Loading...
HomeMy WebLinkAboutResolution - 6103 - CO To Contract - Duininck Brothers Inc - 11_12_1998Resolution No. 6103 ItemNo. 44 November 12, 1998 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock a Change Order # Three (3) by and between the City and Duininck Brothers, Inc., and all related documents. Said Agreement is attached hereto and incorporated in this Resolution as if fully set forth herein and shall be included in the minutes of the Council. Passed by the City Council this 12th day of November 1998. AT: q6' &W& , Kaythi arnell, City Secretary f ROVED O CONTENT: 7 Mark le, Aviation Director AP Mark AS TO FORM: A1SAk/Change Order #311A.RES ccdocs/November 2, 1999 Resolution No. 6103 Item No. 44 CHANGE ORDER # THREE (3) November 12, 1998 Date Prepared : September 28, 1998 Lubbock International Airport OWNER'S Route 3 Box 389 OWNER: City of Lubbock ADDRESS: Lubbock, Texas 79401 NAME OF LOCATION OF AIRPORT: Lubbock International Airport AIRPORT: Lubbock, Texas NAME OF Duininck Brothers, Inc. ADDRESS OF 330 W.Northwest Highway CONTRACTOR: CONTRACTOR: Grapevine, Texas 76051 DESCRIPTION OF WORK IN CONTRACT: Delta Project No.: TX 97053 AIP Project No.: 3-48-0138-19-97 Reconstruct Runway 17R-35L Reel Current Contract Amt.: S 5,547,185.41 Est. Cost This Change: S +174,712.00 New Contract Amount: S 5,721,897.41 CHANGES ORDERED: ITEM DESCRIPTION QUANTITY UNIT PRICE AMOUNT See attached sheet for description of increased quantities and increased costs TOTAL: $+174,712.00 REASON(S) FOR CHANGE ORDER: Addition of work to complete displacement of Runway 8 landing threshold. CURRENT CONTRACT TIME (DAYS) 360 NEW CONTRACT TIME (DAYS) 360 Subject to conditions set forth below, an equitable adjustment is established as follows: CONTRACT PRICE CONTRACT TIME Not Changed X Not Changed X Increased by S 174.712.00 Dollars Increased by days Decreased by Dollars Decreased by days The foregoing is in accordance with your contract dated and as listed below: A. The aforementioned change and work affected thereby are subject to all contract stipulations and covenants, B. The rights of the OWNER are not prejudiced; and C. All claims against the OWNER which are incidental to or as a consequence of the aforementioned change are satisfied. ACCEPTED CONTRA TOE TIT7.E r6i�J DATE f /�� DELTA 7053C509.co3 0 CHANGE ORDER NO. THREE (3) Displace Runway 8 Threshold Reconstruct Runway 17R-35L Keel (11,500' x 50') Lubbock International Airport Lubbock, Texas Date: September 26, 1998 AIP Project No. 3-48-0138-19-97 Delta Project No. TX 97053 ITEM SPEC DESCRIPTION UNIT 19 P-619 PAINT REMOVAL SF 21 P-620 PERMANENT AIRFIELD MARKING SF 27 L-108 CABLE TRENCH LF 29 L-108 #8, 5kV, TYPE'C' CABLE LF 30 L-108 #6 BARE COUNTERPOISE LF 31 L-110 2" PVC CONDUIT LF 32 L-110 DIRECTIONAL DRILL 2" RIGID CONDUIT LF 47 co3.1 MOBILIZATION LS 48 co3.2 RELOCATE RW 8 THRESHOLD LIGHTS LS 49 co3.3 RELOCATE VASI LS 50 co3.4 RELOCATE REIL LS 51 co3.5 #8,600V I #8CU, 600V TYPE C CABLE LF 52 co3.6 6PR#19 AWG CABLE LF File: 7053CO03.WK4 CO #3 UNIT CO 93 ,NTITY PRICE COST 80,000 $0.30 $24,000.00 90,000 $0.22 $19,800.00 1,100 $3.20 $3,520.00 250 $0.64 $160.00 1,150 $0.43 $494.50 1,150 $1.10 $1,265.00 600 $23.50 $14,100.00 1 $40,000.00 $40,000.00 1 $23,000.00 $23,000.00 1 $22,500.00 $22,500.00 1 $22,000.00 $22,000.00 5,350 $0.64 $3,424.00 650 $0.69 $448.50 Change Order #3 TOTAL: $174,712.00 J 1' .....i� ATTEST: 77 l - Kayt Darnell, City Secre ary APPROVED ONTENT: Hark e, Director o bock International Airport APPROVED AS TO FORK: William D. de Hass Competition and Contracts Manager