Loading...
HomeMy WebLinkAboutResolution - 2023-R0506 - Amendment 15 To Contract 15200, RS&H, Inc., LBK Preston Smith Int'l Airport - 10/10/2023Resolution No. 2023-R0506 Item No. 5.26 October 10, 2023 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Amendment No. 15 to LBB Contract No. 15200, by and between the City of Lubbock and RS&H, Inc. for engineering design services concerning the replacement of certain mechanical HVAC equipment at the Lubbock Preston Smith International Airport, and related documents. Said Amendment is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. APPROVED AS TO CONTENT: Kelly Campbell, Executive Director of Aviation Passed by the City Council on October 10, 2023 ccdocsII1RES.Amend 15-RS&H August 21, 2023 DocuSign Envelope ID: 3A22847A-1418-4BB9-94F4-D1CCO2B291B8 Resolution No. 2023-R0506 Mechanical Equipment Replacement Construction Documentation Services Scope o f Work Version 1.0 July 27, 2023 City of Lubbock, Texas Lubbock Preston Smith Int'I Airport LBB Contract No.: 15200 RS&H Project No.: 223-1874-015 Prepared by RS&H, Inc. at the direction of Lubbock Preston Smith International Airport TBPE Registration No. F-3401 RS�I DocuSign Envelope ID: 3A22847A-1418-46B9-94F4-D1CCO2829168 5 C O P E O F W 0 R K PROJECT DESCRIPTION The City of Lubbock (City) has requested that RS&H, Inc. (RS&H or Consultant) provide a scope and fee for engineering design services to develop Construction Documents for the replacement of multiple pieces of inechanical HVAC equipment as identified in the Mechanical Systems Condition Assessment report dated February 24, 2023, prepared by RS&H and identified below. Specifically, this proposal is for the creation of construction drawings and specifications, ROM opinion of probable construction cost estimates and associated site visits, kick-off and review meetings with LBB staff, as well as providing bidding and award recommendations. Upon receipt of approval from LBB, RS&H will provide construction administration phase services via separate work authorization. Figure 1: Mechanical Equipment Replacement List from Assessment Report 4.5 MECHANICAL SYSTEMS PRIORITIES Listed below in order of priority are the retommendation for the HVAC system repairs, replacements, and improvements. 1. Replace existing Greenheck exhaust fan and curb that serves the boiler flue stack with an exhaust system specifically designed for boiler flue systems, such as Exhausto. 2. Replace all three primary chiEled water pump (1-3 years) 3. Replace all three condenser water pump (1-3 years) 4. Replace HCFC-123 chillers (1-3 years) 5. Install refrigerant leak detection system and ASHRAE 15 accessories (Same time as chiller replacement) ' 6. Remove sand filter from chilled water loop. 7. Replace Cooling Towers (5-10 years) S. Replace condenser water sand filter with basin sweep system. 9. Integrate chilled water and condenser water controls system into the Automated Logic Building Management System. 10. Replace all three hot water secondary pumps (1-3 years) 11. Replace AHU-025 12. Replace AHU-026 13. Replace AHU-031 14. Replace AHU-032 15. Replace AHU-027 16. Install dust mitigation items in cooling tower pump rooms. 17. Reptace AHU's-013 thru •017, & -020 A complete description of the scope of services can be found in Section 11: Project Tasks. Mechonical Equipment Replocement Construction Documentation Services - (Version 1.0) DocuSign Envelope ID: 3A22847A-1418-4B69-94F4-D1CCO26291B8 5 C O P E O F W 0 R K Il PROJECT TASKS TASK 1 PROJECT INITIATION & EXISTING CONDITION DOCUMENTATION Task 1.1 Perform Project Initiation / Setup RS&H will complete the necessary Project initiation and documentation setup to appropriately manage the Project. Task 1.2 Project Kick-off Meeting The Consultant will prepare for and attend one pre-design kick-off meeting with the Airport staff and other appropriate agencies to establish the design goals and methods. The kickoff meeting will be held at the Lubbock Preston Smith International Airport administrative offices. This meeting will review the discussions previously held with the airport, and confirm the scope, schedule and deliverables of this task order. RS&H attendees at the Kick-Off meeting will include the Project Manager, Mechanical Engineering Task Lead, and Eledrical Engineering Task Lead. This meeting is anticipated to be held at the Airport at the same time as the site walk through and will require travel by the Consultant. Task 1.3 Data Collection and Review of As-Built Gonditions RS&H will review as-built documentation and record documents in their possession. The Airport will provide the Consultant with any available updated information for the Terminal Building or specific equipment. The Consultant will review all provided information and will forward any questions or comments to the Airport for response and additional information. Task 1.4 Site Walkthrough The Consultant will conduct an in-person walkthrough for all visible and readily accessible areas that are included as part of this project. Ladders will be provided by L66 for spot "above ceiling" obsenrations. The Airport will attend with knowledgeable staff and provide access to all areas associated with the Project to ensure a comprehensive walkthrough is performed. The following RS&H attendees will be present for the site walkthrough: » Project Manager » Mechanical Engineering Task Lead » Electrical Engineering Task Lead Mechanicol Equipment Rep(acement Construction Documentation Services - (Version 1.0) 2 DocuSign Envelope ID: 3A22847A-1418-48B9-94F4-D1CCO2629188 5 C O P E O F W 0 R K The walkthrough will use the record data information that RS&H has in their possession, as well as any new information received from the Airport as the basis for the verification of existing documentation to the extent possible. Task 1.5 Existing Conditions Modelling The Consultant will utilize the record drawing information and any observations made during the site walkthrough to develop a baseline model of existing conditions in REVIT to be used and updated throughout the design process to develop the construction documents. The REVIT model will be prepared to a Level of Detail (LOD) 300. Task 1.6 Project Management The Consultant will administerthe project in coordination with assigned airport staff. The Consultant will manage the project, coordinate with LBB staff, assign qualified individuals or sub-consultants to the project, and will complete the efforts within a reasonable and agreeable time frame. This task will include scheduling, resource allocation, monitoring, oversight, direction and control for aspects of the team's efforts including assembly and coordination of documentation. The Consultant will complete meeting preparation activities, prepare and distribute meeting minutes, and assign appropriate follow-up activities. TASK 2 50°/a CONSTRUCTION DOCUMENTS Task 2.1 Prepare 50% Construction Documents The consultant will prepare 50% Construction Documents that will include: • Technical specifications with minimum requirements for the equipment and components necessary for the execution of the project. • Demolition Floor plans (drawings) showing the demolition of existing equipment, ductwork distribution systems, mechanical piping systems, and electrical power systems necessary for the replacement of the identified mechanical equipment. • New Work Floor plans (drawings) showing the installation of new equipment, new duct and piping distribution systems, and electrical power modifications to support the mechanical renovations. • Control System Schematics and Riser diagrams(schematics) that indicate the sequence of operations for new equipment. Mechanical Equipment Replacement Construction Documentation Services - (Version 1.0) � DocuSign Envelope ID� 3A22847A-1418-46B9-94F4-D1CCO2B29168 S C O P E O F W 0 R K Task 2.2 Code and Permitting Coordination The Consultant will coordinate with the Authorities Having Jurisdidion (AHJs) relative to Building Code, Mechanical Code and Electrical Code requirements and permitting requirements for the project. Task 2.3 Opinion of Probable Construction Costs The Consultant will prepare a cost estimate for the project based on the level of completion. In providing estimates of probable construction cost, the Airport understands that the Consultant has no control over the cost or availability of labor, equipment, or materials, or over market conditions or a Contractor's method of pricing, and that the Consultant's estimates of probable construction costs are made on the basis of the Consultant's professional judgement and experience. The Consultant makes no warranty, express or implied, that the bids or the negotiated cost of the Work will not vary from the ConsultanYs estimate of probable construction cost. Task 2.4 Design Coordination Meeting The Consultant will attend one (1) coordination meeting with the Airport/Stakeholders during this stage of document preparation. This meeting will be held virtually and will include the Consultant team members (Project Manager, Mechanical Engineering, and Electrical Engineering) and Airport Staff. The intent of the meetings will be to resolve any issues impeding the development of the construction documents, in particular the phasing and logistics of construction to accommodate construction while maintaining Airport operations. Task 2.5 Quality Control Review The Consultant will conduct in-house quality control review of the 50% Construction Documents package and estimate of probable construction cost prior to submittal to the Airport. The review will cover the design deliverables prior to submittal to the Client. The QC review will be performed as follows: • Independent QC Review — An independent Architect/Engineer not actively involved in the Project will review for readability, accuracy, appearance, and acceptability. • Independent Technical Peer Review — For each discipline associated with the Project, an independent Engineer not actively involved in the Project will review the documents for alignment with design methodologies, calculations, and code compliance. Mechanical Equipment Rep(pcement Construction Documentation Services - (Version 1.0) 4 DocuSign Envelope ID: 3A22847A-1418-4669-94F4-D1CCO2629188 SCOPE OF WORK • Constructability Review — a comprehensive look at the Project to ensure alignment between plans and specifications, phasing impacts, potential conflicts, etc. • Discipline Coordination Review — an interdisciplinary review to ensure coordination of elements between disciplines. • BIM Manager Review — review and assessment of the status of the Revit model and ensure proper coordination. Task 2.6 Submit 50% Construction Documents The Consultant will submit and distribute an electronic copy of the 50% Construction Documents and estimate of probable construction cost, to the Airport for review, comment, and approval to proceed to 90% Construction Documents. Task 2.7 50% Construction Documents Review Meeting The Consultant will coordinate and attend one (1) design review meeting with the Airport to review the SO% submittal. The Consultant will provide written minutes of the meeting and distribute to all attendees. Within 10 days of the 50% design review meeting, the airport will provide any additional written comments. The 50% design review meeting will be held virtually via web conference. Task 2.8 Project Management The Consultant will administer the project in coordination with assigned airport staff. The Consultant will manage the project, coordinate with LBB staff, assign qualified individuals or sub-consultants to the project, and will complete the efforts within a reasonable and agreeable time frame. This task will include scheduling, resource allocation, monitoring, oversight, direction and control for aspects of the team's efforts including assembly and coordination of documentation. The Consultant will complete meeting preparation activities, prepare and distribute meeting minutes, and assign appropriate follow-up activities. Mechanical Equipment Replacement Construction Documentation Services - (Version 7.0) $ DocuSign Envelope ID: 3A22847A-1418-4B69-94F4-D1CCO2829168 5 C O P E O F W 0 R K TASK 3 90% CONSTRUCTION DOCUMENTS Task 3.1 Incorporate 50°� Construction Documents Review Comments The Consultant will review all comments received from the Airport's authorized representative(s) from the 50% construdion documents submittal review and incorporate applicable comments into the documents and estimate of probable construction cost. Task 3.2 Prepare 90�o Construction Documents The Consultant will prepare 90% Construction Documents consisting of technical specifications, drawings and estimate of probable cost. Task 3.3 Opinion of Probable Construction Costs The Consultant will prepare a cost estimate for the project based on the level of completion. In providing estimates of probable construction cost, the Airport understands that the Consultant has no control over the cost or availability of labor, equipment, or materials, or over market conditions or a Contractor's method of pricing, and that the Consultant's estimates of probable construction costs are made on the basis of the Consultant's professional judgement and experience. The Consultant makes no warranty, express or implied, that the bids or the negotiated cost of the Work will not vary from the Consultant's estimate of probable construction cost. Task 3.4 Design Coordination Meeting The Consultant will attend a coordination meeting with the Airport/Stakeholders during this stage of document preparation. One (1) design coordination meeting is expected. This meeting will be held virtually and will include the Consultant team members (Project Manager, Mechanical Engineering, and Electrical Engineering) and Airport Staff. The intent of the meetings will be to resolve any issues impeding the development of the construction documents. Task 3.5 Qualifiy Control Review The Consultant will conduct in-house quality control review of the 90% Construction Documents and estimate of probable construction cost prior to submittal to the Airport. The review will cover the design deliverables prior to submittal to the Client. The QC review will be performed as follows: Mechanical Equipment Replocement Construction Documentation Services - (Version 1.0) 6 DocuSign Envelope ID: 3A22847A-1418-4669-94F4-D1CCO26291B8 S C O P E O F W 0 R K • Independent QC Review — An independent Architect/Engineer not actively involved in the Project will review for readability, accuracy, appearance, and acceptability. • Independent Technical Peer Review — For each discipline associated with the Project, an independent Engineer not actively involved in the Project will review the documents for alignment with design methodologies, calculations, and code compliance. • Constructability Review — a comprehensive look at the Project to ensure alignment between plans and specifications, phasing impacts, potential conflicts, etc. • Discipline Coordination Review — an interdisciplinary review to ensure coordination of elements between disciplines. • BIM Manager Review — review and assessment of the status of the Revit model and ensure proper coordination. Task 3.6 Submit 90°r6 Construction Documents Deliverable The Consultant will submit and distribute an electronic copy of the 90% Construction Documents and estimate of probable construction cost to the Airport for review and comment. Task 3.7 90�o Construction Documents Review Meeting The Consultant will coordinate and attend one (1) design review meeting with the Airport to review the 90% submittal. The intent of this review meeting is to confirm the final extents of the construction work, confirm the phasing and logistics for maintaining operations, and establish the bidding schedule and process. The Consultant will provide written minutes of the meeting and distribute to all attendees. The 90% design review meeting will be held in person at the airport and will require travel by the Consultant. Task 3.8 Project Management The Consultant will administer the project in coordination with assigned airport staff. The Consultant will manage the project, coordinate with LBB staff, assign qualified individuals or sub-consultants to the project, and will complete the efforts within a reasonable and agreeable time frame. Mechanicol Equipment Replacement Construction Documentation Serv�ces - (Version 7.0) �' DocuSign Envelope ID: 3A22847A-1418-46B9-94F4-D1CCO2629168 S C 0 P E 0 F W O R K This task will include scheduling, resource allocation, monitoring, oversight, direction and control for aspects of the team's efforts including assembly and coordination of documentation. The Consultant will complete meeting preparation activities, prepare and distribute meeting minutes, and assign appropriate follow-up activities. TASK 4 100% CONSTRUCTION DOCUMENTS Task 4.1 Incorporate 90°/a Construction Documents Review Coe�ments The Consultant will review all comments received from the Airport's authorized representative(s) from the 90% Construction Documents submittal review and incorporate applicable comments into the documents. The Consultant will provide a written response on each comment on how it will be incorporated into the documents, or why it was not applicable. Task 4Z Prepare 100% Construction (Bid) Documents The Consultant will prepare the 100% Construdion Documents consisting of technical specifications, drawings, and schematics. Specifications will be based on a lump sum total cost construction contract, with alternate bid items as identified during 50% design and 90% design coordination meetings. Front-end specification requirements and format will be provided by the Airport including, but not limited to, the advertisement to bid, legal requirements, proposal, contract, bond forms, general provisions, labor rates, minority participation requirements, special conditions, insurance requirements, and any other pertinent and or required information. Project specifications will be formatted to include BIL/ATP funding requirements, such as Build America/Buy America(BABA) requirements. Task 4.3 Quality Control Review The Consultant will conduct an in-house quality control review of the 100% Construction Documents prior to submittal to the Airport. The review will coverthe design deliverables prior to submittal to the Client. The QC review will be performed as follows: • Independent QC Review — An independent Architect/Engineer not actively involved in the Project will review for readability, accuracy, appearance, and acceptability. • Independent Technical Peer Review — For each discipline associated with the Project, an independent Engineer not actively involved in the Project will review Mechanical Equipment Replacement Construction Documentation Services - (Version 1.0) $ DocuSign Envelope ID: 3A22847A-1418-4669-94F4-01CCO2B29188 S C O P E O F W 0 R K the documents for alignment with design methodologies, calculations, and code compliance. • Construdability Review — a comprehensive look at the Project to ensure alignment between plans and specifications, phasing impacts, potential conflicts, etc. • Discipline Coordination Review — an interdisciplinary review to ensure coordination of elements between disciplines. • BIM Manager Review — review and assessment of the status of the Revit model and ensure proper coordination. Task 4.4 Submit 100°� Construction Documents The Consultant will submit and distribute the 100% Construction Documents to the Airport as electronic files in PDF and MS Word format for use and distribution during the bidding phase. Additionally, the consultant will submit Signed and Sealed Documents for Permit Review as determined in coordination meetings with the Building Department. Task 4.5 Project Management The Consultant will administerthe project in coordination with assigned airport staff. The Consultant will manage the project, coordinate with LBB staff, assign qualified individuals or sub-consultants to the project, and will complete the efforts within a reasonable and agreeable time frame. This task will include scheduling, resource allocation, monitoring, oversight, direction and control for aspects of the team's efforts including assembly and coordination of documentation. The Consultant will complete meeting preparation activities, prepare and distribute meeting minutes, and assign appropriate follow-up activities. TASK S BIDDING/AWARD PHASE SERVICES Task 5.1 Pre-Bid Conference The Consultant will attend a pre-bid conference at the Airport, receive comments, record the minutes of the conference and distribute to the Airport's authorized representative(s) and prospective contractors. Two representatives from the Consultant will attend the meeting in person at the airport. This meeting will require travel by the Consultant. Mechanica( Equipment Rep(acement Construction Documentation Services - (Version 1.0) g DocuSign Envelope ID: 3A22847A-1418-4B69-94F4-D1CCO2B29168 S C O P E O F W O R K Task 5.2 Issue Addenda The Consultant will issue required addenda to revise drawings, schematics, specifications and other contract documents prepared by the Consultant in order to provide clarifications, correct discrepancies, or correct errors and/or omissions. Task 5.3 Bid Tabulation and Award Recommendation The Consultant will develop a tabulation of all bids received and provide evaluation of checking for correctness, qualifications of apparent low bidder, DBE participation goals, etc., and make recommendations of award based solely on apparent low bidder. Task 5.4 Project Management The Consultant will administerthe project in coordination with assigned airport staff. The Consultant will manage the project, coordinate with LBB staff, assign qualified individuals or sub-consultants to the project, and will complete the efforts within a reasonable and agreeable time frame. This task will include scheduling, resource allocation, monitoring, oversight, direction and control for aspects of the team's efforts including assembly and coordination of documentation. The Consultant will complete meeting preparation activities, prepare and distribute meeting minutes, and assign appropriate follow-up activities. I11 MEE7INGS RS&H will prepare for and attend the following meetings: »(1) Kick-off Meeting and Site Walk Through (3 people, 3 days) »(1) Virtual Design Coordination Meeting 50% CD »(1) Virtual Design Review Meeting 50% CD »(1) Virtual Design Coordination Meeting 90% CD »(1) On Site Design Review Meeting 90% CDs (2 people, 1 day) »(1) Pre-Bid Conference / Walk Through (2 people, 1 day) IV DELIVERABLES RS&H will provide the following deliverables: » Meeting Minutes (Kick-off Mtg, 50%, and 90% Design Coordination and Review Mtgs and Pre-Bid Conference) Mechanica! Equipment Replacemenf Consfruction Documentation Services - (Version 1.0) �� DocuSign Envelope ID: 3A22847A-1418-4B69-94F4-D1CCO2B29168 5 C 0 P E 0 F W O R K �� Construction Document Drawings and Specifications (50%, 90% and 100°/a) — one hard copy and electronic copies for each deliverable milestone » ROM Estimate of Probable Construction Cost (50% and 90%) — electronic copies for each deliverable milestone All deliverables will be provided in electronic format. V PROJECT SCHEDULE RS&H will provide the above referenced senrices within the following anticipated schedule (or as mutually agreed upon by the Airport and RS&H): �.—„�_� . _, ..� _�...,.�. Task �r�s�r� ;��!�+� ' � � �r;' Duration .-,� �-.- _ ��.; ,-� :.t-� � . ;,;��r:�,� -�r- � � �,T tL`� L--'!�_'�... .. _ . . .._.._��� , . , .�.,.. 1r':���_Y_: j i�, i�, f'i i w •t.i�_ �i:. • !:.__is _. ;u;4_.. NTP TBD Kick-Off Mtg & Site Walk Through 50% Design Coordination Mtgs 50% Design Submission 50°/a Design Review Mtg 90% Design Coordination Mtg 90% Design Submission 90% Design Review Mtg 100% Design Submission Pre-Bid Conference Within 30 calendar days from NTP TBD 60 Calendar days from KO Mtng & Site Walk 14 Calendar days after 50% Design Submission TBD 60 calendar days after 90°/a Coord. Mtg 14 Calendar days after 90% submittal 30 calendar days after 90% review mtg TBD The actual schedule may vary significantly as the Project design progresses and the scope is further developed. Delays to the proposed design schedule outside of the Consultant's control will require re-evaluation of the proposed schedule and / or design fees. VI ASSUMPTIONS AND EXCLUSIONS The following items are excluded from this Scope of Work: » Design of temporary facilities for housing Airport operations during construction. » Design of electrical system or communications system upgrades. » Design of temporary power or temporary cooling and heating during construction. » Additional Submissions beyond the deliverables listed. » Additional Site Visits/Meetings beyond the quantity identified above. » Agency/Permit Fees or Procurement of any Building Permits. It is assumed that these will be part of the contractor's construction costs if needed. Mechanical Equfpment Replacement Construction Documentation Services - (Version 1.0) 17 DocuSign Envelope ID: 3A22847A-1418-4BB9-94F4-D1CCO2B291B8 S t 0 P E O F W 0 R K » In person attendance at Bid Opening. » FAA Coordination. » Any other services not explicitly defined. The following are assumed for this proposal: >? All ladders, lifts and escorts will be provided by L6B as needed. » Available record documents will be provided by L66 personnel. VII PROFESSIONAL SERVICES FEE AND FEE TYPE RS&H will provide the above referenced services for a Fixed Lump Sum Fee of $255,965.47. See Exhibit A for a breakdown of costs. Mechonical Equipment Replacement Cons[ruction Documentation Services - (Version 1.0) r� OocuSign Envelope ID 3A22847A-1418-4869-94F4-01CCO2B29188 Submitted by: RSdtH, INC.: oowa�a� � �s'yC - By: Print Name: EEtiot Ne�h Title: Vice President Approved as to Content By: Print Name: I.�y G�,mn�ell _ Title: Executive Di�ector of Aviation � � �,/ ��� � /,1�/� / ,//, ,/.%/, � �� / �t' .. t' :i � � . - Mechonicol fquipment Replocement Construct�on Documentohon Services (Version 10) S C O P E O F W 0 R K 13 Attest• By: Print Name: Courtnev Paz Title: Citv Secretary DocuSign Envelope ID: 3A22847A-1418-46B9-94F4-D1CCO2B291B8 S C O P E 0 F W O R K ATTACHMENT A Design and Bidding Support Fee Table Mechanical Equipment Replocement Construction Documentation Services - (Version 1.0) » � z � � e r� E ax F° sS �� $� �� E � a o zo � E n 6 0 yy K a �a J � O W � Cq L � � NN Q M 0 m a 0 m > c W c rn � � 0 0 DocuSign Envelope ID: 3A22847A-1418-4l3B9-94F4-D1C13026291B8 SCOPE / TASK TITLE OFFICER MANAGER CHREC ELEC. ENGN ENGINEER L CHNIC ML ENGN ENGINEER ECH. EN ENGINEER UCT. EN ENGINEER ASSISTAN TOTAL ASK 2 - 50% Constructon Documents 2.1 Prepare 50% Design Dr n s 75 18 24 24 4 8 40 e0 4 12 22 2.1a Prepare 50% Design Specifications 4 1 8 2 2 8 2 12 3 22 Code and Permftft Coordination 1 1 1 2.3 Opinion of Probable Construction Costs 4 1 1 3 1 1 2.4 Des n Coordination Meebng 1 1 1 2.5 Quality Control Review 2 4 4 4 1 1 4 4 t 1 2.5 Submit 50% Construction Documents 1 1 1 1 t 161 2.7 50% Construction Documents Review Meeting2 1 1 2 171 2.8 Project Management 2 8 4 1 I SUBTOTAL HOURS' RATE TOTAL DIRECT LABOR f 4 41 1 $341.44 f334.50 f205.99 $151.00 $201.32 4109.38 f117.57 f238.02 $177.35 f248.18 f152.15 $179.43 f108.07 f91.59 31.365.78 $13.718.50 $0.00 $0.00 55,033.00 54,047.05 f2,824.08 $2.142.15 f1,773.50 $13.152.48 $15,079.95 $1,514.37 31.512.95 $1.557.03 353.821.4 Total Proposed Fee for TASK 2 - 50% Construction Documents $63,821,49 DocuSign Envelope ID: 3A22847A-1418-4BB9-94F4-D1CCO2B291B8 TITLE OFFICER MANAGER CHITEC ELEC. ENGN ENGJARCHITF INEER CHNIC MLEN ENGINEER ECH. ENG ENGINEER UCT.EN ENGINEER )MILSCOPE/TASK ASSIST TOTAL ASK 3: 90% Construction Documents 3.1 Incorporate 50% Construction Documents Review Comments 2 2 1 2 1 32 Pre 90% Construction Documents 20 18 24 24 2 4 40 60 4 8 18 238 3.3 Opinion of Probable Construction Costs 2 1 1 2 1 3A 90% Design Coordination Meeting 1 1 1 3.5 Quality Control Review 2 8 6 4 2 1 6 4 2 1 34 3.8 Submit 90% Construction Documents Deliverable 1 1 1 1 1 1 3.7 90% Construction Documents Review MeethV 8 1 1 8 1 1 3.8 Project Management 2 8 4 1 SUBTOTAL HOURS RATE TOTAL DIRECT LABOR f 4 f311.44 f33{.80 f205.99 $151.00 f201.32 f109.38 i117.87 f238.02 5177.35 S21a.18 f1a2.15 f179.{3 f108.07 591. $1.355.78 $15.050.30 $0.00 $0.00 5.435.64 53,172.02 f2,82l.0a f1,128.12 f1241.{5 514.541.44 f13,944.90 f1,435.44 1.185.77 f1,923.39 ,881 1159 Total Proposed Fee for TASK 3: 90% Construction Documents f64,661 At ASK 4: 100% Construction (Bid) Documents 4e1 Incorporate 90% Construction Documents Review Comments 2 2 1 2 2 1 42 Prepare 100% Construction Documents Documents 12 2 4 a 2 4 a 12 2 4 4 4.3 Quality Control Review 4 2 1 4 1 4.4 Submit 100% Construction Documents 1 1 1 1 1 1 4.5 Project Management 2 B 4d121 SU O AL HOURS RATE DIRECT LABOR f51,207.92 2 2 0 0 8 3�113.S. 14 1 3 8 9 5341.14 f334.80 5205.99 5781.00 $201.32 f109.38 f117.87 �02 5218.11 f182.15 $179.43 f108.07 f91.59TOTAL f5l8,90 5708.02 f711 f3,4742{ f2,43225 f53829 f818.{2 f821.31Total Proposed Fee for TASK 4: 100% Construction (Bid) Documents DocuSign Envelope ID: 3A22847A-1418-4BB9-94F4-D1CCO2B291B8 SCOPE / TASK TITLE OFFICER MANAGER CHREC ELEC. ENGN ENGINEER CHNICEVffM ML ENGN ENGINEER SENIOR CIVIL CH. ENGINEER UCT. ENGINEER AD ASSISTAN TOTAL ASK 6: BID 6, AWARD SERVICES 5.1 Pro -Bid Conference 8 6 1 52 Issue Addenda 8 4 4 1 1 4 6 1 1 4 36 5.3 BM Tabulation and Award Recommendation 4 1 1 2 7 5A Project Management 2 4 SUBTOTAL HOURS RATE TOTAL DIRECT LABOR f 2 4 1 1 S341.41 5334.60 f205.03 $151.00 1 $201.32 $109.36 $117.57 1 f236.02 1 $177.35 1 $248.15 1162.15 $179.43 f/06.07 561.50 2.83 $3.030.40 f0.00 1 $0.00 1 $1,006.60 1 $437.52 50.00 1 $475.04 1 $117.35 1 $3.47424 51287.20$353.35 $108.07 f366.35 $16.415.52. Total Proposed Fee for TASK 5: BID a AWARD SERVICES $16.415.62 DocuSign Envelope ID: 3A22847A-1418-4BB9-94F4-D1CCO2B291B8 SCOPE: TASK TITLE OFFICER MANAGER CNITEC rRCHITEGTj SENIOR CAq ELEC. ENGN ENGINEER ELECT CNNIC ML ENG ENGINEER ECH. ENG ENGINEER UCT. EN ENGINEER ASSISTAN TOTAL REIMBURSABLES tf WGS 6 PAGES REPRODUCTION $1.60 $0.10 6 SETS Permit Documents 50 500 3 63 TOTAL REPRODUCTION d PKGS APKGS POSTAGE/DELNERY 115.00 53.00 4 4 3 TOTAL POSTAGE I DELIVER SUBCONSULTANTS The Concorde Group S 20,000 Ito. TOTAL NSULTANTS TRAVEL AirfareQ Car® Lodging ilp Meals III Trips gFlfta 8—s She Visit6 Kickoff 3 4 1,820 S720 1 A 90% Review Maet 2 2 $1,500 $150 S360 $240 1 $225 Pre -Sid Conference 2 2 $1,500 $150 $380 $240 1 92, REIMBURSABLES $29,790 SUMMARY TASK 1 - PROJECT INITIATION & EXISTING CONDITION DOCUMENTATION $E9,413 TASK 2 -so —construction Documents $63.321.421 TASK 3: 90% Construction Documents 964,661.E TASK 4: 100% Construction (Bid) Documents 921,673.E TASK 5: BID 6 AWARD SERVICES 916,416.E REIMBURSABLES 929,760