HomeMy WebLinkAboutResolution - 2002-R0382 - Change Order - Utility Contractors Of America - 09_26_2002Resolution No. 2002—RO382
September 26, 2002
Item No. 20
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, by and between the City of
Lubbock and Utility Contractor's of America, a Change Order No. Three for ITB 4048-
01/VK, and related documents. Said Change Order is attached hereto and incorporated in
this Resolution as if fully set forth herein and shall be included in the minutes of the City
Council.
Passed by the City Council this 26th day of
ATTEST:
Re ecca Garza, City Secreta
APPROVED AS TO CONTENT:
Chester Carthel
Chief Engineer -Public Works
APPROVED AS TO FORM:
William de Haas
Contract Manager/Attorney
Gs/ccdocs/ChOrder3-Utility Contractor's of America.res
Sept. 11, 2002
Resolution No. 2002—RO382
CITY OF LUBBOCK
CHANGE ORDER
CHANGE ORDER #: 3 CONTRACTOR: Utility Contractor's of America
DATE: 9/6/02 CITY OF LUBBOCK BID#: ITB #048-01NK
PROJECT NAME: Annexation Sanitary Sewer System Improvements
Revision of scope of work due to a change in alignment of 1loth Street because of a revised
subdivision plat.
ITEM
DESCRIPTION
AMOUNT
A.
ORIGINAL CONTRACT VALUE:
$4,136,593.35
B.
AMOUNT OF THIS CHANGE ORDER: council approval required if over $25,000
C.
PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A):
aw M1.
D.
AMOUNT OF PREVIOUS CHANGE ORDERS:
$ 5,863.00
E.
TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D):
$ 86,668.44
F.
PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/425%Max.
9, J' I"
G.
NEW CONTRACT AMOUNT (A+E):
$4,223,261.79
This Change Order is not valid without the following signatures:
/4G-
ROJECT ARCHITECT/ENGINEER
Approved a to Form: l
illiam de Haas, Contract Manager/Attorney
qa��q K&�O�Lv, /_l_
Victor Kilman, Pur(tasing Manager Bob Cass, City Manager
Orders over $21000 *buire the
CITY OF)XBBOCK
ATTEST:
9 / 26 / 02 cc�OJL��_,9 /26 /02
Rebecca Garza, City Secr tary
PUR-045 (Rev 12101)
Resolution No. 2002-RO382
Annexation Sanitary Sewer Improvements 09/10/02
Change Order No. 3
City of Lubbock, Water Utilities
Estimate by:
XX
Ty
Deducts
24" SDR 35: 22' - 24' de th
1,223
LF
$70.00
$85,610.00)
12" SDR 35: 20' - 22' de th
(500)
LF
$32.00
$16,000.00)
12" SDR 35: 18' - 20' de th
(410)
LF
$30.00
$12,300.00)
Std. 60" MH (4 ft. depth) MHC11 - 16
(6)
ea
$2,400.00
($14,400.00
Addl. MH depth 60" dia.) MHC11 - 16
151
VLF
$190.00
$28,731.80)
Additions
24" SDR 35: 24'- 26' de th
1,186
LF
$75.00
$88,950.00
24" SDR 35: 22' - 24' depth
587
LF
$70.00
$41,090.00
24" SDR 35: 20' - 22' de th
184
LF
$65.00
$11,960.00
24" SDR 35: 18' - 20' de th
186
LF
$60.00
$11,160.00
Addl. Cost due to incr. In 24" pie price
920
LF
$12.05
$11,086.00
Std. 60" MH 4 ft. depth) MHC11 - 16
5
ea
$2,400.00
$12,000.00
Addl. MH depth (60" dia.) MHC11 - 16
109
VLF
$190.00
$20,759.40
Trench safety (sta. 72+84 to 73+26)
42
LF
$1.00
$42.00
Addl. Cost for mechanical compaction
3,026
LF
$10.00
$30,260.00
$0.00
Subtotal
$70,265.60
Contractors OH&P @
15.00%
$10,539.84
NET TOTAL
$80,805.44
Line C Rev CO Est1