HomeMy WebLinkAboutResolution - 2002-R0217 - Amendment To Contract Agreement - Parkhill, Smith And Cooper - 06_13_2002Resolution NO. 2002-RO217
June 13, 2002
Item No. 25
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, an Amendment No.5 to
the Agreement between the City of Lubbock and Parkhill, Smith & Cooper for Design
and Construction Phase Services for the extension of the Westport Access Road, Phase
II, and all related documents. Said Amendment is attached hereto and incorporated in
this resolution as if fully set forth herein and shall be included in the minutes of the
City Council.
Passed by the City Council this 13th day of June , 2002.
ATTEST:
cpa4-� -,--
Rebecca Garza, City Secretary
TO CONTENT:
le, Director of Aviation
APPROVED AS TO FORM:
— h�4"7� 4�&
William de Haas
Contract Manager/Attorney
gs/ccdocs/Amend. 5 — Westport Access Rd Phase 2
May 30, 2002
■uuMonuuMoMou
.....sous: INUM01
...=uoMENoomno
111
■i •v w --
n n • Mono
■i u n, Mono�� _ram.•. W—■
MuEMoMoOuuiu
MoMoouuuumono
Mr. Mark N. Earle
Airport Director
Lubbock International Airport
Route 3 Box 389
Lubbock, Texas 79401
Re: Amendment No. 5 to Agreement for Professional Services,
Design and Construction Phase Services for:
Extension of the Westport Access Road, Phase H
Dear Mr. Earle:
Resolution No. 2002—RO217
June 13, 2002
Item No. 25
May 29, 2002
We have met with your staff, reviewed the project, prepared an Engineers Opinion of Probable Costs
(EOPC) as well as a site plan for the Extension of the Westport Access Road, Phase II to the North. Our
understanding of the scope and a fee proposal for the three tasks (design, construction and surveying/testing)
associated with this project follows.
Extension of the Westport Access Road, Phase 11(FULL SCOPE)
Task 1 - Fee for Professional Services (Study and Report, Preliminary Design,
Final Design and Bidding/Negotiation, lump sum) $49,300
Task 2 - Construction Phase Services (Paragraph A1.05 of contract, which includes RPR
And construction related Engineering Services, lump sum) $43,400
Task 3 - Surveying and Testing Services, (hourly rate w/ max) $17,540
TOTAL $110,240
We also understand that the City has applied for a grant to fund both design services and construction services
as set out in this agreement. In that regard, per your direction we will not incur any charges for the design of
this road segment until we are advised that the City has in fact secured the grant. In the event that the grant is
not approved, we will provide the professional services for the reduced scope project, which is outlined
below.
Extension of the Westport Access Road, Phase H (REDUCED SCOPE)
Task 1 - Fee for Professional Services (Study and Report, Preliminary Design,
Final Design and Bidding/Negotiation, lump sum) $42,700
Task 2 - Construction Phase Services (Paragraph A1.05 of contract, which includes RPR
And construction related Engineering Services, lump sum) $31,050
Task 3 - Surveying and Testing Services, (hourly rate w/ max) $17,000
TOTAL $90,750
Parkhill, Smith & Cooper, Inc.
Engineers ■ Architects us Planners
4222 85th Street, Lubbock, Texas 79423 (806) 473-2200
FAX (806) 473-3500
Lubbock El Paso Midland Amarillo
Mr. Mark N. Earle Page 2 May 29, 2002
A more detailed breakdown of the work associated with each task (for the full and reduced scope), which
includes the anticipated time associated with them, is included as an attachment to this agreement.
We propose to modify the agreement between the City of Lubbock and Parkhill, Smith & Cooper, Inc. dated
June 12, 1997 and to provide the task 1 and 2 services on a lump sum basis under the provisions of EXHIBIT
A - PART 1, and EXHIBIT B PAYMENTS TO THE ENGINEER LUMP SUM METHOD, Paragraph
B4.01. We proposed to provide the task 3 services on an hourly rate basis with a maximum amount under
the provisions of EXHIBIT A - PART 1, ENGINEERS SERVICES and EXHIBIT B PAYMENTS TO THE
ENGINEER LUMP SUM METHOD, Paragraph B4.02.
If this meets with your approval, please sign and return one copy of this letter to our office. Because of the
nature of the funding for this project, we will wait to receive a notice to proceed from your office before
proceeding with these services. We look forward to working with you in completing these projects. If you
have any questions please call either me or John Hamilton.
Sincerely,
PARKHILL, SMITH & COOPER, INC.
By. 4
C. Cla ton Yeager PE
President
Enclosures
IN DUPLICATE
Accepted by:
CITZOFL
By
Marc P
Mayor
Attest:
By_1
r..�
City Secretary
Approved as to Content:
B�C
Y
ar . Earle
irector of Aviation
Approved as to Form:
By�.�/i�`"
William de Haas
Municipal Contracts Attorney
Resolution No. 2002--RO217
City of Lubbock, Texas
Lubbock International Airport
>`-sE EXTENSION OF THE WESTPORT ACCESS ROAD, PHASE II
............. (FULL SCOPE)
ENGINEER'S OPINION OF PROBABLE COSTS
OR-m qv-m
1
Contractor mobilization
1
LS
$48,500.00
$48,500.00
2
Remove and Dispose of Existing Bituminuous
Surface and Granular Base Course Material
2520
SY
$2.33
$5,871.60
3
Remove and Relocate Existing Overhead Power
service underground
1
LS
$39,500.00
$39,500.00
4
Remove and Dispose of Existing Trees
1
LS
$4,000.00
$4,000.00
5
Temporary Soil Erosion and Siltation Control
1
LS
$11,700.00
$11,700.00
6
Excavation, Grading and Subgrade Preparation
13525
SY
$3.52
$47,608.00
7
Excavation and Grading in Unpaved Areas
(15' behind back of curb)
8615
SY
$1.66
$14,300,90
8
Concrete Curb and Gutter, 24-inch wide section
5210
LF
$6.88
$35,844.80
9
Portland Cement Concrete Paving, 8-inch thickness
370
SY
$35.03
$12,961.10
10
Portland Cement Concrete Paving, 4-inch thickness
(behind curb)
70
SY
$34.10
$2,387.00
11
Flexible Base Course, 10-inch thickness
11835
SY
$5.75
$68,051.25
12
Flexible Base Course, 6-inch thickness
420
SY
$4.50
$1,890.00.
13
Hot Mix Asphaltic Concrete Pavement, Type C,
3-inch thickness
2000
Ton
$54.81
$109,620.00
14
Bituminous Prime Coat (0.25 gal/SY)
2960
Gallon
$1.92
$5,683.20
15
Bituminous Tack Coat
300
Gallon
$1.15
$345.00
16
Traffic Marking, 4-inch wide
3790
LF
$2.44
$9,247.60
17
Seeding and Fertilizing
1.8
Acre
$3,593.70
$6,468.66
18
Construct New Chain Link Perimeter Fencing
0
LF
$12.31
$0.00
19
Roadway Illumination, as per plans and
specifications
1
LS
$49,840.00
$49,840.00
20
Entrance Sign Type 3
1
LS
$10,000.00
$10,000.00
21
Utility Relocation (irrigation lines & FAA cables)
1
LS
$18,000.00
$18,000.00
22
Construction Contingencies (10%)
1
LS
$50,000.00
$50,000.00
TOTAL - CONSTRUCTION
$551,819.11
Basic Engineering Services (Study and Report, Preliminary Design, Final Design and Bidding/Negotiation)
$49,300.00
Construction Phase Services (Paragraph A1.05 of contract includes RPR and Construction related En r. Services
$43,400.00
Surveying
and Testing Services
$17,540.00
TOTAL ENGINEERS OPINION OF PROBABLE PROJECT COSTS
$662,059.11
R:Iprojects1199810015.981CIVILUTHIL1A1WestportAccess Ph Most Estimate (Final).xts
PARKHILL, SMITH & COOPER, INC. -
LUBBOCK
PROJECT BUDGET SHEET
LOCATION CODE:
01
PROJECT NAME:
LIA Wstprt Rd Ph II
JOB NO.:
01-2726-02
TASK:
DSGN
DATE:
05/13/02
FEE TYPE:
Lump Sum
PREPARED BY:
JTH
PRINCIPAL:
EE.D
PROJ. MANAGER:
JTH
OVERHEAD RATE:
PROFIT ON LABOR:
PROFIT ON REIMB:
15.00%
PROFIT ON DIRECTS:
15.00%
FEE:
$49
LABOR:
$44,214
OVERHEAD:
RERVIB. CONSULTANTS:
REIMB. EXPENSES:
DIRECT CONSULTANTS:
DIRECT EXPENSES:
$4,429
LABOR BUDGETS:
CODE
DESCRIPTION HOURS
COSTS
01
Firm Principal
25
$2,575
N/A
#N/A
03
Engineer
110
$9,746
09
Engineering Technician
221
$15,249
07
Engineer -in -Training
126
$8,694
14
CADD Operator
134
$7,370
18
Clerical
15
$580
Page 1 of 3
FEE ESTIMATING SHEET PROJECT: LIAwstprtRdPh11
JOB NO.:
01-2726-02 TASK:
DSGN
SALARY
CATEGORY OF PERSONNEL
RATE PER HOUR
FP
ENG
ENG TECH EIT CADD OPT
CLERICAL
TASK
01 #N/A
03
09 07 14
18
Trips
$103.00
$89.00
$69.00 $69.00 $55.00
$40.00
TOTAL
STUDY AND REPORT PHASE
Predesign Conference
1
1
4
1
6.0
Site Visits, Gather Data, Council/Board
1
1
4
4
9.0
ID/anlyze/consult review for govt. author.
4
4.0
Develop/analyze project scope
1
1
4
1
6.0
Coordinate soils investigation
1
4
4.0
Coordinate topographic surveys
1
4
4.0
Preliminary Engineering Report
Not used
develop design criteria
Not used
alternate solutions
Not used
environmental concerns
Not used
narrative
Not used
schematic layouts
Not used
opinion of costs
2
42 8
52.0
review with Owner
1
4
4-0
revise and resubmit
4
4-0
PRELIMINARY DESIGN PHASE
Refine scope, coord- with Owner
4
0.5
4.5
Meetings and conferences
1
1
4
0.5
5.5
Scope and arrange for special surveys
0.5
0.5
Preliminary design documents
Not used
design basis, project descrip, criteria
1
1.0
preliminary drawings (26 shts, 21 new)
2
10.5
84 42 63
201.5
outline specifications
Not used
review w/ Owner
1
1
6
7.0
Scope and arrange for addnl services
Revise opinion of costs
4
4.0
FINAL DESIGN PHASE
Final drawings
2
21
84 42 63
212.0
Final specifications
2
7
10
4
23.0
Coordinate with FAA standards
Not used
Assist/consult with govt authorities - City Engr & Util.
2
2.0
Final design basis
4
0.5
4.5
Final opinion of costs
4
5
9.0
Review with Owner
1
1
2
3.0
Revisions
3
11 6 8
2
30.0
Prepare Construction Management Program
Not used
Misc meetings and conferences
1
4
4
8.0
Finalize preliminary engineering report
Not used
Rpt of revisions to FAA AC15015300-10A
Not used
0.5
0.5
FAA Forms 7460-1 and 7480-1
4
1
5.0
BIDDING PHASE
Assist in advertisement
Not used
Plan distribution - issue/record/deposits
Not used
Conduct Pre -Bid Conference, minutes
Not used
Miscellaneous addenda
Not used
Attend Bid Opening
Not used
Evaluate bids, bid tabulation, award
Not used
Prepare contract documents
Not used
Check out Contr, subcontractors, etc.
Not used
Review substitute materials/equipment
Not used
MISCELLANEOUS ITEMS
QC/PM (3 mos. @ 2 hrs./mo.)
6
6.0
Prepare stmts. (3 @ 0.5 hr.)
1.5
3
4.5
Monthly Progress Reports (0.5 hr. each)
1.5
1.5
Coordination with Owner
4
4.0
BUDGET SUBTOTALS: HOURS/ Trips -
10
25
110
221 126 134
15
630
SALARY
$2,575
$9,746
$15,249 $8,694 $7,370
$580 1_$
1.214
Page 2 of 3
FEE ESTIMATING SHEET PROJECT:
DIRECTS
LIA Wstprt Rd Ph II JOB NO.:
01-2726-02
TASK:
DSGN
DIRECT CONSULTANT COSTS
SUBTOTAL
611 STRUCTURAL CONSULTANTS
612 MECH/ELEC CONSULTANTS
613 ENV & CIVIL CONSULTANTS
614 LANDSCAPE CONSULTANTS
615 TESTING CONSULTANTS
616 SURVEYING CONSULTANTS
617 INTERIOR DESIGN CONSULTANTS
618 OTHER CONSULTANTS
TOTAL DIRECT CONSULTANTS
DIRECT EXPENSES
621 TRAVEULODGING
MOTEL DAYS @
AIR TRAVEL AIR FARE @
PARKING DAYS @
CAR RENTAL DAYS @
MILEAGE 30 MILES @
MEN @ /MANDAY =
MEN @ /MAN =
/DAY =
/DAY =
$0.345 @ 10 TRIPS =
SUBTOTAL
$103.50
$104
622 REPRODUCTIONS
BLUELINE PRINTS
SEPIA PRINTS
PRINTING:
ORIGINAL SET-UP COST
COST PER SHEET
BINDING COST
XEROX
26 SHTS @ $2.55 @ 15 SETS =
SHTS @ $8.51 @ SETS =
225 ORIGINALS @ $0.15 /ORI. _
22 SETS @ $0.08 /SHT @ 225 SHEETS =
22 SETS @ $2.00 /SET =
22 SHTS @ $0.08 /SHT =
SUBTOTAL
$994.50
$33.75
$396.00
$44.00
$1.76
$1.470
623 MODEURENDERINGS/PHOTOS
Shots @
/Shot
$200
624 TELEPHONE 45 Calls
$5.00 /Call
$225
625 MEALS DAYS @
MEN @
/MANDAY
626 FIELD SUPPLIES
628 POSTAGE 40 Mailings @
$2.50 /Mailin
$100
629 PUBLICATIONS &SUBSCRIPTIONS
630 MISC DIRECT EXP
631 FAX 200 Pages @
$1.00
$200
632 TEMPORARY PERSONNEL
633 DRAFTING SUPPLIES
634 OFFICE SUPPLIES
635 CADD 355 HOURS @
$6.00 /HOUR
$2,130
636 FIELD EQUIP RENTAL
646 SOFTWARE
TOTAL DIRECT EXPENSES
$4,429
Page 3 of 3
PARKHILL, SMITH & COOPER, INC. - LUBBOCK
PROJECT BUDGET SHEET
LOCATION CODE:
01
PROJECT NAME:
LIA Wstprt Rd Ph II
JOB NO.:
01-2726-02
TASK:
CSTR
DATE:
05/13/02
FEE TYPE:
Lump Sum
PREPARED BY:
JTH
PRINCIPAL:
EED
PROJ. MANAGER:
JTH
OVERHEAD RATE:
PROFIT ON LABOR:
PROFIT ON REIMB:
15.00%
PROFIT ON DIRECTS:
15.00%
FEE:
$�2539 5 Gtl�7y 001ij
LABOR:
$41,514
OVERHEAD:
REIMB. CONSULTANTS:
REIIvIB. EXPENSES:
DIRECT CONSULTANTS:
DIRECT EXPENSES:
$1,636
LABOR BUDGETS:
CODE
DESCRIPTION HOURS
COSTS
01
Firm Principal 4
$412
N/A
#N/A
03
Engineer 48
$4,272
01
Resident Project Representat 544
$33,728
07
Engineer -in -Training 24
$1,622
14
CADD Operator 16
$880
18
Clerical 15
$600
Page 1 of 3
FEE ESTIMATING SHEET
PROJECT: LIAwstprt Rd Ph II
JOB NO.:
01-2726-02
TASK:
CSTR
SALARY
CATEGORY OF PERSONNEL
RATE PER HOUR
FP
ENG
RPR
EIT
CADD OPT
CLERICAL
TASK
01 #N/A
03
01
07
14
18
Trips
$103.00.
$89.00
$62.00
$69.00
$55.00
$40.00
TOTAL
RPR (4-month construction period)
Preconstruction Conference
1
4
2
6
135 Calendar Days at 4 Hrs/Calendar Day
540
540
CONSTRUCTION PHASE
Conduct Preconstr Conference, minutes
1
2
4
1.5
1
9
Coord baseline surveys, benchmark
2
2
Site visits, notes
4
2
6
4
2
14
Coord. with RPR, Contractor, Owner
2
2
2
6
Routine change orders
2
2
1
5
Review submittals
2
4
2
8
Pay estimates including final
1
4
5
Certifications, guarantees & warranties
1
1
Initial operation/startup, Perftests
1
2
2
Final inspection and notes/findings
1
2
2
MISCELLANEOUS ITEMS
QC/PM (4 mos. @ 2 hrs./mo.)
8
8
Prepare stmts. (4 @ 0.5 hr.)
2
4
6
Monthly Progress Reports (0.5 hr. each)
2
2
Coordination with Owner
4
4
CLOSEOUT PHASE
Record drawings
2
2
16
20
O&M manuals
Warranty insp.
1
4
1
5
Addnl. compliance insps.
2
4
2
6
Final test and QC rpt.
Not used
BUDGET SUBTOTALS: HOURS/
Trips - 11
4
48
544
24
16
15
65111
SALARY
$412
$4,272
$33,728
$1,622
$880
$600
$41,514
Page 2 of 3
FEE ESTIMATING SHEET PROJECT:
DIRECTS
LIA Wstprt Rd Ph II JOB NO.:
01-2726-02 TASK:
CSTR
DIRECT CONSULTANT COSTS
SUBTOTAL
611 STRUCTURAL CONSULTANTS
612 MECH/ELEC CONSULTANTS
613 ENV & CIVIL CONSULTANTS
614 LANDSCAPE CONSULTANTS
615 TESTING CONSULTANTS
616 SURVEYING CONSULTANTS
617 INTERIOR DESIGN CONSULTANTS
618 OTHER CONSULTANTS
TOTAL DIRECT CONSULTANTS
DIRECT EXPENSES
621 TRAVEULODGING
MOTEL DAYS @
AIR TRAVEL AIR FARE @
PARKING DAYS @
CAR RENTAL DAYS @
MILEAGE 60 MILES @
MEN @ /MANDAY =
MEN @ /MAN =
/DAY =
/DAY =
$0.345 @ 11 TRIPS = $227.70
SUBTOTAL
$228
622 REPRODUCTIONS
BLUELINE PRINTS SHTS @ $2.55 @ 5 SETS =
SEPIA PRINTS SHTS @ $8.51 @ SETS =
PRINTING:
ORIGINAL SET-UP COST 1250 ORIGINALS @ $0.15 /ORL _ $187.50
COST PER SHEET SETS @ $0.08 /SHT @ 225 SHEETS =
BINDING COST SETS @ $2.00 /SET =
XEROX SHTS @ $0.08 /SHT =
SUBTOTAL
$188
623 MODEURENDERINGS/PHOTOS
Shots @
/Shot
$200
624 TELEPHONE 125 Calls
$5.00 /Call
$625
625 MEALS DAYS @
MEN @
/MANDAY
626 FIELD SUPPLIES
628 POSTAGE 40 Mailings @
$2.50 /Mailing
$100
629 PUBLICATIONS & SUBSCRIPTIONS
630 MISC DIRECT EXP
631 FAX 200 Pages
$1.00
$200
632 TEMPORARY PERSONNEL
633 DRAFTING SUPPLIES
634 OFFICE SUPPLIES
635 CADD 16 HOURS @
$6.00 /HOUR
$96
636 FIELD EQUIP RENTAL
646 SOFTWARE
TOTAL DIRECT EXPENSES
$1,636
Page 3 of 3
PARKHILL, SMITH & COOPER, INC. - LUBBOCK
PROJECT BUDGET SHEET
LOCATION CODE:
01
PROJECT NAME:
LIA Wstprt Rd Phll
JOB NO.:
01-2726-02
TASK:
S&T
DATE:
05/08/02
FEE TYPE:
Hourly Rate w/Max
PREPARED BY:
JTH
PRINCIPAL:
EED
PROJ. MANAGER:
JTH
OVERHEAD RATE:
PROFIT ON LABOR:
PROFIT ON REIMB:
15.00%
PROFIT ON DIRECTS:
15.00%
FEE:
$17�5'38
LABOR:
OVERHEAD:
REIMB. CONSULTANTS:
$15,250
REIMB. EXPENSES:
DIRECT CONSULTANTS:
DIRECT EXPENSES:
LABOR BUDGETS:
CODE
DESCRIPTION HOURS COSTS
13
Drafter
N/A
#N/A
13
Drafter
13
Drafter
13
Drafter
14
CADD Operator
18
Clerical
Page 1 of 2
FEE ESTIMATING SHEET PROJECT:
EIMBURSABLES
LIA Wstprt Rd Phll JOB NO.:
01-2726-02 TASK:
S&T
REIMBURSABLE CONSULTANT COSTS
SUBTOTAL
511 STRUCTURAL CONSULTANTS
512 MECH/ELEC CONSULTANTS
513 ENV & CIVIL CONSULTANTS
514 LANDSCAPE CONSULTANTS
515 TESTING CONSULTANTS
$11,000
516 SURVEYING CONSULTANTS
$4,250
517 INTERIOR DESIGN CONSULTANTS
518 OTHER CONSULTANTS
TOTAL REIMBURSABLE CONSULTANTS
$15,250
REIMBURSABLE EXPENSES
521 TRAVEULODGING
MOTEL DAYS @
AIR TRAVEL AIR FARE @
PARKING DAYS @
CAR RENTAL DAYS @
MILEAGE MILES @
MEN @
MEN @
/DAY
/DAY
$0.345 @
/MANDAY =
/MAN =
=
=
TRIPS =
SUBTOTAL
522 REPRODUCTIONS
BLUELINE PRINTS
SEPIA PRINTS
PRINTING:
ORIGINAL SET-UP COST
COST PER SHEET
BINDING COST
XEROX
SHTS @ $2.55 @ 8 SETS =
SHTS @ $8.51 @ SETS =
ORIGINALS @ $0.15 /ORI. _
SETS @ $0.08 /SHT @ 250 SHEETS =
SETS @ $2.00 /SET =
SHTS @ $0.08 /SHT =
SUBTOTAL
523 MODEURENDERINGS/PHOTOS
Shots @
/Shot
524 TELEPHONE Calls
$2.00 /Call
625 MEALS DAYS
MEN @
/MANDAY
526 FIELD SUPPLIES
528 POSTAGE Mailings @
$2.00 /Mailin
529 PUBLICATIONS & SUBSCRIPTIONS
530 MISC REIMBURSABLE EXP
531 FAX Pages 0
$1.00
532 TEMPORARY PERSONNEL
533 DRAFTING SUPPLIES
534 OFFICE SUPPLIES
535 CADD HOURS @
$6.00 /HOUR
536 FIELD EQUIP RENTAL
546 SOFTWARE
TOTAL REIMBURSABLE EXPENSES
�J
Page 2 of 2
City of Lubbock, Texas
;.: Lubbock International Airport
EXTENSION OF THE WESTPORT ACCESS ROAD, PHASE II
.................. (REDUCED SCOPE)
ENGINEER'S OPINION OF PROBABLE COSTS
17-May-02
1
Contractor mobilization
1
LS
$36,000.00
$36,000.00
2
Remove and Dispose of Existing Bituminuous
Surface and Granular Base Course Material
5925
SY
$2.33
$13,805.25
3
LP&L to install)
0
L-S
$39,599,GQ
$9 99
4
0
L-S
$4,A94*OA
$A.BB
5
Gap and AhapdoR ExistiRg Wrigatiop 1.4foll
A
Ll%
$5,9AA,00
$0=
6
Temporary Soil Erosion and Siltation Control
1
LS
$11,700.00
$11,700.00
7
Excavation, Grading and Subgrade Preparation
12365
SY
$3.52
$43,524.80
8
Excavation and Grading in Unpaved Areas
(15' behind back of curb)
7845
SY
$1.66
$13,022.70
9
Concrete Curb and Gutter, 24-inch wide section
4745
LF
$6.88
$32,645.60
10
Portland Cement Concrete Paving, 8-inch thickness
370
SY
$35.03
$12,961.10
11
Portland Cement Concrete Paving, 4-inch thickness
(behind curb)
70
SY
$34.10
$2,387.00
12
Flexible Base Course, 10-inch thickness
10830
SY
$5.75
$62,272.50
13
Flexible Base Course, 6-inch thickness
420
SY
$4.50
$1,890.00
14
Hot Mix Asphaltic Concrete Pavement, Type C,
3-inch thickness
1830
Ton
$54.81
$100,302.30
15
Bituminous Prime Coat (0.25 gal/SY)
2710
Gallon
$1.92
$5,203.20
16
Bituminous Tack Coat
300
Gallon
$1.15
$345.00
17
Traffic Marking, 4-inch wide
3790
LF
$2.44
$9,247.60
18
Seeding and Fertilizing
1.6
Acre
$3,593.70
$5,749.92
4.9
0
L�
$ L0 34
$9 b1G
20
Roadway Illumination, as per plans and
specifications
1
LS
$46,280.00
$46,280.00
24
A
L-S
$4B,9B9.00
$A,4)8
22
Utility Relocation (irrigation lines, FAA cables
water, sewer and gas)
1
LS
$18,000.00
$18,000.00
23
Traffic Control Signage
6
Ea
$750.00
$4,500.00
24
Construction Contingencies (4%)
1
LS
$15,000.00
$15,000.00
TOTAL - CONSTRUCTION
$434,836.97
Basic Engineering Services (Study and Report, Preliminary Design, Final Design and Bidding/Negotiation)
$42,700.00
Construction Phase Services (Paragraph A1.05 of contract includes RPR and Construction related Engr. Services)
$31,050.00
Surveying and Testing Services
$17,000.00
TOTAL ENGINEERS OPINION OF PROBABLE PROJECT COSTS
$525,586.97
R:IprojectsN99610015.9MCIVILVTHUAIWestport Access Ph Most EsBmafe (Finat).xls
PARKKHILL, SMITH & COOPER, INC. - LUBBOCK
PROJECT BUDGET SHEET
LOCATION CODE:
01
PROJECT NAME:
LIA Wstprt Rd Ph II
JOB NO.:
01-2726-02
TASK:
DSGN
DATE:
05/ 17/02
FEE TYPE:
Lump Sum
PREPARED BY:
JTH
PRINCIPAL:
EED
PROJ. MANAGER:
JTH
OVERHEAD RATE:
PROFIT ON LABOR:
PROFIT ON REIMB:
15.00%
PROFIT ON DIRECTS:
15.00%
FEE:
$42 84-(gdLZ���
LABOR:
$37,783
OVERHEAD:
REIMB. CONSULTANTS:
REIMB. EXPENSES:
DIRECT CONSULTANTS:
DIRECT EXPENSES:
$4,262
LABOR BUDGETS:
CODE
DESCRIPTION HOURS
COSTS
01
Firm Principal
24
$2,472
#N/A
#N/A
03
Engineer
68
$6,052
09
Engineering Technician
197
$13,593
07
Engineer -in -Training
114
$7,866
14
CADD Operator
132
$7,260
18
Clerical
14
$540
Page 1 of 3
FEE ESTIMATING SHEET
PROJECT: LIP, wstprt Rd Ph ii
JOB NO.:
01-272"2
TASK: OSGN
SALARY
CATEGORY OF PERSONNEL
RATE PER HOUR
FP
ENG
ENG TECH EIT
CADD OPT CLERICAL
TASK
01 #N/A
03
09 07
14 18
Trips
$103.00
$89.00
$69.00 $69.00
$55.00 $40.00
TOTAL
STUDY AND REPORT PHASE
Predesign Conference
1
1
4
1
6.0
Site Visits, Gather Data, Council/Board
1
4
4.0
ID/anlyze/consult review for govt. author.
Not used
Develop/analyze project scope
1
1
4
1
6.0
Coordinate soils investigation
Not used
Coordinate topographic surveys
1
4
4.0
Preliminary Engineering Report
Not used
develop design criteria
Not used
alternate solutions
Not used
environmental concerns
Not used
narrative
Not used
schematic layouts
Not used
opinion of costs
2
24 4
30.0
review with Owner
1
4
4.0
revise and resubmit
PRELIMINARY DESIGN PHASE
Refine scope, coord. with Owner
Not used
Meetings and conferences
1
1
4
0.5
5.5
Scope and arrange for special surveys
0.5
0.5
Preliminary design documents
Not used
design basis, project descrip, criteria
1
1.0
preliminary drawings (25 shts, 20 new)
2
9
80 40
60
191.0
outline specifications
Not used
review w/ Owner
1
1
3
4.0
Scope and arrange for addnl services
Revise opinion of costs
4
4.0
FINAL DESIGN PHASE
Final drawings
2
12
80 40
60
194.0
Final specifications
2
2
10
4
18.0
Coordinate with FAA standards
Not used
Assistfconsult with govt authorities - City Engr & Util.
2
2.0
Final design basis
Not used
Final opinion of costs
4
5
9.0
Review with Owner
1
1
2
3.0
Revisions
4
13 6
12 2
37.0
Prepare Construction Management Program
Not used
Misc meetings and conferences
1
2
4
6.0
Finalize preliminary engineering report
Not used
Rpt of revisions to FAA AC150/5300-10A
Not used
0.5
0.5
FAA Forms 7460-1 and 7480-1
2
1
3.0
BIDDING PHASE
Assist in advertisement
Not used
Plan distribution - issue/record/deposits
Not used
Conduct Pre -Bid Conference, minutes
Not used
Miscellaneous addenda
Not used
Attend Bid Opening
Not used
Evaluate bids, bid tabulation, award
Not used
Prepare contract documents
Not used
Check out Contr, subcontractors, etc.
Not used
Review substitute materials/equipment
Not used
MISCELLANEOUS ITEMS
QC/PM (3 mos. @ 2 hrs./mo.)
6
6.0
Prepare stmts. (3 @ 0.5 hr.)
1.5
3
4.5
Monthly Progress Reports (0.5 hr. each)
1.5
1.5
Coordination with Owner
4
4.0
BUDGET SUBTOTALS: HOURS/
Trips - 9
24
68
197 114
132 14
549
SALARY
$2,472
$6,052
$13,593 $7,866
$7,260 $540
$37,783
11
Page 2 of 3
FEE ESTIMATING SHEET PROJECT:
DIRECTS
LIA Wstprt Rd Ph 11 JOB NO.:
01-2726-02 TASK:
DSGN
DIRECT CONSULTANT COSTS
SUBTOTAL
611 STRUCTURAL CONSULTANTS
612 MECH/ELEC CONSULTANTS
613 ENV & CIVIL CONSULTANTS
614 LANDSCAPE CONSULTANTS
616 TESTING CONSULTANTS
616 SURVEYING CONSULTANTS
617 INTERIOR DESIGN CONSULTANTS
618 OTHER CONSULTANTS
TOTAL DIRECT CONSULTANTS
DIRECT EXPENSES
621 TRAVEULODGING
MOTEL DAYS @
AIR TRAVEL AIR FARE @
PARKING DAYS @
CAR RENTAL DAYS @
MILEAGE 30 MILES @
$0.345
MEN @ /MANDAY =
MEN @ /MAN =
/DAY =
/DAY =
@ 9 TRIPS =
SUBTOTAL
$93.15
$93
622 REPRODUCTIONS
BLUELINE PRINTS 26 SHTS @
SEPIA PRINTS SHTS @
PRINTING:
ORIGINAL SET-UP COST 225 ORIGINALS
COST PER SHEET 22 SETS @
BINDING COST 22 SETS @
XEROX 22 SHTS @
$2.55 @ 15 SETS =
$3.51 @ SETS =
@ $0.15 /ORI. _
$0.08 /SHT @ 225 SHEETS =
$2.00 /SET =
$0.08 /SHT =
SUBTOTAL
$994.50
$33.75
$396.00
$44.00
$1.76
$1,470
623 MODEURENOERINGS/PHOTOS
Shots @
/Shot
$200
624 TELEPHONE 45 Calls @
$5.00 /Call
$225
625 MEALS DAYS @
MEN @
/MANDAY
626 FIELD SUPPLIES
628 POSTAGE 40 Mailings @
$2.50 /Mailing
$100
629 PUBLICATIONS & SUBSCRIPTIONS
630 MISC DIRECT EXP
631 FAX 200 Pages @
$1.00
$200
632 TEMPORARY PERSONNEL
633 DRAFTING SUPPLIES
634 OFFICE SUPPLIES
635 CADD 329 HOURS @
$6.OD /HOUR
$1,974
636 FIELD EQUIP RENTAL
646 SOFTWARE
TOTAL DIRECT EXPENSES
$4,262
Page 3 of 3
PARKHILL, SMITH & COOPER, INC. - LUBBOCK
PROJECT BUDGET SHEET
LOCATION CODE:
01
PROJECT NAME:
LIA Wstprt Rd Ph II
JOB NO.:
01-2726-02
TASK:
CSTR
DATE:
05/17/02
FEE TYPE:
Lump Sum
PREPARED BY:
JTH
PRINCIPAL:
EED
PROD. MANAGER:
JTH
OVERHEAD RATE:
PROFIT ON LABOR:
PROFIT ON REIMB:
15.00%
PROFIT ON DIRECTS:
15.00%
FEE:
$31,050
LABOR:
$27,312
OVERHEAD:
REIMB. CONSULTANTS:
REIMB. EXPENSES:
DIRECT CONSULTANTS:
DIRECT EXPENSES:
$3,251
LABOR BUDGETS:
CODE
DESCRIPTION HOURS
COSTS
01
Firm Principal 2
$206
#N/A
#N/A
03
Engineer 44
$3,916
01
Resident Project Representati 324
$20,088
07
Engineer -in -Training 24
$1,622
14
CADD Operator 16
$880
18
Clerical 15
$600
Page 1 of 3
FEE ESTIMATING SHEET
PROJECT:
LIA Wstprt Rd Ph I I
JOB NO.:
01-2726-02
TASK:
CSTR
SALARY
CATEGORY OF PERSONNEL
RATE PER HOUR
FP
ENG
RPR
EIT
CADD OPT
CLERICAL
TASK
01 #N/A
03
01
07
14
18
Trips
$103.00
$89.00
$62.00
$69.00
$55.00
$40.00
TOTAL
RPR (4-month construction period)
Preconstruction Conference
1
4
2
6
4.5 month construction period
RPR for 80 half days (4 Hrs/ Day)
80
320
320
CONSTRUCTION PHASE
Conduct Preconstr Conference, minutes
1
2
4
1.5
1
9
Coord baseline surveys, benchmark
2
2
Site visits, notes
2
4
4
2
10
Coord. with RPR, Contractor, Owner
2
2
2
6
Routine change orders
2
2
1
5
Review submittals
2
4
2
8
Pay estimates including final
1
4
5
Certifications, guarantees & warranties
1
1
Initial operation/startup, Perf tests
1
2
2
Final inspection and notes/findings
1
2
2
MISCELLANEOUS ITEMS
QC/PM (4 mos. @ 2 hrs./mo.)
8
8
Prepare stmts. (4 @ 0.5 hr.)
2
4
6
Monthly Progress Reports (0.5 hr. each)
2
2
Coordination with Owner
2
2
CLOSEOUT PHASE
Record drawings
2
2
16
20
O&M manuals
Warranty insp.
1
4
1
5
Addnl. compliance insps.
2
4
2
6
Final test and QC rpt.
Not used
BUDGET SUBTOTALS: HOURS/
Trips - 89
2
44
324
24
16
15
425
SALARY
$206
$3,916
$20,088
$1,622
$880
$600
$27,312
Page 2 of 3
EE ESTIMATING SHEET PROJECT:
DIRECTS
LIA Wstprt Rd Ph II JOB NO.:
Ot-2726-02 TASK
CSTR
DIRECT CONSULTANT COSTS
SUBTOTAL
611 STRUCTURAL CONSULTANTS
612 MECH/ELEC CONSULTANTS
613 ENV & CIVIL CONSULTANTS
614 LANDSCAPE CONSULTANTS
615 TESTING CONSULTANTS
616 SURVEYING CONSULTANTS
617 INTERIOR DESIGN CONSULTANTS
618 OTHER CONSULTANTS
TOTAL DIRECT CONSULTANTS
r--,
DIRECT EXPENSES
621 TRAVEULODGING
MOTEL DAYS @
AIR TRAVEL AIR FARE @
PARKING DAYS @
CAR RENTAL DAYS @
MILEAGE 60 MILES @
$0.345
MEN @ 1MANDAY =
MEN @ /MAN =
/DAY =
/DAY =
@ 89 TRIPS = $1,642.30
SUBTOTAL
$1,842
622 REPRODUCTIONS
BLUELINE PRINTS SHTS @
SEPIA PRINTS SHTS @
PRINTING:
ORIGINAL SET-UP COST 1250 ORIGINALS
COST PER SHEET SETS @
BINDING COST SETS @
XEROX SHTS @
$2.55 @ 5 SETS =
$8.51 @ SETS =
@ $0.15 /ORI. _ $18T50
$0.08 /SHT @ 225 SHEETS =
$2.00 /SET =
$0.08 /SHT =
SUBTOTAL
$1BB
623 MODEURENDERINGS/PHOTOS
Shots @
/Shot
$200
624 TELEPHONE 125 Calls @
$5.00 /Call
$625
625 MEALS DAYS @
MEN @
/MANDAY
626 FIELD SUPPLIES
628 POSTAGE 40 Mailings @
$2.50 /Mailing
$100
629 PUBLICATIONS & SUBSCRIPTIONS
630 MISC DIRECT EXP
631 FAX 200 Pages @
$1.00
$200
632 TEMPORARY PERSONNEL
633 DRAFTING SUPPLIES
634 OFFICE SUPPLIES
635 CADD 16 HOURS @
$6.00 /HOUR
$96
636 FIELD EQUIP RENTAL
646 SOFTWARE
TOTAL DIRECT EXPENSES A
$3,25111
Page 3 of 3
PARKHILL, SMITH & COOPER, INC. - LUBBOCK
PROJECT BUDGET SHEET
LOCATION CODE:
01
PROJECT NAME:
LIA Wstprt Rd PhII
JOB NO.:
01-2726-02
TASK:
S&T
DATE:
05/17/02
FEE TYPE:
Hourly Rate w/Max
PREPARED BY:
JTH
PRINCIPAL:
EED
PROJ. MANAGER:
JTH
OVERHEAD RATE:
PROFIT ON LABOR:
PROFIT ON REIMB:
15.00%
PROFIT ON DIRECTS:
15.00%
FEE:
$17 r/?DOD
LABOR:
OVERHEAD:
REIMB. CONSULTANTS:
$14,800
REIMB. EXPENSES:
DIRECT CONSULTANTS:
DIRECT EXPENSES:
LABOR BUDGETS:
CODE
DESCRIPTION HOURS COSTS
13
Drafter
#N/A
#N/A
13
Drafter
13
Drafter
13
Drafter
14
CADD Operator
18
Clerical
Page 1 of 2
,3
REIMBURSABLE EXPENSES
521 TRAVELILODGING
MOTEL
DAYS @
MEN @
/MANDAY =
AIR TRAVEL
AIR FARE @
MEN @
/MAN =
PARKING
DAYS @
/DAY
=
CAR RENTAL
DAYS @
/DAY
=
MILEAGE
MILES @
$0.345
@
TRIPS =
SUBTOTAL
522 REPRODUCTIONS
BLUELINE PRINTS
SHTS @
$2.55 @
8 SETS =
SEPIA PRINTS
SHTS @
$8.51 @
SETS =
PRINTING:
ORIGINAL SET-UP COST
ORIGINALS
@ $0.15 /ORI. _
COST PER SHEET
SETS @
$0.08 /SHT @
250 SHEETS =
BINDING COST
SETS @
$2.00 /SET
=
XEROX
SHTS @
$0.08 /SHT
=
SUBTOTAL
523 MODEL/RENDERINGS/PHOTOS
Shots @
/Shot
524 TELEPHONE
Calls @
$2.00 /Call
525 MEALS
DAYS @
MEN @
/MANDAY
526 FIELD SUPPLIES
528 POSTAGE
Mailings @
$2.00 /Mailing
529 PUBLICATIONS & SUBSCRIPTIONS
530 MISC REIMBURSABLE EXP
531 FAX
Pages @
$1.00
532 TEMPORARY PERSONNEL
533 DRAFTING SUPPLIES
534 OFFICE SUPPLIES
535 CADD
HOURS @
$6.00 /HOUR
536 FIELD EQUIP RENTAL
546 SOFTWARE
11 TOTAL REIMBURSABLE EXPENSES
Page 2 of 2