: 3637.000 HR IN: 367U.000 TOTAL; 33.000 FREE: 488.000 EXCESS: 0 HRS CHG: 28,750 EMISSI�NS & ENV SURCHARGE EMI5SION5 TX SPECIAL INVENTORY TAX 2201000001 c-r��s�� QTY TTEMS 35 REFUEL 741000001 - REFUEL 5ERVICE FEE - REVENU WET SIGNATURE LANCE P. LEONARO PUMP IUR DAY ' 1NEEK ° 4 V1lEEK AMOUNT 108.67 652.00 1421.00 4600.00 5252.00 8 40 160 103.99 7.35 PRICE AM�UNT EA . . � ensure accurate paymeni processing, please include a remittance with your payment. paying by ACH/Wire, send remittance to HercTimeChecksQhercrentais_com. -edit Card Payments: send to USCreditCards@hercrentals.com and include remittance. paying with Check by Phone, call 877-953-8778 (option 1, option 1). your COI on file with Ne�c expired or about to be? Please send updated COI electronically to HercC01@hercrentals.com. IIP TO: RENTED FROM• iW HEAD C PUMP STATION HERC RENTALS 449 10 MILWAUKEE AVE 8282 IH 20 WEST BBOCK, TX 79424 MIDLAND, TX 79706 PH: 432-563-0361 ;ENTAL DAYS/HOURS: 28/ 9.18 INVOICE FROM: 6/29/22 7:01 INVOICE TO: 7/27/22 16:11 RENTAL START DAiE: 5/04/22 7:06 CUSTOMER �: 3043873 RES/QUO7E x OTHER CHAR6E�S FUEL CHARGES TAXABLE CHARGES TAX TOTAI CHARGES 5252. 111. 419. 111.34 419.65 5775.64 555.27 6338.26 LATE CHARGES MAY APPLY INVO[CE t�: 3285U139-003 INVOICE DATE: 07/29/2022 Page i of 1 11-12. .�p�� �'le��t���� GaNTi iACT�17S,IN�. Bill To: Dennard Electric 7540 Andrews Hwy Odessa, TX 7976 -5 5 $66� Electrical Crew & Truck 5 � Electricaf Crew & Truck pple Electrical Contractors, PO Box 12741 Odessa, TX 79768--2741 Phone: (432) 363-0191 Fax: (432)363-0192 www.appleelectric.com Invoice Invoice Numbe�: . 55965 ' Invoice: Date: : � 8/4/2022 Re: Dennard -Lubbock Low Head C HR 112.50 �H&F10 HR 112.50 �6¢�}0 .. Subiotal $ Sales Tax (if applicable) $ Total Due $ ` � �� �� Thank you for your business! Regulated by the Texas Department of Licensing and Regula6on, PO Box 12157, Austin Tx 78711,1-80Q-803-9202; www.license.state.bc.us/complaints Supplemental crew to support pulling temp power to PS-14 from the generator. r+ u� x��iic�Ei.ui�n�vrc.e..s �nsa.ee3i3V+ox�..saoM s,Naerou:� : � O w 1 m o m � �O � r ZO Z .; � :. � o m � Z ���� � � :� s P��p : a � PO � . � r � � � m , b b I _ _. � i I i i i O� , ; � � I c 0 s � n O xperH 2 - A C^ y O 2 ' A � m A ��� 1 ISW fO iM (ONSIIIU(1pN vEainwiE wnm.:wmmo�a � � O O � � � � � `�� 1 � .� ,�-�----Q �� � , � ..:p0 s � � „� �� 1� " r r Z 6 �1'�,1^�D� T c �� f +� a ys � � � a i � � 1 1 o , � > � . `'� .. � �. s �i ✓ O � � sV � � 6 O o�yF s � y o �g�S ' � � i �a =` >pg -�ac o : _ _ � � _ � _ o'zor P, �' c � �a:; o = o x o�o� T o i i ��o� a = � � Goaim $ i o 'o oS-'^.o c s o i T s;� m p� o '" ; � �`zS � Diig i „yzo T o •`-1,� i E c o� ^ mco ^ �hz� � 9 ° � � peo_ �N� � m�a o z�c e fni c o •a a � Z oi,n - �p � F . 3 D G G � o fo m.� m�,. . W « .. m 0 0� 3i '� S" Lo' i�03 �� �m m c c'= �� g5 z c o�`'z "cp gc o� � �$� �p <z s- o i� sg S� >� m� Z � � ^: - � � �' :i p� �� o c `3 j �a � '- » o `am S$ `-c �< !n � - o�� �' o a Sm mo �i on � oG i �N i � a o$o mz Hp mA os � 3� o z � N mi si =o R-�i T � o? - z o'"cy m ir m o w go c_� o T m �e F p�o a aa o > " a cz no m = oi o a o c i o� ^ oa i� �r � � o g ao 7a 3 N� � NP ;�� 7� c os �� �F g � s � s' � ;� - ma i � N o 8 '"i oc � z o _ io �u R� 3 s = � � _� � - _ � � e �; �a �a = F g� � � oo s� a o T o � � s ;m ;< �o _ g '; c i " o > � _ �� � "g i+ - 's � �z o ^ c o S a'" o _ - = - p Is' i 3 O � ; o � � - ~ . m g � m @ s o � o � o i ,.� z � o _ 3 � D � g a � � � i�a�yi�� CIiY OF LUBBOCK, TEXAS """"°'° LOW HEAD C PUMP STATION a �1���� `M EIECTNICAL snsno "nTM IWt E�u�.n.nE�.. SITE PLAN 0c' S c 0 o; e � c m < a^� = �� m y � � g � � = g ` o 0 0 � _ � � � 0 0 3 a ; 7 a f� � � E 0 i a z�; � x ; S." ^S". �': Fo� �� o y o� oz x �� � cc �c i A o�^ y o^o o� ' ��a g o � s$ �g i � o x � _ : � s � � � a�� a s � � ' 0 0� �o , �Ro ; > � � am �� ! o - _ � W ` s= �N o� � � ; m f �,� < _ F 5 m 5 0� 'ob � ,za o �� � 00 � S = gz i _� � a T a� ; o� �' o � a 1 mi � � � g'° o i 7 g� n � a� a > �^> ° 8 o �' � 3 po s :� � �a � s go w � � I � 0 _ :� i? a S i � Z O m N � < 3 0 � WSS Inlmu�qrW YYu. Lb }pp IM WmRTeu� )6109Jt9S pinl an I ��., f� o x o? T .... \ M i .ka �Ig, FH3 � � �ta a+ r-, -- Y: �- - r� NICHO�S Change Proposal PROJECT OWNER BUILDER DESIGNER CM Low Head C Pump Station City of Lubbock Archer Western Contractors Freese and Nichols, Inc. Bret Calvert PROJECT NUMBER 92450.9241.30000 CP No. CP-011 CP Description Install discrete wire not shown on plans and allow PS14 ATS and Gen-SWBD,ATO to communicate. Install additional discrete wires required by Eaton between the generator and GEN-SWBD,ATO for generator status. Pull wires and terminate. Specification Drawing / Detail NOTIFICATION BY BUILDER The Builder proposes to make the additions, modifications, or deletions to �he Work described in the Contract Documents, as shown in Attachment and requests that you take the following action: Purpose of Change Proposal Requested Action Basis of Compensation Required Documentation Total Change Proposal Amount Adjustment in Contract Time Attachment New Change Proposal Issue a Work Change Directive or Change Order for the described change Lump Sum calculated using Cost of Work provisions in General Conditions paragraph 13.01 - Detailed cost breakdown attached showing labor, materials, equipment, and all other costs for this change $ 2,633.00 0 days CP-011-SwitchboardCommunication-Kyle Shrell-Pending.pdf Submitted By Kyle Shrell Date 10-27-2022 CONSTRUCTION MANAGER'S RESPONSE Recommended Basis for Compensation: Authorization to proceed with changes must be approved by the Owner through Change Order in accordance with the Contract Documents. Status Action Comments Attachments Response By Recommended for Approval Final Distribution Please include in CP: Cost of CAT6 cable (deduct), Cost of discreet wire (add). CP-011-SwitchboardCommunication-Kyle Shrell-Pending.pdf Matthew Weaver Date 11-15-2022 CP 011 Switchboard Communication Project Name: Project Owner: Consultant Project No. Contractor: Attention Low Head C Pump Station Project No: City of lubbock Initiated By: Archer Western Construction, Ltd. Date: 220149 Q Owner Engineer Contrador 10/27/2022 The following change in the contract on this project is proposed • Work shall not commence until authorized by the OWNER. Description of the Proposed Install discrete wire not shown on plans and allow PS14 ATS and Gen-SWBD,ATO to communicate. Install additional discrete wires required by Eaton between the generator and GEN-SWBD,ATO for erator status. Pull wires and terminate. Frank Etier BY City of Lubbock All work shall be in accordance with the terms, stipulations, & conditions of the original Contrect Q ACCepted Q Rejected Documents. If the work herein provided for is Approved by Change Order, the time of completion will be: ❑ Increased � Decreased L; Unchanged by 0 calendar days This change will: Q Add a Deduct Q Not Change Comments: $2,633 /� �e �'�i�e�� GE ERALCONTRACTOR 11 /2/2022 DATE BY (Consultant Name): DATE Owner's Action: Q Accepted � Rejected BY (Owner) Date � 3 oc Q 3 m��v N � W c � � � � ° � � � m � n � rn .�a� ° O �m p tO/! � v � z � . � aZ 3 � `° cri' � �G�Orn '� � � m � � � �� � Ommz � c � v � ���0 � cn o � D� C? r^� O � n � � o N 3 m � � c�o � • � �7 Q° c � � n o ' n � O � � . m �' � v � Z n o � � � R� � c Z � v v o _ ' � m m r c � � � v � � c� m � Oc O cn (n v� cn . ..3 . ���m o a � m v c� (�j � � °' v a � o n y �p�j � v�a�� m� o00 0�� oo-�-�� o00 000.p � o'� O �� m o DD ��� DDDDD �T� q�� °/ � Z � o � � ���-C-� �7�7�J:U � �vi � � � � m C � o � � o � �. m rn g� � Pn c m� o �o. °"� � � �'�i � � m� c ��D� �' � �°, cs� � � cs� ba A w c�i, � � a m� (g� n a' �- o ao 0 0 o cn o o cn � � "' y fD � � � o00 0000 � � �•d � �' � g � � a v'i �, � �w � m� Q � ,`�° ,c°'i, ,c°n� o w °' � n� cs� va Fn o � p c�n o 00 0000 0 0� 0 0 0 � � o000 � � m � � � � � � 0 0 0 0 °� � (/� o � � d uQ, o � � � o 0 0 °� � a v — Q o 000 � G� � d ? c � o 0 0 0 � � p�0 a � o 00 0 �'� =D � o � �� � o 0 0 0 0 � m� � � 0 0000o ZO �►_ 0 00000 , � o tA � � � � v° � � � � � io i� � o D � � � N � A � 7 � c C C p� � o0 0o EA EA � p� ��• N N � � � O O OD n � � � � �D <D � O O � � � (D C. G. EA V1 d► d9 p N N � N � 6q N N v�i o�o c�o rn � En O) A Efl EA tA (A Efl A EA � En EA tt1 tA 69 EA 69 cf; 6H o N -� �I(O W OCT OD 000 000� 00000 000 0000 W • � J�� � � �� � � 0 � 0� � � � � � 0 0 � 0 � � 0 t� �6i1cn -�oo� o00 00� o0000 000 0000 o W Job # B20-071 Change Proposal GEN-SWB October 27, 2022 Kyle Shrell-Assistant Project Manager Archer Western 1411 Greenway Drive lrving, Texas 75038 C: 972.589.1688 kshrell@walsh�roup.com ELECTRIC RE: City of Lubbock Low Head C Pumps Station — Change Proposal GEN-SWB Dennard electric proposes to provide materials labor and equipment, using standard rates working (5) 8- hour days M-F for the City of Lubbock Low Head C Pump Station- Change Proposal GEN-SWB add control wires. Scope of Work: Install discrete wire not shown on plans and allow PS14 ATS and Gen-SWBD,ATO to communicate. Install additional discrete wires required by Eaton between the generator and GEN-SWBD,ATO for generator status. Pull wires and terminate. Pricing as follows: Materials Equipment Labor $ 596.70 $ 180.00 $ 918.00 Markup $ 254.21 Total: $1,948.91 ExcepNons: Pricing does not include Sales Taxes or Bonding costs. The terms and conditions outlined in this proposal are valid for 15 days. An authorized signature below constitutes acceptance of this offer by company. Company shall be responsible for any additional costs caused by changes. Sincerely, Eddy Shelton President Signature: Title: Regulated by The Texas Department of Licensing and Regulation, P. O. Box 12157, Austin, Texas 78711, 1-800- 803-9202, 512-463-6599; website: www.license.state.tx.uslcompl PO Box 12741 7540 N. Andrews Hwy Odessa Tx 79768 432-362-4326 r� NICHOLS Change Proposal PROJECT OWNER BUILDER DESIGNER CM CP No. CP Description Low Head C Pump Station City of Lubbock Archer Western Contractors Freese and Nichols, Inc. Bret Calvert CP-012 Modify the slide gate to open towards the west. Work associated with the desired modification includes: 1. Extend existing electrical duct bank for the gate controller from the eastside of the driveway to the westside. 2. Relocate the gate controller to the westside of the driveway so that the gate will open to the west. 3. Remove previously placed track rail east of the driveway beginning at the gutter. 4. Backfill cut to match existing grade. 5. Install new track to the west as needed for proper gate operation. 6. Cut out 16" x 12" CMU/brick west of opening for drainage. 7. 2 CY of concrete for existing flume adjustment, to include formwork and rebar. 8. Grade soil north and south of west wall to ensure drainage. 9. Raise existing control box on west side of drive to prevent flooding. 10. Raise new control box on west side of drive to prevent flooding. PROJECT NUMBER 92450.9241.30000 Specification Drawing / Detail C-15 & E-3 NOTIFICATION BY BUILDER The Builder proposes to make the additions, modifications, or deletions to the Work described in the Contract Documents, as shown in Attachment and requests that you take the following action: Purpose of Change Proposal Requested Action Basis of Compensation Required Documentation Total Change Proposal Amount Adjustment in Contract Time Attachment New Change Proposal Issue a Work Change Directive or Change Order for the described change Lump Sum calculated usinq Cost of Work provisions in General Conditions paragraph 13.01 - Detailed cost breakdown attached showing labor, materials, equipment, and all other costs for this change $ 32,272.00 0 days CP-012-SlideGateModifications-Matthew Weaver-Pending.pdf Submitted By Matthew Weaver CONSTRUCTION MANAGER'S RESPONSE Recommended Basis for Compensation: Date 11-02-2022 Authorization to proceed with changes must be approved by the Owner through Change Order in accordance with the Contract Documents. Status Action Comments Attachments Recommended for Approval Final Distribution No final comment. CP-012-SlideGateModifications-Matthew Weaver-Pending.pdf Response By Matthew Weaver Date 11-07-2022 Change Proposal Project Low Head C Pump Station Project Number Owner City of Lubbock 15431 Contractor Archer Western 92450.9241.30000 Construction Manager Freese & Nichols, Inc. LU619278 Design Professional Freese & Nichols, Inc. Change Proposal No. 12 Description Slide Gate Modifications Specification C-15 & Drawing No. E-3 Detail Description Changes to gate width and slide direction Reference Document � Request for a Change Proposal No. 010 ❑ Request for Information No. O Shop Drawing Deviation Request No. ❑ Field Order No. Contractor proposes the following modifications to the Contract Documents: Slide Gate Modifications per RCP-10; Electrical, Concrete, New V-Track Basis of Compensation � Unit Prices ❑ Lump Sum calculated using Cost of Work provisions in the Contract ❑ Time and Materials using Cost of Work provisions in the Contract The compensation offered for this Change Proposal is the full, complete, and final compensation for all costs Contractor may incur because of or relating ro this change whether said costs are known, unknown, foreseen, or unforeseen at this time, including without limitation, any cosi for delay, extended overhead, ripple or impact cost, or any other effect on changed or unchanqed Work because of this Change Proposal. Requested changes in Contract Times are the complete and final adjustments for impacts to the ability of Contractor to complete the Work within the Contract Times and are the only adjustments to which Contractor is entitled. All terms and provisions of the Coniract Documents remain in effect except as specifically modified by this Change Proposal. Proposed Net Change in Contract Price this Change Proposal $ 32,272.00 Proposed Net Change in Contract Times this Change Proposal 00 days Required Documentation � Detailed cost breakdown attached showing labor, materials, equipment, and all other costs for this change O Schedule attached to show impacts and justification for requested change in Contract Times Reason for the Change Proposal The slide gate design in the construction drawings withdrew the gate towards the existing PS14 GST and necessitate a recessed track in the ground that slopes away from the GST. During construction, concern over safety (people tripping or driving over recessed gate track) and maintenance (dirt and debris in wheel track) of this design led to discussion of modifying the design. This Change Proposal includes the results of a collaborative re-design discussion between engineer, contractor and City and will give the City a safer and lower maintenance motorized site access gate. Change Proposal Page 1 of 2 Change Proposal Attachments RCP 010 Requested Action ❑ Issue a Field Order � Issue a Work Change Directive or Change Order for the described changes Requested by Matthew Weaver Date 10/18/2022 Action by Owner's Project Team Change Proposal No. � 2 � Accepted ❑ Not Accepted - Revise and Resubmit ❑ Cancelled Comments Response by ��M�� Date 10/26/2022 Change Proposal Page 2 of 2 RCP 010 Slide Gate Fence 2 Project Name: Project Owner: Consultant Project No. Contractor: Attention Low Head C Pump Station Project No: City of Lubbock Initiated By: Archer Western Construction, Ltd. Date: 220149 Q Owner Engineer Contractor 10/14/2022 The following change in the contract on this project is proposed • Work shall not commence until authorized by the OWNER. Description of the Proposed Change: Slide Gate Modifications per RCP-10; Electrical, Concrete, New V-Track Frank Etier BY City of Lubbock All work shall be in accordance with the terms, stipulations, & conditions of the original Contract � Attepted � Rejected Documents. If the work herein provided for is Approved by Change Order, the time of completion will be: �Increased Q Decreased Q Unchanged by 0 calendar days This change will: Q Add ❑ Deduct ❑ Not Change Comments: $32,272 � �� s����� GENERALCONTRACTOR 10/14/2022 DATE ,�;e.���' `Cf��— BY (Consultant Name): 10/26/2022 DATE Owner's Action: Q Accepted ❑ Rejeded BY (Owner) Date �vN ���m n3 m��v5 3 �c � o p o y �c o o n � �i � �/1 > > W n 3 � C � � S - <p ' � O m „n c� cn� m v m m .Q-� .��.0 �m O t�/! � 3 n� � z � rr ��-z m`�m �y �cri�� ��Om � • Z � � l �� -Z1 r �° o�i -�im z � � m � � Ornmz � � -n-i v � ���0 � !/� Z � o � D� n N � m �• � � N � � �• nm`<o m 1 � =�o� � m . N � 3 �Q°c �c p p �Z � n O ; � n � O � • - m `� • � � Z m c� n o � � � � � z � v v o . � � � ' � m m r c n n � W � � v � c� � O �m � r -�I e � f� (n a cn . . . ; . cn v -m a o � O �n w � � � � � j�w �p � � m � o00 0�� oo�-�� oow oocncn �0 cn � a. mm rrr ppppp r�C� aZ � o � o DD ��� DDDDD �T-< ___= C �• ����� ?0 m a � � � � � d � (P� � o 2 � � � N p QO \ � � � 'a � C �, c�n � � 1 �� �C \ C�O IV W�� A fA fi> fA !A � Z1 � � n � c� lA� V N (fl690 A W Cfl V � (� n a' �- ONO� ONO 000 U700U� �j � O 3� 00-� 000 000 0000 � � � y j O 00--• 000 000 0000 O o fn m � � �� � (,Tl � W V� W N N � •n-• � A � � V W v � � rn � Efl O CT N Q N W � N N p O O O( T � — ( p � �� O O O O � O 7 n (A 6H � b� --' � � (D � � � N N � C1 � W � O O N � (D tQn O � O O O O O � � �, o 0 o coo G a o 000 � 5 � 0 � � c�'n � c�n c � D � Efl � N � N 69 69 Ff� =� N � ' � w � o� o 000rvo m a3 0 \ o 0 0 0 0 0 � C tl! .3�► EA Ei1 � � � W W � n � � W N N N � N O = _ 0 O O O �� V � �� N+ � -' ONO� n � � � � N O O� � �- Q- .. .. � O EA � .� ��N _O�D�A W b9N i�(flffl � W N N � W y,� � Of � N Of N�l Cf (D N W N W V� N TI- W W� V <O �I �I t7� d9 lA 69 fA � V b9 CA �� N 69 <-f� O ffl O CT N y O N 10 NOo �0�� V 000 ONOD OOO N O 0 0 0 O O O C T y� �I Of ON �n10N � 000 00� 00000 000 0000 CO O�? Cf OU7 � 000 00� 00000 000 0000 0^% O Request for a Change Proposal Project Low Head C Pump Station Project Number Owner City of Lubbock 92450.9241.30000 Contractor Archer Western Construction Manager FNI LUB19278 Design Professional FNI LU619278 Request for Change Proposal No. 010 Description Slide Gate Modification Specification Drawing No. C-15 & E-3 Detail Description Gate Modifications Reference Document ❑ Request for a Change Proposal No. ❑ Work Change Directive No. ❑ Shop Drawing Deviation Request No. ❑ Contract Document Owner requests a Change Proposal for the following modifications to the Contract Documents: Modify the slide gate to open towards the west. Work associated with the desired modification includes: 1. Extend existing electrical duct bank for the gate controller from the eastside of the driveway to the westside. 2. Relocate the gate controller to the westside of the driveway so that the gate will open to the west. 3. Remove previously placed track rail east of the driveway beginning at the gutter. 4. Backfill cut to match existing grade. 5. Install new track to the west as needed for proper gate operation. 6. Cut out 16" x 12" CMU/brick west of opening for drainage. 7. 2 CY of concrete for existing flume adjustment, to include formwork and rebar. 8. Grade soil north and south of west wall to ensure drainage. 9. Raise existing control box on west side of drive to prevent flooding. 10. Raise new control box on west side of drive to prevent flooding. Owner requests that Contractor prepare a Change Proposal for the changes in ihe Contract Documents described in this Request for a Change Proposal. The compensation offered for this Change Proposal is io be rhe full, complete, and final compensation for all cosrs Contractor may incur because of or relatinq to this change whether said costs are known, unknown, foreseen, or unforeseen at this time, including without limitation, any cost for delay, extended overhead, ripple or impact cost, or any other effect on changed or unchanged Work because of this Change Proposal. Requested changes in Contract Times are to be the complete and final adjustments for impacts to the ability of Contractor to complete the Work within the Contract Times and are the only adjustments to which Contractor will be entitled. All terms and provisions of the Contract Documents remain in effect except as specifically modified by this Change Proposal. Authorization to proceed with changes must be approved by the Owner in accordance with the Contract Documents. Reason for the Change Proposal The slide gate design in the construction drawings withdrew the gate towards the existing PS14 GST and necessitate a recessed track in the ground that slopes away from the GST. During construction, concern over safety (people tripping or driving over recessed gate track) and maintenance (dirt and debris in wheel track) of this design led to discussion of modifying the design. This Change Proposal includes the results of a collaborative re-design discussion between engineer, contractor and City and will give the City a safer and lower maintenance motorized site access gate. Request for a Change Proposal Page 1 of 2 for a Attachments Image/ sketch Requested by Matt Weaver Date 9/20/2022 Follow Up Action by Owner's Project Team Change Proposal No. ❑ Accepted ❑ Not Accepted - Revise and Resubmit ❑ Cancelled Request for a Change Proposal Page 2 of 2