HomeMy WebLinkAboutResolution - 2023-R0296 - Contract 17340, With Matthews Backhoe, Inc - 06/13/2023Resolution No. 2023-R0296
Item No. 5.25
June 13, 2023
RESOLUTION
BE IT RESOLVED BY THE CTTY COUNCTL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute
for and on behalf of the City of Lubbock, Contract No. 17340 for demolition of secondary
structures on a particular lot, by and between the City of Lubbock and Matthews Backhoe, Inc.,
of Lubbock, Texas, and related documents. Said Contract is attached hereto and incorporated
in this resolution as if fully set forth herein and shall be included in the minutes of the City
Council.
Passed by the City Council on June 13, 2023
ATTEST:
Courtney Paz, City Se etary
APPROVED AS TO CONTENT:
..
Erik Rejino, Assistant City Manager
APPROVED AS TO FORM:
.
Amy�,! Si�rZs, Deputy City Attorney
RES.Contract-17340 Matthews Backhoe
5.25.23
Resolution No. 2023-R0296
BID SUBMITTAL FORM
LUMP SUM BID CONTRACT
DATE: � I' � I � 3
PROJECT NUMBER: iTB 23-17340-MA, Demolition of Secondary Structures on lot (approx. 5600 sqft)
Bid of �j�T�f �� E � , _ _ (hereinafter called
Bidder)
To the Honorable Mayor and City Council City of Lubbock, Texas (hereinafter called Owner)
Ladies and Gentlemen:
The Bidder, in compliance with your Invitation to Bid for the construction of the referenced project, having
carefully examined the plans, specifications, instructions to bidders, notice to bidders and all other related
contract documents and the site of the intended work, and being familiar with all of the conditions surrounding
the construction of the intended project including the availability of materials and labor, hereby intends to
furnish all labor, materials, and supplies; and to construct the project in accordance with the plans, specifications
and contract documents, within the time set forth therein and at the price stated.
The bidder binds himself on acceptance of his bid to execute a contract and any required bonds, according to
the accompanying forms, for performing and completing the said work within the time stated and for the prices
stated.
Bidder hereby agrees to commence the work on the above project on a date to be specified in a written "Notice
to Proceed" of the Owner and to substantially complete the project within 5 consecutive calendar days with
final completion of the project within 10 consecutive calendar days as stipulated in the specification and other
contract documents. Bidder hereby further agrees to pay to Owner as liquidated damages in the sum of $25for
each consecutive calendar day after substantial completion and liquidated damages in the sum of $25 for each
consecutive calendar day after final completion set forth herein above for completion of this project, all as
more fully set forth in the General Conditions of the Agreement.
Bidder understands and agrees that this bid submittal shall be completed and submitted in accordance with
instruction number 29 of the General Instructions to Bidders.
Bidder understands that the Owner reserves the right to reject any or all bids and to waive any formality in the
bidding.
The Bidder agrees that this bid shall be good and may not be withdrawn for a period of 60 calendar days after
the scheduled closing time for receiving bids.
The undersigned Bidder hereby declares that he has visited the site of the work and has carefully examined the
plans, specifications and contract documents pertaining to the work covered by this bid, and he further agrees
to commence work on or before the date specified in the written notice to proceed, and to substantially complete
the work on which he has bid; as provided in the contract documents.
Bidders are required, whether or not a payment or performance bond is required, to submit a cashier's check or
certified check issued by a bank satisfactory to the City of Lubbock, or a bid bond from a reliable surety
company, payable without recourse to the order of the City of Lubbock in an amount not less than five percent
(5%) of the total amount of the bid submitted as a guarantee that bidder will enter into a contract, obtain all
required insurance policies, and execute all necessary bonds (if required) within 10 business days after notice
of award of the contract to him.
City of Lubbock, TX
Public Works
ITB 23-17340-MA
Demolition of Secondary Structures on Lot (approx. 5600 sqft)
Matthews Backhoe, Inc., Lubbock, TX
#
Items
QTY U/M
+/-
Extended
Cost
Base Bid
# 1-1 Demolition of a secondary structures on a lot located at:
1712 48th Street, Lubbock, Texas
Base bid consists of the materials and labor for the demolition for
the above referenced project, as specified herein.
LS
81,950.00
Total for Item (#1-1): $81,950.00
Enclosed with this bid is a Cashier's Check or C r'fied Check for
Dollars ($ or a Bid Bond in the sum of
' p ollars ($��? (��Q,� which it is agreed shall be collected and
ret ined y the Owner as liquidated damages in the event the bid is accepted by the Owner and the
undersigned fails to execute the necessary contract documents, insurance certificates, and the required
bond (if any) with the Owner within l0 business days after the date of receipt of written notification of
acceptance of said bid; otherwise, said check or bond shall be returned to the undersigned upon
demand.
Bidder understands and agrees that the contract to be executed by Bidder shall be bound and include all contract
documents made available to him for his inspection in accordance with the Notice to �3idder�.
Pursuant to Texas Local Government Code 252.043(g), a
competitive sealed bid that has been opened may not be
changed for the purpose of correcting an error in the bid pr ce. -_-
THEREFORE, ANY CORRECTIONS TO THE BID PRIC
MUST BE MADE ON THE BID SUBMITTAL FORM PRIOR
TO BID OPENING.
(Seal if Bidde� s a Co oration) �
AT E�T: � � j '
p � I� � -
� t �
se� �-� �'�
Bidder acknowledges receipt of the following addenda:
Addenda No. �
Addenda No. _
Addenda No. _
Addenda No.
Date S � 3
Date
Date
Date
Name)
T. �an �J� � � �
� u�o�ooc� , c n I�
e�as , �
State �p Code n
Telephone: ��-���'eZ�'1
Fax: -
FEDERAL TAX ID or SOCIAL SECURITY No.
'15-�(�3Q'133
EMAIL:r� W5� _ o I•C�Om
M/WBE oman ac mer�can ative merican
Firm:
ispanic sian aci ic t er pec� y
American American
CERTIFICATE OF INTERESTED PARTIES
Complete Nos. 1- 4 and 6 if there are interested parties.
Complete Nos. i, 2, 3, 5, and 6 if there are no interested parties.
1 Name of business entity filing form, and the ciry, state and country of the business entiry's place
of business.
Matthews Backhoe, Inc.
Lubbock, TX United States
being filed.
Ciry of Lubbock
or state agency tnac is a
FORnn 1295
lofl
OFFICE USE ONLY
CERTIFICATION OF FILING
Certificate Number:
2023-1027981
Date Filed:
05/31/2023
Acknowledged:
g Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a
description of the services, gaods, or other property to be provided under the contract.
ITB 23-17340-MA
Demolition of Secondary Structures on lot (approx. 5600)
Nature of interest
4 Name of Interested Party City, State, Country (place of business) (check applicable;
Controllina Interm�
5 Check only if there is NO Interested Party. a
6 UNSWORN DECLARATION
My name is � l � � � VI�V�.J , and my date of birth is _� � ` �
My address is �• \ 1 � � /� � 1 � 1 �O� 4` , �, �-�{--L'�r v�.
(street) (city) (state) (zip code) (country)
I declare under penalty of peryury that the foregoing is true and correct.
Executedin ��u�l/ti
; ��'� :• JAIME GREER
-* :•= My Notsry ID # 130384564
'?•� �,y� Expir+es Sept�tber 25, 2023
,,,�;+.;:
Forrns provid�gi by Texas
Sig ure of authorized agent of contracting business entity
(Declarant)
www.ethics.state.bc.us Version V3.5.1.a18ea2ca
State� ��Xp S , on the � day of J� n�, 2p ��
� (month) (year)
� �D�rr1e'� r�� , No�iZ�.
�,�rnmissi�n �k�ir�s Se��2h,2C113
CERTIFICATE OF INTERESTED PARTIES
FORnn 1295
1 of 1
Complete Nos. 1- 4 and 6 if there are interested parties. OFFICE USE ONLY
Complete Nos. l, 2, 3, 5, and 6 if there are no interested parties. CERTIFICATION OF FILING
1 Name of business entity filing form, and the ciry, state and country of the business entity's place Certificate Number:
of business. 2023-1027981
Matthews Backhoe, Inc.
Lubbock, TX United States �ate Filed:
2 Name of governmental entity or state agency that is a party to the contract for which the form is 05/31/2023
being filed.
City of LubboCk Date Acknowledged:
06/02/2023
g Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a
description of the services, goods, or other property to be provided under the contract.
ITB 23-17340-MA
Demolition of Secondary Structures on lot (approx. 5600)
4 Nature of interest
Name of Interested Party City, State, Country (place of business) (check applicable)
Controlling Intermediary
5 Check only if there is NO Interested Party. ❑
X
6 UNSWORN DECLARATION
My name is , and my date of birth is
My address is
(street) (city) (state) (zip code) (country)
I declare under penalry of perjury that the foregoing is true and correct.
Executed in Counry, State of , on the day of , 20
(month) (year)
Signature of authorized agent of contracting business entiry
(Declarant)
Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V3.5.1.a18ea2ca
BOND CHECK
BEST RATING
LICENSED IN TEXAS
DATE BY:
CONTRACT AWARD DATE: June 13, 2023
CITY OF LUBBOCK
SPECIFICATIONS FOR
Demolition of Secondary Structures on lot (approx. 5600 sqft)
ITB 23-17340-MA
CONTRACT 17340
PROJECT NUMBER: 4211.8801
Plans & Specifications may be obtained from
https://ci-lubbock-tx.bonfirehub.com/
CITY OF LUBBOCK
Lubbock, Texas
Pate Intentionally Left Blank
Addenda
Page Intentionally Left Blank
City of
Lubbock
ADDENDUM I
Revised General Conditions and Bid Submittal
Form
ITB 23-17340-MA
Demolition of Secondary Structures on Lot (approx.
5600 sgft)
DATE ISSUED: May 2, 2023
CLOSING DATE: May 18, 2023 at 3:00 p.m.
The following items take precedence over specifications for the above named Invitation to Bid (ITB).
Where any item called for in the ITB documents is supplemented here, the original requirements, not
affected by this addendum, shall remain in effect.
The following date in the Request for Proposals has been revised.
Revised General Conditions
1. Insurance requirements have been revised on the General Conditions Document.
Revised Bid Submittal Form
1. Bid Submittal Form has been revised to include liquidated damages and completion days.
All requests for additional information or clarification must be submitted in writing and directed to:
Kiara Morgan
City of Lubbock
Purchasing and Contracts Management Office
1314 Ave K, Floor 9
Lubbock, Texas 79401
Questions may be emailed to kmorgangmylubbock.us
Questions are preferred to be posted on https://ci-lubbock-tx.bonfirehub.com/
THANK YOU,
CITY OF LUBBOCK
Kiara Morgan
Buyer III
City of Lubbock
Purchasing and Contracts Management Office
It is the intent and purpose of the City of Lubbock that this request permits competitive proposals. It shall be the
proposer's responsibility to advise the Director of Purchasing and Contract Management if any language_
requirements, etc., or any combinations thereof, inadvertently restricts or limits the requirements stated in this RFP to
a single source. Such notification must be submitted in writing and must be received by the Director of Purchasing
and Contract Management no later than five (5) business days prior to the close date. A review of such notifications
will be made.
Page Intentionally Left Blank
NOTICE TO BIDDERS
Pate Intentionally Left Blank
0 AW ity of
Lub o ek
IIMGS
ITB 23-17340-MA
Demolition of Secondary Structures on lot (approx. 5600 sqft)
1. NOTICE TO BIDDERS
1.1. Bidders may submit responses electronically by uploading required documents at the City of
Lubbock's partner website, Bonfire. This Invitation to Bid is for your convenience in submitting a
bid for the specified project. If submitting electronically, do not submit paper documents. If you
choose to submit in hard copy, submit one original paper copy of your submittal to the office of
the Director of Purchasing and Contract Management:
Physical: Marta Alvarez, Director of Purchasing and Contract Management
City of Lubbock
13 14 Avenue K, 9th Floor
Lubbock, Texas 79401
Mailing: Marta Alvarez, Director of Purchasing and Contract Management
City of Lubbock
P.O. Box 2000
Lubbock, Texas 79457
MARK ENVELOPE WITH THE SOLICITATION NUMBER, TITLE, AND DUE DATE/TIME
1.2. Bids will be opened in the office of the Director of Purchasing and Contract Management,
Citizens Tower, 1314 Avenue K, Floor 9, Lubbock, Texas, 79401, and via teleconference as
shown below at 3:00 PM on May 18, 2023, or as changed by the issuance of formal addenda to
all planholders, to furnish all labor and materials and perform all work for the construction of the
above referenced.
1.3. After the expiration of the time and date above first written, said sealed bids will be opened in the
office of the Director of Purchasing and Contract Management and publicly read aloud. Bids will
be opened via teleconference if date/time stamped on or before the deadline stated at the office
listed above. The Zoom meeting information is as follows:
Website: ZOOM Meeting
Meeting ID: Join Zoom Meeting
https://zoom.us/j/94317563838?pwd=TUVHM1hOOENYOW95enIwYOlga25IUT09
Meeting ID: 943 1756 3838
Passcode: 1314
One tap mobile
+13462487799„943175638389 US (Houston)
+16694449171„943175638389 US
Passcode: 1314
1.4. It is the sole responsibility of the bidder to ensure that his bid is actually received by the office of the
Director of Purchasing and Contract Management for the City of Lubbock, before the expiration of
the date above first written. Any bid received after the date and hour specified will be rejected and
returned unopened to the bidder.
1.5. Mailing of a bid does not ensure that the bid will be delivered on time or delivered at all. If bidder
does not hand deliver bid, we suggest that he/she use some sort of delivery service that provides a
receipt. The City of Lubbock assumes no responsibility for errant delivery of bids, including those
relegated to a courier agent who fails to deliver in accordance with the time and receiving point
specified.
1.6. Although bids may be submitted electronically, hard copy bids will be accepted in person, by United
States Mail, by United Parcel Service, or by private courier service. THE CITY WILL NOT
ACCEPT FAX BIDS.
1.7. Bids may be withdrawn prior to the above scheduled time set for closing. Alteration made before
ITB opening must be initialed by bidder guaranteeing authenticity.
1.8. Bids are due at 3:00 PM on May 18, 2023, and the City of Lubbock Council members will consider
the bids on TBD, at the Citizens Tower, 1314 Avenue K, Lubbock, Texas, or as soon thereafter as
may be reasonably convenient, subject to the right to reject any or all bids and waive any formalities.
The successful bidder will be required to furnish a performance bond in accordance with Chapter
2253, Government Code, in the amount of 100% of the total contract price in the event that said
contract price exceeds $100,000 and the successful bidder will be required to furnish a payment
bond in accordance with Chapter 2253, Government Code, in the amount of 100% of the total
contract price in the event that said contract price exceeds $50,000. Said statutory bonds shall be
issued by a company carrying a current Best Rating of "A" or better. THE BONDS MUST BE IN
A FORM ACCEPTABLE TO THE CITY ATTORNEY. NO WORK ON THE CONTRACT
SHOULD COMMENCE BEFORE THE BONDS ARE PROVIDED AND APPROVED.
1.9 NOTICE TO PROCEED WILL BE ISSUED 30 DAYS FOLLOWING THE AWARD OF
THE CONTRACT BY THE LUBBOCK CITY COUNCIL.
1.10. Please allow time to upload required documentation. 24hrs in advance is recommended.
1.11. The estimated budget for this project is $50,000.00
1.12. Bidders are required, whether or not a payment or performance bond is required, to submit a
cashier's or certified check issued by a bank satisfactory to the City of Lubbock, or a proposal bond
from a reliable surety company, payable without recourse to the order of the City of Lubbock in an
amount not less than 5% of the total amount of the proposal submitted as a guarantee that bidder will
enter into a contract and execute all necessary bonds within ten (10) business days after notice of
award of the contract to the bidder. FAILURE OF THE BIDDER TO INCLUDE BID
SECURITY WITH THE BID SUBMITTAL SHALL CONSTITUTE A NONRESPONSIVE
BID AND RESULT IN DISQUALIFICATION OF THE BID SUBMITTAL.
1.13. Copies of plans and specifications may be obtained at bidder's expense from the City of Lubbock
Purchasing and Contract Management office. Plans and specifications can be viewed online and
downloaded from hgps:Hci-lubbock-tx.bonfirehub.com/portal/ at no cost. In the event of a large file
size, please be patient when downloading or viewing. BUSINESSES WITHOUT INTERNET
ACCESS may use computers available at most public libraries.
1.14. It shall be each bidder's sole responsibility to inspect the site of the work and to inform bidder
regarding all local conditions under which the work is to be done. It shall be understood and agreed
that all such factors have been thoroughly investigated and considered in the preparation of the bid
submitted.
2. PRE -BID MEETING — DELETE
3. Attention of each bidder is particularly called to the schedule of general prevailing rate of per diem wages
included in the contract documents on file in the office of the Purchasing and Contract Management Office
of the City of Lubbock, which document is specifically referred to in this notice to bidders. Each bidders
attention is further directed to Texas Government Code, Chapter 2258, Prevailing Wage Rates, and the
requirements contained therein concerning the above wage scale and payment by the contractor of the
prevailing rates of wages as heretofore established by owner in said wage scale.
4. The City of Lubbock hereby notifies all bidders that in regard to any contract entered into pursuant to this
advertisement, minority and women business enterprises will be afforded equal opportunities to submit bids
in response to this invitation and will not be discriminated against on the grounds of race, color, sex,
disability, or national origin in consideration for an award.
5. The City of Lubbock does not discriminate against persons with disabilities. City of Lubbock pre -proposal
meetings and proposal openings are available to all persons regardless of disability. If you require special
assistance, please contact the Purchasing and Contract Management Office at (806) 775-2572 write to Post
Office Box 2000, Lubbock, Texas 79457 at least 48 hours in advance of the meeting.
CITY OF LUBBOCK,
M�
Marta Alvarez
DIRECTOR OF PURCHASING &
CONTRACT MANAGEMENT
Page Intentionally Left Blank
GENERAL INSTRUCTIONS TO BIDDERS
Page Intentionally Left Blank
GENERAL INSTRUCTIONS TO BIDDERS
1. BIDDER INQUIRIES AND CLARIFICATION OF REQUIREMENTS
1.1 It is the intent and purpose of the City of Lubbock that this request permit competitive bids. It shall be
the bidder's responsibility to advise the Purchasing and Contract Management Office if any language,
requirements, etc., or any combinations thereof, inadvertently restricts or limits the requirements stated
in this ITB to a single source. Such notification must be submitted in writing and must be received by
the City of Lubbock Purchasing and Contract Management Office no later than five (5) calendar days
before the bid closing date. A review of such notifications will be made.
1.2 NO BIDDER SHALL REQUEST ANY INFORMATION VERBALLY. ALL REQUESTS FOR
ADDITIONAL INFORMATION OR CLARIFICATION CONCERNING THIS INVITATION
TO BID (ITB) MUST BE SUBMITTED IN WRITING NO LATER THAN FIVE (5) CALENDAR
DAYS PRIOR TO THE BID CLOSING DATE AND ADDRESSED TO:
Kiara Morgan
City of Lubbock
Purchasing and Contract Management Office
1314 Avenue K, Floor 9
Lubbock, Texas 79401
Fax: 806-775-2164
Email: kmorgan(a�mylubbock.us
2. TIME AND ORDER FOR COMPLETION
2.1 The construction covered by the contract documents shall be substantially completed within TEN DAYS
(10) from the date specified in the Notice to Proceed issued by the City of Lubbock to the successful
bidder.
2.2 The Contractor will be permitted to prosecute the work in the order of his own choosing, provided,
however, the City reserves the right to require the Contractor to submit a progress schedule of the work
contemplated by the contract documents. In the event the City requires a progress schedule to be
submitted, and it is determined by the City that the progress of the work is not in accordance with the
progress schedule so submitted, the City may direct the Contractor to take such action as the City deems
necessary to ensure completion of the project within the time specified.
3. Upon receipt of notice to proceed, and upon commencement of the work, the Contractor shall ensure daily
prosecution of the work is conducted every business day until the work is completed, regardless if the
work will be substantially or finally complete ahead of specified deadlines in the agreement, unless the
City determines that additional time is required to complete the work, the City, may, but is not obligated
to, in his or her discretion, to grant up to an additional ten (10) days of time so long as the amount of the
consideration does not increase.
4. GUARANTEES
4.1 All equipment and materials incorporated in the project and all construction shall be guaranteed against
defective materials and workmanship. Prior to final acceptance, the Contractor shall furnish to the Owner,
a written general guarantee which shall provide that the Contractor shall remedy any defects in the work,
and pay for any and all damages of any nature whatsoever resulting in such defects, when such defects
appear within ONE year from date of final acceptance of the work as a result of defective materials or
workmanship, at no cost to the Owner (City of Lubbock).
4.2 Notwithstanding any provisions contained in the contractual agreement, the Contractor represents and
warrants fault -free performance and fault -free result in the processing date and date -related data
(including, but not limited to calculating, comparing and sequencing) of all hardware, software and
firmware products delivered and services provided under this Contract, individually or in combination,
as the case may be from the effective date of this Contract. Also, the Contractor warrants calculations
will be recognized and accommodated and will not, in any way, result in hardware, software or firmware
failure. The City of Lubbock, at its sole option, may require the Contractor, at any time, to demonstrate
the procedures it intends to follow in order to comply with all the obligations contained herein.
4.3 The obligations contained herein apply to products and services provided by the Contractor, its sub-
contractor or any third party involved in the creation or development of the products and services to be
delivered to the City of Lubbock under this Contract. Failure to comply with any of the obligations
contained herein, may result in the City of Lubbock availing itself of any of its rights under the law and
under this Contract including, but not limited to, its right pertaining to termination or default.
4.4 The warranties contained herein are separate and discrete from any other warranties specified in this
Contract, and are not subject to any disclaimer of warranty, implied or expressed, or limitation to the
Contractor's liability which may be specified in this Contract, its appendices, its schedules, its annexes
or any document incorporated in this Contract by reference.
5. BID AWARD
5.1 The City of Lubbock reserves the right to reject any or all bids, reject any particular item on a bid, and
to waive immaterial formalities and to accept the offer most advantageous to the City of Lubbock in its
sole discretion. Unless otherwise specified herein, the City shall award the bid based on the total bid for
Bid Items I (one) plus the sum of any Alternate Bids or Options the City may select.
5.2 All bids are evaluated for compliance with specifications before the bid price is considered. Response
to specifications is primary in determining the best low bid. Failure to comply with the specifications
may result in disqualification of the bid.
5.3 In case of tie bids, preference will be given to local bidders. Consistent and continued tie bidding may
be cause for rejection of bids by the City of Lubbock and/or investigation by the Attorney General to
determine possible Anti -Trust violations.
5.4 Before the City may award a bid to a nonresident bidder, the nonresident bidder's bid must be lower than
lowest bid submitted by a responsible Texas bidder by the same margin or amount that a Texas bidder
would be required to underbid the nonresident bidder in the nonresident bidders' home state.
5.5 Any contract made, or purchase order issued, as a result of this Invitation to Bid, shall be entered into the
State of Texas and under the laws of the State of Texas. In connection with the performance of work,
the Bidder agrees to comply with the Fair Labor Standard Act, Equal Opportunity Employment Act, and
all other applicable Federal, State, and Local laws, regulations, and executive orders to the extent that the
same may be applicable.
5.6 NO INDIVIDUAL OF ANY USING DEPARTMENT HAS THE AUTHORITY TO LEGALLY
AND/OR FINANCIALLY COMMIT THE CITY TO ANY CONTRACT, AGREEMENT OR
PURCHASE ORDER FOR GOODS OR SERVICES, UNLESS SPECIFICALLY SANCTIONED
BY THE REQUIREMENTS OF THIS INVITATION TO BID.
GENERAL INSTRUCTIONS TO BIDDERS
(Continued)
6. ADDENDA & MODIFICATIONS
6.1 Any changes, additions, or clarifications to the ITB are made by ADDENDA information available over
the Internet at https://ci-lubbock-tx.bonfirehub.com/portal/. We strongly suggest that you check for
any addenda a minimum of forty-eight hours in advance of the response deadline. BUSINESSES
WITHOUT INTERNET ACCESS may use computers available at most public libraries.
6.2 Any bidder in doubt as to the true meaning of any part of the specifications or other documents may
request an interpretation thereof from the Purchasing and Contract Management Office. At the request
of the bidder, or in the event the Purchasing and Contract Management Office deems the interpretation
to be substantive, the interpretation will be made by written addendum issued by the Purchasing and
Contract Management Office. Such addenda issued by the Purchasing and Contract Management Office
will be available over the Internet at https://ci-lubbock-tx.bonfirehub.com/portal/ and will become part
of the bid package having the same binding effect as provisions of the original ITB. NO VERBAL
EXPLANATIONS OR INTERPRETATIONS WILL BE BINDING. In order to have a request for
interpretation considered, the request must be submitted in writing and must be received by the City of
Lubbock Purchasing and Contract Management Office no later than five (5) calendar days before the bid
closing date.
6.3 All addenda, amendments, and interpretations of this solicitation shall be in writing. The City of Lubbock
shall not be legally bound by any amendment or interpretation that is not in writing. Only information
supplied by the City of Lubbock Purchasing and Contract Management Office in writing or in this ITB
should be used in preparing bid responses. All contacts that a bidder may have had before or after receipt
of this ITB with any individuals, employees, or representatives of the City and any information that may
have been read in any news media or seen or heard in any communication facility regarding this bid
should be disregarded in preparing responses.
6.4 The City does not assume responsibility for the receipt of any addendum sent to bidders
7. EXAMINATION OF DOCUMENTS AND REQUIREMENTS
7.1 Each bidder shall carefully examine all ITB documents and thoroughly familiarize itself with all
requirements before submitting a bid to ensure that their bid meets the intent of these specifications.
7.2 Before submitting a bid, each bidder shall be responsible for making all investigations and examinations
that are necessary to ascertain conditions and requirements affecting the requirements of this Invitation
to Bid. Failure to make such investigations and examinations shall not relieve the bidder from obligation
to comply, in every detail, with all provisions and requirements of the Invitation to Bid.
7.3 Notices of any discrepancies or omissions in these plans, specifications, or contract documents, shall
be given to the Purchasing and Contract Management Office and a clarification obtained before
the bids are received, and if no such notice is received by the Purchasing and Contract Management
Office prior to the opening of bids, then it shall be deemed that the bidder fully understands the
work to be included and has provided sufficient sums in its bid to complete the work in accordance
with these plans and specifications. If bidder does not notify Purchasing and Contract
Management Office before bidding of any discrepancies or omissions, then it shall be deemed for
all purposes that the plans and specifications are sufficient and adequate for completion of the
project. It is further agreed that any request for clarification must be submitted no later than five
(5) calendar days prior to the bid closing date.
8. BID PREPARATION COSTS
8.1 Issuance of this ITB does not commit the City of Lubbock, in any way, to pay any costs incurred in the
preparation and submission of a bid.
8.2 The issuance of this ITB does not obligate the City of Lubbock to enter into contract for any services or
equipment.
8.3 All costs related to the preparation and submission of a bid shall be paid by the bidder.
9. TRADE SECRETS, CONFIDENTIAL INFORMATION AND THE TEXAS PUBLIC INFORMATION
ACT
8.1 If you consider any portion of your bid to be privileged or confidential by statute or judicial decision,
including trade secrets and commercial or financial information, clearly identify those portions.
8.2 The City of Lubbock will honor your notations of trade secrets and confidential information and decline
to release such information initially, but please note that the final determination of whether a particular
portion of your bid is in fact a trade secret or commercial or financial information that may be withheld
from public inspection will be made by the Texas Attorney General or a court of competent jurisdiction.
In the event a public information request is received for a portion of your bid that you have marked as
being confidential information, you will be notified of such request and you will be required to justify
your legal position in writing to the Texas Attorney General pursuant to Section 552.305 of the
Government Code. In the event that it is determined by opinion or order of the Texas Attorney General
or a court of competent jurisdiction that such information is in fact not privileged and confidential under
Section 552.110 of the Government Code and Section 252.049 of the Local Government Code, then such
information will be made available to the requester.
8.3 Marking your entire bid CONFIDENTIAL/PROPRIETARY is not in conformance with the Texas Open
Records Act.
8.4 Pursuant to Section 552.234(c) of the Texas Government Code, submit your open records request using
the link provided below.
ho2s://Iubbocktx.govga.us/WEBAPP/ rs/(S(guiyirflbtihahinycegwpcs))/SupportHome. aspx
8.5 For more information, please see the City of Lubbock Public Information Act website at:
hops://ci.lubbock.tx.us/pies/public-information-act
10. LICENSES, PERMITS, TAXES
10.1 The price or prices for the work shall include full compensation for all taxes, permits, etc. that the bidder
is or may be required to pay.
11. UTILIZATION OF LOCAL BUSINESS RESOURCES
11.1 Prospective bidders are strongly encouraged to explore and implement methods for the utilization of local
resources, and to outline in their bid submittal how they would utilize local resources.
12. CONFLICT OF INTEREST
12.1 The bidder shall not offer or accept gifts or anything of value nor enter into any business arrangement
with any employee, official or agent of the City of Lubbock.
12.2 By signing and executing this bid, the bidder certifies and represents to the City the bidder has not offered,
conferred or agreed to confer any pecuniary benefit or other thing of value for the receipt of special
treatment, advantage, information, recipient's decision, opinion, recommendation, vote or any other
exercise of discretion concerning this bid.
12.3It is not necessary to fill out the CIQ Form unless you have a business relationship that might cause
a conflict of interest with the City of Lubbock
12.4 Effective January 1, 2006, Chapter 176 of the Texas Local Government Code requires that any vendor
or person considering doing business with a local government entity disclose in the Questionnaire, Form
CIQ, the vendor or person's affiliation or business relationship that might cause a conflict of interest
with a local government entity. By law, the questionnaire must be filed with the records administrator
of the City of Lubbock not later than the Seventh business day after the date the person becomes aware
of the facts that require the statement to be filed. The questionnaire can be found at:
hlt2s://www.ethics.state.tx.us/forms/conflict/
For the City of Lubbock, these forms should be filed with the City Secretary's Office, P.O. Box 2000,
Lubbock, Texas, 79457
See Section 176.006, Local Government Code:
http://www.statutes.legis.state.tx.us/SOTWDocs/LG/htm/LG.176.htm.
A person commits an offense if the person violates Section 176.006, Local Government Code.
An offense under this section is a Class C misdemeanor.
13. CONTRACT DOCUMENTS
13.1 All work covered by the contract shall be done in accordance with contract documents described in the
General Conditions.
13.2 All bidders shall be thoroughly familiar with all of the requirements set forth on the contract documents
for the construction of this project and shall be responsible for the satisfactory completion of all work
contemplated by said contract documents.
14. CERTIFICATE OF INTERESTED PARTIES
14.1 Effective January 1, 2016, Section 2252.908, as amended, of Chapter 2252 of the Texas Government
Code requires certain business entities to submit an electronic disclosure form to the Texas Ethics
Commission before entering into a contract with a local government entity when any of the following
apply:
1) Contract requires an action or vote by the City Council (governing body); OR
2) Contract value is $1 Million or greater; OR
3) Contract is for services that would require a person to register as a lobbyist under Chapter 305
of the Government Code.
This must be done before executing the contract. The disclosure form may be found at
https://www.ethics.state.tx.us/whatsnew/elf_ info_forml295.htm. You must log in and create an
account the first time you fill out the form. Tutorial videos on how to log in for the first time and how
to fill out the form can be found through the link above. After you electronically submit the
disclosure form, a screen will come up confirming the submission and assigning a certificate number.
Then, you must print the form, have an authorized agent complete the declaration and sign, and
provide it to the City (scanned email copy is acceptable).
15. PLANS FOR USE BY BIDDERS
15.1It is the intent of the City of Lubbock that all parties with an interest in submitting a bid on the project
covered by the contract documents be given a reasonable opportunity to examine the documents and
prepare a bid without charge or forfeiture of deposit. The contract documents may be examined without
charge as noted in the Notice to Bidders.
16. PAYMENT
16.1 All payments due to Contractor shall be made in accordance with the provisions of the General
Conditions of the contract documents.
17. AFFIDAVITS OF BILLS PAID
17.1 The City of Lubbock reserves the right, prior to final acceptance of this project to require the Contractor
to execute an affidavit that all bills for labor, materials and incidentals incurred in the construction of the
improvements contemplated by the contract documents have been paid in full and that there are no claims
pending, of which the Contractor has been notified.
18. MATERIALS AND WORKMANSHIP
18.1 The intent of these contract documents is that only materials and workmanship of the best quality and
grade will be furnished. The fact that the specifications may fail to be sufficiently complete in some
detail will not relieve the Contractor of full responsibility for providing materials of high quality and for
protecting them adequately until incorporated into the project. The presence or absence of a
representative of the City on the site will not relieve the Contractor of full responsibility of complying
with this provision. The specifications for materials and methods set forth in the contract documents
provide minimum standards of quality, which the Owner believes necessary to procure a satisfactory
proj ect.
19. PLANS FOR THE CONTRACTOR
19.1 The contractor will, upon written request, be furnished up to five sets of plans and specifications and
related contract documents for use during construction. Plans and specifications for use during
construction will only be furnished directly to the Contractor. The Contractor shall then distribute copies
of plans and specifications to suppliers, subcontractors or others, as required for proper prosecution of
the work contemplated by the Contractor.
20. PROTECTION OF THE WORK
20.1 The Contractor shall be responsible for the care, preservation, conservation, and protection of all
materials, supplies, machinery, equipment, tools, apparatus, accessories, facilities, and all means of
construction, and any and all parts of the work whether the Contractor has been paid, partially paid, or
not paid for such work, until the date the City issues its certificate of completion to Contractor. The City
reserves the right, after the bids have been opened and before the contract has been awarded, to require
of a bidder the following information:
20.1.1 The experience record of the bidder showing completed jobs of a similar nature to the one
covered by the intended contract and all work in progress with bond amounts and percentage
completed.
20.1.2 A sworn statement of the current financial condition of the bidder.
20.1.3 Equipment schedule.
21. TEXAS STATE SALES TAX
21.1 This contract is issued by an organization which qualifies for exemption provisions pursuant to provisions
of Article 20.04 of the Texas Limited Sales, Excise and Use Tax Act.
21.2 The Contractor must obtain a limited sales, excise and use tax permit which shall enable him to buy the
materials to be incorporated into the work without paying the tax at the time of purchase.
22. PROTECTION OF SUBSURFACE LINES AND STRUCTURES
22.1 It shall be the Contractor's responsibility to prosecute the work contemplated by the contract documents
in such a way as to exercise due care to locate and prevent damage to all underground pipelines, utility
lines, conduits or other underground structures which might or could be damaged by Contractor during
the construction of the project contemplated by these contract documents. The City of Lubbock agrees
that it will furnish Contractor the location of all such underground lines and utilities of which it has
knowledge. However, such fact shall not relieve the Contractor of his responsibilities aforementioned.
All such underground lines or structures cut or damaged by Contractor during the prosecution of the work
contemplated by this contract shall be repaired immediately by Contractor to the satisfaction of the City
of Lubbock, Texas, at Contractor's expense.
23. BARRICADES AND SAFETY MEASURES
23.1 The contractor shall, at his own expense, furnish and erect such barricades, fences, lights and danger
signals, and shall take such other precautionary measures for the protection of persons, property and the
work as may be necessary. The Contractor will be held responsible for all damage to the work due to
failure of barricades, signs, and lights to protect it, and when damage is incurred, the damaged portion
shall be immediately removed and replaced by Contractor at his own cost and expense. The Contractor's
responsibility for maintenance of barricades, signs, and lights shall not cease until the date of issuance to
Contractor of City's certificate of acceptance of the project.
24. EXPLOSIVES
24.1 The use of explosives will not be permitted unless written permission to do so is obtained by the
Contractor from the City. In all cases where written permission is obtained for the use of explosives, the
Contractor shall assume full responsibility for all damage, which may occur as a direct or indirect result
of the blasting. In addition, in all cases where explosives are authorized to be used, the Contractor shall
use utmost care so as not to endanger life or property and the Contractor shall further use only such
methods as are currently utilized by persons, firms, or corporations engaged in similar type of
construction activity.
24.2 Explosive materials shall not be stored or kept at the construction site by the Contractor.
24.3In all cases where explosives are to be used during the construction of the project contemplated by this
contract, it shall be the duty of the Contractor to notify each utility company having structures (above or
below the ground) in proximity to the site of the work of Contractor's intention to use explosives, and
such notice shall be given sufficiently in advance to enable the companies to take such steps as they may
deem necessary to protect their property from injury. Such notice, however, shall not relieve the
Contractor of responsibility for any damage resulting from his blasting operations.
25. CONTRACTOR'S REPRESENTATIVE
25.1 The successful bidder shall be required to have a responsible local representative available at all times
while the work is in progress under this contract. The successful bidder shall be required to furnish the
name, address and telephone number where such local representative may be reached during the time
that the work contemplated by this contract is in progress.
26. INSURANCE
26.1 The Contractor shall not commence work under this contract until he has obtained all insurance as
required in the General Conditions of the contract documents, from an underwriter authorized to do
business in the State of Texas and satisfactory to the City. Proof of coverage shall be furnished to the
City and written notice of cancellation or any material change will be provided ten (10) days in advance
of cancellation or change. All policies shall contain an agreement on the part of the insurer waiving the
right to subrogation. The Contractor shall procure and carry at his sole cost and expense through the life
of this contract, insurance protection as hereinafter specified. Coverage in excess of that specified herein
also shall be acceptable. Such insurance shall be carried with an insurance company authorized to
transact business in the State of Texas and shall cover all operations in connection with this contract,
whether performed by the Contractor or a subcontractor, or separate policies shall be provided covering
the operation of each subcontractor. A certificate of insurance specifying each and all coverages shall be
submitted before contract execution.
26.2 PROOF OF COVERAGE SHALL BE FURNISHED TO THE CITY OF LUBBOCK IN THE FORM
OF A CERTIFICATE OF INSURANCE. THE INSURANCE CERTIFICATES FURNISHED SHALL
NAME THE CITY OF LUBBOCK AS ADDITIONAL INSURED ON AUTO/GENERAL LIABILITY
ON A PRIMARY AND NON-CONTRIBUTORY BASIS TO INCLUDE PRODUCTS OF COMPLETE
OPERATIONS. PROVIDE A WAIVER OF SUBROGATION IN FAVOR OF THE CITY OF
LUBBOCK. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE TO THE
OWNER ALL PROOF OF COVERAGE INSURANCE DOCUMENTS INCLUDING WORKERS
COMPENSATION COVERAGE FOR EACH SUBCONTRACTOR. COPIES OF THE
ENDORSEMENTS ARE REQUIRED.
27. LABOR AND WORKING HOURS
27.1 Attention of each bidder is particularly called to the schedule of general prevailing rate of per diem wages
included in these contract documents. The wage rate that must be paid on this project shall not be less
than specified in the schedule of general prevailing rates of per diem wages as above mentioned. The
bidders' attention is further directed to the requirements of Texas Government Code, Chapter 2258,
Prevailing Wage Rates providing for the payment of the wage schedules above mentioned and the
bidder's obligations thereunder. The inclusion of the schedule of general prevailing rate of per diem
wages in the contract documents does not release the Contractor from compliance with any wage law
that may be applicable. Construction work under the contract requiring an inspector shall not be
performed on weekends or holidays unless the following conditions exist:
27.1.1 The project being constructed is essential to the City of Lubbock's ability to provide the
necessary service to its citizens.
27.1.2 Delays in construction are due to factors outside the control of the Contractor. The
Contractor is approaching the penalty provisions of the contract and Contractor can show he
has made a diligent effort to complete the contract within the allotted time.
27.1.3 Before construction work requiring an inspector is to be performed on Sunday or holidays,
the Contractor must notify the Owner's Representative not less than three full working days
prior to the weekend or holiday he desires to do work and obtain written permission from the
Owner's Representative to do such work. The final decision on whether to allow construction
work requiring an inspector on Sunday or holidays will be made by the Owner's
Representative.
27.2In any event, if a condition should occur or arise at the site of this project or from the work being done
under this contract which is hazardous or dangerous to property or life, the Contractor shall immediately
commence work, regardless of the day of the week or the time of day, to correct or alleviate such
condition so that it is no longer dangerous to property or life.
28. PAYMENT OF EMPLOYEES AND FILING OF PAYROLLS
28.1 The contractor and each of his subcontractors shall pay each of his employees engaged in work on the
project under this contract in full (less mandatory legal deductions) in cash, or by check readily cashable
without discount, not less often than once each week. The Contractor and each of his subcontractors
shall keep a record showing the name and occupation of each worker employed by the Contractor or
subcontractor in the construction of the public work and the actual per diem wages paid to each worker.
This record shall be open at all reasonable hours to inspection by the officers and agents of the City. The
Contractor must classify employees according to one of the classifications set forth in the schedule of
general prevailing rate of per diem wages, which schedule is included in the contract documents. The
Contractor shall forfeit as a penalty to the City of Lubbock on whose behalf this contract is made, sixty
dollars ($60) for each laborer, workman, or mechanic employed for each calendar day, or portion thereof,
such laborer, workman or mechanic is paid less than the wages assigned to his particular classification
as set forth in the schedule of general prevailing rate of per diem wages included in these contract
documents.
29. PROVISIONS CONCERNING ESCALATION CLAUSES
29.1 Bids submitted containing any conditions which provide for changes in the stated bid price due to
increases or decreases in the cost of materials, labor or other items required for the project will be rejected
and returned to the bidder without being considered.
30. PREPARATION FOR BID
30.1 The bidder shall submit his bid on forms furnished by the City, and all blank spaces in the form shall be
correctly filled in, stating the price in numerals for which he intends to do the work contemplated or
furnish the materials required. Such prices shall be written in ink, distinctly and legibly, or typewritten.
In case of discrepancy between the unit price and the extended total for a bid item, the unit price will be
taken. A bid that has been opened may not be changed for the purpose of correcting an error in the bid
price.
30.2If the bid is submitted by an individual, his name must be signed by him or his duly authorized agent. If
a bid is submitted by a firm, association, or partnership, the name and address of each member must be
given and the bid signed by a member of the firm, association or partnership, or person duly authorized.
If the bid is submitted by a company or corporation, the company or corporate name and business address
must be given, and the bid signed by an official or duly authorized agent. Powers of attorney authorizing
agents or others to sign bids must be properly certified and must be in writing and submitted with the
bid.
30.3 Pursuant to Texas Local Government Code 252.043(g), a competitive sealed bid that has been opened
may not be changed for the purpose of correcting an error in the bid price. THEREFORE, ANY
CORRECTIONS TO THE BID PRICE MUST BE MADE ON THE BID SUBMITTAL FORM PRIOR
TO BID OPENING.
30.4 Bid submittals may be withdrawn and resubmitted at any time before the time set for opening of the bids,
but no bid may be withdrawn or altered thereafter.
31. BOUND COPY OF CONTRACT DOCUMENTS
31.1 Bidder understands and agrees that the contract to be executed by bidder shall be bound and will include
the following:
(a) Notice to Bidders.
(b) General Instructions to Bidders.
(c) Bidder's Submittal.
(d) Statutory Bonds (if required).
(e) Contract Agreement.
(f) General Conditions.
(g) Special Conditions (if any).
(h) Specifications.
(i) Insurance Certificates for Contractor and all Sub -Contractors.
(j) All other documents made available to bidder for his inspection in accordance with the
Notice to Bidders.
29.2 If Plans and Specifications are too bulky or cumbersome to be physically bound, they are to be
considered incorporated by reference into the aforementioned contract documents.
32. OUALIFICATIONS OF BIDDERS
32.1 The bidder may be required before the award of any contract to show to the complete satisfaction of the
City of Lubbock that it has the necessary facilities, ability, and financial resources to provide the service
specified therein in a satisfactory manner. The bidder may also be required to give a past history and
references in order to satisfy the City of Lubbock about the bidder's qualifications. The City of Lubbock
may make reasonable investigations deemed necessary and proper to determine the ability of the bidder
to perform the work, and the bidder shall furnish to the City of Lubbock all information for this purpose
that may be requested. The bidder's bid may be deemed not to meet specifications or the bid may be
rejected if the evidence submitted by, or investigation of, the bidder fails to satisfy the City of Lubbock
that the bidder is properly qualified to carry out the obligations of the contract and to complete the work
described therein. Evaluation of the bidder's qualifications shall include:
(a) The ability, capacity, skill, and financial resources to perform the work or provide the
service required.
(b) The ability of the bidder to perform the work or provide the service promptly or within the
time specified, without delay or interference.
(c) The character, integrity, reputation, judgment, experience, and efficiency of the bidder.
(c) The quality of performance of previous contracts or services.
(d) The safety record of the Contractor and proposed Sub -Contractors
32.2 Before contract award, the recommended contractor for this project may be required to show that he has
experience with similar projects that require the Contractor to plan his work efforts and equipment needs
with City of Lubbock specifications in mind. Demonstration of experience shall include a complete list
of ALL similar municipal and similar non -municipal current and completed projects for the past three
(3) years for review. This list shall include the names of supervisors and type of equipment used to
perform work on these projects. In addition, the Contractor may be required to provide the name(s) of
supervisor(s) that will be used to perform work on this project in compliance with City of Lubbock
specifications herein.
33. PLANS FOR THE CONTRACTOR
33.1 The contractor will, upon written request, be furnished up to five sets of plans and specifications and
related contract documents for use during construction. Plans and specifications for use during
construction will only be furnished directly to the Contractor. The Contractor shall then distribute copies
of plans and specifications to suppliers, subcontractors or others, as required for proper prosecution of
the work contemplated by the Contractor.
34. ANTI -LOBBYING PROVISION
34.1 DURING THE PERIOD BETWEEN THE BID CLOSE DATE AND THE CONTRACT AWARD,
BIDDERS, INCLUDING THEIR AGENTS AND REPRESENTATIVES, SHALL NOT DIRECTLY
DISCUSS OR PROMOTE THEIR BID WITH ANY MEMBER OF THE LUBBOCK CITY COUNCIL
OR CITY STAFF EXCEPT IN THE COURSE OF CITY -SPONSORED INQUIRIES, BRIEFINGS,
INTERVIEWS, OR PRESENTATIONS, UNLESS REQUESTED BY THE CITY.
34.2 This provision is not meant to preclude bidders from discussing other matters with City Council members
or City staff. This policy is intended to create a level playing field for all potential bidders, assure that
contract decisions are made in public, and to protect the integrity of the bid process. Violation of this
provision may result in rejection of the bidder's bid.
35. PREVAILING WAGE RATES
35.1 Bidders are required to comply with Texas Government Code, Chapter 2258, Prevailing Wage Rates,
with respect to the payment of prevailing wage rates for the construction of a public work, including a
building, highway, road, excavation, and repair work or other project development or improvement, paid
for in whole or in part from public funds, without regard to whether the work is done under public
supervision or direction. A worker is employed on a public work if the worker is employed by the
contractor or any subcontractor in the execution of the contract for the project
35.2 A worker employed on a public work by or on behalf of the City of Lubbock shall be paid not less than
the general prevailing rate of per diem wages for the work of a similar character in the locality in which
the work is performed, and not less than the general prevailing rate of per diem wages for legal holiday
and overtime work.
35.3 A contractor or subcontractor who violates Texas Government Code Section 2258.023 shall pay to the
City of Lubbock sixty dollars ($60) for each worker employed for each calendar day or part of the day
that the worker is paid less than the wage rates stipulated in the contract.
36. PROTEST
36.1 All protests regarding the ITB process must be submitted in writing to the City Director of Purchasing
and Contract Management within 5 working days after the protesting party knows of the occurrence of
the action which is protested relating to advertising of notices deadlines, proposal opening and all other
related procedures under the Local Government Code, as well as any protest relating to alleged
improprieties with the ITB process. This limitation does not include protests relating to staff
recommendations as to award of contract. Protests relating to staff recommendations may be directed to
the City Manager. All staff recommendations will be made available for public review prior to
consideration by the City Council as allowed by law.
36.2 FAILURE TO PROTEST WITHIN THE TIME ALLOTTED SHALL CONSTITUTE A
WAIVER OF ANY PROTEST.
INSURANCE INFORMATION CONTINUED
CONTRACTORCHECKLIST
A CONTRACTOR SHALL:
(1) provide coverage for its employees providing services on a project, for the duration of the
project based on proper reporting of classification codes and payroll amounts and filling of
any coverage agreements;
(2) provide a certificate of coverage showing workers' compensation coverage to the
governmental entity prior to beginning work on the project;
(3) provide the governmental entity, prior to the end of the coverage period, a new certificate
of coverage showing extension of coverage, if the coverage period shown on the
contractor's current certificate of coverage ends during the duration of the project;
(4) obtain from each person providing services on a project, and provide to the governmental
entity:
(A) a certificate of coverage, prior to that person beginning work on the project, so the
governmental entity will have on file certificates of coverage showing coverage
for all persons providing services on the project; and
(B) no later than seven days after receipt by the contractor, a new certificate of
coverage showing extension of coverage, if the coverage period shown on the
current certificate of coverage ends during the duration of the project;
(5) retain all required certificates of coverage on file for the duration of the project and for one
year thereafter;
(6) notify the governmental entity in writing by certified mail or personal delivery, within ten
(10) days after the contractor knew or should have known, of any change that materially
affects the provision of coverage of any person providing services on the project;
(7) post a notice on each project site informing all persons providing services on the project
that they are required to be covered, and stating how a person may verify current coverage
and report failure to provide coverage. This notice does not satisfy other posting
requirements imposed by the Act or other commission rules. This notice must be printed
in at least 19-point normal type, and shall be in both English and Spanish and any other
language common to the worker population. The text for the notices shall be the following
text provided by the commission on the sample notice, without any additional words or
changes:
PROOF OF COVERAGE SHALL BE FURNISHED TO THE CITY OF LUBBOCK
IN THE FORM OF A CERTIFICATE OF INSURANCE. THE INSURANCE
CERTIFICATES FURNISHED SHALL NAME THE CITY OF LUBBOCK AS
ADDITIONAL INSURED ON AUTO/GENERAL LIABILITY ON A PRIMARY
AND NON-CONTRIBUTORY BASIS TO INCLUDE PRODUCTS OF COMPLETE
OPERATIONS. PROVIDE A WAIVER OF SUBROGATION IN FAVOR OF THE
CITY OF LUBBOCK IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY
TO PROVIDE TO THE OWNER ALL PROOF OF COVERAGE INSURANCE
DOCUMENTS INCLUDING WORKERS COMPENSATION COVERAGE FOR
EACH SUBCONTRACTOR. COPIES OF THE ENDORSEMENTS ARE
REQUIRED.
REQUIRED WORKERS' COMPENSATION COVERAGE
"The law requires that each person working on this site or providing services related to this construction
project must be covered by workers' compensation insurance. This includes persons providing, hauling,
or delivering equipment and materials, or providing labor or transportation or other service related to the
project, regardless of the identity of their employer or status as an employee."
"Call the Texas Workers' Compensation Commission at 512-305-7238 to receive information on the legal
requirement for coverage, to verify whether your employer has provided the required coverage, or to report
an employer's failure to provide coverage." and contractually require each person with whom it
contracts to provide services on a project, to:
(A) provide coverage based on proper reporting of classification codes and payroll
amounts and filing of any coverage agreements for all of its employees providing
services on the project, for the duration of the project;
(B) provide a certificate of coverage to the contractor prior to that person beginning
work on the project;
(C) provide the contractor, prior to the end of the coverage period, a new certificate of
coverage showing extension of coverage, if the coverage period shown on the
current certificate of coverage ends during the duration of the project;
(D) obtain from each other person with whom it contracts, and provide to the contractor:
(i) a certificate of coverage, prior to the other person beginning work on the project;
and
(ii) prior to the end of the coverage period, a new certificate of coverage showing
extension of the coverage period, if the coverage period shown on the current
certificate of coverage ends during the duration of the project;
(E) retain all required certificates of coverage on file for the duration of the project and
for one year thereafter;
(F) notify the governmental entity in writing by certified mail or personal delivery,
within (ten) 10 days after the person knew or should have known, of any change
that materially affects the provision of coverage of any person providing services
on the project; and
(G) contractually require each other person with whom it contracts, to perform as
required by paragraphs (A) - (H), with the certificate of coverage to be provided to
the person for whom they are providing services.
The Contractor shall not commence work under this contract until he has obtained all insurance as
required in the General Conditions of the contract documents, from an underwriter authorized to
do business in the State of Texas and satisfactory to the City. Proof of coverage shall be furnished
to the City and written notice of cancellation or any material change will be provided ten (10)
calendar days in advance of cancellation or change. All policies of insurance, required herein,
including policies of insurance required to be provided by Contractor and its subcontractors, shall
contain a waiver of any and all of the insurer's or payor's, in the event of self-insurance, rights to
subrogation that any such insurer or payor, in the event of self-insurance, may acquire by virtue of
payment of any loss under such insurance or self-insurance. All certificates of insurance submitted
to the City in conformity with the provisions hereof shall establish such waiver.
The Contractor shall procure and carry at its sole cost and expense through the life of this contract,
insurance protection as hereinafter specified. Coverage in excess of that specified herein also shall
be acceptable. Such insurance shall be carried with an insurance company authorized to transact
business in the State of Texas and shall cover all operations in connection with this contract,
whether performed by the Contractor or a subcontractor, or separate policies shall be provided
covering the operation of each subcontractor. A certificate of insurance specifying each and all
coverages shall be submitted prior to contract execution.
BID SUBMITTAL FORM
Pate Intentionally Left Blank
BID SUBMITTAL FORM
LUMP SUM BID CONTRACT
DATE: 1171 f
PROJECT NUMBER: ITB 23-17340-MA, Demolition
of Secondary Structures on lot (approx. 5600 sqft)
Bid of / -p- wes- (hereinafter called
Bidder)
To the Honorable Mayor and City Council City of Lubbock, Texas (hereinafter called Owner)
Ladies and Gentlemen:
The Bidder, in compliance with your Invitation to Bid for the construction of the referenced project, having
carefully examined the plans, specifications, instructions to bidders, notice to bidders and all other related
contract documents and the site of the intended work, and being familiar with all of the conditions surrounding
the construction of the intended project including the availability of materials and labor, hereby intends to
furnish all labor, materials, and supplies; and to construct the project in accordance with the plans, specifications
and contract documents, within the time set forth therein and at the price stated.
The bidder binds himself on acceptance of his bid to execute a contract and any required bonds, according to
the accompanying forms, for performing and completing the said work within the time stated and for the prices
stated.
Bidder hereby agrees to commence the work on the above project on a date to be specified in a written "Notice
to Proceed" of the Owner and to substantially complete the project within 5 consecutive calendar days with
final completion of the project within 10 consecutive calendar days as stipulated in the specification and other
contract documents. Bidder hereby further agrees to pay to Owner as liquidated damages in the sum of $25for
each consecutive calendar day after substantial completion and liquidated damages in the sum of $25 for each
consecutive calendar day after final completion set forth herein above for completion of this project, all as
more fully set forth in the General Conditions of the Agreement.
Bidder understands and agrees that this bid submittal shall be completed and submitted in accordance with
instruction number 29 of the General Instructions to Bidders.
Bidder understands that the Owner reserves the right to reject any or all bids and to waive any formality in the
bidding.
The Bidder agrees that this bid shall be good and may not be withdrawn for a period of 60 calendar days after
the scheduled closing time for receiving bids.
The undersigned Bidder hereby declares that he has visited the site of the work and has carefully examined the
plans, specifications and contract documents pertaining to the work covered by this bid, and he further agrees
to commence work on or before the date specified in the written notice to proceed, and to substantially complete
the work on which he has bid; as provided in the contract documents.
Bidders are required, whether or not a payment or performance bond is required, to submit a cashier's check or
certified check issued by a bank satisfactory to the City of Lubbock, or a bid bond from a reliable surety
company, payable without recourse to the order of the City of Lubbock in an amount not less than five percent
(5%) of the total amount of the bid submitted as a guarantee that bidder will enter into a contract, obtain all
required insurance policies, and execute all necessary bonds (if required) within 10 business days after notice
of award of the contract to him.
City of Lubbock, TX
Public Works
ITB 23-17340-MA
Demolition of Secondary Structures on Lot (approx. 5600 sqft)
Matthews Backhoe, Inc., Lubbock, TX
Items
Base Bid
41-1 Demolition of a secondary structures on a lot located at:
QTY Extended
+/- U/M Cost
1712 48th Street, Lubbock, Texas
Base bid consists of the materials and labor for the demolition for 1 LS
the above referenced project, as specified herein.
Total for Item (41-1):
81,950.00
$81,950.00
Enclosed with this bid is a Cashier's Check or C r Tied Check for
Dollars ($ or a Bid Bond in the sum of
Q jy: ollars ($ U,M0 ,0q which it is agreed shall be collected and
red ined by the Owner as liquidated damages in the event the bid is accepted by the Owner and the
undersigned fails to execute the necessary contract documents, insurance certificates, and the required
bond (if any) with the Owner within 10 business days after the date of receipt of written notification of
acceptance of said bid; otherwise, said check or bond shall be returned to the undersigned upon
demand.
Bidder understands and agrees that the contract to be executed by Bidder shall be bound and include all contract
documents made available to him for his inspection in accordance with the Notice to PidderO.
Pursuant to Texas Local Government Code 252.043(g), a
competitive sealed bid that has been opened may not be
changed for the purpose of correcting an error in the bid pr ce.
THEREFORE, ANY CORRECTIONS TO THE BID PRIC
MUST BE MADE ON THE BID SUBMITTAL FORM PRIOR
TO BID OPENING.
(Seal if Bidder s a
ATI+:
Bidder acknowledges receipt of the following addenda:
Addenda No. Date S' -13
Addenda No. Date
Addenda No. Date
Addenda No. Date
or Tged Name)
Y- 0 .
�VA jCy> C un '�
c`�e�CQS ty 'S �
State Zip Code nn
Telephone: VOU - ?U ) ",;2 W _l
Fax: -
FEDERAL TAX ID or SOCIAL SECURITY No.
'1'5-,2s'3 133
EMAIL:m A;T IPw5bwY j &— fn
M/WBE Woman Black American Native American
Firm:
---
Hispanic Asian Pacific Other peci
American American
Pate Intentionally Left Blank
City of Lubbock, TX
Purchasing and Contract Management
Similar Projects and Reference Form
Please list three references of current customers who can verify the quality of service your company
provides. The City prefers customers of similar size and scope of work. Please do not use the City of
Lubbock.
REFERENCE ONE
Company Name:7-C&W T& t) M
Address:
Contact Person and Title: Te M ftch V— t k
Phone: Q(o — Z 9 Z @LA?Dsl Email:
Similar Project: De mo r�21C'2q - 5LIT h Wabo '< Year
REFERENCE TWO
Company Name: )\4o r) 0' �J I
Address:
ContactPerson and kgo
Phone: nI-A Email: \oa&eo*boM noi
Similar . 1 V �.
REFERENCE THREE
Company Name: l orn %sire ie 1 t ncf,
Address:
Contact Person and Title:
Phone:
Similar Project: I LA* h
K W-0-0, I I L6111M
Year
Page Intentionally Left Blank
City of Lubbock, TX
Purchasing and Contract Management
Safety Record Questionnaire
The City of Lubbock City Council desires to avail itself of the benefits of Section 252.0435 of the Local Government
Code, and consider the safety records of potential contractors prior to awarding proposals on City contracts. Pursuant
to Section 252.0435 of the Local Government Code, City of Lubbock has adopted the following written definition and
criteria for accurately determining the safety record of a proposer prior to awarding proposals on City contracts.
The definition and criteria for determining the safety record of a proposer for this consideration shall be:
The City of Lubbock shall consider the safety record of the offerors in determining the responsibility thereof. The City
may consider any incidence involving worker safety or safety of the citizens of the City of Lubbock, be it related or caused
by environmental, mechanical, operational, supervision or any other cause or factor. Specifically, the City may consider,
among other things:
a. Complaints to, or final orders entered by, the Occupational Safety and Health Review Commission (OSHRC),
against the proposer for violations of OSHA regulations within the past three (3) years.
b. Citations (as defined below) from an Environmental Protection Agency (as defined below) for violations
within the past five (5) years. Environmental Protection Agencies include, but are not necessarily limited to,
the U.S. Army Corps of Engineers (USACOE), the U.S. Fish and Wildlife Service (USFWS), the
Environmental Protection Agency (EPA), the Texas Commission on Environmental Quality (TCEQ), the
Texas Natural Resource Conservation Commission (TNRCC) (predecessor to the TCEQ), the Texas
Department of State Health Services (DSHS), the Texas Parks and Wildlife Department (TPWD), the
Structural Pest Control Board (SPCB), agencies of local governments responsible for enforcing environmental
protection or worker safety related laws or regulations, and similar regulatory agencies of other states of the
United States. Citations include notices of violation, notices of enforcement, suspension/revocations of state
or federal licenses or registrations, fines assessed, pending criminal complaints, indictments, or convictions,
administrative orders, draft orders, final orders, and judicial final judgments.
C. Convictions of a criminal offense within the past ten (10) years, which resulted in bodily harm or death.
d. Any other safety related matter deemed by the City Council to be material in determining the responsibility of
the offeror and his or her ability to perform the services or goods required by the proposal documents in a safe
environment, both for the workers and other employees of offeror and the citizens of the City of Lubbock.
In order to obtain proper information from offerors so that City of Lubbock may consider the safety records of potential
contractors prior to awarding proposals on City contracts, City of Lubbock requires that offerors answer the following
four (4) questions and submit them with their proposals:
QUESTION ONE
Has the offeror, or the firm, corporation, partnership, or institution represented by the offeror, or anyone acting for
such firm, corporation, partnership or institution, received citations for violations of OSHA within the past three (3)
years?
YES NO_/
If the offeror has indicated YES for question number one above, the offeror must provide to City of Lubbock, with its
proposal submission, the following information with respect to each such citation:
Date of offense, location of establishment inspected, category of offense, final disposition of offense, if any, and
penalty assessed.
QUESTION TWO
Has the offeror, or the firm, corporation, partnership, or institution represented by the offeror, or anyone acting for
such firm, corporation, partnership or institution, received citations for violations of environmental protection laws or
regulations, of any kind or type, within the past five years? Citations include notice of violation, notice of enforcement,
suspension/revocations of state or federal licenses, or registrations, fines assessed, pending criminal complaints,
indictments, or convictions, administrative orders, draft orders, final orders, and judicial final judgments.
YES NO
If the offeror has indicated YES for question number two above, the offeror must provide to City of Lubbock, with its
proposal submission, the following information with respect to each such conviction:
Date of offense or occurrence, location where offense occurred, type of offense, final disposition of offense, if any,
and penalty assessed.
QUESTION THREE
Has the offeror, or the firm, corporation, partnership, or institution represented by offeror, or anyone acting for such
firm, corporation, partnership, or institution, ever been convicted, within the past ten (10) years, of a criminal offense
which resulted in serious bodily injury or death?
YES NO %/
If the offeror has indicated YES for question number three above, the offeror must provide to City of Lubbock, with
its proposal submission, the following information with respect to each such conviction:
Date of offense, location where offense occurred, type of offense, final disposition of offense, in any, and penalty
assessed.
QUESTION FOUR
Provide your com an 's Experience Modification Rate and supporting information:
ACKNOWLEDGEMENT
THE STATE OF TEXAS
COUNTY OF LUBBOCK
I certify that I have made no willful misrepresentations in this Questionnaire nor have I withheld information in my
statements and answers to questions. I am aware that the information given by me in this questionnaire will be
investigated, with my full permission, and that any misrepresentati ions may cause my proposal to be
rejected. ,
Si
-Y pr'ps&ff- "
Title
NON -COLLUSION AFFIDAVIT
STATE OF TEXAS
LUBBOCK COUNTY
0— 0 r being first duly sworn, on his/her oath, says that the
bid above suhn d is a genuine and not a sham or collusive bid, or made in the interest or on behalf of any
person not therein named; and s/he further says that the said respondent has not directly induced or solicited any
firm on the above work or supplies to put in a sham, or any other person or corporation to refrain from a statement
of qualifications; and that said firm has not in any manner sought by collusion to secure to self an advantage over
any other firm or firms.
Subscribed and sworn to 1
41 _R'L
Notary Publ'
My Commission Expires:
me this
day of 2021
JAIME GREER
My Notary ID # 13OU4564
Expires September 25, 2023
NOTE: THIS FORM MUST BE COMPLETED AND INCLUDED IN WITH THE SUBMISSION
Page Intentionally Left Blank
Company Name
1.
2.
3.
4.
5.
6.
7.
8.
9.
]0.
11.
12.
13.
14.
15.
16.
PROPOSED LIST OF SUB -CONTRACTORS
Location
qtA7__
Services Provided
Minority Owned
Yes No
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
THIS FORM SHALL BE COMPLETED AND RETURNED ALONG WITH YOUR
RESPONSE
IF NO SUB -CONTRACTORS WILL BE USED PLEASE INDICATE SO
SUBMITTED BY:
%,C
(PRINT NAME OF COMPANY
Page Intentionally Left Blank
POST -CLOSING DOCUMENT REQUIREMENTS
The below -listed document must be received in the Purchasing and Contract Management Office
Not Later Than SEVEN BUSINESS DAYS after the close date when responses are due.
FINAL LIST OF SUB -CONTRACTORS
Pate Intentionally Left Blank
FINAL LIST OF SUB -CONTRACTORS
Minority Owned
Company Name Location Services Provided Yes No
1. ° °
2. ° °
3. ° °
N
4. ° °
5. ° °
6. ° °
7. ° °
8. ° Cl
9. ° °
10. ° °
11. ° °
12.
13.
14. ° °
15. ° °
16. ° °
Fj.. SUBMITTED BY:
(PRINT NAMEOFCOMPANY)
THIS FORM SHALL BE COMPLETED AND RETURNED NOT LATER THAN SEVEN
BUSINESS DAYS AFTER THE CLOSE DATE WHEN RESPONSES ARE DUE
IF NO SUB -CONTRACTORS WILL BE USED PLEASE INDICATE SO
Page Intentionally Left Blank
PAYMENT BOND
Pate Intentionally Left Blank
STATUTORY PAYMENT BOND PURSUANT TO SECTION 2253.021(a)
OF THE TEXAS GOVERNMENT CODE
(CONTRACTS MORE THAN $50,000)
KNOW ALL MEN BY THESE PRESENTS, that Matthews Backhoe, Inc. (hereinafter called the Principal(s),
as Principal(s), and
(hereinafter called the Surety(s), as Surety(s), are held and firmly bound unto the City of Lubbock (hereinafter
called the Obligee), in the amount of Eighty -One Thousand Nine Hundred Fifty Dollars ($81,950) lawful
money of the United States for the payment whereof, the said Principal and Surety bind themselves, and their
heirs, administrators, executors, successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, the Principal has entered into a certain written contract with the Obligee, dated 13tb day of
June, 2022, to ITB 23-17340-MA Demolition of Secondary Structures on lot (approx. 5600 soft)
and said Principal under the law is required before commencing the work provided for in said contract to execute
a bond in the amount of said contract which contract is hereby referred to and made a part hereof as fully and to
the same extent as if copied at length herein.
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal
shall pay all claimants supplying labor and material to him or a subcontractor in the prosecution of the work
provided for in said contract, then, this obligation shall be void; otherwise to remain in full force and effect;
PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Section 2253.021(a) of
the Texas Government Code, and all liabilities on this bond shall be determined in accordance with the provisions
of said Article to the same extent as if it were copied at length herein.
IN WITNESS WHEREOF, the said Principal (s) and Surety (s) have signed and sealed this instrument
this day of
Surety
By:
(Title)
2022.
(Company Name)
By:
(Printed Name)
(Signature)
(Title)
Pate Intentionally Left Blank
The undersigned surety company represents that it is duly qualified to do business in Texas, and hereby
designates an agent resident in Lubbock County to whom any requisite notices may be
delivered and on whom service of process may be had in matters arising out of such suretyship.
Surety
By:
Approved as to form:
City of Lubbock
By:
City Attorney
(Title)
* Note: If signed by an officer of the Surety Company there must be on file a certified extract from the by-laws
showing that this person has authority to sign such obligation. If signed by an Attorney in Fact, we must have
copy of power of attorney for our files.
Pate Intentionally Left Blank
PERFORMANCE BOND
Pate Intentionally Left Blank
STATUTORY PERFORMANCE BOND PURSUANT TO SECTION 2253.021(a)
OF THE TEXAS GOVERNMENT CODE
(CONTRACTS MORE THAN $100,000)
KNOW ALL MEN BY THESE PRESENTS, that Matthews Backhoe, Inc. (hereinafter called the Principal(s),
as Principal(s), and
(hereinafter called the Surety(s), as Surety(s), are held and firmly bound unto the City of Lubbock (hereinafter
called the Obligee), in the amount of Eighty -One Thousand Nine Hundred Fifty Dollars ($81,950) lawful
money of the United States for the payment whereof, the said Principal and Surety bind themselves, and their
heirs, administrators, executors, successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, the Principal has entered into a certain written contract with the Obligee, dated 13t" day of
June, 2023, to ITB 23-17340-MA Demolition of Secondary Structures on lot (approx. 5600 sgft)
and said principal under the law is required before commencing the work provided for in said contract to execute
a bond in the amount of said contract which contract is hereby referred to and made a part hereof as fully and to
the same extent as if copied at length herein.
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal
shall faithfully perform the work in accordance with the plans, specifications and contract documents, then this
obligation shall be void; otherwise to remain in full force and effect.
PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Section 2253.021(a) of
the Texas Government Code, and all liabilities on this bond shall be determined in accordance with the provisions
of said article to the same extent as if it were copied at length herein.
IN WITNESS WHEREOF, the said Principal (s) and Surety (s) have signed and sealed this instrument
this day of , 2022.
Surety
* By
(Title)
(Company Name)
By:
(Printed Name)
(Signature)
(Title)
Pate Intentionally Left Blank
The undersigned surety company represents that it is duly qualified to do business in Texas, and hereby
designates an agent resident in Lubbock County to whom any requisite
notices may be delivered and on whom service of process may be had in matters arising out of such suretyship.
Surety
By:
(Title)
Approved as to Form
City of Lubbock
By:
City Attorney
* Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws
showing that this person has authority to sign such obligation. If signed by an Attorney in Fact, we must have
copy of power of attorney for our files.
Pate Intentionally Left Blank
CERTIFICATE OF INSURANCE
Page Intentionally Left Blank
CERTIFICATE OF INSURANCE
TO: CITY OF LUBBOCK DATE:
P.O. BOX 2000, Room 204
LUBBOCK, TX 79457 TYPE OF PROJECT:
THIS IS TO CERTIFY THAT (Name and Address of Insured) is, at the date of this certificate,
insured by this Company with respect to the business operations hereinafter described, for the typed of insurance and in accordance with the provisions
of the standard policies used by this company, the further hereinafter described. Exceptions to standard policy noted hereon.
TYPE OF INSURANCE
POLICY NUMBER
EFFECTIVE
EFFECTIVE
LIMITS
DATE
DATE
GENERAL LIABILITY
LJ Commercial General Liability
General Aggregate $
LJ Claims Made
Products-Comp/Op AGG $
LJ Occurrence
Personal & Adv. Injury $
LJ Owner's & Contractors Protective
Each Occurrence $
❑
Fire Damage (Any one Fire) $
$
Med Exp (Any one Person)
AUTOMOTIVE LIABILITY
LJ Any Auto
Combined Single Limit $
LJ All Owned Autos
Bodily Injury (Per Person) $
LJ Scheduled Autos
Bodily Injury (Per Accident) $
LJ Hired Autos
Property Damage $
LJ Non -Owned Autos
LJ
GARAGE LIABILITY
LJ Any Auto
Auto Only - Each Accident $
LJ
Other than Auto Only:
Each Accident $
Aggregate $
LJ BUILDER'S RISK
LJ 100% of the Total Contract Price
$
LJ INSTALLATIONELOATER
$
EXCESS LIABILITY
LJ Umbrella Form
Each Occurrence $
Aggregate $
LJ Other Than Umbrella Form
$
WORKERS COMPENSATIONAND
EMPLOYERS' LIABILITY
The Proprietor/ LJ Included
Statutory Limits
Partners/Executive LJ Excluded
Each Accident $
Officers are:
Disease Policy Limit $
Disease -Each Employee $
OTHER
The above policies either in the body thereof or by appropriate endorsement provide that they may not be changed or canceled by the insurer in less
than the legal time required after the insured has received written notice of such change or cancellation, or in case there is no legal requirement, in less
than five days in advance of cancellation.
FIVE COPIES OF THE CERTIFICATE OF INSURANCE
MUST BE SENT TO THE CITY OF LUBBOCK
(Name of Insurer)
ma
Title:
The Insurance Certificates Furnished shall name the City of Lubbock as Additional Insured on Auto General
Liability and provide a Waiver of Subrogation in favor of the City of Lubbock. IT SHALL BE THE CONTRACTOR'S.
THE ADDITIONAL INSURED ENDORSEMENT SHALL INCLUDE PRODUCTS AND COMPLETE OPERATIONS.
CONTRACTORCHECKLIST
A CONTRACTOR SHALL:
(1) provide coverage for its employees providing services on a project, for the duration of the project based on
proper reporting of classification codes and payroll amounts and filling of any coverage agreements;
(2) provide a certificate of coverage showing workers' compensation coverage to the governmental entity prior
to beginning work on the project;
(3) provide the governmental entity, prior to the end of the coverage period, a new certificate of coverage
showing extension of coverage, if the coverage period shown on the contractor's current certificate of
coverage ends during the duration of the project;
(4) obtain from each person providing services on a project, and provide to the governmental entity:
(A) a certificate of coverage, prior to that person beginning work on the project, so the governmental
entity will have on file certificates of coverage showing coverage for all persons providing services
on the project; and
(B) no later than seven days after receipt by the contractor, a new certificate of coverage showing
extension of coverage, if the coverage period shown on the current certificate of coverage ends
during the duration of the project;
(5) retain all required certificates of coverage on file for the duration of the project and for one year thereafter;
(6) notify the governmental entity in writing by certified mail or personal delivery, within ten (10) days after
the contractor knew or should have known, of any change that materially affects the provision of coverage
of any person providing services on the project;
(7) post a notice on each project site informing all persons providing services on the project that they are
required to be covered, and stating how a person may verify current coverage and report failure to provide
coverage. This notice does not satisfy other posting requirements imposed by the Act or other commission
rules. This notice must be printed in at least 19-point normal type, and shall be in both English and Spanish
and any other language common to the worker population. The text for the notices shall be the following
text provided by the commission on the sample notice, without any additional words or changes:
PROOF OF COVERAGE SHALL BE FURNISHED TO THE CITY OF LUBBOCK IN THE FORM
OF A CERTIFICATE OF INSURANCE. THE INSURANCE CERTIFICATES FURNISHED
SHALL NAME THE CITY OF LUBBOCK AS ADDITIONAL INSURED ON AUTO/GENERAL
LIABILITY ON A PRIMARY AND NON-CONTRIBUTORY BASIS TO INCLUDE PRODUCTS
OF COMPLETE OPERATIONS. PROVIDE A WAIVER OF SUBROGATION IN FAVOR OF
THE CITY OF LUBBOCK. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
PROVIDE TO THE OWNER ALL PROOF OF COVERAGE INSURANCE DOCUMENTS
INCLUDING WORKERS COMPENSATION COVERAGE FOR EACH SUBCONTRACTOR.
COPIES OF THE ENDORSEMENTS ARE REQUIRED.
REQUIRED WORKERS' COMPENSATION COVERAGE
"The law requires that each person working on this site or providing services related to this construction project must be
covered by workers' compensation insurance. This includes persons providing, hauling, or delivering equipment and
materials, or providing labor or transportation or other service related to the project, regardless of the identity of their
employer or status as an employee."
"Call the Texas Workers' Compensation Commission at 512-305-7238 to receive information on the legal requirement for
coverage, to verify whether your employer has provided the required coverage, or to report an employer's failure to provide
coverage." and contractually require each person with whom it contracts to provide services on a project, to:
(A) provide coverage based on proper reporting of classification codes and payroll amounts and filing
of any coverage agreements for all of its employees providing services on the project, for the
duration of the project;
(B) provide a certificate of coverage to the contractor prior to that person beginning work on the project;
(C) provide the contractor, prior to the end of the coverage period, a new certificate of coverage
showing extension of coverage, if the coverage period shown on the current certificate of coverage
ends during the duration of the project;
(D) obtain from each other person with whom it contracts, and provide to the contractor:
(i) a certificate of coverage, prior to the other person beginning work on the project; and
(n) prior to the end of the coverage period, a new certificate of coverage showing extension of the
coverage period, if the coverage period shown on the current certificate of coverage ends during
the duration of the project;
(E) retain all required certificates of coverage on file for the duration of the project and for one year
thereafter;
(F) notify the governmental entity in writing by certified mail or personal delivery, within (ten) 10 days
after the person knew or should have known, of any change that materially affects the provision of
coverage of any person providing services on the project; and
(G) contractually require each other person with whom it contracts, to perform as required by
paragraphs (A) - (H), with the certificate of coverage to be provided to the person for whom they
are providing services.
The Contractor shall not commence work under this contract until he has obtained all insurance as required in the
General Conditions of the contract documents, from an underwriter authorized to do business in the State of Texas
and satisfactory to the City. Proof of coverage shall be furnished to the City and written notice of cancellation or
any material change will be provided ten (10) calendar days in advance of cancellation or change. All policies of
insurance, required herein, including policies of insurance required to be provided by Contractor and its
subcontractors, shall contain a waiver of any and all of the insurer's or payor's, in the event of self-insurance, rights
to subrogation that any such insurer or payor, in the event of self-insurance, may acquire by virtue of payment of
any loss under such insurance or self-insurance. All certificates of insurance submitted to the City in conformity
with the provisions hereof shall establish such waiver.
The Contractor shall procure and carry at its sole cost and expense through the life of this contract, insurance
protection as hereinafter specified. Coverage in excess of that specified herein also shall be acceptable. Such
insurance shall be carried with an insurance company authorized to transact business in the State of Texas and shall
cover all operations in connection with this contract, whether performed by the Contractor or a subcontractor, or
separate policies shall be provided covering the operation of each subcontractor. A certificate of insurance
specifying each and all coverages shall be submitted prior to contract execution.
Page Intentionally Left Blank
CONTRACT
Page Intentionally Left Blank
Contract 17340
STATE OF TEXAS
COUNTY OF LUBBOCK
THIS AGREEMENT, made and entered into this �3th day of June 2023 by and between the City of Lubbock,
County of Lubbock, State of Texas, acting by and through the Mayor, City of Lubbock, thereunto authorized to do so,
hereinafter referred to as OWNER, and Matthews Backhoe, Inc. of the City of Lubbock, County of Lubbock and the
State of TX hereinafter termed CONTRACTOR.
WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned, to be made and
performed by the OWNER and under the conditions expressed in the bond bearing even date herewith (if any) the
CONTRACTOR hereby agrees with OWNER to commence and complete the construction of certain improvements
described as follows:
ITB 23-17340-MA Demolition of Secondary Structures on lot (approx. 5600 sqft)
and all extra work in connection therewith, under the terms as stated in the contract documents and at his (or their) own
proper cost and expense to furnish all materials, supplies, machinery, equipment, tools, superintendence, labor, insurance
and other accessories and services necessary to complete the said construction in accordance with the contract documents
as defined in the General Condition of Agreement. Matthews Backhoe, Inc. 's bid dated May 18, 2023, is incorporated
into and made a part of this agreement.
The CONTRACTOR hereby agrees to commence work within ten days after the date written notice to do so shall have
been given to him and to substantially complete same within the time specified in the contract documents.
The OWNER agrees to pay the CONTRACTOR in current funds for the performance of the contract in accordance with
the bid submitted therefore, subject to additions and deductions, as provided in the contract documents and to make payment
on account thereof as provided therein.
IN WITNESS WHEREOF, the parties to these presents have executed this agreement in Lubbock, Lubbock County,
Texas in the year and day first above written.
CONTRACTOR:
CITY OF L
(OWNER):
Matthews Backhoe, Inc.
:
: ��� � � � � - �
. . • ��' �1'!R� ��L. `�:�-' ' - - �
' i..���
COMPLETE ADDRESS:
�
Courtney Paz, City Secretary
�
APPROV ' AS TO CONTENT:
Co nforcement epresentative
(�u` � «( 21
Name (Printed) Date
APPROVED AS TO F RM:
Amy Si ty orney
Matthews Backhoe, Inc.
Page Intentionally Left Blank
GENERAL CONDITIONS OF THE AGREEMENT
Page Intentionally Left Blank
GENERAL CONDITIONS OF THE AGREEMENT
•ram,
Whenever the word Owner, or First Parry, are used in this contract, it shall be understood as referring to the City
of Lubbock, Texas.
2. CONTRACTOR
Whenever the word Contractor, or Second Parry, is used, it shall be understood to mean the person, persons, co-
partnership or corporation, to wit Matthews Backhoe, Inc. who has agreed to perform the work embraced
in this contract, or their legal representative.
3. OWNER'S REPRESENTATIVE
Whenever the word Owner's Representative or representative is used in this contract, it shall be understood as
referring to, City of Lubbock, or its representative Stuart Walker, Director of Code Enforcement, so
designated who shall inspect constructions; or to such other representatives, supervisors, architects, engineers, or
inspectors as may be authorized by said Owner to act in any particular under this agreement. Engineers,
supervisors or inspectors shall act for the Owner under the direction of Owner's Representative, but shall not
directly supervise the Contractor or persons acting on behalf of the Contractor.
4. CONTRACT DOCUMENTS
The contract's documents shall consist of the Invitation to Bid, Bid, Signed Agreement, Statutory Bonds (if
required), General Conditions of the Agreement, Special Conditions of the Agreement (if any), Specifications,
Plans, Insurance Certificates, and all other documents made available to Bidder for inspection in accordance with
the Invitation to Bid. The above described materials are sometimes referred to herein as the "contract" or
"contract documents".
5. INTERPRETATION OF PHRASES
Whenever the words "Directed," "Permitted," "Designated," "Required," "Considered Necessary," "Prescribed,"
or words of like import are used, it shall be understood that the direction, requirement, permission, order,
designation or prescription of the Owner's Representative is intended; and similarly, the words "Approved,"
"Acceptable," "Satisfactory," or words of like import shall mean approved by or acceptable or satisfactory to the
Owner's Representative.
6. SUBCONTRACTOR
The term Subcontractor, as employed herein, includes only those having a direct contract with the Contractor for
performance of work on the project contemplated by these contract documents. Owner shall have no responsibility
to any Subcontractor employed by Contractor for performance of work on the project contemplated by these
contract documents, but said Subcontractors shall look exclusively to Contractor for any payments due
Subcontractor. The City reserves the right to approve or disapprove the selection of any subcontractor(s).
7. WRITTEN NOTICE
Written notice shall be deemed to have been duly served if delivered in person to the individual or to a member of
the firm or to an Office of the corporation for whom it is intended, or if delivered at or sent certified mail to the
last business address known to the parry who gives the notice.
1
CONTRACTOR'S RESPONSIBILITIES
Unless otherwise stipulated, the Contractor shall provide and pay for all materials, supplies, machinery,
equipment, tools, superintendence, labor, insurance, and all water, light, power, fuel, transportation and all other
facilities necessary for the execution and completion of the work covered by the contract documents. Unless
otherwise specified, all materials shall be new and both workmanship and materials shall be of a good quality.
The Contractor shall, if required, furnish satisfactory evidence as to the kind and quality of materials. Materials
or work described in words which so applied have well known, technical or trade meaning shall be held to refer
such recognized standards.
All work shall be done and all materials furnished in strict conformity with the contract documents.
SUBSTANTIALLY COMPLETED
The term "Substantially Completed" is meant that the structure or project contemplated by the contract documents
has been made suitable for use or occupancy or the facility is in a condition to serve its intended purpose, but still
may require minor miscellaneous work and adjustment.
10. LAYOUT
Except as specifically provided herein, the Contractor shall be responsible for laying out all work and shall
accomplish this work in a manner acceptable to the Owner's Representative. The Owner's Representative shall
check the Contractor's layout of all major structures and any other layout work done by the Contractor at
Contractor's request, but this check does not relieve the Contractor of the responsibility of correctly locating all
work in accordance with the Plans and Specifications.
11. KEEPING OF PLANS AND SPECIFICATIONS ACCESSIBLE
The Contractor shall be furnished copies of all Plans and Specifications without expense to Contractor and
Contractor shall keep one copy of same consistently accessible on the job site.
12. RIGHT OF ENTRY
The Owner's Representative may make periodic visits to the site to observe the progress or quality of the executed
work and to determine, in general, if the work is proceeding in accordance with the contract documents. Owner's
Representative shall not be required to make exhaustive or continuous onsite inspections to check the quality or
quantity of the work, nor shall Owner's Representative be responsible for the construction means, methods,
techniques, sequences or procedures, or the safety precautions incident thereto. Notwithstanding the Owner's
Representative's rights of entry hereunder, the Owner's Representative shall not be responsible for the
Contractor's failure to perform the work in accordance with the Contract Documents.
13. LINES AND GRADES
All lines and grades shall be furnished whenever Owner's Representative deems said lines and grades are
necessary for the commencement of the work contemplated by these contract documents or the completion of the
work contemplated by these contract documents. Whenever necessary, Contractor shall suspend its work in order
to permit Owner's Representative to comply with this requirement, but such suspension shall be as brief as
practical and Contractor shall be allowed no extra compensation therefore. The Contractor shall give the Owner's
Representative ample notice of the time and place where lines and grades are needed. All stakes, marks, etc.,
shall be carefully preserved by the Contractor, and in case of careless destruction or removal by Contractor, its
Subcontractors, or its employees, such stakes, marks, etc., shall be replaced by the Owner's Representative at
Contractor's expense.
14. OWNER'S REPRESENTATIVE'S AUTHORITY AND DUTY
Unless otherwise specified, it is mutually agreed between the parties to this Agreement that the Owner's
Representative has the authority to review all work included herein. The Owner's Representative has the
authority to stop the work whenever such stoppage may be necessary to ensure the proper execution of the
contract. The Owner's Representative shall, in all cases, determine the amounts and quantities of the several kinds
of work which are to be paid for under the contract documents, and shall determine all questions in relation to said
work and the construction thereof, and shall, in all cases, decide every question which may arise relative to the
execution of this contract on the part of said Contractor. The decision of the Owner's Representative shall be
conclusive in the absence of written objection to same delivered to Owner's Representative within fifteen (15)
calendar days of any decision or direction by Owner's Representative. In the absence of timely written objection
by Contractor, as provided herein, any and all objection or objections shall be deemed waived.
15. SUPERINTENDENCE AND INSPECTION
It is agreed by the Contractor that the Owner's Representative shall be and is hereby authorized to appoint from
time to time such subordinate engineers, supervisors, or inspectors as the said Owner's Representative may deem
proper to inspect the materials furnished and the work done under this Agreement, and to see that said material is
furnished and said work is done in accordance with the specifications therefore. The Contractor shall furnish all
reasonable aid and assistance required by the subordinate engineers, supervisors or inspectors for the proper
inspection and examination of the work. The Contractor shall regard and obey the directions and instructions of
any subordinate engineers, supervisors or inspectors so appointed, when such directions and instructions are
consistent with the obligations of this Agreement and accompanying plans and specifications provided, however,
should the Contractor object to any orders by any subordinate engineer, supervisor or inspector, the Contractor
may within fifteen (15) calendar days make written appeal to the Owner's Representative for its decision. In the
absence of timely written objection by Contractor, as provided herein, any and all objection or objections shall be
deemed waived.
16. CONTRACTOR'S DUTY AND SUPERINTENDENCE
The Contractor shall give personal attention to the faithful prosecution and completion of this contract and shall
keep on the work, during its progress, a competent superintendent and any necessary assistants, all satisfactory to
Owner's Representative. The superintendent shall represent the Contractor in its absence and all directions given
to superintendent shall be binding as if given to the Contractor. It is expressly agreed that adequate supervision
by competent and reasonable representatives of the Contractor is essential to the proper performance of the work
and lack of such supervision shall be grounds for suspending operations of the Contractor.
The work, from its commencement to completion, shall be under the exclusive charge and control of the
Contractor and all risk in connection therewith shall be borne by the Contractor.
The Owner or Owner's Representatives shall not be responsible for the acts or omissions of the Contractor, or any
subcontractors, or any of Contractor's agents or employees, or any other persons performing any of the work.
17. CONTRACTOR'S UNDERSTANDING
It is understood and agreed that the Contractor has, by careful examination, satisfied itself as to the nature and
location of the work, the confirmation of the ground, the character, quality and quantity of materials to be
encountered, the character of equipment and facilities needed preliminary to and during the prosecution of the
work, and the general and local conditions, and all other matters which in any way affect the work under the
contract documents. No oral agreement or conversation with any Office, agent, or employee of the Owner, or
Owner's Representative either before or after the execution of this contract, shall affect or modify any of the
terms or obligations herein contained. Subject to the rights of Owner as set forth in Paragraph 23 hereof, all
modifications and/or amendments to the contract documents, shall be in writing, and executed by Owner's
Representative and Contractor.
3
Unless otherwise specified herein, all loss, expense or damage to Contractor arising out of the nature of the work
to be done, or from the action of the elements, or from any unforeseen circumstance and the prosecution of the
work, shall be sustained and borne by the Contractor at its own cost and expense.
18. CHARACTER OF WORKERS
The Contractor agrees to employ only orderly and competent workers, skillful in the performance in the type of
work required under this contract, to do the work; and agrees that whenever the Owner's Representative shall
inform Contractor in writing that any man or men on the work, are, in Owner's Representative's sole opinion,
incompetent, unfaithful, disorderly, or otherwise unacceptable to Owner or Owner's Representative, such man or
men shall be discharged from the work and shall not again be employed on the work without the Owner's
Representative's written consent.
19. CONSTRUCTION PLANT
The Contractor shall provide all labor, tools, equipment, machinery and materials necessary in the prosecution
and completion of this contract where it is not otherwise specifically provided that Owner shall furnish same, and
it is also understood that Owner shall not be held responsible for the care, preservation, conservation, or
protection of any materials, tools, equipment or machinery or any part of the work until it is finally completed and
accepted.
The building of structures for the housing of men or equipment are permitted only at such places as the Owner's
Representative shall consent or direct, and the sanitary conditions of the grounds in or about such structure shall
at all times be maintained in a manner satisfactory to the Owner's Representative.
20. SANITATION
Necessary sanitary conveniences for the use of laborers on the work site, properly secluded from public
observation, shall be constructed and maintained by the Contractor in such manner and at such points as shall be
approved by the Owner's Representative and their use shall be strictly enforced.
21. OBSERVATION AND TESTING
The Owner or Owner's Representative shall have the right at all times to observe and test the work. Contractor
shall make necessary arrangements and provide proper facilities and access for such observation and testing at any
location wherever such work is in preparation or progress. Contractor shall ascertain the scope of any observation
that may be contemplated by Owner or Owner's Representative and shall give ample notice as to the time each
part of the work shall be ready for such observation. Owner or Owner's Representative may reject any such work
found to be defective or not in accordance with the contract documents, regardless of the stage of its completion
or the time or place of discovery of such errors and regardless of whether Owner's Representative has previously
accepted the work through oversight or otherwise. If any such work should be covered without approval or
consent of the Owner, it must, if requested by Owner or Owner's Representative, be uncovered for examination at
Contractor's expense. In the event that any part of the work is being fabricated or manufactured at a location
where it is not convenient for Owner or Owner's Representative to make observations of such work or require
testing of said work, then in such event Owner or Owner's Representative may require Contractor to furnish
Owner or Owner's Representative certificates of inspection, testing or approval made by persons competent to
perform such tasks at the location where that part of the work is being manufactured or fabricated. All such tests
shall be in accordance with the methods prescribed by the American Society for Testing and Materials or such
other applicable organization as may be required by law or the contract documents.
If any such work which is required to be inspected, tested, or approved is covered up without written approval or
consent of the Owner or Owner's Representative, it must, if requested by the Owner or Owner's Representative, be
uncovered for observation and testing at the Contractor's expense. The cost of all such inspections, tests and
approvals shall be borne by the Contractor unless otherwise provided herein. Any work which fails to meet the
requirements of any such tests, inspections or approvals, and any work which meets the requirements of any such
tests or approvals but does not meet the requirements of the contract documents shall be considered defective, and
shall be corrected at the Contractor's expense.
Neither observations by the Owner or Owner's Representative, nor inspections, tests, or approvals made by
Owner, Owner's Representative, or other persons authorized under the contract documents to make such
inspections, tests, or approvals shall relieve the Contractor from its obligation to perform the work in accordance
with the requirements of the contract documents.
22. DEFECTS AND THEIR REMEDIES
It is expressly agreed that if the work or any part thereof, or any material brought on the site of the work for use in
the work or selected for the same, shall be deemed by the Owner or Owner's Representative as unsuitable or not in
conformity with plans, specifications and/or contract documents, the Contractor shall, after receipt of written
notice thereof from the Owner's Representative, forthwith remove such material and rebuild or otherwise remedy
such work so that it shall be in full accordance with the contract documents. It is further agreed that any remedial
action contemplated as hereinabove set forth shall be at Contractor's expense.
23. CHANGES AND ALTERATIONS
The Contractor further agrees that the Owner may make such changes and alterations as the Owner may see fit, in
the line, grade, form dimensions, plans or materials for the work herein contemplated, or any part thereof, either
before or after the beginning of the construction, without affecting the validity of this contract and the
accompanying bond.
If such changes or alterations diminish the quantity of the work to be done, they shall not constitute the basis for a
claim for damages, or anticipated profits on the work that may be dispensed with. If they increase the amount of
work, and the increased work can fairly be classified under the specifications, such increase shall be paid
according to the quantity actually done and at the unit price established for such work under this contract;
otherwise such additional work shall be paid for as provided under Extra Work. In case the Owner shall make
such changes or alterations as shall make useless any work already done or material already furnished or used in
said work, then the Owner shall recompense the Contractor for any material or labor so used, and for actual
expenses incurred in preparation for the work as originally planned.
24. EXTRA WORK
The term "extra work" as used in this contract shall be understood to mean and include all work that may be
required by the Owner or Owner's Representative to be done by the Contractor to accomplish any change,
alteration or addition to the work as shown on the plans and specifications or contract documents and not covered
by Contractor's bid, except as provided under Changes and Alterations herein.
It is agreed that the Contractor shall perform all extra work under the direction of the Owner's Representative
when presented with a written work order signed by the Owner's Representative; subject, however, to the right of
the Contractor to require written confirmation of such extra work order by the Owner. It is also agreed that the
compensation to be paid to the Contractor for performing said extra work shall be determined by the following
methods:
Method (A) - By agreed unit prices; or
Method (B) - By agreed lump sum; or
Method (C) - If neither Method (A) or Method (B) be agreed upon before the extra work is
commenced, then the Contractor shall be paid the lesser of the following: (1) actual field
cost of the extra work, plus fifteen (15%) percent; or (2) the amount that would have been
charged by a reasonable and prudent Contractor as a reasonable and necessary cost for
performance of the extra work.
5
In the event said extra work be performed and paid for under Method (C)(1), then the provisions of this paragraph
shall apply and the "actual field cost" is hereby defined to include the cost of all workmen, such as foremen,
timekeepers, mechanics and laborers, materials, supplies, teams, trucks, rentals on machinery and equipment, for
the time actually employed or used on such extra work, plus actual transportation charges necessarily incurred,
together with all expenses incurred directly on account of such extra work, including Social Security, Old Age
Benefits, Maintenance Bonds, Public Liability and Property Damage and Workers' Compensation and all other
insurances as may be required by law or ordinances or directed by the Owner or Owner's Representative, or by
them agreed to. Owner's Representative may direct the form in which accounts of the actual field cost shall be
kept and records of these accounts shall be made available to the Owner's Representative. The Owner's
Representative may also specify in writing, before the work commences, the method of doing the work and the
type and kind of machinery and equipment to be used; otherwise, these matters shall be determined by the
Contractor. Unless otherwise agreed upon, the prices for the use of machinery and equipment shall be determined
by using 100%, unless otherwise specified, of the latest Schedule of Equipment and Ownership Expenses adopted
by the Associated General Contractors of America. Where practical, the terms and prices for the use of
machinery and equipment shall be incorporated in the written extra work order. The fifteen percent (15%) of the
actual field cost to be paid to Contractor shall cover and compensate Contractor for its profit, overhead, general
superintendence and field office expense, and all other elements of cost and expense not embraced within the
actual field cost as herein defined, save that where the Contractor's Camp or Field Office must be maintained
primarily on account of such Extra Work, then the cost to maintain and operate the same shall be included in the
"actual field cost."
No claim for extra work of any kind shall be allowed unless ordered in writing by Owner's Representative. In
case any orders or instructions appear to the Contractor to involve extra work for which Contractor should receive
compensation or an adjustment in the construction time, Contractor shall prior to commencement of such extra
work, make written request to the Owner's Representative for a written order authorizing such extra work. Should
a difference of opinion arise as to what does or does not constitute extra work or as to the payment therefore, and
the Owner's Representative insists upon its performance, the Contractor shall proceed with the work after making
written request for written order and shall keep adequate and accurate account of the actual field cost thereof, as
provided under Method (C) (1). If Contractor does not notify Owner's Representative before the commencement
of any extra work, any claim for payment due to alleged extra work shall be deemed waived.
25. DISCREPANCIES AND OMISSIONS
It is further agreed that it is the intent of the contract documents that all work described in the bid, the
specifications, plans and other contract documents, is to be done for the prices quoted by the Contractor and that
such price shall include all appurtenances necessary to complete the work in accordance with the intent of these
contract documents as interpreted by Owner's Representative. Notices of any discrepancies or omissions in
these plans, specifications, or contract documents, shall be given to the Owners' Representative and a
clarification obtained before the bids are received, and if no such notice is received by the Owner's
Representative prior to the opening of bids, then it shall be deemed that the Contractor fully understands
the work to be included and has provided sufficient sums in its bid to complete the work in accordance with
these plans and specifications. If Contractor does not notify Owner's Representative before bidding of any
discrepancies or omissions, then it shall be deemed for all purposes that the plans and specifications are
sufficient and adequate for completion of the project. It is further agreed that any request for clarification
must be submitted no later than five (5) calendar days prior to the opening of bids.
26. RIGHT OF OWNER TO MODIFY METHODS AND EQUIPMENT
If at any time the methods or equipment used by the Contractor are found to be inadequate to secure the quality of
work with the rate of progress required under this contract, the Owner or Owner's Representative may order the
Contractor in writing to increase their safety or improve their character and efficiency and the Contractor shall
comply with such order. If, at any time, the working force of the Contractor is inadequate for securing the
progress herein specified, the Contractor shall, if so ordered in writing, increase its force or equipment, or both, to
such an extent as to give reasonable assurance of compliance with the schedule of progress.
C1
27. PROTECTION AGAINST ACCIDENT TO EMPLOYEES AND THE PUBLIC AND GENERAL INDEMNITY
The Contractor shall take out and procure a policy or policies of Workers' Compensation Insurance with an
insurance company licensed to transact business in the State of Texas, which policy shall comply with the
Workers' Compensation laws of the State of Texas. The Contractor shall at all times exercise reasonable
precaution for the safety of employees and others on or near the work and shall comply with all applicable
provisions of federal, state and municipal laws and building and construction codes. All machinery and
equipment and other physical hazards shall be guarded in accordance with the "Manual of Accident Prevention in
Construction" of Associated General Contractors of America, except where incompatible with federal, state or
municipal laws or regulations. The Contractor, its sureties and insurance carriers shall defend, indemnify and
hold harmless the Owner and all of its Offices, agents and employees against any all losses, costs, damages,
expenses, liabilities, claims and/or causes of action, whether known or unknown, fixed, actual, accrued or
contingent, liquidated or unliquidated, including, but not limited to, attorneys' fees and expenses, in connection
with, incident to, related to, or arising out of, the Contractor's or any subcontractor's, agent's or employee's, in
any manner whatsoever, omission, execution and/or supervision of this contract, and the project which is the
subject matter of this contract.
The safety precautions taken shall be the sole responsibility of the Contractor, in its sole discretion as an
Independent Contractor; inclusion of this paragraph in the Agreement, as well as any notice which may be given
by the Owners or the Owner's Representative concerning omissions under this paragraph as the work progresses,
are intended as reminders to the Contractor of its duty and shall not be construed as any assumption of duty to
supervise safety precautions by either the Contractor or any of its subcontractors.
28. CONTRACTOR'S INSURANCE
The Contractor shall not commence work under this contract until he has obtained all insurance as required in the
General Conditions of the contract documents, from an underwriter authorized to do business in the State of
Texas and satisfactory to the City. Proof of coverage shall be furnished to the City and written notice of
cancellation or any material change shall be provided ten (10) calendar days in advance of cancellation or change.
All policies of insurance, required herein, including policies of insurance required to be provided by Contractor
and its subcontractors, shall contain a waiver of any and all of the insurer's or payor's, in the event of self-
insurance, rights to subrogation that any such insurer or payor, in the event of self-insurance, may acquire by
virtue of payment of any loss under such insurance or self-insurance. All certificates of insurance submitted to
the City in conformity with the provisions hereof shall establish such waiver.
The Contractor shall procure and carry at its sole cost and expense through the life of this contract, insurance
protection as hereinafter specified. Coverage in excess of that specified herein also shall be acceptable. Such
insurance shall be carried with an insurance company authorized to transact business in the State of Texas and
shall cover all operations in connection with this contract, whether performed by the Contractor or a
subcontractor, or separate policies shall be provided covering the operation of each subcontractor. A certificate of
insurance specifying each and all coverages shall be submitted prior to contract execution.
PROOF OF COVERAGE SHALL BE FURNISHED TO THE CITY OF LUBBOCK IN THE FORM OF
A CERTIFICATE OF INSURANCE. THE INSURANCE CERTIFICATES FURNISHED SHALL
NAME THE CITY OF LUBBOCK AS ADDITIONAL INSURED ON AUTO/GENERAL LIABILITY
ON A PRIMARY AND NON-CONTRIBUTORY BASIS TO INCLUDE PRODUCTS OF COMPLETE
OPERATIONS. PROVIDE A WAIVER OF SUBROGATION IN FAVOR OF THE CITY OF
LUBBOCK, OR IN THE ALTERNATIVE, SHALL BE ACCOMPANIED BY A STATEMENT FROM
THE CONTRACTOR TO THE EFFECT THAT NO WORK ON THIS PARITCULAR PROJECT
SHALL BE SUBCONTRACTED. IT SHALL BE THE CONTRACTOR'S RESPONSIBLITY TO
PROVIDE OT THE OWNER ALL PROOF OF COVERAGE INSURANCE DOCUMENTS
INCLUDING WORKER'S COMPENSATION COVERAGE FOR EACH SUBCONTRACTOR.
COPIES OF THE ENDORSEMENTS ARE REQUIRED.
A. Commercial General Liability Insurance (Primary Additional Insured and Waiver of Subrogation
required)
Commercial General Liability Requirements: $IM occurrence / $2M aggregate (can be
combined with an Excess Liability to meet requirements). CGL is required in ALL contracts. It
is perhaps the most important of all insurance policies in a contractual relationship. It insures the
Contractor has broad liability coverage for contractual activities and for completed operations.
Commercial General Liability to include Products — Completion/OP, Personal and Advertising
Injury, Contractual Liability, Fire Damage (any one fire), and Medical Expenses (any one
person).
Commercial General Liabili . HeavyEquipment Endorsement: Heavy equipment endorsement is
required
B. Owner's and Contractor's Protective Liability Insurance. NOT REQUIRED.
For bodily injuries, including accidental death and or property damage, - NOT REQUIRED.
C. Comprehensive Automobile Liability Insurance (Waiver of Subrogation Required)
NOT REQUIRED.
D. Builder's Risk Insurance/Installation Floater Insurance - NOT REQUIRED.
E. Umbrella Liability Insurance - NOT REQUIRED.
F. Worker's Compensation and Employers Liability Insurance (Waiver of Subrogation required)
Worker's Compensation Insurance covering all employees whether employed by the Contractor or any
Subcontractor on the job with Employer Liability ($IM min) is required with Workers
Compensation.
Definitions:
Certificate of coverage ("certificate") - A copy of a certificate of insurance, a certificate of
authority to self -insure issued by the commission, or a coverage agreement (TWCC-81, TWCC-
82, TWCC-83, or TWCC-84), showing statutory workers' compensation insurance coverage for
the person's or entity's employees providing services on a project, for the duration of the project.
Duration of the project - includes the time from the beginning of the work on the project until the
Contractor's/person's work on the project has been completed and accepted by the governmental
entity.
Persons providing services on the project ("subcontractor" in Section 406.096, Texas Labor
Code) - includes all persons or entities performing all or part of the services the Contractor has
undertaken to perform on the project, regardless of whether that person contracted directly with
the Contractor and regardless of whether that person has employees. This includes, without
limitation, independent contractors, subcontractors, leasing companies, motor carriers, owner -
operators, employees of any such entity, or employees of any entity which furnishes persons to
provide services on the project. "Services" include, without limitation, providing, hauling, or
delivering equipment or materials, or providing labor, transportation, or other service related to a
project. "Services" does not include activities unrelated to the project, such as food/beverage
vendors, office supply deliveries, and delivery of portable toilets.
2. The Contractor shall provide coverage, based on proper reporting of classification codes and
payroll amounts and filing of any coverage agreements, which meets the statutory requirements
of Texas Labor Code, Section 401.011(44) for all employees of the contractor providing services
on the project, for the duration of the project.
The Contractor must provide a certificate of coverage to the governmental entity prior to being
awarded the contract.
4. If the coverage period shown on the Contractor's current certificate of coverage ends during the
duration of the project, the Contractor must, prior to the end of the coverage period, file a new
certificate of coverage with the governmental entity showing that coverage has been extended.
The Contractor shall obtain from each person providing services on the project, and provide to
the governmental entity:
(a) a certificate of coverage, prior to that person beginning work on the project, so the
governmental entity shall have on file certificates of coverage showing coverage for all
persons providing services on the project; and
(b) no later than seven days after receipt by the Contractor, a new certificate of coverage
showing extension of coverage, if the coverage period shown on the current certificate of
coverage ends during the duration of the project.
The Contractor shall retain all required certificates of coverage for the duration of the project and
for one year thereafter.
The Contractor shall notify the governmental entity in writing by certified mail or personal
delivery, within 10 days after the Contractor knew or should have known, of any change that
materially affects the provision of coverage of any person providing services on the project.
The Contractor shall post on each project site a notice, in the text, form and manner prescribed by
the Texas Workers' Compensation Commission, informing all persons providing services on the
project that they are required to be covered, and stating how a person may verify coverage and
report lack of coverage.
The Contractor shall contractually require each person with whom it contracts to provide services
on the project, to:
(a) provide coverage, based on proper reporting of classification codes and payroll amounts
and filing of any coverage agreements, which meets the statutory requirements of Texas
Labor Code, Section 401.011(44) for all of its employees providing services on the
project, for the duration of the project;
(b) provide to the Contractor, prior to that person beginning work on the project, a certificate
of coverage showing that coverage is being provided for all employees of the person
providing services on the project, for the duration of the project;
(c) provide the Contractor, prior to the end of the coverage period, a new certificate of
coverage showing extension of coverage, if the coverage period shown on the current
certificate of coverage ends during the duration of the project;
I
G
(d) obtain from each other person with whom it contracts, and provide to the Contractor:
(1) a certificate of coverage, prior to the other person beginning work on the project;
and
(2) a new certificate of coverage showing extension of coverage, prior to the end of
the coverage period, if the coverage period shown on the current certificate of
coverage ends during the duration of the project;
(e) retain all required certificates of coverage on file for the duration of the project and for
one year thereafter;
(f) notify the governmental entity in writing by certified mail or personal delivery, within 10
days after the person knew or should have known, of any change that materially affects
the provision of coverage of any person providing services on the project; and
(g) contractually require each person with whom it contracts to perform as required by
paragraphs (a) - (g), with the certificates of coverage to be provided to the person for
whom they are providing services.
10. By signing this contract or providing or causing to be provided a certificate of coverage, the
Contractor is representing to the governmental entity that all employees of the Contractor who
shall provide services on the project shall be covered by worker's compensation coverage for the
duration of the project, that the coverage will be based on proper reporting of classification codes
and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance
carrier or, in the case of a self -insured, with the commission's Division of Self -Insurance
Regulation. Providing false or misleading information may subject the Contractor to
administrative penalties, criminal penalties, civil penalties, or other civil actions.
11. The Contractor's failure to comply with any of these provisions is a breach of contract by the
Contractor which entitles the governmental entity to declare the contract void if the Contractor
does not remedy the breach within ten days after receipt of notice of breach from the
governmental entity.
Proof of Coverage
Before work on this contract is commenced, each Contractor and subcontractor shall submit to the Owner
for approval five Certificates of Insurance covering each insurance policy carried and offered as evidence
of compliance with the above insurance requirements, signed by an authorized representative of the
insurance company setting forth:
(1) The name and address of the insured.
(2) The location of the operations to which the insurance applies.
(3) The name of the policy and type or types of insurance in force thereunder on the date borne by
such certificate.
(4) The expiration date of the policy and the limit or limits of liability thereunder on the date borne
by such certificate.
(5) A provision that the policy may be canceled only by mailing written notice to the named insured
at the address shown in the bid specifications.
(6) A provision that written notice shall be given to the City ten days prior to any change in or
cancellation of the policies shown on the certificate.
10
(7) The certificate or certificates shall be on the form (or identical copies thereof) contained in the job
specifications. No substitute of nor amendment thereto will be acceptable.
(8) If policy limits are paid, new policy must be secured for new coverage to complete project.
(9) A Contractor shall:
(a) provide coverage for its employees providing services on a project, for the duration of the
project based on proper reporting of classification codes and payroll amounts and filling
of any coverage agreements;
(b) provide a certificate of coverage showing workers' compensation coverage to the
governmental entity prior to beginning work on the project;
(c) provide the governmental entity, prior to the end of the coverage period, a new certificate
of coverage showing extension of coverage, if the coverage period shown on the
Contractor's current certificate of coverage ends during the duration of the project;
(d) obtain from each person providing services on a project, and provide to the governmental
entity:
(1) a certificate of coverage, prior to that person beginning work on the project, so
the governmental entity will have on file certificates of coverage showing
coverage for all persons providing services on the project; and
(ii) no later than seven days after receipt by the Contractor, a new certificate of
coverage showing extension of coverage, if the coverage period shown on the
current certificate of coverage ends during the duration of the project;
(e) retain all required certificates of coverage on file for the duration of the project and for
one year thereafter;
(f) notify the governmental entity in writing by certified mail or personal delivery, within 10
days after the Contractor knew or should have known, of any change that materially
affects the provision of coverage of any person providing services on the project;
(g) post a notice on each project site informing all persons providing services on the project
that they are required to be covered, and stating how a person may verify current
coverage and report failure to provide coverage. This notice does not satisfy other
posting requirements imposed by the Texas Worker's Compensation Act or other
commission rules. This notice must be printed with a title in at least 30 point bold type
and text in at least 19 point normal type, and shall be in both English and Spanish and
any other language common to the worker population. The text for the notices shall be
the following text provided by the commission on the sample notice, without any
additional words or changes:
REQUIRED WORKERS' COMPENSATION COVERAGE
"The law requires that each person working on this site or providing services related to
this construction project must be covered by workers' compensation insurance. This
includes persons providing, hauling, or delivering equipment or materials, or providing
labor or transportation or other service related to the project, regardless of the identity
of their employer or status as an employee. "
"Call the Texas Workers' Compensation Commission at 800-372-7713 or 512-804-
4000 (www.tdi.state.tx.us) to receive information of the legal requirements for
coverage, to verify whether your employer has provided the required coverage, or to
report an employer's failure to provide coverage; " and
11
(h) contractually require each person with whom it contracts to provide services on a project,
to:
(1) provide coverage based on proper reporting of classification codes and payroll
amounts and filing of any coverage agreements for all of its employees providing
services on the project, for the duration of the project;
(ii) provide a certificate of coverage to the Contractor prior to that person beginning
work on the project;
(iii) include in all contracts to provide services on the project the following
language:
`By signing this contract or providing or causing to be
provided a certificate of coverage, the person signing this
contract is representing to the governmental entity that all
employees of the person signing this contract who will
provide services on the project will be covered by workers'
compensation coverage for the duration of the project, that
the coverage will be based on proper reprinting of
classification codes and payroll amounts, and that all
coverage agreements will be filed with the appropriate
insurance carrier or, in the case of a self -insured, with the
commission's Division of Self -Insurance Regulation.
Providing false or misleading information may subject the
Contractor to administrative penalties, criminal penalties,
civil penalties, or other civil actions.", -
(iv) provide the Contractor, prior to the end of the coverage period, a new certificate
of coverage showing extension of coverage, if the coverage period shown on the
current certificate of coverage ends during the duration of the project;
(v) obtain from each other person with whom it contracts, and provide to the
Contractor:
(1) a certificate of coverage, prior to the other person beginning work on the
project; and
(2) prior to the end of the coverage period, a new certificate of coverage
showing extension of the coverage period, if the coverage period shown
on the current certificate of coverage ends during the duration of the
project;
(vi) retain all required certificates of coverage on file for the duration of the project
and for one year thereafter;
(vii) notify the governmental entity in writing by certified mail or personal delivery,
within 10 days after the person knew or should have known, of any change that
materially affects the provision of coverage of any person providing services on
the project; and
(viii) contractually require each other person with whom it contracts, to perform as
required by paragraphs (i)-(viii), with the certificate of coverage to be provided
to the person for whom they are providing services.
29. DISABLED EMPLOYEES
Contractors having more than fifteen (15) employees agree to comply with the Americans with Disabilities Act of
1990, and agree not to discriminate against a qualified individual with a disability because of the disability of
12
such individual in regard to job application procedures, the hiring, advancement, or discharge of employees,
employee compensation, job training, and other terms, conditions, and privileges of employment.
30. PROTECTION AGAINST CLAIMS OF SUBCONTRACTORS, LABORERS, MATERIALMEN, AND
FURNISHERS OF MACHINERY, EQUIPMENT AND SUPPLIES
Without limiting, in any way, manner or form, the indemnity provided by Contractor in paragraph 27 hereof, the
Contractor agrees that it will indemnify and save the Owner and all of its Offices, agents and employees, harmless
against any and all claims, liabilities, losses, damages, expenses and causes of action arising out of, in any way,
manner or form, the demands of subcontractors, laborers, workmen, mechanics, material men and furnishers of
machinery and parts thereof, equipment, power tools, and supplies, incurred in the performance of this contract
and the project which is the subject matter of this contract. When Owner so desires, the Contractor shall furnish
satisfactory evidence that all obligations of the nature hereinabove designated have been paid, discharged or
waived.
31. PROTECTION AGAINST ROYALTIES OR PATENT INVENTION
The Contractor shall pay all royalties and license fees, and shall provide for the use of any design, device,
material or process covered by letters patent or copyright by suitable legal agreement with the Patentee or owner
thereof. Without limiting, in any way, manner or form, the indemnity provided by Contractor in paragraph 27
hereof, the Contractor shall defend all suits or claims for infringement of any patent or copyrights and shall
indemnify and save the Owner, and all of its Offices, agents and employees harmless from any loss on account
thereof, except that Owner shall defend all such suits and claims and shall be responsible for all such loss when a
particular design, device, material or process or the product of a particular manufacturer or manufacturers is
specified or required in these contract documents by Owner; provided, however, if choice of alternate design,
device, material or process is allowed to the Contractor, then Contractor shall indemnify and save Owner, and all
of its Offices, agents and employees harmless from any loss on account thereof. Notwithstanding anything herein
to the contrary, if the material or process specified or required by Owner and/or this contract is an infringement,
the Contractor shall be responsible for such loss unless it gives written notice of such infringement to the Owner's
Representative prior to bidding.
32. LAWS AND ORDINANCES
The Contractor shall at all times observe and comply with all federal, state and local laws, ordinances and
regulations, which in any manner affect the contract or the work, and without limiting, in any way, manner or
form, the indemnity provided by Contractor in paragraph 27 hereof, Contractor shall indemnify and save harmless
the Owner, and all of its Offices, agents, and employees against any claims arising from the violation of any such
laws, ordinances, and regulations, whether by the Contractor, its employees, or subcontractors. If the Contractor
observes that the plans and specifications are at variance therewith, he shall notify the Owner's Representative in
writing prior to bidding and any necessary changes shall be adjusted as provided in the contract for changes in the
work. In the absence of timely written notification to Owner's Representative of such variance or variances
within said time, any objection and/or assertion that the plans and specifications are at variance with any federal,
state or local laws, ordinances or regulations shall be deemed waived. If the Contractor, its employees or
subcontractors perform any work contrary to such laws, ordinances, rules and regulations, and without such notice
to the Owner's Representative, Contractor shall bear all costs arising therefrom.
The Owner is a municipal corporation of the State of Texas and the law from which it derives its powers, insofar
as the same regulates the objects for which, or the manner in which, or the conditions under which the Owner may
enter into contracts, shall be controlling, and shall be considered as part of this contract to the same effect as
though embodied herein.
33. SUBCONTRACTING
The Contractor agrees that it will retain personal control and will give its personal attention to the fulfillment of
this contract. The Contractor further agrees that subletting of any portion or feature of the work, or materials
13
required in the performance of this contract, shall not relieve the Contractor from its full obligations to the Owner,
as provided by the contract documents.
34. TIME FOR SUBSTANTIAL COMPLETION AND LIQUIDATED DAMAGES
It is hereby understood and mutually agreed by and between the Contractor and the Owner, that the date of
beginning and time for completion as specified in the contract documents, of work to be done hereunder are
essential conditions of this contract; and it is further mutually understood and agreed that the work embraced in
this contract shall be commenced as provided in the contract documents.
If the Contractor should neglect, fail, or refuse to substantially complete the work within the time herein specified,
then the Contractor does hereby agree as part of the consideration for the awarding of this contract, the Owner
may withhold permanently from Contractor's total compensation, the sum of $ 25.00 PER DAY, not as a penalty,
but as liquidated damages for the breach of the contract as herein set forth for each and every working day that the
Contractor shall be in default after the time stipulated for substantially completing the work.
It is expressly understood and agreed, by and between Contractor and the Owner, that the time for the substantial
completion of the work described herein is reasonable time for the completion of the same, taking into
consideration the average climatic range and conditions and usual industrial conditions prevailing in this locality.
The amount is fixed and agreed upon by and between the Contractor and the Owner because the actual damages
the Owner would sustain in such event would be difficult and/or impossible to estimate, however, the amount
agreed upon herein is a reasonable forecast of the amount necessary to render just compensation to Owner, and is
expressly agreed to be not disproportionate to actual damages as measured at time of breach.
IT IS FURTHER AGREED AND UNDERSTOOD BETWEEN THE CONTRACTOR AND OWNER THAT
TIME IS OF THE ESSENCE OF THIS CONTRACT.
35. TIME AND ORDER OF COMPLETION
It is the meaning and intent of this contract, unless otherwise herein specifically provided, that the Contractor
shall be allowed to prosecute its work at such time and sessions, in such order of precedence, and in such manner
as shall be most conductive to economy of construction; provided, however, that the order and time of prosecution
shall be such that the work shall be substantially completed as a whole and in part, in accordance with this
contract, the plans and specifications, and within the time of completion designated in the bid; provided, also, that
when the Owner is having other work done, either by contract or by its own force, the Owner's Representative
may direct the time and manner of constructing work done under this contract so that conflicts will be avoided
and the construction of the various works being done for the Owner shall be harmonized.
The Contractor shall submit, at such times as may reasonably be requested by the Owner's Representative,
schedules which shall show the order in which the Contractor intends to carry on the work, with dates at which
the Contractor will start the several parts of the work and estimated dates of completion of the several parts.
36. TIME OF PERFORMANCE
The Contractor agrees that it has submitted its bid in full recognition of the time required for the completion of
this project, taking into consideration the average climatic range and industrial conditions prevailing in this
locality, and has considered the liquidated damage provisions of paragraph 34 hereinabove set forth and expressly
agrees that it shall not be entitled to, nor will it request, an extension of time on this contract, except when its
work has been delayed by an act or neglect of the Owner, Owner's Representative, employees of the Owner or
other contractors employed by the Owner, or by changes ordered in the work, or by strike, walkouts, acts of God
or the public enemy, fire or flood. Any request for extension shall be in writing with the written request for same
setting forth all justifications, in detail, for the request, and submitted to Owner's Representative within twenty
(20) calendar days of the occurrence of the event causing said delay. A failure by Owner's Representative to
affirmatively grant the extension no later than twenty (20) calendar days of written submission by Contractor shall
14
be deemed a denial, and final. Further, in the absence of timely written notification of such delay and request for
extension, as provided herein, any request for extension by Contractor shall be deemed waived.
37. HINDRANCE AND DELAYS
In executing the contract, the Contractor agrees that in undertaking to complete the work within the time herein
fixed, Contractor has taken into consideration and made allowances for all hindrances and delays incident to such
work, whether growing out of delays due to unusual and unanticipated circumstances, difficulties or delays in
securing material or workmen, or any other cause or occurrence. No charge shall be made by the Contractor for
hindrance or delays from any cause during the progress of any part of the work embraced in this contract except
where the work is stopped by order of the Owner or Owner's Representative for the Owner's convenience, in
which event, such expense as in the sole judgment of the Owner's Representative that is caused by such stoppage
shall be paid by Owner to Contractor.
38. QUANTITIES AND MEASUREMENTS
No extra or customary measurements of any kind will be allowed, but the actual measured or computed length,
area, solid contents, number and weight only shall be considered, unless otherwise specifically provided. In the
event this contract is let on a unit price basis, then Owner and Contractor agree that this contract, including the
specifications, plans and other contract documents are intended to show clearly all work to be done and material
to be furnished hereunder. Where the estimated quantities are shown, and only when same are expressly stated to
be estimates, for the various classes of work to be done and material to be furnished under this contract, they are
approximate and are to be used only as a basis for estimating the probable cost of the work and for comparing
their bids offered for the work. In the event the amount of work to be done and materials to be furnished are
expressly stated to be estimated, and only when same are expressly stated to be estimated, it is understood and
agreed that the actual amount of work to be done and the materials to be furnished under this contract may differ
somewhat from these estimates, and that where the basis for payment under this contract is the unit price method,
payment shall be for the actual amount of work done and materials furnished on the project.
39. PROTECTION OF ADJOINING PROPERTY
The Contractor shall take proper means to protect the adjacent or adjoining property or properties in any way
encountered, which may be injured or seriously affected by any process of construction to be undertaken under
this agreement, from any damage or injury by reason of said process of construction; and Contractor shall be
liable for any and all claims for such damage on account of his failure to fully protect all adjacent property.
Without limiting, in any way, manner and form, the indemnity provided by Contractor in paragraph 27 hereof, the
Contractor agrees to indemnify, save and hold harmless the Owner, and any of its Offices, agents and employees,
against any and all claims or damages due to any injury to any adjacent or adjoining property, related to, arising
from or growing out of the performance of this contract.
40. PRICE FOR WORK
In consideration of the furnishing of all necessary labor, equipment and material and the completion of all work
by the Contractor, and on the delivery of all materials embraced in this contract in full conformity with the
specifications and stipulations herein contained, the Owner agrees to pay the Contractor the price set forth in the
bid proposal attached hereto, which has been made a part of this contract, and the Contractor hereby agrees to
receive such price in full for furnishing all materials and all labor required for the aforesaid work, also, for all
expenses incurred by Contractor and for well and truly performing the same and the whole thereof in the manner
and according to this agreement, the attached specifications, plans, contract documents and requirements of
Owner's Representative.
41. PAYMENTS
No payments made or certificates given shall be considered as conclusive evidence of the performance of the
contract, either wholly or in part, nor shall any certificate or payment be considered as acceptance of defective
15
work. Contractor shall at any time requested during the progress of the work furnish the Owner or Owner's
Representative with a verifying certificate showing the Contractor's total outstanding indebtedness in connection
with the work. Before final payment is made, Contractor shall satisfy Owner, by affidavit or otherwise, that there
are no outstanding liens against Owner's premises by reason of any work under the contract. Acceptance by
Contractor of final payment of the contract price shall constitute a waiver of all claims against Owner, Owner's
agents and employees, which have not theretofore been timely filed as provided in this contract.
42. PARTIAL PAYMENTS
On or before the tenth day of each month, the Contractor shall submit to Owner's Representative an application
for partial payment or, if the Contractor does not submit such application, the Owner's Representative shall
determine the amount to be partially paid. Owner's Representative shall review said application for partial
payment if submitted, and the progress of the work made by the Contractor and if found to be in order, shall
prepare a certificate for partial payment showing as completely as practical the total value of the work done by the
Contractor up to and including the last day of the preceding month. The determination of the partial payment by
the Owner's Representative shall be in accordance with Paragraph 14 hereof.
The Owner shall then pay the Contractor on or before the fifteenth day of the current month the total amount of
the Owner's Representative's Certificate of Partial Payment, less 5% of the amount thereof, which 5% shall be
retained until final payment, and further, less all previous payments and all further sums that may be retained by
Owner under the terms of the contract documents.
Any partial payment made hereunder shall not constitute a waiver by the Owner of any and all other rights to
enforce the express terms of the contract documents, and all remedies provided therein, as to any and all work
performed, to be performed and/or materials delivered hereunder, including, but limited to, work to which said
partial payment is attributable.
43. SUBSTANTIAL COMPLETION
Contractor shall give Owner's Representative written notice of substantial completion. Within thirty-one (31)
working days after the Contractor has given the Owner's Representative written notice that the work has been
substantially completed, the Owner's Representative and/or the Owner shall inspect the work and within said time,
if the work be found to be substantially completed in accordance with the contract documents, the Owner's
Representative shall issue to the Owner and Contractor a certificate of substantial completion. Notwithstanding
the issuance of a certificate of substantial completion, Contractor shall proceed with diligence to finally complete
the work within the time provided in this contract.
44. FINAL COMPLETION AND PAYMENT
The Contractor shall give written notice to Owner's Representative of final completion. Upon written notice of
final completion, the Owner's Representative shall proceed to make final measurement to determine whether final
completion has occurred. If the Owner's Representative determines final completion has occurred, Owner's
Representative shall so certify to the Owner. Upon certification by Owner's Representative of final completion,
Owner shall pay to the Contractor on or before the 31st working day after the date of certification of final
completion, the balance due Contractor under the terms of this agreement. Neither the certification of final
completion nor the final payment, nor any provisions in the contract documents shall relieve the Contractor of the
obligation for fulfillment of any warranty which may be required in the contract documents and/or any warranty
or warranties implied by law or otherwise.
45. CORRECTION OF WORK
Contractor shall promptly remove from Owner's premises all materials condemned by the Owner's Representative
on account of failure to conform to the contract documents, whether actually incorporated in the work or not, and
Contractor shall at its own expense promptly replace such condemned materials with other materials conforming
to the requirements of the contract documents. Contractor shall also bear the expense of restoring all work of
16
other contractors damaged by any such removal or replacement. If Contractor does not remove and replace any
such condemned work within a reasonable time after a written notice by the Owner or the Owner's Representative,
Owner may remove and replace it at Contractor's expense.
Neither the final payment, nor certification of final completion or substantial completion, nor any provision in the
contract documents shall relieve the Contractor of responsibility for faulty materials or workmanship, and
Contractor shall remedy any defects due thereto and pay for any damage to other work resulting therefrom, which
shall appear within a period of one (1) year from the date of certification of final completion by Owner's
Representative.
46. PAYMENT WITHHELD
The Owner or Owner's Representative may, on account of subsequently discovered evidence, withhold or nullify
the whole or part of any certification to such extent as may be necessary to protect itself from loss on account of:
(a) Defective work not remedied and/or work not performed.
(b) Claims filed or reasonable evidence indicating possible filing of claims.
(c) Damage to another contractor.
When the above grounds are removed, or the Contractor provides a surety bond satisfactory to the Owner, in the
amount withheld, payment shall be made for amounts withheld because of them.
47. CLAIM OR DISPUTE
It is further agreed by both parties hereto that all questions of dispute or adjustment presented by the Contractor
shall be in writing and filed with the Owner's Representative within fifteen (15) calendar days after the Owner's
Representative has given any direction, order or instruction to which the Contractor desires to take exception.
Timely written notice of dispute as provided in this contract of any decision by Owner's Representative or Owner
shall be a condition precedent to the bringing and/or assertion of any action or claim by Contractor of any right
under this Contract. If the matters set forth in the notice of dispute are not granted or otherwise responded to by
Owner's Representative within fifteen (15) calendar days of receipt of notice of dispute by Owner's
Representative, said objections shall be deemed denied. Any decision by the Owner's Representative, or deemed
denial by the Owner's Representative, shall be final and conclusive in the absence of fraud. It is further agreed
that the acceptance by the Contractor of the final payment shall be a bar to any and all claims of the Contractor,
and constitute a waiver of the right to assert any claim against Owner, Owner's agents and employees and
Owner's Representative, by Contractor.
48. NON-COMPLIANCE AND/OR ABANDONMENT BY CONTRACTOR
In case the Contractor should (1) abandon and fail or refuse to resume work within fifteen (15) calendar days after
written notification from the Owner or the Owner's Representative, or (2) if the Contractor fails to comply with
the written orders of the Owner's Representative, when such orders are consistent with this contract, then the
Surety on the bond shall be notified in writing and directed to complete the work and a copy of said notice shall
be delivered to the Contractor. In the event a bond is not required by law, or otherwise obtained by the
Contractor, no further notice of such non-compliance to Contractor shall be required.
After receiving said notice of abandonment or non-compliance , the Contractor shall not remove from the work
any machinery, equipment, tools, materials or supplies then on the job, but the same, together with any materials
and equipment under the contract for work, may be held for use on the work by the Owner or the Surety of the
Contractor, or another contractor, in completion of the work; and the Contractor shall not receive any rental or
credit therefore (except when used in connection with Extra Work, where credit shall be allowed as provided for
under paragraph 24 of this contract); it being understood that the use of such equipment and materials will
ultimately reduce the cost to complete the work and be reflected in the final settlement.
17
In the event the Contractor, or Surety, whichever is applicable, should fail to commence compliance with the
notice hereinbefore provided within ten (10) calendar days after service of such notice, and/or shall fail to proceed
with diligence to complete the project as contemplated and in compliance with all terms and provisions of the
contract documents, then the Owner may exercise any and all remedies available to it pursuant to law, contract,
equity or otherwise, including, but not limited to, providing for completion of the work in either of the following
elective manners:
(a) The Owner may employ such force of men and use of machinery, equipment, tools, materials and
supplies as said Owner may deem necessary to complete the work and charge the expense of such labor,
machinery, equipment, tools, materials and supplies to said Contractor, and the expense so charged shall
be deducted and paid by the Owner out of such moneys as may be due, or that may thereafter at any time
become due to the Contractor under and by virtue of this Agreement. In case such expense is less than
the sum which would have been payable under this contract, if the same had been completed by the
Contractor, then said Contractor shall receive the difference. In case such expense is greater than the sum
which would have been payable under this contract, if the same had been completed by said Contractor,
then the Contractor and/or its Surety shall pay the amount of such excess to the Owner; or
(b) The Owner, under sealed bids, after notice published as required by law, at least twice in a newspaper
having a general circulation in the County of location of the work, may let the contract for the completion
of the work under substantially the same terms and conditions which are provided in this contract. In case
of any increase in cost to the Owner under the new contract as compared to what would have been the
cost under this contract, such increase shall be charged to the Contractor and the Surety shall be and
remain bound therefore. Should the cost to complete any such new contract prove to be less than that
which would have been the cost to complete the work under this contract, the Contractor or his Surety
shall be credited therewith.
In the event the Owner's Representative elects to complete the work, as described above, when the work shall
have been finally completed, the Contractor and his Surety shall be so notified and certification of completion as
provided in paragraph 44 hereinabove set forth, shall be issued. A complete itemized statement of the contract
accounts, certified to by Owner's Representative as being correct shall then be prepared and delivered to
Contractor and his Surety, if applicable, whereon the Contractor or his Surety, or the Owner as the case may be,
shall pay the balance due as reflected by said statement within 30 days after the date of certification of
completion.
In the event the statement of accounts shows that the cost to complete the work is less than that which would have
been the cost to the Owner had the work been completed by the Contractor under the terms of this contract, or
when the Contractor and/or his Surety, if applicable, shall pay the balance shown to be due by them to the Owner,
then all machinery, equipment, tools, materials or supplies left on the site of the work shall be turned over to the
Contractor and/or his Surety, if applicable. Should the cost to complete the work exceed the contract price, and
the Contractor and/or his Surety, if applicable, fail to pay the amount due the Owner within the time designated
hereinabove, and there remains any machinery, equipment, tools, materials or supplies on the site of the work,
notice thereof, together with an itemized list of such equipment and materials shall be mailed to the Contractor
and his Surety, if applicable, at the respective addresses designated in this contract; provided, however, that actual
written notice given in any manner will satisfy this condition. After mailing, or other giving of such notice, such
property shall be held at the risk of the Contractor and his Surety, if applicable, subject only to the duty of the
Owner to exercise ordinary care to protect such property. After fifteen (15) calendar days from the date of said
notice the Owner may sell such machinery, equipment, tools, materials or supplies and apply the net sum derived
from such sale to the credit of the Contractor and his Surety, if applicable. Such sale may be made at either public
or private sale, with or without notice, as the Owner may elect. The Owner shall release any machinery,
equipment, tools, materials, or supplies that remain on the jobsite and belong to persons other than the Contractor
or his Surety, if applicable, to their proper owners.
The remedies provided to Owner by law, equity, contract, or otherwise, shall be cumulative, to the extent
permitted by law. It is expressly agreed and understood that the exercise by Owner of the remedies provided in
W.
this paragraph shall not constitute an election of remedies on the part of Owner, and Owner, irrespective of its
exercise of remedies hereunder, shall be entitled to exercise concurrently or otherwise, any and all other remedies
available to it, by law, equity, contract or otherwise, including but not limited to, liquidated damages, as provided
in paragraph 34, hereinabove set forth.
49. LIMITATION ON CONTRACTOR'S REMEDY
The remedies of Contractor hereunder shall be limited to, and Owner shall be liable only for, work actually
performed by Contractor and/or its subcontractors as set forth in the contract documents, and Owner shall not be
liable for any consequential, punitive or indirect loss or damage that Contractor may suffer in connection with the
project which is the subject matter of this contract.
50. BONDS
The Contractor is required to furnish a performance bond in accordance with Chapter 2253, Government Code, in
the amount of 100% of the total contract price in the event that said contract price exceeds $100,000 and the
Contractor is required to furnish a payment bond in accordance with Chapter 2253, Government Code, in the
amount of 100% of the total contract price in the event that said contract price exceeds $50,000. All bonds shall
be submitted on forms supplied by the Owner, and executed by an approved Surety Company authorized to do
business in the State of Texas. It is further agreed that this contract shall not be in effect until such bonds are so
furnished.
51. SPECIAL CONDITIONS
In the event special conditions are contained herein as part of the contract documents and said special conditions
conflict with any of the general conditions contained in this contract, then in such event the special conditions
shall control.
52. LOSS OR EXPENSE DUE TO UNUSUAL OR UNANTICIPATED CIRCUMSTANCES
Unless otherwise specified herein, all loss, expense or damage to the Contractor arising out of the nature of the
work to be done, or from the action of the elements, or from any unforeseen circumstance or from unusual
obstructions or difficulties, naturally occurring, man made or otherwise, which may be encountered in the
prosecution of the work, shall be sustained and borne by the Contractor at his own cost and expense.
53. INDEPENDENT CONTRACTOR
Contractor is, and shall remain, an independent contractor with full, complete and exclusive power and authority
to direct, supervise, and control its own employees and to determine the method of the performance of the work
covered hereby. The fact that the Owner or Owner's Representative shall have the right to observe Contractor's
work during Contractor's performance and to carry out the other prerogatives which are expressly reserved to and
vested in the Owner or Owner's Representative hereunder, is not intended to and shall not at any time change or
effect the status of the Contractor as an independent contractor with respect to either the Owner or Owner's
Representative or to the Contractor's own employees or to any other person, firm, or corporation.
54. CLEANING UP
The Contractor shall at all times keep the premises free from accumulation of debris caused by the work, and at
the completion of the work Contractor shall remove all such debris and also its tools, scaffolding, and surplus
materials and shall leave the work room clean or its equivalent. The work shall be left in good order and
condition. In case of dispute Owner may remove the debris and charge the cost to the Contractor.
55. HAZARDOUS SUBSTANCES AND ASBESTOS
19
Hazardous Substances (herein so called), as defined in the Comprehensive Environmental Response,
Compensation, and Liability Act (42 U.S.C.S. §9601(14)) and the regulations promulgated thereunder, as same
may be amended from time to time, hydrocarbons or other petroleum products or byproducts and/or asbestos, in
any form, shall not (1) be utilized, in any way, manner or form, in the construction of, or incorporation into, the
Project; or (ii) be brought upon, placed, or located, by any party, on the Project site, or any other property of the
City, without the written consent of the Owner's Representative. If Contractor believes that the utilization of a
Hazardous Substance, hydrocarbons or other petroleum products or byproducts and/or asbestos is necessary in the
construction of the Project, or that it is necessary to place and/or otherwise locate upon the site of the Project or
other property of the City, a Hazardous Substance, hydrocarbons or other petroleum products or byproducts
and/or asbestos, Contractor shall notify the Owner's Representative, and request consent therefrom, at least
twenty (20) days prior to such action. Owner's Representative may grant or deny the request of Contractor and
provide whatever requirements such consent, if granted, is conditioned upon, in its sole and absolute discretion. If
the request of Contractor is not granted, or otherwise not responded to, by Owner's Representative within five (5)
days of the receipt of said request, said request shall be deemed to be denied.
In the event Owner's Representative shall consent to the request of Contractor, Contractor shall be responsible for
ensuring that all personnel involved in the Project are (1) trained for the level of expertise required for proper
performance of the actions contemplated by this Contract and, in particular, in all aspects of handling, storage,
disposal and exposure of Hazardous Substances, hydrocarbons or other petroleum products or byproducts and/or
asbestos; and (ii) are provided and utilize all protective equipment, including without limitation, personal
protective gear, necessary to provide protection from exposure to Hazardous Substances, hydrocarbons or other
petroleum products or byproducts and/or asbestos.
56. NONAPPROPRIATION
All funds for payment by the City under this contract are subject to the availability of an annual appropriation for
this purpose by the City. In the event of non -appropriation of funds by the City Council of the City of Lubbock
for the goods or services provided under the contract, the City will terminate the contract, without termination
charge or other liability, on the last day of the then -current fiscal year or when the appropriation made for the
then -current year for the goods or services covered by this contract is spent, whichever event occurs first. If at
any time funds are not appropriated for the continuance of this contract, cancellation shall be accepted by the
Seller on thirty (30) days prior written notice, but failure to give such notice shall be of no effect and the City
shall not be obligated under this contract beyond the date of termination.
57. THE CITY RIGHT TO AUDIT
At any time during the term of this Contract and for a period of four (4) years thereafter the City or a duly
authorized audit representative of the City, or the State of Texas, at its expense and at reasonable times, reserves
the right to audit Contractor's records and books relevant to all services provided under this Contract. In the event
such an audit by the City reveals any errors/overpayments by the City, Contractor shall refund the City the full
amount of such overpayments within thirty (30) days of such audit findings, or the City, at its option, reserves the
right to deduct such amounts owing the City from any payments due Contractor.
20
58. NON -ARBITRATION
The City reserves the right to exercise any right or remedy available to it by law, contract, equity, or
otherwise, including without limitation, the right to seek any and all forms of relief in a court of
competent jurisdiction. Further, the City shall not be subject to any arbitration process prior to
exercising its unrestricted right to seek judicial remedy. The remedies set forth herein are cumulative
and not exclusive, and may be exercised concurrently. To the extent of any conflict between this
provision and another provision in, or related to, this document, this provision shall control.
Page Intentionally Left Blank
DAVIS BACON WAGE DETERMINATIONS
Page Intentionally Left Blank
EXHIBIT A
"General Decision Number: TX20230002 01/06/2023
Superseded General Decision Number: TX20220002
State: Texas
Construction Types: Heavy and Highway
Counties: Armstrong, Carson, Crosby, Ector, Irion, Lubbock,
Midland, Potter, Randall, Taylor and Tom Green Counties in Texas.
HEAVY & HIGHWAY CONSTRUCTION PROJECTS
Note: Contracts subject to the Davis -Bacon Act are generally
required to pay at least the applicable minimum wage rate
required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered
contracts entered into by the federal government that are
subject to the Davis -Bacon Act itself, but do not apply to
contracts subject only to the Davis -Bacon Related Acts,
including those set forth at 29 CFR 5.1 (a) (2) - (60) .
JIf the contract is entered �.
linto on or after January 30,
12022, or the contract is
lrenewed or extended (e.g., an �.
loption is exercised) on or 1
lafter January 30, 2022: 1
If the contract was awarded onl.
or between January 1, 2015 andl
January 29, 2022, and the
contract is not renewed or �.
extended on or after January
30, 2022:
Executive Order 14026 1
generally applies to the 1
contract. 1
The contractor must pay 1
all covered workers at 1
least $16.20 per hour (or 1
the applicable wage rate 1
listed on this wage 1
determination, if it is 1
higher) for all hours 1
spent performing on the 1
contract in 2023. 1
I
Executive Order 13658 1
generally applies to the 1
contract. 1
The contractor must pay alil
covered workers at least 1
$12.15 per hour (or the 1
applicable wage rate listed)
on this wage determination,)
if it is higher) for all
hours spent performing on
that contract in 2023.
I I
The applicable Executive Order minimum wage rate will be
adjusted annually. If this contract is covered by one of the
Executive Orders and a classification considered necessary for
performance of work on the contract does not appear on this
wage determination, the contractor must still submit a
conformance request.
Additional information on contractor requirements and worker
protections under the Executive Orders is available at
http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/06/2023
SUTX2011-002 08/02/2011
Rates
CEMENT MASON/CONCRETE
FINISHER (Paving & Structures) ... $ 13.55 **
ELECTRICIAN ......................$ 20.96
FORM BUILDER/FORM SETTER
Paving & Curb ...............$ 12.36 **
Structures ..................$ 13.52 **
I A i0' 0'7
Asphalt Raker ...............$ 12.28 **
Flagger.....................$ 9.30 **
Laborer, Common .............$ 10.30 **
Laborer, Utility ............ $ 11.80 **
Work Zone Barricade
Servicer....................$ 10.30 **
POWER EQUIPMENT OPERATOR:
Asphalt Distributer ......... $ 14.87 **
Asphalt Paving Machine ...... $ 13.40 **
Fringes
Broom and Sweeper ...........
$ 11.21
**
Crane, Lattice Boom 80
Tons or Less ................$
16.82
Crawler Tractor Operator ....
$ 13.96
**
Excavator, 50,000 lbs or
less ........................$
13.46
**
Front End Loader Operator,
Over 3 CY...................$
12.77
**
Front End Loader, 3CY or
less ........................$
12.28
**
Loader/Backhoe..............$
14.18
**
Mechanic ....................$
20.14
Milling Machine .............$
15.54
**
Motor Grader, Rough ........
$ 16.15
**
Motor Grader, Fine ..........
$ 17.49
Pavement Marking Machine ....
$ 16.42
Reclaimer/Pulverizer........$
12.85
**
Roller, Asphalt .............$
10.95
**
Roller, Other ...............$
10.36
**
Scraper .....................$
10.61
**
Spreader Box ................$
12.60
**
Servicer .........................$ 13.98 **
Steel Worker (Reinforcing) ....... $ 13.50 **
TRUCK DRIVER
Lowboy -Float ................$ 14.46 **
Single Axle .................$ 12.74 **
Single or Tandem Axle Dump..$ 11.33 **
Tandem Axle Tractor with
Semi ........................$ 12.49 **
----------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
** Workers in this classification may be entitled to a higher
minimum wage under Executive Order 14026 ($16.20) or 13658
($12.15). Please see the Note at the top of the wage
determination for more information.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis -Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017. If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health -related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health -related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking. Additional information
on contractor requirements and worker protections under the EO
is available at
https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii) ) .
The body of each wage determination lists the classification
and wage rates that have been found to be prevailing for the
cited type(s) of construction in the area covered by the wage
determination. The classifications are listed in alphabetical
order of ""identifiers"" that indicate whether the particular
rate is a union rate (current union negotiated rate for local),
a survey rate (weighted average rate) or a union average rate
(weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed
in dotted lines beginning with characters other than ""SU"" or
""UAVG"" denotes that the union classification and rate were
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of
the union which prevailed in the survey for this
classification, which in this example would be Plumbers. 0198
indicates the local union number or district council number
where applicable, i.e., Plumbers Local 0198. The next number,
005 in the example, is an internal number used in processing
the wage determination. 07/01/2014 is the effective date of the
most current negotiated rate, which in this example is July 1,
2014.
Union prevailing wage rates are updated to reflect all rate
changes in the collective bargaining agreement (CBA) governing
this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that
no one rate prevailed for this classification in the survey and
the published rate is derived by computing a weighted average
rate based on all the rates reported in the survey for that
classification. As this weighted average rate includes all
rates reported in the survey, it may include both union and
non -union rates. Example: SULA2012-007 5/13/2014. SU indicates
the rates are survey rates based on a weighted average
calculation of rates and are not majority rates. LA indicates
the State of Louisiana. 2012 is the year of survey on which
these classifications and rates are based. The next number, 007
in the example, is an internal number used in producing the
wage determination. 5/13/2014 indicates the survey completion
date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a
new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate
that no single majority rate prevailed for those
classifications; however, 1000 of the data reported for the
classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union
average rate. OH indicates the state. The next number, 0010 in
the example, is an internal number used in producing the wage
determination. 08/29/2014 indicates the survey completion date
for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of
each year, to reflect a weighted average of the current
negotiated/CBA rate of the union locals from which the rate is
based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can
be.
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on
a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests
for summaries of surveys, should be with the Wage and Hour
National Office because National Office has responsibility for
the Davis -Bacon survey program. If the response from this
initial contact is not satisfactory, then the process described
in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal
process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an
interested party (those affected by the action) can request
review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and by any information (wage
payment data, project description, area practice material,
etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISIO"
EXHIBIT B & C
City of Lubbock
Overtime
Legal Holiday
Prevailing Wage Rates
The rate for overtime (in excess of forty hours per week) shall be as required by the Fair Labor
Standards Act.
The rate for legal holidays shall be as required by the Fair Labor Standard
SPECIFICATIONS
Pate Intentionally Left Blank
Scope of Work
For
1712 48" St
Remove:
DEMOLITION OF SECONDARY STRUCTURES ON LOT. THESE ARE METAL AND WOOD FRAME
MULTI -UNIT APARTMENTS WITH CONFIRMED ASBESTOS PRESENT (APPROX. 5600 SQFT)
ALL RUBBISH AND DEBRIS
PAVING MATERIALS AND FOUNDATIONS ASSOCIATED WITH SECONDARY STRUCTURES
ALL DEAD TREES, AND ANY TREESNEGETATION THAT HINDER DEMOLITION
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CAP AND REMOVE ALL UTILITIES
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CLEAR AND LEVEL GROUNDS TO PROPER
DRAINAGE GRADE
IT IS THE RESPONSIBILTY OF THE CONTRACTOR TO OBTAIN DEMOLITION PERMIT PRIOR TO
DEMOLITION
Leave:
PRIMARY STRUCTURE
ALL VEHICLES
ALL LARGE ILIVEI TREES
REAR AND SIDE FENCING IF POSSIBLE