Loading...
HomeMy WebLinkAboutResolution - 2002-R0382 - Change Order - Utility Contractors Of America - 09_26_2002Resolution No. 2002—RO382 September 26, 2002 Item No. 20 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock, by and between the City of Lubbock and Utility Contractor's of America, a Change Order No. Three for ITB 4048- 01/VK, and related documents. Said Change Order is attached hereto and incorporated in this Resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council this 26th day of ATTEST: Re ecca Garza, City Secreta APPROVED AS TO CONTENT: Chester Carthel Chief Engineer -Public Works APPROVED AS TO FORM: William de Haas Contract Manager/Attorney Gs/ccdocs/ChOrder3-Utility Contractor's of America.res Sept. 11, 2002 Resolution No. 2002—RO382 CITY OF LUBBOCK CHANGE ORDER CHANGE ORDER #: 3 CONTRACTOR: Utility Contractor's of America DATE: 9/6/02 CITY OF LUBBOCK BID#: ITB #048-01NK PROJECT NAME: Annexation Sanitary Sewer System Improvements Revision of scope of work due to a change in alignment of 1loth Street because of a revised subdivision plat. ITEM DESCRIPTION AMOUNT A. ORIGINAL CONTRACT VALUE: $4,136,593.35 B. AMOUNT OF THIS CHANGE ORDER: council approval required if over $25,000 C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A): aw M1. D. AMOUNT OF PREVIOUS CHANGE ORDERS: $ 5,863.00 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): $ 86,668.44 F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/425%Max. 9, J' I" G. NEW CONTRACT AMOUNT (A+E): $4,223,261.79 This Change Order is not valid without the following signatures: /4G- ROJECT ARCHITECT/ENGINEER Approved a to Form: l illiam de Haas, Contract Manager/Attorney qa��q K&�O�Lv, /_l_ Victor Kilman, Pur(tasing Manager Bob Cass, City Manager Orders over $21000 *buire the CITY OF)XBBOCK ATTEST: 9 / 26 / 02 cc�OJL��_,9 /26 /02 Rebecca Garza, City Secr tary PUR-045 (Rev 12101) Resolution No. 2002-RO382 Annexation Sanitary Sewer Improvements 09/10/02 Change Order No. 3 City of Lubbock, Water Utilities Estimate by: XX Ty Deducts 24" SDR 35: 22' - 24' de th 1,223 LF $70.00 $85,610.00) 12" SDR 35: 20' - 22' de th (500) LF $32.00 $16,000.00) 12" SDR 35: 18' - 20' de th (410) LF $30.00 $12,300.00) Std. 60" MH (4 ft. depth) MHC11 - 16 (6) ea $2,400.00 ($14,400.00 Addl. MH depth 60" dia.) MHC11 - 16 151 VLF $190.00 $28,731.80) Additions 24" SDR 35: 24'- 26' de th 1,186 LF $75.00 $88,950.00 24" SDR 35: 22' - 24' depth 587 LF $70.00 $41,090.00 24" SDR 35: 20' - 22' de th 184 LF $65.00 $11,960.00 24" SDR 35: 18' - 20' de th 186 LF $60.00 $11,160.00 Addl. Cost due to incr. In 24" pie price 920 LF $12.05 $11,086.00 Std. 60" MH 4 ft. depth) MHC11 - 16 5 ea $2,400.00 $12,000.00 Addl. MH depth (60" dia.) MHC11 - 16 109 VLF $190.00 $20,759.40 Trench safety (sta. 72+84 to 73+26) 42 LF $1.00 $42.00 Addl. Cost for mechanical compaction 3,026 LF $10.00 $30,260.00 $0.00 Subtotal $70,265.60 Contractors OH&P @ 15.00% $10,539.84 NET TOTAL $80,805.44 Line C Rev CO Est1