Loading...
HomeMy WebLinkAboutOrdinance - 2023-O0137 - Budget Amendment 2, FY 2023-24 Budget - 11/07/2023First Reading October 24, 2023 Item No. 5.2 Second Reading November 7, 2023 Item No. 5.1 ORDINANCE NO. 2023-00137 AN ORDINANCE AMENDING THE FY 2023-24 BUDGET FOR MUNICIPAL PURPOSES RESPECTING THE ENGINEERING FEES; PROVIDING FOR FILING; AND PROVIDING FOR A SAVINGS CLAUSE WHEREAS, Section 102.010 of the Local Government Code of the State of Texas authorizes the City Council to make changes in the budget for municipal purposes; and WHEREAS, in accordance with the City Budget Ordinance the City Council shall approve all transfers between funds; and WHEREAS, the City Council deems it advisable to change the FY 2023-24 Budget for municipal purposes and reallocate funds as follows; NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: SECTION 1. THAT the City Council of the City of Lubbock hereby approves changes to the City of Lubbock Budget FY 2023-24 (Budget Amendment #2) for municipal purposes, as follows: I. Amend Engineering Review and Inspection Fees to comply with House Bill 3492 as reflected in Exhibit A. SECTION 2. THAT a copy of the changes made to the City of Lubbock Budget pursuant to this Ordinance shall be filed with the City Secretary and County Clerk of Lubbock as required by law. SECTION 3. THAT should any section, paragraph, sentence, clause, phrase or word of this Ordinance be declared unconstitutional or invalid for any reason, the remainder of this Ordinance shall not be affected thereby. AND IT IS SO ORDERED Passed by the City Council on first reading on October 24_ 2023 Passed by the City Council on second reading on November 7, 2023 ATTEST: Cou ney Paz City Secretary APPROVED AS TO CONTENT: D. lu K , telich Chief Financial Offcer APPROVED AS TO FORM: . Amy ims Deput ' Attorney ccdocs I IIB udgetFY22-23. Amend2. ord October 2, 2023 Exhibit A- Summary of Engineering Fee Changes Account Rate Department Account Description Number Details Eliminate the following fees: Engineering OEPT-NEW/SUB/OUTSIDE ENG 6473 Eng Review Fee $75,001- 150,000 Construction Cost Inspection Services Eng Review Fee $50,001- 75,000 Construction Cost Eng Review Fee $40,001 - 50,000 Construction Cost Eng Review Fee $30,001 - 40,000 Construction Cost Eng Review Fee $25,001 - 30,000 Construction Cost Eng Review Fee $20,001 - 25,000 Construction Cost Eng Review Fee $0 - 20,000 Construction Cost Eng Review Fee Over $150,000 Construction Cost Fees are collected from contractors as an Commercial Driveway Cut 7505 administrative fee for inspection services of repaired Inspection Fee cut streets (in connection with construction of commercial driveways). Commercial Approach Inspection 7505 Fee for inspections of Commercial Approach Replace with the following fees: Engineering DEPT-NEW/SUB/OUTSIDE ENG Inspection Services 6473 Water Testing and Inspection Fee Base (Administrative Fee) Waier Testing and Inspection fee Rate ( per Linear foot of pipe) Sewer Testing and Inspection Fee Base (Administrative fee) Sewer Testing and Inspection Fee Rate (per linear foot of pipe) Pavement Testing and Inspection Fee Base (Administrative Fee) Pavement Testing and Inspection Fee Rate (per Sq. YD of pavement) i�cludes paved alleys Engineering Water Plan Review (1000 LF and Under) Engineering Water Plan Review (1001 Lf - 4000 lF) Engineering Water Plan Review (4000 LF and greater) Engineering Sewer Plan Review (1000 LF and under) Engineering Sewer Plan Review (1001 LF - 4000 LF) Engineering Sewer Plan Review (4000 LF and greater) Engineering Paving Plan Review (5000 Lf and under) Engineering Paving Plan Review (5001 LF - 10000 LF) Engineering Paving Plan Review (10001 LF and greater) Drainage Analysis Review - by Rational Method Drainage Analysis Review - by Unit Hydrography (i.e. models) Drainage Analysis Re-Review Fee (after 3rd Review) Engineering Cut and Fill plan review fee -$300 minimum for 1 acre or less, plus $25/additional acre wiYh a max fee of $3500 Engineering Grading plan review fee - 5250 minimum for 1 acre or less, plus 525/additional acre with a max fee of $1000 2023-24 0.02 0.025 0.03 0.0325 0.035 0.0375 0.04 0.015 100 150 Amended S Change 2023-24 from Amended (0.02) (0.03) (0.03) (0.03) (0.04) (0.04) (0.04) (0.02) - (100.00) - (150.00) 200.00 0.70 200.00 0.95 200.00 0.65 250.00 450.00 700.00 250.00 450.00 700.00 400.00 550.00 400.00 300.00 600.00 100.00 25.00 200.00 0.70 200.00 0.95 200.00 0.65 250.00 450.00 700.00 250.00 450.00 700.00 400.00 550.00 400.00 300.00 600.00 100.00 25.00 25.00 25.00