HomeMy WebLinkAboutResolution - 2023-R0519 - PSA Contract 17625, Freese And Nichols, Inc - 10/24/2023Resolution No. 2023-R0519
Item No. 5.13
October 24, 2023
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute
and on behalf of the City of Lubbock, Professional Services Agreement Contract No. 17625
engineering design services for Upland Avenue from 50�" Street to 66�' Street, by and between
City of Lubbock and Freese and Nichols, Inc., and related documents. Said Contract is attac:
hereto and incorporated in this resolution as if fully set forth herein and shall be included in
minutes of the City Council.
Passed by the City Council on October 24, 2023
� ��
TRAY PAYN �, AYOR ��
AT"TEST:
Courtney Paz, City ary
APPROVED AS TO CONTLNT:
�/�'► '�i►�
Erik Rej' o, Assistant Ci anager
APPROVED AS TO FORM:
�
elli Leisure, Senior Assistant City Attorney
ccdocslRES.PSA-No. 17625 — PNI Upland Design 55'�' to 66'n
10.04.23
Resolution No. 2023-R0519
PROFESSIONAL SERVICES AGREEMENT
STATE OF TEXAS §
COUNTY OF LUBBOCK §
This Professional Service Agreement ("AgreemenY') Contract No. 17625 is entered into this 24th
day of October , 2023, is by and between the City of Lubbock (the "City"), a Texas home rule
municipal corporation, and Freese and Nichols, Inc., (the" Engineer"), a Texas corporation.
WITNESSETH
WHEREAS, The City desires to contract with the Engineer to provide engineering design
services for Upland Avenue from 50'�' Street to 66'" Street, (the "Activities"); and
WHEREAS, the Engineer has a professional staff experienced and is qualified to provide
professional engineering services related to Activities, and will provide the services, as defined below, for
the price provided herein, said price stipulated by the City and the Engineer to be a fair and reasonable
price; and
WHEREAS, the City desires to contract with the Engineer to provide professional services
related to the Activities, and Engineer desires to provide the Services related to same.
NOW THEREFORE, for and in consideration of the terms, covenants and conditions set forth in
this Agreement, the City and the Engineer hereby agree as follows:
ARTICLE I. TERM
The term of this Agreement commences on the Effective Date and continues without interruption
for a term of 12 months. If the Engineer determines that additional time is required to complete the Services,
the City Engineer, may, but is not obligated to, in his or her discretion, execute an agreement to grant up to
an additional six (6) months of time so long as the amount of the consideration does not increase. An
amendment to this Agreement resulting in an increase in the amount of the consideration must be approved
by the City acting through its governing body.
Page 1 of 11
ARTICLE II. SERVICES AND COMPENSATION
A. The Engineer shall conduct all activities, and within such timeframes, as set forth on Exhibit
"A", attached hereto (the "Services")
B. The Engineer shall receive as consideration to be paid for the performance of the Services, in
an amount not to exceed $1,208,443, as set forth in Exhibit "B".
ARTICLE III. TERMINATION
A. General. The City may terminate this Agreement, for any reason or convenience, upon thirty
(30) days written notice to the Engineer. In the event this Agreement is so terminated, the City shall only
pay the Engineer for services actually performed by the Engineer u� to the date the Engineer is deemed to
have received notice of termination, as provided herein.
B. Termination and Remedies. In the event the Engineer breaches any term and/or provision of this
Agreement, the City shall be entitled to exercise any right or remedy available to it by this Agreement, at
law, eyuity, or otherwise, including without limitation, termination of this Agreement and assertion of an
action for damages andlor injunctive relief. The exercise of any right or remedy shall not preclude the
concurrent or subsequent exercise of any right or remedy and all rights and remedies shall be cumulative.
ARTICLE IV. NON - ARBITRATION
The City reserves the right to exercise any right or remedy available to it by law, contract, equity,
or otherwise, including without limitation, the right to seek any and all forms of relief in a court of
competent jurisdiction. Further, the City shall not be subject to any arbitration process prior to exercising
its unrestricted right to seek judicial remedy. The remedies set forth herein are cumulative and not exclusive,
and may be exercised concurrently. To the extent of any conflict between this provision and another
provision in, or related to, this Agreement, this provision shall control.
ARTICLE V. REPRESENTATIONS AND WARRANTIES
A. Existence. The Engineer is a corporation duly organized, validly existing, and in good standing
under the laws of the State of Texas and is qualified to carry on its business in the State of Texas.
B. Corporate Power. The Engineer has the corporate power to enter into and perform this
Agreement and all other activities contemplated hereby.
C. Authorization. Execution, delivery, and performance of this Agreement and the activities
contemplated hereby have been duly and validly authorized by all the requisite corporate action on the part
Page 2 of 11
of the Engineer. This Agreement constitutes legal, valid, and binding obligations of the Engineer and is
enforceable in accordance with the terms thereof.
D. Engineer. The Engineer maintains a professional staff and employs, as needed, other qualified
specialists experienced in providing the Services, and is familiar with all laws, rules, and regulations, both
state and federal, including, without limitation the applicable laws, regarding the Activities contemplated
hereby.
E. Performance. The Engineer will and shall conduct all activities contemplated by this Agreement
in accordance with the standard of care, skill and diligence normally provided by a professional person in
performance of similar professional services, and comply with all applicable laws, rules, and regulations,
both state and federal, relating to professional services, as contemplated hereby.
F. Use of Copyrighted Material. The Engineer wanants that any materials provided by the Engineer
for use by City pursuant to this Agreement shall not contain any proprietary material owned by any other
party that is protected under the Copyright Act or any other law, statute, rule, order, regulation, ordinance
or contractual obligation relating to the use or reproduction of materials. The Engineer shall be solely
responsible for ensuring that any materials provided by the Engineer pursuant to this Agreement satisfy this
requirement and the Engineer agrees to indemnify and hold City harmless from all liability or loss caused
to City or to which City is exposed on account of the Engineer's failure to perform this duty.
ARTiCLE Vi. SCOPE OF WORK
The Engineer shall accomplish the following: Professional Services related to the Services, as
provided in Exhibit "A", attached hereto and made a part hereof.
ARTICLE VII. INDEPENDENT CONTRACTOR STATUS
The Engineer and the City agree that the Engineer shall perform the duties under this Agreement
as an independent contractor and shall be considered as independent contractor under this Agreetnent andlor
in its activities hereunder for all purposes. The Engineer has the sole discretion to determine the manner in
which the Services are to be performed. During the performance of the Services under this Agreement, the
Engineer and the Engineer's employees and/or sub-consultants, will not be considered, for any purpose,
employees or agents of the City within the meaning or the application of any federal, state or local law or
regulation, including without limitation, laws, rules or regulations regarding or related to unemployment
insurance, old age benefits, workers compensation, labor, personal injury or taxes of any kind.
Page 3 of 11
ARTICLE VIII. INSURANCE
The Engineer shall procure and carry, at its sole cost and expense through the life of this Agreement,
except as otherwise provided herein, insurance protection as hereinafter specified, in form and substance
satisfactory to the City, carried with an insurance company authorized to transact business in the state of
Texas, covering all aspects and risks of loss of all operations in connection with this Agreement, including
without limitation, the indemnity obligations set forth herein. The Engineer shall obtain and maintain in
full force and effect during the term of this Agreement, and shall cause each approved subcontractor or sub-
consultant of the Engineer to obtain and maintain in full force and effect during the term of this Agreement,
commercial general liability, professional liability and automobile liability coverage for non-owned and
hired vehicles with insurance carriers admitted to do business in the state of Texas. The insurance
companies must carry a Best's Rating of A-VII or better. Except for Professional Liability, the policies will
be written on an occunence basis, subject to the following minimuin limits of liability:
Commercial General Liability:
Per Occurrence Single Limit: $1,000,000
General Aggregate Limit: $2,000,000
Professional Liability:
Combined Single Limit: $2,000,000
Automobile Liability:
Combined Single Limit for any auto: $1,000,000 Per Occurrence
Employer's Liability:
Per Occurrence Single Limit: $1,000,000
Worker's Compensation
Per Occurrence Single Limit: $500,000
The Engineer shall further cause any approved subcontractor or sub-consultant to procure and
carry, during the term of this Agreement, the insurance coverage required of Engineer herein, including
without limitation, Professional Liability coverage, protecting the City against losses caused by the
professional negligence of the approved subcontractor or sub-consultant. The City shall be listed as a
primary and noncontributory additional insured with respect to the Automobile Liability and Commercial
General Liability and shall be granted a waiver of subrogation under those policies. The Engineer shall
provide a Certificate of Insurance to the City as evidence of coverage.
The Certificate shall provide 30 days' notice of cancellation. A copy of the additional insured
endorsement and waiver of subrogation attached to the policy shall be included in the Certificate. The
Engineer shall elect to obtain worker's compensation coverage pursuant to Section 406.002 of the Texas
Labor Code. Further, the Engineer shall maintain said coverage throughout the term of this Agreement and
Page 4 of 11
shall comply with all provisions of Title 5 of the Texas Labor Code to ensure that the Engineer maintains
said coverage. The Engineer may maintain Occupational Accident and Disability Insurance in lieu of
Worker's Compensation. In either event, the policy must be endorsed to include a waiver of subrogation in
favor of the City. If at any time during the life of the Agreement or any extension hereof, the Engineer fails
to maintain the required insurance in full force and effect, the Engineer shall be in breach hereof and all
work under the Agreement shall be discontinued immediately.
Notwithstanding anything contained herein to the contrary, the professional liability policy shall be
maintained at the Engineer's sole cost and expense. The retroactive date shall be no later than the
commencement of the performance of this Agreement and the discovery period (possibly through tail
coverage) shall be no less than 10 years after the completion of the Services provided for in this Agreement.
The provisions of this Article VIII shall survive the termination or expiration of this Agreement.
ARTICLE IX. EMPLOYMENT OF AGENTS/RETAINING OF CONSULTANTS
The Engineer may employ or retain consultants, contractors, or third parties (any of which are
referred to herein as "Sub-consultant"), to perform certain duties of Engineer, as set forth on Exhibit "A",
attached hereto, under this Agreement, provided that the City approves the retaining of Sub-consultants.
The Engineer is at all times responsible to the City to perform the Services as provided in this Agreement
and the Engineer is in no event relieved of any obligation under this Agreement upon retainage of any
approved Sub-consultant. Any agent and/or Sub-consultant retained and/or employed by the Engineer shall
be required by the Engineer to carry, for the protection and benefit of the City and the Engineer and naming
said third parties as additional insureds, insurance as described above required to be carried by the Engineer
in this Agreement.
The Engineer represents that such services are either under applicable value thresholds or are
otherwise exempt from notice and/or bid requirements under Texas Law.
ARTICLE X. CONFIDENTIALITY
The Engineer shall retain all information received from or concerning the City and the City's
business in strictest confidence and shall not reveal such information to third parties without prior written
consent of the City, unless otherwise required by law.
ARTICLE XI. INDEMNITY
THE ENGINEER SHALL INDEMNIFY AND SAVE HARMLESS THE CITY OF LUBBOCK
AND ITS ELECTED OFFICIALS, OFFICERS, AGENTS, AND EMPLOYEES FROM ALL SUITS,
ACTIONS, LOSSES, DAMAGES, CLAIMS, OR LIABILITY OF ANY K1ND, CHARACTER, TYPE,
OR DESCRIPTION, INCLUDING WITHOUT LIMITING THE GENERALITY OF THE FOREGOING,
Page 5 of 11
ALL EXPENSES OF LITIGATION, COURT COSTS, AND ATTORNEY'S FEES, FOR INJURY OR
DEATH TO ANY PERSON, OR INNRY TO ANY PROPERTY, RECEIVED OR SUSTAINED BY
ANY PERSON OR PERSONS OR PROPERTY, TO THE EXTENT ARISING OUT OF, RELATED TO
OR OCCASIONED BY, THE NEGLIGENT ACTS OF THE ENGINEER, ITS AGENTS, EMPLOYEES,
ANDIOR SUBCONSULTANTS, RELATED TO THE PERFORMANCE, OPERATIONS OR
OMISSIONS UNDER THIS AGREEMENT ANDIOR THE USE OR OCCUPATION OF CITY OWNED
PROPERTY. THE INDEMNITY OBLIGATION PROVIDED HEREIN SHALL SURVIVE THE
EXPIRATION OR TERMINATION OF THIS AGREEMENT.
ARTICLE XII. COMPLIANCE WITH APPLICABLE LAWS
The Engineer shall comply with all applicable federal, state and local laws, statutes, ordinances,
rules and regulations relating, in any way, manner or form, to the activities under this Agreement, and any
amendments thereto.
ARTICLE XIII. NOTICE
A. General. Whenever notice from the Engineer to the City or the City to the Engineer is required
or permitted by this Agreement and no other method of notice is provided, such notice shall be given by
(1) actual delivery of the written notice to the other party by hand (in which case such notice shall be
effective upon delivery); (2) facsimile (in which case such notice shall be effective upon delivery); or (3)
by depositing the written notice in the United States mail, properly addressed to the other party at the
address provided in this article, registered or certified mail, return receipt requested, in which case such
notice shall be effective on the third business day after such notice is so deposited.
B. Engineer's Address. The Engineer's address and numbers for the purposes of notice are:
Freese and Nichols, Inc.
Kevin Morris, P.E.
1500 Broadway Street, Suite 206
Lubbock, TX 79401
Telephone: 806-686-2700
Email: kevin.morris cr,freese.com
C. City's Address. The City's address and numbers for the purposes of notice are:
Sarah Davis
City of Lubbock
P.O. Box 2000
1314 Avenue K
Lubbock, Texas 79457
Telephone: 806-775-3157
Email: sdavis@mylubbock.us
Page 6 of 11
D. Change of Address. Either party may change its address or numbers for purposes of notice by
giving written notice to the other party as provided herein, referring specifically to this Agreement, and
setting forth such new address or numbers. The address or numbers shall become effective on the 15th day
after such notice is effective.
ARTICLE XIV. CITY-PROVIDED DATA AND RESPONSIBILITIES
Provision of Data. The City shall furnish the Engineer non-confidential studies, reports and other
available data in the possession of the City pertinent to the Engineer's Services, so long as the City is
entitled to rely on such studies, reports and other data for the performance of the Engineer's Services under
this Agreement (the "Provided Data"). The Engineer shall be entitled to use and rely, so long as such
reliance is reasonable, upon all such Provided Data.
ARTICLE XV. MISCELLANEOUS
A. Captions. The captions for the articles and sections in this Agreement are inserted in this
Agreement strictly for the parties' convenience in identifying the provisions to this Agreement and shall not
be given any effect in construing this Agreetnent.
B. Audit. The Engineer shall provide access to its corporate books and records to the City. The City
may audit, at its expense and during normal business hours, the Engineer's books and records with respect
to this Agreement between the Engineer and the City.
C. Records. The Engineer shall maintain records that are necessary to substantiate the services
provided by the Engineer.
D. Assignability. The Engineer may not assign this Agreement without the prior written approval
of the City.
E. Successor and Assigns. This Agreement binds and inures to the benefit of the City and the
Engineer, and in the case of the City, its respective successors, legal representatives, and assigns, and in the
case of the Engineer, its permitted successors and assigns.
F. Construction and Venue.
THIS AGREEMENT SHALL BE GOVERNED BY AND CONSTRUED IN ACCORDANCE WITH THE
LAWS OF THE STATE OF TEXAS. THIS AGREEMENT IS PERFORMABLE IN LUBBOCK
COUNTY, TEXAS. THE PARTIES HERETO HEREBY IRREVOCABLY CONSENT TO THE SOLE
Page 7 of 11
AND EXCLUSIVE JURISDICTION AND VENUE OF THE COURTS OF COMPETENT
JURISDICTION OF THE STATE OF TEXAS, COUNTY OF LUBBOCK, FOR THE PURPOSES OF
ALL LEGAL PROCEEDINGS ARISING OUT OF OR RELATING TO THIS AGREEMENT OR THE
ACTIONS THAT ARE CONTEMPLATED HEREBY.
G. Severability. If any provision of this Agreement is ever held to be invalid or ineffective by any
court of competent jurisdiction with respect to any person or circumstance, the remainder of this Agreement
and the application of such provision to persons andlor circumstances other than those with respect to which
it is held invalid or ineffective shall not be affected thereby.
H. Amendment. No amendment, modification, or alteration of the terms of this Agreement shall be
binding unless such amendment, modification, or alteration is in writing, dated subsequent to this
Agreement, and duly authorized and executed by the Engineer and the City.
I. Entire Agreement. This Agreement, including Exhibits "A" through "B" attached hereto, contains
the entire agreement between the City and the Engineer, and there are no other written or oral promises,
conditions, warranties, or representations relating to or affecting the matters contemplated herein.
J. No Joint Enterprise. Nothing contained herein shall be construed to imply a joint venture, joint
enterprise, partnership or principal — agent relationship between the Engineer and the City.
K. Documents Owned by City. Any and all documents, drawings and specifications prepared by
Engineer as part of the Services hereunder, shall become the property of the City when the Engineer has
been compensated as set forth in Article II, above. The Engineer shall make copies of any and all work
products for its files.
L. Notice of Waiver. A waiver by either the City or the Engineer of a breach of this Agreement
must be in writing and duly authorized to be effective. ln the event either party shall execute and deliver
such waiver, such waiver shall not affect the waiving party's rights with respect to any other or subsequent
breach.
M. Third Party Activities. Nothing in this Agreement shall be construed to provide any rights or
benefits whatsoever to any party other than the City and the Engineer.
N. Non-Appropriation. All funds for payment by the City under this Agreement are subject to the
availability of an annual appropriation for this purpose by the City. in the event of non-appropriation of
funds by the City Council of the City of Lubbock for the services provided under the Agreement, the City
will tenninate the Agreement, without termination charge or other liability, on the last day of the then-
current fiscal year or when the appropriation made for the then-current year for the services covered by this
Agreement is spent, whichever event occurs first (the "Non-Appropriation Date"). lf at any time funds are
Page 8 of 11
not appropriated for the continuance of this Agreement, cancellation shall be accepted by the Engineer on
thirty (30) days prior written notice, but failure to give such notice shall be of no effect and the City shall
not be obligated under this Agreement beyond the Non-Appropriation Date.
O. Contracts with Companies Engaged in Business with Iran, Sudan, or Foreign Terrorist
Organization Prohibited. Pursuant to Section 2252.152 of the Texas Government Code, prohibits the City
from entering into a contract with a vendor that is identified by The Comptroller as a company known to
have contracts with or provide supplies or service with Iran, Sudan or a foreign terrorist organization
P. No Boycott of Israel. Pursuant to Section 2271.002 of the Texas Government Code, a) This
section applies only to a contract that: (1) is between a governmental entity and a company with 10 or more
full-time employees; and (2) has a value of $100,000 or more that is to be paid wholly or partly from public
funds of the governmental entity. (b) A governmental entity may not enter into a contract with a company
for goods or services unless the contract contains a written verification from the company that it: (1) does
not boycott Israel; and (2) will not boycott Israel during the term of the contract.
Q. Texas Government Code 2274. By entering into this Agreement, Contractor verifies that: (1) it
does not, and will not for the duration of the contract, have a practice, policy, guidance, or directive
that discriminates against a firearm entity or firearm trade association or (2) the verification required by
Section 2274.002 of the Texas Government Code does not apply to the contract. If Contractor is a company
with 10 or more full-time employees and if this Agreement has a value of at least $100,000 or more,
Contractor verifies that, pursuant to Texas Government Code Chapter 2274, it does not have a practice,
policy, guidance, or directive that discriminates against a fireann entity or fireann trade association; and
will not discriminate during the term of the contract against a iirearni entity or firearm trade association.
R. Contractor represents and warrants that: (1) it does not, and will not for the duration of the
contract, boycott energy companies or (2) the verification required by Section 2274.002 of the Texas
Government Code does not apply to the contract. If Contractor is a company with 10 or more full-time
employees and if this Agreement has a value of at least $100,000 or more, Contractor verifies that, pursuant
to Texas Government Code Chapter 2274, it does not boycott energy companies; and will not boycott
energy companies during the term of the Agreement. This verification is not required for an agreement
where a governmental entity determines that these requirements are inconsistent with the governmental
entity's constitutional or statutory duties related to the issuance, incurrence, or manage�nent of debt
obligations or the deposit, custody, management, borrowing, or investment of funds.
S. Texas Public Information Act. The requirements of Subchapter J, Chapter 552, Government
Code, may apply to this contract and the contractor or vendor agrees that the contract can be tenninated if
the contractor or vendor knowingly or intentionally fails to comply with a requirement of that subchapter.
Page 9 of 11
To the extent Subchapter J, Chapter 552, Governinent Code applies to this agreement, Contractor agrees
to: (1) preserve all contracting information related to the contract as provided by the records retention
requirements applicable to the governmental body for the duration of the contract; (2) promptly provide to
the governmental body any contracting information related to the contract that is in the custody or
possession of the entity on request of the governmental body; and (3) on completion of the contract, either:
(A) provide at no cost to the governmental body all contracting information related to the contract that is in
the custody or possession of the entity; or (B) preserve the contracting information related to the contract
as provided by the records retention requirements applicable to the governmental body.
T. Professional Responsibility. All architectural or engineering services to be performed shall be
done with the professional skill and care ordinarily provided by competent architects or engineers practicing
under the same or similar circumstances and professional license.
EXECUTED as of the Effective Date hereof.
CITY OF LUBBOCK
A EST:
Courtney Paz, City Secretary
APPROVED AS TO CONTENT:
/ �.�
Michael G. Keenum, P.E., CFM, Division Director of Engineering 1 City Engineer
APPROVED AS TO FORM:
elli Leisure, Senior Assistant City Attorney
Page 10 of 11
Firm
Freese and Nichols, Inc.
By:
Jo F. Dewer, P.E.
V' e PresidentlPrincipal
Page 11 of 11
EXHIBIT A
Scope for Enaineerinq Desiqn Related Services for
Upland Avenue (from 50th Street to 66th Street)
The scope set forth herein defines the work to be performed by the ENGINEER in
completing the project. Both the CITY and ENGINEER have attempted to clearly define the
work to be pertormed and address the needs of the Project.
OBJECTIVE
Engineering Design: The objective of the Upland Avenue (50`h St to 66'h St) Improvements
project is to improve vehicular and pedestrian mobility and safety from 50'h Street to 66cn
Street (1.0 miles) The existing conditions within the project area are generally a two-lane
undivided roadway with bar ditch drainage conveyance within variable right of way. Project
limits are generally 50'h Street to 66'h Street; however, the intersection of 50th Street and
Upland Avenue has been previously designed by the ENGINEER while the intersection of
66'h Street and Upland Avenue has been designed by others. The project will include the
design and construction of a five-lane undivided thoroughfare with curb and gutter, drainage,
street lights, and sidewalks within a 110-foot right-of-way. The project will include up to
three (3) drainage easements to accommodate cross-drainage.
The project will require active coordination with four projects adjacent to this project:
Upland Avenue 34'h Street to 50'h Street
Upland Avenue 66th Street to 82"d Street
66'h Street Alcove Avenue to Upland Avenue
50'h Street/CR 6900 from FM 179 to Upland Avenue
WORK TO BE PERFORMED
Engineering Design:
Task 1. Design Management and Quality Control/Quality Assurance
Task 2. Conceptual Design (Schematic)
Task 3. Preliminary Design (60%)
Task 4. Final Design (90% and 100%)
Task 5. Bid Phase Services
Task 6. ROW/Easement Services
Task 7. Survey and Subsurface Utility Engineering Services
Task 8. Geotechnical Investigation / Pavement Design
Task 9. Permitting
Cily of Lubbock Upland Avenue
AQachmenl A From 50'^ Street to 66'" Slreel
Page 1 of 18
ENGINEERING DESIGN:
TASK 1. DESIGN MANAGEMENT
ENGINEER will manage the work outlined in this scope to efficiently and effectively use
ENGINEER's and CITY's time and resources. ENGINEER will manage change,
communicate effectively, coordinate internally and externally as needed, and proactively
address issues with the CITY's Project Manager and others as necessary to make progress
on the work.
ENGINEER will develop a Quality Control/ Quality Assurance Plan (QC/QA Plan) outlining
the ENGINEER's method of ensuring the highest levels of design and accuracy are
incorporated into the calculations, plans, specifications, and estimates.
ENGINEER is responsible for and shall coordinate all subconsultant activity to include
quality and consistency of plans.
At any time during the project the CITY may request from the ENGINEER documentation
relative to QC/QA for project submittals.
1.1. Managing the Team:
• Lead, manage and direct design team activities
• Perform Quality Control / Quality Assurance (QC/QA) reviews in conjunction with
performance of the work.
• Communicate internally among team members
• Task and allocate team resources
1.2. Communications and Reporting:
• Attend a pre-design project kickoff meeting with CITY staff to confirm and clarify
scope, understand CITY objectives, and develop economical and functional
designs that meet CITY requirements
• Conduct and document monthly project update meetings with CITY Project
Manager
• Conduct and document biweeklv internal design team meetings
• Conduct up to three (3) site visits
• Conduct one (1) review meeting with the CITY after each of the 30%, 60%, and
90% design submittals
• Conduct QC/QA reviews and document those activities.
• Prepare invoices, and submit monthly in the format requested by the CITY.
Prepare and submit monthly One Page Reports.
• Prepare and submit baseline Project Schedule initially, and monthly Project
Schedule updates with a schedule narrative as updates occur.
• Coordinate with adjacent projects including:
• Upland Avenue 34'h Street to 50'h Street
City of Lubbock Upland Avenue
Exhibd A From 50'" Street to 66'" Street
Page 2 0/18
• Upland Avenue 66'h Street to 82"d Street
• 66"' Street Alcove Avenue to Upland Avenue
• 50"' Street/CR 6900 from FM 179 to Upland Avenue
1.3. QC/QA of Subconsultants
The ENGINEER's subconsultants shall perform Quality Control/ Quality
Assurance on all procedures, field surveys, data, and products prior to delivery to
the CITY. ENGINEER's subconsultants shall certify in writing via a letter that the
information provided has undergone a Quality Control/ Quality Assurance
process.
1.4. QC/QA of Design Documentation
• ENGINEER shall perform a QC/QA review of all documents being submitted for
review at all stages of the design. QA should be performed by an individual
within the firm who is not on the design team.
• A Comment Resolution Log will be used to document conflicting comments
between reviewers and to highlight comments made by the CITY that the
ENGINEER is not incorporating into the design documents along with the
associated explanation.
• The documentation of a QC/QA review includes electronic copies of the color-
coded, original marked-up document (or "check prinY') developed during the QC
checking process and/or review forms which sequentially list documents and
associated comments.
ASSUMPTIONS
• One (1) pre-design project kickoff meeting with CITY
• Twelve (12) monthly project update meetings during design phase with the CITY
• Three (3) plan review meetings with the CITY
• Twenty (20) bi-weekly design team meetings
• Project design phase is anticipated to take twelve (12) months.
• Twelve (12) monthly updates of One Page Reports, Project Schedule, Action
Items/Decisions Made Log.
• All submittals to the CITY will be quality checked prior to submission.
DELIVERABLES
A. Meeting summaries with action items
B. Baseline design schedule and monthly updates with schedule narrative
describing any current or anticipated schedule changes
C. Monthly One Page Reports
D. Monthly invoices
City of Lubbock Upland Avenue
Exhibit A From 50w Street to 66'" Street
Page 3 of 18
E. QC/QA documentation
TASK 2. CONCEPTUAL DESIGN (SCHEMATIC)
The Conceptual Design shall be submitted to CITY per the approved Project Schedule.
The purpose of the Conceptual Design is for the ENGINEER to identify, develop,
communicate through the defined deliverables, and recommend the design concept that
successfully addresses the design problem, and to obtain the CITY's endorsement of this
concept.
ENGINEER will develop the Conceptual Design of the improvements as follows:
2.1. Data Collection
• Review Available CAD and GIS files from CITY
• Gather Aerial, GIS, LiDAR Data
• Review available CITY records development including plats and drainage studies
• Review available Franchise Utility Data
• Setup CAD files based on Available Data
• Conduct up to two (2) site visits
2.2. Conceptual Design Schematic
ENGINEER will provide design services to the CITY with the following design
components. All information listed will be provided on the design schematic:
GENERAL DESIGN
• TYPICAL SECTIONS — Including existing and proposed typical sections showing
pavement (roadway, sidewalk, curb), ROW, lane widths (with direction arrows).
• ALIGNMENT DATA
RIGHT-OF-WAY AND EASEMENT MAP — Including parcels numbers
ROADWAY DESIGN
• ROADWAY PLAN AND PROFILE — Including plan and profile views (Upland
Avenue) showing existing and proposed horizontal and vertical roadway
alignments, existing and proposed right-of-way/easements, sidewalks,
driveways, and existing utilities.
CROSS SECTION DESIGN
• CROSS SECTIONS — Including Upland Avenue centerline station at a 50'
interval, existing top of ground line, proposed roadway section, and easement
and right-of-way limits.
2.3. Conceptual Drainage Design Analysis
ENGINEER will provide design services to the CITY with the following design
analysis. All information listed will be provided in the drainage design analysis:
City of Lubbock Upland Avenue
Exhibit A From 50"' Street to 66'� Street
Page 4 of 18
• Hydrologic and hydraulic data sources for existing conditions.
• Project drainage area map
• Conveyance paths, slopes, time of concentration, and runoff coefficients as
required to calculate design-year flows.
• Subdivided drainage areas into sub-areas and calculations of the discharge at
each discharge location.
• ICPR H8H models of existing and proposed conditions
• Evaluation of adequacy of the ROW needed to accommodate the proposed
roadway and drainage system.
• Identification and preliminary sizing of necessary offsite drainage easements.
• Identification and preliminary sizing of cross culvert.
• Identification and preliminary sizing of playa lake cut/fill needs.
2.4. Opinion of Probable Construction Cost
• ENGINEER will develop an opinion of probable construction cost (OPCC) based
on design plans. Sources of data used in the preparation of the OPCC include
construction data aggregation services, similar past project performed by
ENGINEER, and professional experience and engineering judgement.
2.5. Utility Conflict Coordination
• ENGINEER will develop the design of CITY facilities to avoid or minimize
conflicts with existing utilities, and where known and possible consider potential
future utilities in designs. Where conflicts cannot be avoided, coordination of
Utility Conflicts will begin at the Conceptual Design phase.
• In the case of a public utility conflict, the ENGINEER will design CITY facilities to
avoid or minimize conflicts with existing utilities, and where known and possible
consider potential future utilities in designs.
• In the case of a private Utility Conflict, the ENGINEER will provide a PDF set of
plans with the utility conflicts highlighted and a Utility Conflicts Table of those
conflicts to be included in a Utility Clearance Letter for coordination. The
ENGINEER may need to coordinate directly with the private utility provider if that
provider needs to undertake design to adjust their utility's location.
• The ENGINEER shall deliver a PDF file of the approved preliminary schematic to
the City for forwarding to all utility companies which have facilities within the
limits of the project. The PDF file should be created directly from the CAD files.
ASSUMPTIONS
• Digital copy of Schematic (PDF).
• Digital copy of Drainage Analysis Report.
• Digital copy of opinion of probable construction cost.
City of Lubbock Upland Avenue
Exhibit A From 50'" Street to 66'" Street
Page 5 of 18
DELIVERABLES
A. Conceptual Schematic
B. Conceptual Drainage Analysis Report
C. Opinion of Probable Construction Cost
D. Utility Conflict Coordination Package
TASK 3. PRELIMINARY DESIGN (60%)
ENGINEER shall not proceed with Preliminary Design activities without written approval by
the CITY of the Conceptual Design Package. Preliminary Design shall be submitted to CITY
per the approved Project Schedule.
ENGINEER will develop the Preliminary Design of the improvements as follows:
3.1. Preliminary Design Plans:
• ENGINEER will progress, update, or revise the design components listed in the
Conceptual Design submittal and the additional design plans:
GENERAL DESIGN
• COVER SHEET — Including project limits and location map
• INDEX OF SHEETS
• GENERAL NOTES — Including applicable City standard general notes
• DESIGN LEGEND
• QUANTITY SUMMARY — Including tables of quantities per sheet
• SURVEY CONTROL AND PROJECT LAYOUT — Including control points with X,
Y, Z coordinates, identified coordinate system, vertical datum, and bearing base.
• RIGHT-OF-WAY AND EASEMENT MAP — Including parcels numbers
• EXISTING UTILITY MAP — Including collected Level A-D SUE data (Task 8).
• CONSTRUCTION PHASING NARRATIVE AND TYPICAL SECTION — Including
description of the suggested construction phasing and typical sections. The
construction phasing narrative includes expectation and restrictions of the
construction during the multi-phase project.
• CONSTRUCTION DETOUR PLAN — Including layout of allowable/approved detour
plan to be utilized but the project
• TRAFFIC CONTROL DETAILS — Including applicable CITY and TxDOT traffic
control details. Assumes that the Contractor will prepare and implement a traffic
control plan in accordance with the Texas Manual on Uniform Traffic Control
Devices.
Ciry of Lubbock Upland Avenue
Exhibit A From 50�' Street to 66'" Street
Page 6 of 18
ROADWAY DESIGN
• REMOVAL PLAN — Including removal of above and below ground features
necessary for the construction of the project improvements.
• ROADWAY PLAN AND PROFILE — Including plan and profile sheets (Upland
Avenue) showing existing and proposed horizontal and vertical roadway
alignments, right-of-way/easements, sidewalks, driveways, lane dimensions,
drainage structures, and City and franchise-owned utilities.
• ROADWAY KEY MAP
• SIDESTREET PLAN AND PROFILE — Including plan and profile sheets showing
existing and proposed horizontal and vertical roadway alignments, right-of-
way/easements, sidewalks, driveways, lane dimensions, drainage structures, and
City and franchise-owned utilities.
• INTERSECTION LAYOUTS — Including spot grades and dimensions for grades at
radii, fillets, and valley gutters at cross-street intersections.
• DRIVEWAY DETAILS - Including key elevations, dimensions, proposed driveway
section, and easement and right-of-way limits.
• ROADWAY DETAILS — Including necessary non-standard details.
• STANDARD ROADWAY DETAILS
DRAINAGE DESIGN
• OVERALL DRAINAGE AREA MAP — Delineate the watershed based on contour
data and field verification and document existing street, right-of-way and drainage
easement capacities for the subject site. A drainage area map will be drawn at
maximum 1" = 200' scale from available 1-foot contour data with the contours
labeled. Data source and year will be provided by the ENGINEER.
• STORMWATER ROUTING PLAN— Including proposed flow lines, HGL contours,
lengths and slopes of outfalls.
• CHANNEL PLAN AND PROFILE - Including plan and profile sheets showing
existing and proposed horizontal and vertical drainage alignments, existing and
proposed flow lines, HGL, lengths, slopes, and cross-section of proposed channel
improvements.
• CULVERT DESIGN — Including culvert layout sheets showing location and size of
all culverts, including existing and proposed flow lines, flows, lengths and slopes of
pipe, top of ground profile over pipe and connections to existing or proposed
culverts.
• CUT/FILL PLAN — Including plan sheets showing limits of cut, fill, peak water
surface elevation, volume calculations, and reclamation totals.
• DRAINAGE DETAILS - Including necessary non-standard details.
City of Lubbock Upland Avenue
Exhibit A From 50'" Street to 66'^ Street
Page 7 of 18
UTILITY DESIGN
• MINOR UTILITY ADJUSTMENT PLAN — Including plan sheets for the minor
adjustment (for example, adjustment of valve or manhole to proposed finished
grade) of existing water and sanitary sewer utilities within the project area.
• CITY OF LUBBOCK - SANITARY SEWER DETAILS
• CITY OF LUBBOCK - WATER DETAILS
ILLUMINATION DESIGN
ILLUMINATION PLAN — Including plan sheets showing proposed illumination pole,
conduit, and electrical service. The development of a photometric diagram will be
considered an additional service. The electrical design for the project will include
the electrical distribution system for the lighting system described. There will be a
minimum of two (2) electrical utility service locations and a maximum of three (3)
electrical service locations.
• ILLUMINATION DETAILS
TRAFFIC SIGNAL DESIGN
• SIGNAL PLAN AND SUMMARIES — CITY Traffic Engineering department will
develop the signal designs required for the project in coordination with the
ENGINEER. Sheets, quantities and specifications will be developed by the CITY
and incorporated into deliverable packages by ENGINEER.
SIGNING AND PAVEMENT MARKING DESIGN
• SIGNING AND PAVEMENT MARKING PLAN — Including pavement markings,
traffic buttons, and traffic signage (CITY and TMUTCD compliant) for the roadway
improvements.
• CITY OF LUBBOCK SIGNING AND PAVEMENT MARKING DETAILS
LANDSCAPE DESIGN
• LANDSCAPE PLAN — Including proposed locations of topsoil, sod, and
hydromulch in relation to the proposed improvements.
EROSION CONTROL
• EROSION CONTROL PLAN — Including proposed locations of sediment and
erosion control BMPs in relation to the proposed improvements.
3.2. Preliminary Design Project Manual (Contract and Specifications)
ENGINEER will submit all deliverables needed to prepare the Project Manual
(Contract and Specifications) using the CITY's front end and technical specifications.
The ENGINEER shall supplement the technical specifications, as needed.
3.3. Opinion of Probable Construction Cost
ENGINEER will develop an opinion of probable construction cost (OPCC) based on
design plans. Sources of data used in the preparation of the OPCC include
City of Lubbock Upland Avenue
Exhibit A From 50'� Street to 66'" Street
Page 8 of 18
construction data aggregation services, similar past project performed by
ENGINEER, and professional experience and engineering judgement.
3.4. Constructability Review Meeting
Prior to the Preliminary Design Review Meeting with the CITY, the ENGINEER shall
schedule and attend a project site visit with the CITY Project Manager. The
ENGINEER shall summarize the CITY's comments from the field visit and submit this
information to the CITY in writing.
3.5. Utility Conflict Coordination
• ENGINEER will provide a digital set of plans in PDF format with the utility
conflicts highlighted and a Utility Conflicts Table of those conflicts. The PDF file
should be created directly from the CAD files.
ASSUMPTIONS
• Two (2) copies of half size (11"x17") plans.
• One (1) set of the Specifications.
• Two (2) copies of opinion of probable construction cost.
• Electronic copy (PDF) of the plans, specifications, and OPCC.
DELIVERABLES
A. Preliminary Design Plans
B. Preliminary Specifications
C. Opinion of Probable Construction Cost
D. Utility Conflict Coordination Package
TASK 4. FINAL DESIGN (90% AND 100%).
ENGINEER shall not proceed with Final Design activities without written approval by the
CITY of the Preliminary Design Package. Final Design shall be submitted to CITY per the
approved Project Schedule.
ENGINEER will develop the Final Design of the improvements as follows:
4.1. Final Design (90%) Plans:
• ENGINEER will progress, update, or revise the design plans listed in the
Conceptual Design submittal and the additional design plans:
4.2. Final Design (90%) Specifications
• ENGINEER will prepare the Specifications using the CITY's front end and
technical specifications. The ENGINEER shall supplement the technical
specifications, as needed.
City of Lubbock Upland Avenue
Exhibit A From 50'" Street to 66'" Street
Page 9 of 18
4.3. Opinion of Probable Construction Cost
• ENGINEER will develop an opinion of probable construction cost (OPCC) based
on design plans. Sources of data used in the preparation of the OPCC include
construction data aggregation services, similar past project perFormed by
ENGINEER, and professional experience and engineering judgement.
4.4. Utility Conflict Coordination Package
• ENGINEER will provide a digital set of plans in PDF format with the utility
conflicts highlighted and a Utility Conflicts Table of those conflicts. The PDF file
should be created directly from the CAD files.
4.5. Final Design (100%) Plans:
• ENGINEER will progress, update, or revise the design plans listed in the
Conceptual Design submittal and the additional design plans:
4.6. Final Design (100%) Specifications
• ENGINEER will prepare the Specificationsg using the CITY's front end and
technical specifications. The ENGINEER shall supplement the technical
specifications, as needed.
4.7. Opinion of Probable Construction Cost
• ENGINEER will develop an opinion of probable construction cost (OPCC) based
on design plans. Sources of data used in the preparation of the OPCC include
construction data aggregation services, similar past project performed by
ENGINEER, and professional experience and engineering judgement.
ASSUMPTIONS
• Two (2) copies of half size (11"x17") plans for 90% and 100% Design.
• One (1) set of the Specifications for 90% and 100% Design.
• Two (2) copies of opinion of probable construction cost for 90% and 100%
Design.
• Electronic copy (PDF) of the plans, project manual, and OPCC for 90% and
100% Design.
DELIVERABLES
A. Final Design Plans (90% and 100%)
B. Final Design Specifications (90% and 100%)
C. Opinion of Probable Construction Cost (90% and 100%)
D. Utility Conflict Coordination Package (90% and 100%)
TASK 5. BID PHASE SERVICES.
ENGINEER will support the bid phase of the project as follows.
City of Lubbock Upland Avenue
Exhibit A From 50'^ Street to 66'" Slreet
Page 10 of 18
5.1. Bid Support
• The ENGINEER will provide technical interpretation of the contract bid
documents and will prepare proposed responses to all bidder's questions and
requests in the form of addenda. Attend the pre-bid conference in support of the
CITY.
• When substitution prior to award of contracts is allowed in the contract
documents, the ENGINEER will advise the CITY as to the acceptability of
alternate materials and equipment proposed by bidders.
• Attend the bid opening in support of the CITY.
• Tabulate and review all bids received for the construction project, assist the CITY
in evaluating bids/proposals, and recommend award of the contract. A copy of
the Bid Tabulation will be provided to the CITY.
• Assist the CITY in determining the qualifications and acceptability of prospective
contractors, subcontractors, and suppliers.
• The ENGINEER will provide the CITY with a recommendation of award letter
after the review of the provided bids.
• Incorporate all addenda into the contract documents and issue conformed sets.
After the bid opening, ENGINEER will provide up to five (5) full size (22"x34")
sets and up to seven (7) half size (11 "x17") sets of the Conformed Plans and up
to two (2) bound copies of the conformed Project Manual set incorporating all
approved addenda.
ASSUMPTIONS
• The project will be bid only once and awarded to one contractor.
• Construction documents will only be made available on the City's document
management system for plan holders and/or given to plan viewing rooms.
• Construction documents will not be printed by the CITY and made available for
purchase by plan holders and/or given to plan viewing rooms.
• The project will be bid via the design, bid, and build process.
DELIVERABLES
A. Up to three (3) Addenda
B. Bid Tabulations
C. Recommendation of Award Letter
D. Conformed Plans and Project Manual
TASK 6. ROW/EASEMENT SERVICES.
ENGINEER will support and perform activities related to ROW and land as outlined below,
per scoping direction and guidance from the CITY's Project Manager.
City of Lubbock Upland Avenue
Exhibit A From 50�' Street to 66'" Street
Page 11 of 18
6.1. Right-of-Way/Easement Preparation and Submittal.
• The ENGINEER shall determine rights-of-way and easement needs for
construction of the project. Required temporary and permanent easements will
be identified based on available information and recommendations will be made
for approval by the CITY.
• The ENGINEER shall prepare documents to be used to obtain right-of-way and
permanent and/or temporary easements required to construct the improvements.
• The ENGINEER shall prepare a ROW and Easement parcel reference map
showing and designating all land interest for project. The map shall be revised as
necessary throughout the land acquisition process.
• ENGINEER shall perform appraisal services including a Market Study Report
and individual appraisals for up to six (6) parcels.
• ENGINEER shall provide abstracting services for up to twelve (12) parcels with
unknown ownership or potential prescriptive ROW parcels.
• Engineer shall provide title and negotiation services for twenty three (23) parcels
including delivery of Initial Offer, negotiation with landowner, submitting signed
conveyance documents/counteroffers to CITY, curing title issues and obtaining
partial release of liens, delivery of Final Offer, recording original conveyance
documents in the real property records and submitting final file to CITY.
ASSUMPTIONS
• Appraisals will be submitted to CITY for review to request approval to make
offers.
• Condemnation services are considered an additional service.
DELIVERABLES
A. Up to twenty-three (23) proposed right-of-way documents
B. Up to three (3) proposed easement documents
C. ROW and Easement parcel reference map
D. Market Study Report
E. Conveyance documents
TASK 7. SURVEY AND SUBSURFACE UTILITY ENGINEERING SERVICES.
ENGINEER witl provide survey support as follows.
7.1. Design Survey and Right-of-Way/Easement Research
ENGINEER will perform field surveys to collect horizontal and vertical elevations
and other information needed by ENGINEER in design and preparation of plans
for the project. Information gathered during the survey shall include topographic
data, elevations of all sanitary and storm sewers, rim/invert elevations, location of
buried utilities, water valves, water meters, curb and gutter, asphalt, concrete,
structures, sidewalks, medians, fences, driveways, tops and toes of slope, utility
Ciry of Lubbock Upland Avenue
Exhibit A From 501h Street to 66'" Street
Page 12 oi 18
poles, mailboxes, signs, telephone risers, trees (measure caliper, identify overall
canopy, and have qualified arborist identify species of trees which are 6" in
diameter or larger), and other visible features relevant to the final plan sheets.
Existing drainage at intersections will be verified by field surveys. Spot elevations
will be shown on intersection layouts with cross slope to fit intersecting grade
lines.
• The minimum survey information to be provided on the plans shall include the
following:
- A Project Control Sheet, showing ALL Control Points, used or set while
gathering data. Generally on a scale of not less than 1:400:
- The following information about each Control Point;
a. Identified (Existing. CITY Monument #8901, PK Nail, 5/8" Iron Rod)
b. X, Y and Z Coordinates, in an identified coordinate system, and a
referred bearing base.
c. Descriptive Location (Ex. Set in the centerline of the inlet in the South
curb line of North Side Drive at the East end of radius at the Southeast
corner of North Side Drive and North Main Street).
- Coordinates on all P.C.'s, P.T.'s, P.I.'s, Manholes, Valves, etc., in the
same coordinate system, as the Control.
-- No less than two horizontal bench marks, per line or location.
- Bearings given on all proposed centerlines, or baselines.
- Station equations relating utilities to paving, when appropriate.
Right-of-Way research includes review of property/right-of-way records based on
current internet-based Lubbock Central Appraisal District (LCAD) information
available at the start of the project and available on-ground property information
(i.e. iron rods, fences, stakes, etc.). It does not include effort for chain of title
research, parent track research, additional research for easements not included
in the LCAD records, right-of-way takings, easement vacations and
abandonments, right-of-way vacations, and street closures.
7.2. Temporary Right of Entry Preparation and Submittal
• Prior to the access of private property for the collection of existing conditions
survey data, the ENGINEER shall prepare, mail, and monitor up to thirteen (13)
temporary right of entry letters.
7.3. Subsurface Utility Engineering
• ENGINEER will perform the Level A-D Subsurface Utility Engineering (SUE)
work required for this project in general accordance with the recommended
practices and procedures described in ASCE Publication Cl/ASCE 38-02
(Standard Guideline for the Collection and Depiction of Existing Subsurface
Utility Data). As described in the mentioned ASCE publication, four levels have
City of Lubbock Upland Avenue
Exhibit A From 50'^ Slreet to 66'^ Street
Page 13 oi 18
been established to describe the quality of utility location and attribute
information used on plans. The four quality levels are as follows:
Quality Level D(QL"D") — Information derived from existing utility records;
Quality Level C(QL"C") - QL"D" information supplemented with information
obtained by surveying visible above-ground utility features such as valves,
hydrants, meters, manhole covers.
Quality Level B(QL"B") — Two-dimensional (x,y) information obtained through the
application and interpretation of non-destructive surface geophysical methods.
Also known as "designating" this quality level provides the horizontal position of
subsurface utilities within approximately one foot.
Quality Level A(QL"A") — Three dimensional (x,y,z) utility information obtained
utilizing non-destructive vacuum excavation equipment to expose utilities at
critical points which are then tied down by surveying. Also known as "locating",
this quality level provides precise horizontal and vertical positioning of utilities
within approximately 0.05 feet.
• Utilities to be designated include gas, telecommunications, electric, drainage,
water and sanitary sewer.
• ENGINEER will designate the known subsurface utilities within the project limits
utilizing geophysical equipment (electromagnetic induction, magnetic) to
designate metallic/conductive utilities (e.g. steel pipe, electrical cable, telephone
cable).
• ENGINEER will provide appropriate traffic control measures (barricades and
signs).
• ENGINEER will utilize non-destructive vacuum excavation equipment to
excavate test holes at the required locations. Due to the risk of damage,
ENGINEER will not attempt to probe or excavate test holes on any AC water
lines unless approval is obtained from the CITY in advance. ENGINEER will
record the utility type, size, material, depth to top, and general direction. Each
test hole will be assigned a unique ID number and will be marked with a nail/disk.
The test-hole ID number and other pertinent utility information will be painted at
each test-hole location.
• ENGINEER shall provide up to six (6) test holes (estimated to be between 8 and
12 feet in depth and within existing pavement) Subsurface Utility Engineering
(SUE) to Quality Level A, as described below:
o Expose and locate utilities at specific locations.
o Tie horizontal and vertical location of utility to survey control.
o Provide utility size and configuration.
o Provide paving thickness and type, where applicable.
o Provide general soil type and site conditions and such other pertinent
information as is reasonably ascertainable from each test hole site.
o Backfill cored holes within existing concrete pavement with temporary
concrete pavement to a minimum of 9" in depth.
City of Lubbock Upland Avenue
Exhibd A From 50'" Street to 66'" Street
Page 14 of 18
DELIVERABLES
A. Drawing of the project layout with Level A-D SUE (including legend and table of
Level A SUE data).
TASK 8. GEOTECHNICAL INVESTIGATION / PAVEMENT DESIGN.
ENGINEER will provide geotechnical investigation services to the CITY as follows:
8.1 Field Exploration
• Select and mark up to eleven (11) boring locations and notify Texas 811,
appropriate CITY Department(s) to request location and marking of existing
underground utilities prior to the field exploration.
8.2 Laboratory Testing
• Perform testing on samples obtained from the borings to determine soil
classification and pertinent engineering properties of the subsurface materials.
ENGINEER will select samples for laboratory testing, assign tests, and review
the test results. Testing will be performed by a geotechnical testing
subcontractor.
• Laboratory tests will be assigned based on the specific subsurface materials
encountered during exploration. Test type and quantity may vary, but are
expected to include:
o Classification tests (liquid and plastic limits and percent passing the No. 200
sieve or gradation)
o Moisture content
o Dry unit weight
o Unconfined compressive strength
o pH lime series
o Soluble sulfate content
8.3 Engineering Analysis and Reporting
• Prepare a technical memorandum of the geotechnical investigation to include:
o Boring locations, boring logs, laboratory test results, and a key to the symbols
used.
a Discussion of subsurface conditions and soil properties indicated by the field
and laboratory work, and the implications for design.
o Recommendations for pavement subgrade treatment
o Pavement thickness calculations for both rigid and flexible pavement
o Earthwork related recommendations for use during development of the plans
and specifications
City of Lubbock Upland Avenue
Exhibit A From 50'" Streel to 66'^ Street
Page 15 of 18
ASSUMPTIONS
• For core drilling, traffic control will be required, including closing a lane of traffic
and providing flagmen.
• It is assumed that a truck-mounted drilling rig can access the drill locations. If
drilling with a track-mounted rig is necessary, it will be considered an additional
service to this contract.
• ENGINEER will coordinate with CITY to obtain the necessary permits for core
drilling within the roadway.
• Soil boring locations are planned to be within the existing pavement and in
locations where traffic control plans for roadway or lane closures will be
necessary.
• Locations of the six (6) core borings will be adjusted for location based upon the
existing utilities and ingress/egress onto Upland Avenue from the adjoining side
streets.
DELIVERABLES
A. One (1) hard copy and one (1) electronic copy of geotechnical technical
memorandum (including exhibits, soil boring results, summary of observations and
pavement (surface and subgrade) recommendations).
TASK 9. PERMITTING.
ENGINEER will provide permitting support for the CITY to obtain any and all agreements
and/or permits normally required for a project of this size and type, as follows:
9.1 Texas Department of Licensing and Regulation (TDLR)
• ENGINEER will provide permitting support for the CITY and will prepare plan
layouts for Americans with Disabilities Act (ADA) and TDLR compliant sidewalks,
curb ramps, pedestrian push buttons, and crosswalks.
• ENGINEER will retain the services of a TDLR Registered Accessibility Specialist
(RAS) Inspector approved by the CITY.
• ENGINEER will be responsible for completing and submitting the inspection
forms, paperwork, and RAS plan review during the design phase as required by
the TDLR.
• During the construction phase, the CITY will coordinate one (1) RAS inspection
with the ENGINEER and RAS Inspector no later than thirty (30) calendar days
after construction substantial completion.
• ENGINEER will be compensated for the RAS Inspector costs by the CITY as a
reimbursable expense.
9.2 Environmental Permit Evaluation
ENGINEER will evaluate the project area for regulatory permitting requirements primarily
related to Section 404 of the Clean Water Act (Section 404) and other know permits. This
City of Lubbock Upland Avenue
Exhibit A From 50'" Street to 66'^ Street
Page 16 of 18
information will be utilized to evaluate the project improvements to minimize regulatory
requirements for the project.
Desktop Evaluation
• Prior to the site visit, ENGINEER's environmental scientists will assemble and
review data such as aerial photographs, topographic maps, National Wetlands
Inventory (NWI) maps, and soils data.
Pedestrian Survev
ENGINEER's environmental scientist will conduct a pedestrian survey within the
project limits (including approximately 200 feet upstream and downstream of the
existing culvert crossings) to document existing environmental conditions and
assess potential environmental impacts. The presence and locations of
waterbodies, including wetlands, potential federally-listed threatened and
endangered species habitat, and vegetation cover types will be identified within
the project area.
THC Coordination
• ENGINEER's environmental scientist will prepare and submit a consultation letter
to the Texas Historical Commission (THC) to determine the potential for the
project to impact protected cultural resources and provide results to the CITY. If
follow up studies are requested by the THC, those studies can be provided as an
additional service with written authorization from the CITY.
Conceptual Environmental PermittinQ Memorandum
• Information gathered during the pedestrian survey (and coordination with the
project team and CITY) will be used to prepare a technical memorandum
identifying potential environmental permitting requirements for the proposed
improvements identified in the conceptual design phase.
ASSUMPTIONS
Section 404 of the Clean Water Act (Section 404) regulates the discharge of
materials within waters of the U.S. (such as streams, ponds, and wetlands), and
the U.S. Army Corps of Engineers must issue a Section 404 permit prior to a
regulated action. This scope assumes the intent of the future proposed project is
to construct roadway improvements in accordance with the terms and conditions
of Nationwide Permit (NWP) 14, Linear Transportation Projects.
DELIVERABLES
A. Conceptual Environmental Permitting Memorandum
Ciry of Lubbock Upland Avenue
Exhibit A From 50'" Street to 66"' Streel
Page 17 of 18
EXHIBIT A, PART 2, ADDITIONAL SERVICES
Upland Avenue (from 50'h Street to 66"' Street)
Additional Services not included in the existing Scope of Services — CITY and
ENGINEER agree that the following services are beyond the Scope of Services described in
the tasks above. However, ENGINEER can provide these services, if needed, upon the
CITY's written request. Any additional amounts paid to the ENGINEER as a result of any
material change to the Scope of the Project shall be agreed upon in writing by both parties
before the services are performed. These additional services include the following:
• Water and wastewater utility design.
• Traffic signal design.
• Condemnation services.
• Construction phase services of any kind, including pre-construction meetings, review
of submittals, field visits, progress meetings, etc.
• Services related to development of the CITY's project financing and/or budget.
• Services related to disputes over pre-qualification, bid protests, bid rejection and re-
bidding of the contract for construction.
• Construction management and inspection services
• Performance of materials testing or specialty testing services.
• Services necessary due to the default of the Contractor.
• Services related to warranty claims, enforcement and inspection after final completion.
• Services to support, prepare, document, bring, defend, or assist in litigation
undertaken or defended by the CITY.
• Performance of miscellaneous and supplemental services related to the project as
requested by the CITY.
• Effort exceeding those outlined in the "Assumptions" section of each task description.
• Survey documents exceeding the number shown in the contract.
• Property appraisals exceeding the number shown in the contract.
• Level A SUE test holes exceeding the number shown in the contract.
City of Lubbock Upland Avenue
Exhibit A From 50"' Streel l0 66�' Streel
Page 18 of 18
EXHIBIT B
Budqet for Enqineerinq DesiQn Related Services for
Upland Avenue (from 50'h Street to 66'h Street)
CITY and ENGINEER have established a not-to-exceed budget of 1 208 443 to complete all engineering
design services as directed under this AGREEMENT. This amount will not be exceeded without a contract
amendment. CITY will pay the ENGINEER hourly, for services identified in Exhibit A, based on ENGINEERS
Fee Schedule presented as EXHIBIT C. Subconsultant services will be billed at cost to ENGINEER with a 10
percent handling fee. The Budget is presented for the services of ENGINEER under this AGREEMENT are
provided in this Exhibit B. CITY and ENGINEER agree to allow redistribution of funds between Tasks as
appropriate to allow flexibility in providing the needed services within the not-to-exceed budget.
ENGINEER agrees to complete these services as delineated above. Should there be a Change in Scope of
Work or Time of Performance, then this can result in an amendment to this contract which shall be
negotiated at that time.
The budget assumes that all work will be completed in accordance with the proposed project schedule of
12 months. The schedule may be extended by six months if the CITY and ENGINEER mutually agree.
EXHIBIT C
Hourlv Rate Schedule Compensation for Enqineerinq Desiqn Related Services for
Upland Avenue (from 50�' Street to 66'h Street)
LUBBOCK RATE SCHEDUIE
E�u
Principal / Group Manager
Tcchnical Profcssional • 6
Techntcal prolculonal S
Technical Prafess3onal - 4
Technical Prafessional - 3
Techmc�l Pru(ess+onal • 2
technical Profess3onal - 1
CAD Technician/Designer - 3
CAOTechn�cian/Designer • 2
CAO Yethmtbn/p�signcr 1
Seniqr CAd Technit�an/Oes�gne�
Construction Manager 4
Construction Ma�agcr 3
Construtuon M�nager • 2
Constr�tlion Manager 1
Corporate Project Support - 3
COrpOrOtt PrO�dtt Suppoti - 2
Corparate Projen Support - 1
Intern/ [oap
Rates lor In•Flouse Sorvlces
7echnelo�v [hane
S8 50 per hour
Tra�rtsl
Standard 1ilS Rates
•�� �� .
Small Format (prr copy)
Wrge �ormat iper sq. ft )
Bond
Gbssy / Mylar
Vlnyl / Adhesive
Mounting (per sq. ft ►
Bindi ng �per bdndir►g!
Rate
342
335
2 T0
232
194
170
140
186
ia�
112
a�i
zao
151
143
112
157
141
1p8
73
8&W Color
So ia so.zs
50.25 50.75
''j0.75 s1.25
SI 5d 52 00
52.00
50.25
OTNER OIREGT EXPENS£S.
Othcr dircct eKprnscs arc reimbursed at actual cost t�mcs a multipl+cr o( 1 10 Thcy intludc outsidc p�in�ing �nd reproduction
erpense, commumcat�on e�pense, travel, transpartation and suhstttente away Irom the FNI office and other miuellaneous ��penses
diredty related tn Ihe work, Includ�ng costs ot laboratory anafysis, test, and other work required 10 he done by independeot persons
other than staH m¢mbers for Resident itepresentative services performed by rwn-FNI employees and CAD services pe�lormed In-
house by non FNI employres wfirre FNi prowdes worksp�ce and equ�pment lo perform such srrvlces, thesr services wifl be brlled at
cost times n mtiltiplfer of 2.0. Thls mnrtup npprorimates the cost to FNI d an FNI employee was performing the same or simllar
scrvites.
CERTIFICATE OF INTERESTED PARTIES FORnn 1295
1 of 1
Complete Nos. l- a and s if there are interested parties. OFFICE USE ONLY
Complete Nos. l, 2, 3, 5, and 6 if there are no interested parties. CERTIFICATION OF FILING
1 Name of business entiry filing form, and the city, state and country of the business entity's place Certificate Number:
of business. 2023-1079264
Freese and Nichols, Inc.
Fort Worth, TX United States Date Filed:
2 Name of governmental entity or state agency that is a party to the contract for which the form is 10/04/2023
being filed.
City of Lubbock Date Acknowledged:
3 Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a
description of the services, goods, or other property to be provided under the contract.
17625
Engineering Design Services for Upland Avenue from 50th Street to 66th Street
Nature ofinterest
4
Name of Interested Party City, State, Country (place of business) (check applicable)
Controlling Intermediary
Pence, Bob Fort Worth, TX United States X
Coltharp, Brian Fort Worth, TX United States X
Archer, Charles Raleigh, NC United States X
Greer, Alan Fort Worth, TX United States X
Hatley, Tricia Oklahoma City, OK United States X
Johnson, Kevin Dallas, TX United States X
Payne, Jeff Fort Worth, TX United States X
Reedy, Mike Houston, TX United States X
Wolfhope, John Austin, TX United States X
5 Check only if there is NO Interested Party. ❑
6 UNSWORN DECLARATION
My name is Pam Fofdtfan , and my date of birth is
My address is $00 N. Shoreline, Suite 1600N Corpus Christi TX 78401 USA
(street) (city) (state) (zip code) (country)
I declare under penalry of perjury that the foregoing is true and correct.
Executed in Nueces Counry, State of Texas , on the 4th day of October 20 23
(month) (year)
�P �-e,�
� �
Signature of authorized agent of contracting business entiry
(Declarant)
Forms provided by Texas Ethfcs Commfssion www.ethics.state.tx.us Versfon V3.5.i.e4ef7e73
CERTIFICATE OF INTERESTED PARTIES FORnn 1295
1 of 1
Complete Nos. 1- 4 and 6 if there are interested parties. OFFICE USE ONLY
Complete Nos. i, 2, 3, 5, and 6 if there are no interested parties. CERTIFICATION OF FILING
1 Name of business entiry filing form, and the city, state and country of the business entity's place Certificate Number:
of business. 2023-1079264
Freese and Nichols, Inc.
Fort Worth, TX United States Date Filed:
2 Name of governmental entiry or state agency that is a party to the contract for which the form is 10/04/2023
being filed.
City of LubboCk Date Acknowledged:
10/05/2023
3 Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a
description of the services, goods, or other property to be provided under the contract.
17625
Engineering Design Services for Upland Avenue from 50th Street to 66th Street
Nature ofinterest
4
Name of Interested Party City, State, Country (place of business) (check applicable)
Controlling Intermediary
Pence, Bob Fort Worth, TX United States X
Coltharp, Brian Fort Worth, TX United States X
Archer, Charles Raleigh, NC United States X
Greer, Alan Fort Worth, TX United States X
Hatley, Tricia Oklahoma City, OK United States X
Johnson, Kevin Dallas, TX United States X
Payne, Jeff Fort Worth, TX United States X
Reedy, Mike Houston, TX United States X
Wolfhope, John Austin, TX United States X
5 Check only if there is NO Interested Party. ❑
6 UNSWORN DECLARATION
My name is , and my date of birth is
My address is
(street) (city) (state) (zip code) (country)
I declare under penalry of perjury that the foregoing is true and correct.
Executed in County, State of , on the day of , 20
(month) (year)
Signature of authorized agent of contracting business entity
(Declarant)
Forms provided bv Texas Ethics Commission www.ethics.state.tx.us Version V3.5.1.e4ef7e73