HomeMy WebLinkAboutResolution - 2002-R0197 - Change Order To Lubbock Internation Airport Taxiway Expansion - 05_23_2002Resolution No. 2002-RO197 May 23, 2002 Item No. 30 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Change Order No. 1 for Lubbock International Airport, Westport Apron and Taxiway Expansion, by and between the City of Lubbock and Duinick Brothers, Inc. of Roanoke, Texas, and related documents. Said change order is attached hereto and incorporated in this Resolution as if fully set forth herein and shall be included in the minutes of the Council. Passed by the City Council this 23rd day of ATTEST: Rebecca Garza, City Secretary APPROVED AS TO CONTENT: ()-I' Arzj- ;:,Mr. M - f - jW McGinley, LIA Deputy Director Operations & Safety APPROVED AS TO FORM: William de Haas Contract Manager/Attorney gs:ccdocs/Chord#1- Duinick Brothers Inc. May, 14, 2002 Resolution No. 2002—RO197 4CITY OF LUBBOCK CHANGE ORDER CHANGE ORDER #: 1 CONTRACTOR: Duinick Brothers, Inc. DATE: 4/23/02 CITY OF LUBBOCK BID#: 212-01/RS PROJECT NAME: Lubbock International Airport, Westport Apron & Taxiway Expansion Description of change caused by conditions encountered_durinq construction not covered by the specifications and drawings of the proiect: During the demolition of the paved shoulder along the south edge of the existing cargo ramp, migrating water was discovered immediately beneath the concrete pavement. This change order is for the installation of an underdrain system to capture the migrating water and direct it from beneath the proposed and existing cargo ramps. This change order also adds 5 calendar days to the contract, which modifies the contract time from 360 to 365 calendar days. A copy of the change order quote from the contractor is included as an attachment. ITEM DESCRIPTION AMOUNT A. ORIGINAL CONTRACT VALUE: $4,844,923.50 B. AMOUNT OF THIS CHANGE ORDER: council approval required if over $25, 000 MEMO C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A): a. D. AMOUNT OF PREVIOUS CHANGE ORDERS: $0 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): $46,367.80 F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A):25%Max. `` x G. NEW CONTRACT AMOUNT (A+E): $4,891,291.30 This Change Order is not valid w ithout the following signatures: NIZYI®2. C NT CTOR Zqk q n C &- 1 5/boa ,NtR'S REPR SENTATIV 41d4— S /+/02- Victor Kilman, Putchasing Manager L �'- t .4 /Z/ OJECT ARCHITECT NGINEER Approved as to Form:d illiam de Haas, Contract Manager/Attorney Bob Cass, City Manager Change Orders over $25,000 require the fol lowing signatures: CITY OF LUBBO ATTEST: 5 / 23 / 02 ,02 AF/Marc Mc g 1 , Mayor Rebec a Garza, Ci reta r PUR-045 (Rev 12101) DUIf*4I1*4CK SIzZO!S, IN,C • April 22, 2002 Parkhill, Smith & Cooper, Inc. Attn: John Hamilton 4222 85`1 Street Lubbock, TX 79423 Ph. (806) 473-2200 // Fax (806) 473-3500 Re: Westport Apron & Taxiway Expansion .Lubbock International Airport Dear Mr. Hamilton, Pursuant, to your request, please see the attached pricing for the revised alternate proposal utilizing 4" ADS underdrain . DBI wilt require 5 working.days be added to the contract time to account for installation of this work. Should you require additional information please give me a call at (817) 491-0946, Sincerely, Dennis Bailey Bncl: 1 cc: A Dvorak, J Roelofs, R Kuiken, I Goodwin, File MAILING ADDRESS: P.O. 13ox 735 * PHYSICAL ADDRESS: 4701 HIGHWAY 377 ROANOKE, TEXAS 76262 e ` Job Name: LUBBOCK WESTPORT APRON & TAXIWAY EXPANSION Location: LUBBOCK, TX Bid Date: ASAP Bid Time: ASAP Item Description No. Qty Unit I Bid l Unit Bid Amount PROPOSED UNDERDRAIN 0.00 0.00 1 4" ADS N-12 PVC (PERFORATED) 3540 LF 8.67 30.691.80 2 DOUBLE CLEAN -OUT 3 EA 477.00 1,431.00 3 SINGLE CLEAN -OUT 10 EA 460.00 4,600.00 4 GRAVEL BACKFILL MATERIAL 295 CY 18.00 5,310.00 5 HAUL -OFF EXCESS SPOILS 295 CY 2.00 590.00 6 CONNECT TO STORM DRAIN 2 EA 460.00 920.00 7 FIELD LAYOUT/ADD'L MOB. 1 LS 2.826.00 2,825.00 0.00 0.00 TOTAL ------- ----- ------------ > $ 46,367.80 0.00 0.00 0.00 0.00 0.00 0.0o 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TOTAL P.03