HomeMy WebLinkAboutResolution - 2023-R0606 - Public Works Contract 17690 With Deerwood Construction, Inc. - 12/12/2023Resolution No. 2023-R0606
Item No. 5.21
December 12, 2023
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute
for and on behalf of the City of Lubbock, Public Works Contract No. 17690 for Sewer Ahead
of Paving, Kline Avenue as per ITB 24-17690-TF, by and between the City of Lubbock and
Deerwood Construction, Inc. of Lubbock, TX, and related documents. Said Contract is
attached hereto and incorporated in this resolution as if fully set forth herein and shall be
included in the minutes of the City Council.
Passed by the City Council on l�Pnember 12��023
TRAY PA E, �OR
ATTEST:
Courtney Paz, City Secretary
APPROVED AS TO CONTENT:
�.X ` ,
Erik Rejino, Assistant City Manager
APPROVED AS TO FORM:
Kelli Leisure, Senior Assistant City Attorney
ccdocs/RES.Public Works Contract 17690 Sewer Ahead of Paving
11.16.23
BID SUBMITTAL FORNi
UNIT PRICE BID CON'I'RACT
DATE': November 16, 2023
1'ROJCCT NUVIBER: [TB 24-17690-TF, Sewer Ahead of Paving, Kline Avenue
Bid of $210964.63 (hereinafter callcd
Bidder)
To the Honorable Mayor and City Council City of Lubbock, "['exas (hereinafter called Owner)
Ladies and Gentlemen:
The Bidder, in compliance with you� lnvitation to Bid for the construction of the referenced project, having
carefully examined the plans, speciFcations, instructions to bidders, notice to bidders and all other related
contract documenls and the site ofthe intended work, and being familiar with all of the conditions surrounding
the construction of the intended project including the availability of materials and labor, hereby intends to
furnish all labor, materials, and supplies; and to construct the project in accordance with the plans, specifications
and contract documents, within the time set forth therein and at the price stated.
The bidder binds himself on acceptance of his bid lo execute a contract and any required bonds, according to
the accompanying forms, for performing and completing the said work within the time stated and for the prices
stated.
Bidder hereby agrees to commence the work on the above project on a date to be speciFied in a written "Notice
to Proceed" of the Owner and to substantialiy eomplete the project within 90 eonsecutive calendar days with
final completion of the projcct within 100 consecutive calendar days as stipulated in the specification and
other contract documents. Bidder hereby further agrees to pay to Owner as liquidated damages in the sum of
$500 for each consecutivc calendar day after substantial completion and liquidated damages in the sum of
$350 for each consecutive calendar day after final eompletion set forth herein above for completion of this
project, all as more fiilly set forth in the General Conditions of the Agreement.
Bidder understands and agrees that this bid submittal shall be completed and submitted in accordance with
instruction number 29 of the General Instructions to Ciidders.
Bidder understands that the Owner reservcs the right to reject any or all bids and to waive any formality in the
bidding.
The Bidder agrecs that this bid shall be good and may not be withdrawn for a period of 60 calendar days after
the scheduled closing time for receiving bids.
The undersigned Bidder hereby declares that he has visited the site of the work and has carefully e:camined the
plans, specifications and contract documents pertaining to the work covcred by this bid, and he further agrccs
to commence work on or before the date specified in the written notice to proceed, and to substantially complete
the work on which he has bid; as provided in the contract documents.
Bidders are required, whether or not a payment or performance bond is required, to submit a cashier's check or
certified check issued by a bank satisfactory to the City of Lubbock, or a bid bond f'rom a reliable surety
company, payable without recourse to the order of the City of Lubbock in an amount not Icss than five percent
(5°/a) of the total amount of the bid submitted as a guarantee that bidder will enter into a contract, obtain all
required insurance policies, and execute all necessary bonds (if required) within 10 b�isiness days aftee notice
of award of the contract to him.
City of Lubbock, TX
Public Works
ITB 24-17690-TF
Sewer Ahead of Paving, Kline Avenue
Deerwood Construction, Inc. of Lubbock, TX
QTY Unit Extended
# +/- U/M Price Cost
General
# 1-1 MOBILIZATION 1 LS 10,045.93 10,045.93
#1-2 TRAFFIC CONTROL 1 LS 8,000.00 8,000.00
#1-3 SWPP 1 LS 13,007.50 13,007.50
# 1-4 TRENCH SAFETY 1400 LF 2.00 2,800.00
Street Repair
#2-1 FLOWFILL 20 CY 220.00 4,400.00
#2-2 ASHPALT REPAIR 30 SY 110.00 3,300.00
Sewer Improvements
#3-1 10" PVC SDR-35 GRAVITY SEWER PIPE 1300 LF 68.00 88,400.00
#3-2 8" PVC SDR-35 GRAVITY SEWER PIPE 200 LF 64.00 12,800.00
#3-3 6" PVC SDR-35 GRAVITY SEWER PIPE 80 LF 62.00 4,960.00
#3-4 4 FT DIA MANHOLE 7 EA 5,400.00 37,800.00
#3-5 EXTRA DEPTH 4 FT MANHOLE 53.1 EVF 385.00 20,451.20
#3-6 TIE TO EXISTING STUB 2 EA 2,500.00 5,000.00
Total (Items 1-1 through 1-4): $ 33,853.43
Total (Items 2-1 through 2-2): $ 7,700.00
Total (Items 3-1 through 3-6): $ 169,411.20
Overall Total (Items 1-1 through 3-6): $ 210,964.63
F,nclosed with this bid is a Cashier's Check or Certified Check for
Dollars ($ or a Bid Bond in the sum of
_ �� � Dollars (S ) � )• which it is agrccd shall bc collected and
retained by the Uwner as I�qu�dated damages in the event the bid is accepted by the Owner and the
undersigned fails to execute the necessary contract documents, insurance certificates, and the required
bond (if any) with the Owner within 10 business days after the date of receipt of written notification of
acceptance of said bid; otherwise, said check or bond shall be returned to the undersigned upon
demand.
Bidder understands and agrees that the contract to be executed by Bidder shall be bound and include all contract
documents made available to him for his inspection in accordance with the Notice to Bidders.
�� ��. � 5 ao�
Pursuant to Teras Local Covernment Code 252.043(g), a -
competitive sealed bid that has been opened may not be � �'V (/ --
changed for the purpuse oPcu�recting an error In the bid price. _ _.__ _ _ —_ ._
THEREFORE, ANY CORRECTIONS TO THF, BID PRICF, rtl�orized Si nature
h1UST BE hiADE ON THE BID SUBMI'1'�PAL FOR�vI PR10R �f an Patterson
TO BID OPENI�C. (Printed or Typed Name)
(Seal if Bidder is a Corporation)
TTES"I': ,�
�� `�I --
ccretary
Bidder acknowledges receipt of the following addenda:
Addenda No. 1 Date 11/9/2023
Addenda No. Z Date 11/13/2023
Addenda No, Date
Addenda No. Date
M/WBE
Firm:
Deerwood Construction, Inc.
Company
P. O. Bo:�3U0J
Address
Lubbock i.uhhock
City, County
Texas 79452
State Zip Code
Telephone: g06_ • 741-1446
Fa;c: 806- 741-1448
FEDERAL TAX ID or SOCIAL SF,CURITY No.
75-2726770
EMAIL: __�anpatlers�u��deerwuodinc.�wn -
�
�
�
�
Contract 17690
STATE OF TEXAS
COUNTY OF LUBBOCK
THIS AGREEMENT, made and entered into this 12"' day of December. 2023 by and bet��een the Cit� of Lubbocl.,
County of Lubbock, State of Texas, acting by and through the Mayor. City of Lubbock, thereunto authorized to do so,
hereinafter referred to as OWNER, and Deerwood Construction, Inc. of the City of Lubbock, County of Lubbock and
the State of Texas hereinafter termed CONTRACTOR.
� WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned, to be made and
performed by the OWNER and under the conditions expressed in the bond bearing even date herewith (if any) the
CONTRACTOR hereby agrees with OWNER to commence and complete the construction of certain improvements
described as follows:
�
�
�
��
�
ITB 24-17690-TF, Sewer Ahead of Paving, Kline Avenue
and all extra work in connection therewith, under the terms as stated in the contract documents and at his (or their) own
proper cost and expense to furnish all materials, supplies, machinery, equipment, tools, superintendence, labor, insurance
and other accessories and services necessary to complete the said construction in accordance with the contract documents
as defined in the General Condition of Agreement. Deerwood Construction, Inc.'s bid dated November 15, 2023, is
incorporated into and made a part of this agreement.
The CONTRACTOR hereby agrees to commence work within ten days after the date written notice to do so shall have
been given to him and to substantially complete same within the time specified in the contract documents.
The OWNER agrees to pay the CONTRACTOR in current funds for the performance of the contract in accordance with
the bid submitted therefore, subject to additions and deductions, as provided in the contract documents and to make payment
on account thereof as provided therein.
IN WITNESS WHEREOF, the parties to these presents have executed this agreement in Lubbock, Lubbock County,
Texas in the year and day first above written.
� CONTRACTOR:
�
�
�
O
�
�
�
Deerwood Construction, Inc.
B:
P NTE NAM�: �� �er `jd ��
TITLE:
CITY OF K, TEXAS (OWNER):
By:
Tray Pa , Mayor
A EST:
Courtney Paz, City Secre ary
COMPLETE ADDRESS:
Deerwood Construction, Inc.
PO Box 3009
Lubbock, TX 79452
TEST: n
�/ /
orporate Secretary
APPROVED AS TO CON ENT:
�— h.ww�
Public Works Representative
��c.1`.(� CT • !- `��. tcww. / � Z ��
Name (Printed) Date
P ED A TO FORM:
►
elli Leisure, Senior Assistant City Attorney
�