HomeMy WebLinkAboutResolution - 2002-R0116 - Amendment To Agreement - Delta Airport Consultants, Inc. - 03_28_2002Resolution No. 2002-RO116
March 28, 2002
Item No. 29
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, Amendment No. 6 to the
Agreement dated May 22, 1997, by and between the City of Lubbock and Delta Airport
Consultants, Inc. for the design of a R/W 17R-35L Exit Taxiway, and related
documents. Said Amendment No. 6 is attached hereto and incorporated in this
resolution as if fully set forth herein and shall be included in the minutes of the City
Council.
Passed by the City Council this 28th day of March 2002.
C '1
WINDY SITTON, MAYOR
ATTEST:
e ecca Garza, City ecretary
APPROVED TO CONTENT:
Mark irector o
APPROVED AS TO FORM:
Linda L. Chamales, Supervising Attorney
Office Practice
gs:/ccdocs/Amendmenti/6,Delta Airport
March 19, 2002
RESOLUTION NO. 2002—RO116
March 28, 2002
Item No. 29
AMENDMENT NO. SIX (6)
TO THE
AGREEMENT FOR PROFESSIONAL SERVICES
BETWEEN
CITY OF LUBBOCK, TEXAS
THE OWNER
[�I7
DELTA AIRPORT CONSULTANTS, INC
THE ENGINEER
DATE: JANUARY 14, 2002
DELTA PROJECT NO. TX 02026
TASK 6 - Construct RIW 17R-35L Exit Taxiway (Design and Contract Documents Services)
and
Construct R/W 17R-35L Exit Taxiway (Bidding and Negotiation Services)
2619
Resolution No. 2002-RO116
AMENDMENT NO. SIX (6)
TO THE AGREEMENT FOR PROFESSIONAL SERVICES
BETWEEN OWNER AND ENGINEER
FOR PROFESSIONAL SERVICES
JANUARY 14, 2002
This AMENDMENT NO. SIX (6), dated January 14, 2002 made a part of the Agreement for
Professional Services dated May 22, 1997, between the City of Lubbock, Texas, the OWNER,
and Delta Airport Consultants, Inc., the ENGINEER, for work at Lubbock International Airport,
Lubbock, Texas.
The following revisions and/or additions are made to the original Agreement:
The scope of work to be covered by Amendment No. Six (6) shall be as follows:
TASK 6 - Construct R/W 17R-35L Exit Taxiway (Design and Contract Documents
Services) and
Construct R/W 17R-35L Exit Taxiway (Bidding and Negotiation Services)
ADD the following paragraphs to Article 6:
6.8 Task 6: Preliminary, Design and Contract Documents Phase. It is understood that the
ENGINEER will proceed on the project after a Notice to Proceed from the OWNER.
The schedule will be as follows:
Design and contracts Documents Phase —120 Calendar Days
6.9 Task 6: The Bidding and Negotiating Phase shall be scheduled as mutually agreed
between the OWNER and the ENGINEER.
ADD the following paragraphs to Article 7:
7.19 Task 6: Construct R/W 17R-35L Exit Taxiway (Design and Contract Documents Phase
and Bidding and Negotiating Phase). For services outlined, the ENGINEER will be
compensated on a Lump Sum Basis. The Lump Sum Fee for Design through Bidding
Phases will be $99,946 unless a major change or addition to the scope of work is required
(not caused by the ENGINEER) in which case and amendment to this agreement will be
negotiated by the participating parties. The Lump Sum Fee is based on a cost breakdown
shown in Attachment AMID 6-1. The fee includes the design and contract documents and
TX 02026 COOLAM6
AMENDMENT NO. SIX (6)
bidding and negotiations. The construction observation phase will be covered in an
amendment to this agreement.
7.20 Task 6: Construct R/W 17R-35L Exit Taxiway. Reimbursables and Subcontracted
Services provided by the ENGINEER shall be on a Unit Cost plus Fixed Fee )basis.
Compensation for these services shall be limited to a budget amount of $42,718 unless
written authorization has been received from the OWNER. The budget amount is based
on an Estimated Cost of $38,654 and a Fixed Fee of $4,065 as outlined in Attachment
AMID 6-2.
The following attachments are made part of this Amendment:
Attachment "AMD 6-1" Workhour & Fee Summaries (Task 6)
Attachment "AMD 6-2" Subconsultant RFPs & Proposals (Task 6)
All other provisions of the original Agreement remain unchanged.
OWNER:
City of Lubbock
1625 13th Street, Suite L-04
Lubbock, Texas 79401
ENGINEER:
Delta Airport Consultants, Inc.
3701 Executive Center Drive, Suite 265
Austin. Texas 78731
'l g
Mayor
Date: March 28, 2002
ATTEST:
APPROVED AS TO CONTENT:
t.
Mark . arle, Director of Aviation
APPROVED AS TO FORM:
Hollaway, P.E.
Vice President
Date: Tliah2
Notary :
O
My Commission Expires: b
pry r ass CRIS iEL GUER€3ERO
NOTARY PUBLIC
STATE OF TEXAS
My Comm. Exp. 07-31-04
Linda Chamales, Supervising Attorney -Office Practice
AMENDMENT NO. SDK `(6)
ATTACHMENT "AMD 6-1"
WORKHOUR & FEE SUMMARIES
ATTACHMENT "AMD 6-1"
Fee Summary - Articles 7.19
Construct R/W 17R-35L Exit Taxiway
Lubbock International Airport
Lubbock, Texas
AIP Project No. 3-48-0144-pending
Delta Project No. TX 02026
Date: January 14, 2002
Est Hourly Est Est
Description hrs rate Cost Fee Totals
1) Design Work Hour Cost
a) Basic Services
Sr. Project Manager
73
$122
8,906
1,336
Proj Manager
275
$87
23,925
3,589
Proj Engineer
400
$57
22,800
3,420
Technician
446
$45
20,070
3,011
Clerical
122
$46
5,612
842
Subtotal:
1316
$81,313
$12,198 $93,511
15%
b) Additional Services
Sr. Project Manager
14
$122
1,708
256
Proj Manager
20
$87
1,740
261
Proj Engineer
28
$57
1,596
239
Technician
0
$45
0
0
Clerical
12
$46
552
83
Subtotal:
74
$5,596
$839 $6,435
15%
1) Totals
$5,596
$839 $6,435
Article 7.19 Lump Sum Fee: $99,946
File: 02026FE01.XLS
ATTACHMENT "AMD 6-1"
Workhour Summary - Article 7.19
Construct R/W 17R-35L Exit TaxWvay
Lubbock International Airport
Lubbock, Texas
AIP Project No. 3-48-0144-pending
Delta Project No. TX 02026
Date: January 14, 2002
Description
No.
SR PM
(hr)
PM
(hr)
PD
(hr)
TECH
(hr)
CLER
(hr)
PLANS
Cover Sheet
1
0
1
4
8
0
General Layout & Notes
1
1
8
16
24
2
Phasing Layout & Notes
2
1
12
32
40
2
Grading & Drainage
1
8
30
44
80
2
Erosion & Sediment Control Notes
1
0
4
8
12
2
Erosion & Sediment Control Details
1
0
4
8
12
0
Typical Sections
1
0
4
8
16
0
Pavement Details
1
1
4
12
32
0
Joint Layout
1
2
8
12
40
0
Joint Details
1
2
8
12
16
2
Drainage Details
1
0
4
8
24
2
Miscellaneous Details
1
0
8
12
24
0
Airfield Signage & Lighting
1
4
12
24
40
0
Cross Sections
1
0
8
12
24
0
15
DESIGN
Predesign Meeting
1
12
0
0
0
2
Coordinate Ground Survey
1
2
4
2
2
Coordinate Geotech Investigations
1
2
4
2
2
Design Correspondence
2
8
16
0
8
Final Grading Design
2
12
24
12
0
Final Drainage Design
2
12
16
0
0
Site Visits
1
12
12
0
0
0
Quantities and Estimates
2
12
40
12
0
Specifications
4
16
24
2
48
Final Design Report
4
16
12
8
24
Quality Control Review
4
16
8
0
0
BIDDING & NEGOTIATION
Bid Prep, Advertisement, and Distrib.
Pre -Bid Meeting
2
8
12
8
8
Bidders Questions & Addendum
0
16
8
0
4
Bid Opening
4
16
12
8
8
Bid Tabulation & Recom.
0
8
0
0
0
2
4
8
0
4
Basic Service Hours Subtotal:
ADDITIONAL SERVICES
User/Phasing Meeting/City Coordination 1
SWP3 Construction Plan
Project Application
73 275
400
446
122
12 12
8
0
4
1 4
12
0
4
1 4
8
0
4
14 20 28 0 12
File: 02026FE01.XLS
Resolution No. 2002-R0116
AMENDMENT NO. SIX (6)
ATTACHMENT "AMD 6-2"
SUBCONSULTANT RFPs & PROPOSALS
ATTACHMENT "AMD 6-2"
Fee Summary - Articles 7.20
Construct R/W 17R-35L Exit Taxiway
Lubbock Intemational Airport
Lubbock,Texas
AIP Project No. 348-0144-pending
Delta Project No. TX 02026
Date: January 14, 2002
1) Direct Nonsalary Expenses
Ground Surveys - High Tech (DBE)
Geotechnical Investigation - Dyce (DBE)
Travel
Printing (incl. bidding)
Advertise, Meals, Misc.
Subtotal:
2) Estimate Cost & Fixed Fee
3) Cost Allowance
15,000 1,500
9,140
914
4,000
600
5,000
750
2,000
300
$35,140 $4,064 $39,204
$35,140 $4,064 $39,204
10% $3,514 $0 $3,514
$38,654 $4,064 $42,718
Article7.20 Budget Amount: $42,718
-ri V C�
_ _ -�po�r conusuLra,�..ys, iwc.
engineers . - planners
Charlotte, NC Austin, TX Harrisburg, PA Richmond, VA
December 20, 2001
Ms. Melissa Watkins, B.B.A.
High -Tech Land and GPS Surveyors, Inc.
3330-70" St.
Suite 202
Lubbock, Texas 79413
RE: Request for Proposal
Design Ground Surveys
Extension of Taxiway "B-1"
Lubbock International Airport
Lubbock, Texas
AIP Project No. 3-48-pending
Delta Project No. 02026
Dear Ms. Watkins:
Delta Airport Consultants is requesting a proposal from your firm'to provide Design Aerial Surveys for
the above referenced project at Lubbock International Airport. This project will include design and
construction of an extension to Taxiway "B-1 ": A marked layout of the. Airport is enclosed.
SCOPE OF WORK
Item 1
1. Baseline "R" shall be set as indicated on the enclosed layout, which is the same baseline used on
the Runway keel project. Topographical information, including spot elevations, shall be provided
from Station 75+00 to Station 50+0.0 and to the offsets shown on the enclosed layout.
2 Locations of all utilities within the marked survey area (underground and above) shall be marked
and identified Utility structures shall be given with top elevations. Waterlines and sewer lines
shall be traced to the next junction or appurtenance upstream and downstream outside the project
limits.
,1*
3761 Executive Center Drivd, Suite 265 Telephone (512) 349-9109
Austin, Texas 78731 Fax (512) 349-9118
Homepage: http://www.dettaairport.com E-mail: delta@deltaairport.com
3. Ihaipage structures within the marked survey area shalt be given .with top elevations, inverts_ (in
and out for all connections) inside pipe diameters, pipe and manhole construction materials; etc.
Drainage outfall lines existing within the project limits shall be traced to the next junction point
outside the project limits.
Item 2
4. Please -use the benchmarks at locations indicated on the enclosed layout by the Engineer.
Benchmarks should be substantial enough to withstand weathering and traffic, as applicable.
Item 3
5. A cost for two (2) additional days of design survey should be included separately. This shall
included both field and office time. These services may.. be 'required on short notice to verify
critical elevations.
6. Horizontal control shall be based on NAD .83 state plane coordinates. Vertical control shall be
based on U. S. Coastal and Geodetic Datum NAYD 88 datum. Spot elevations shall be given to
10.01 feet for paved sections and +0.1 feet for turfed sections. Locations of permanent items
within the project limits shall be shown relative to Baseline "R" (horizontal control f0:050).
7. The drawing world shall be oriented with the State Plane Grid Coordinate System.
8. Coordinate ground control with Delta's Aerial Surveyor.
9. Provide a drawing showing all features located within the project limits, including 1-foot
contours, spot elevations, and all planimetric features.
10. - It is requested that four (4) files containing the following information be submitted for our use:
File 1 - AutoCAD.DWG - Planimetrics only files (AutoCAD Release 14 or later)
File 2 - AutoCAD.DWG - Contours only file (AvtoCAD Release 14 or later)
File 3.- AutoCAD.DWG - Breaklines used to generate:the contours. (AutoCAD Release 14
or later)
File 4 Provide an ASCII text point file; in the format: point number, northing, Basting,
elevation, description (P,N,E,Z,D). A points file corresponding' to State Plane Grid
Coordinate System and the same file translated to Baseline "R", station and offset
coordinates is desired.
o No elevations shall be assigned to any lines or objects in the planimetrics file. Only
contours, breaklines and spot elevations shall have elevations assigned to them.
o All spots shall be on one (1) layer and contain an attribute for elevation(s) and point
description.
o All contours shall be continuous polylines with intermediate and index layers (See layer
name list).
o . Please use the attached layer name list to organize existing features.
o All text in the drawing file shall be standard (simplex font), sized to match "Leroy"
standard templates (89, 100, 120, etc.).
o Provide a list of all layer names with line type, color, and other drawing structure .
information.
o Drawing entities shall have color and line type set `BYLAYER' .
o If any non-standard line types or symbols are used inthe drawing, provide a copyof the
necessary code required to load and edit the drawing as submitted:
11. All computer files (drawing files, and ASCII points files) shall be submitted on 15" high density
diskettes or CD's.
12. -Please prepare proposal showing separate line item cost each for Items 1, 2, and 3.
GENERAL
13. If accepted, your proposal shall serve as a basis fora not -to -exceed contract directly with Delta
Airport Consultants, Inc. The proposal should include a fee schedule; estimated work hours,
anticipated non -salary cost and a "not -to -exceed" ceiling figure. A copy of Delta's subconsultant
contract has been attached for your review.
14.'. As soon as your services are complete, your firm should invoice Delta Airport Consultants, Inc.
Your invoice will then be included with the next Delta invoice. Payment for your services will be
forwarded within fourteen (14) days upon receipt of payment from the. Owner. -
15 All crews working. in the active aircraft operational areas shall have aviation band radios and
'monitor the airport Ground Control frequency (121.9 I IM) at all times. All activities on the.
airfield shall -be coordinated with the Owner and the Engineer. It is anticipated that required work
wiHiin the runway safety areas will be accomplished without closing the runways. The work
crews shall be prepared to clear the runway and taxiway safely areas during aircraft operations.'
Please note- that security training for the field crew leader will be required. Security :training .
requires approximaately, one full day. Work shall be scheduled to minimize closures of Runway
17-35. The work crews shall be prepared to clear the Runway and Taxiway safety areas during
aircraft operations as ordered by the Owner.
16. The Airport Manager must be contacted prior to beginning any reconnaissance and/or field work
inside and outside the Airport Security fence or adjacent properties.
Lubbock International Airport
W. Mark Earle
.Director of Aviation
Route 3, Box 389
Lubbock, Texas
806.775.3125
17. Since this project is funded by the Federal Government, please confirm that. your firm is in
compliance with the attached Title VI Assurances.
18. Companies whose employees perform work on the airport shall have General Liability- Insurance
with a. minimum coverage of $2,000,000.00.
19. If your firm is a disadvantaged business enterprise (DBE), provide a copy(s) of current
certification by a State or Federal agency(s), preferably where the project is located
Delta is requesting your proposal on or before January 117 2001 It is anticipated that a notice -to -proceed
for your work will be given during March, 2002. Upon receipt of the written notice -to -proceed, it is
requested that a copy of the electronic files for the requested surveys be forwarded to our office within 30
days.
If .you should have any questions concerning this matter, pleases do not hesitate to contact our office:
S' rely,
Edwar - ollaway, PE
Enclosures
cc:- Mark Earle, Director of Aviation, Lubbock International Airport
1:ID=W202aO2026F003"QGROUI DMOC.
w/encl.
LAYER NAME LIST
Laver Name Description of Items in Laver
0
Blank
Ex_spot
All existing spot elevations taken
Ex_ep
All existing edges of airfield pavement
Ex road
All existing edges of roadway pavement (which are not curb and gutter)
Ex_dirtroad
All existing edges of non -paved roadways
Ex drain
All existing drainage structures and pipe
Ex_inter
All. existing intermediate contours
Ex index
All existing index contours
Ex contour label
All existing contour labels
Ex fence
All existing fence and gates
Ex build .
All existing buildings
Ex mark
All existing markings
Ex curb
All existing curb and gutter
Ex sidewalk
All existing sidewalk
Ex]guardrail
All existing guardrail and other barriers
Ex break
All existing breaklines
-Ex tree
All existing vegetation
Ex pond
All existing bodies -of water
Ex stream
All existing streams and tributaries
Exutil
All existing utilities
Ex elec
All existing electrical fixtures
Ex sign
All -existing signs
Exrr
All existing railroads
Ex _grid
Reference grid
Ex text
All existing text not associated with any of the above layers
Provide a text layer for each of the above mentioned layers.
(i.e. Ex ep.- Ex eptxt, Ex drain - Ex draintxt)
If something does not fall in any of the above layer categories, create a new layer for that category.
UK
DELTA AIRPORT CONSULTANTS, INC.
3701 EXECUTIVE CENTER DRIVE, SUITE 265
AUSTIN, TEXAS 78731
JANUARY 8, 2002
RE:. ' LUBBOCK.INTERNATIONAL AIRPORT
DESIGN GROUND SURVEYS/EXTENSION OF TAXIWAY "B-1"
AIP PROJECT NO.3-48-pending
DELTA PROJECT NO. 02026
ATTN: SHERI EDWARDS-HOLLAWAY, P.E.
Dear Ms. Edwards-Hollaway,
We appreciate the opportunity to provide this proposal to Delta Airport Consultants, Inc. for the
surveying. services for the design and constuction survey of an extension to Taxiway `B-1 at the
Lubbock International Airport in.Lubbock, Texas. Our proposed "not-to=exceed" ceiling fee for.this
project is $15,000.00 as per your general scope of services dated December 20, 2001, as per the
following breakdown of hours estimated for each .Item. All billing will be as per our attached rate
schedule according to actual time spent. Please note our invoicing has a term of net 30 days.
The following is our estimated workhours for this project:
ITEM 11:
*Topo area of approximately 86 acres as per RFP scope
*Horizontal control for topo points and baseline
*Vertical control for topo points and two existing Benchmarks at area of topo
*Topo data collection
*Data download and edit
*CAD files
*ASCii files
3-Man Field Party .40 Hours @ '$ 110.00 Per Hour $ 4,400100
Mileage
1,600 Miles @ $ 0.60 Per Mile
960.00
Office
40 Hours @ $ 65.00 Per Hour
2,600.00
R.P.L.S.
8 Hours @ $ 80:00 Per Hour
640.00
GPS (2-receivers)
1 Day @ $ 200.00 Per Day
200.00
$ 8,800,00
ITEM 2:
*Level circuit through all existing benchmarks along baseline R using NAVD88 Datum
3-Man Field Party 16 Hours @ $ 110.00 Per Hour $ 1,760.00
Mileage 80 Miles @ $ 0.60 Per. Mile 48.00
Office 4 Hours @ $ 65.00 Per Hour ' 260.00
$ 2,068.00
HIGH-TECH LAND & GPS SURVEYORS, INC.
3330 70th St., Suite 202 - Lubbock, Texas 79413
(806) 788-0020 - Fax (806) 792-1646.
ITEM 3:
*Two (2) additional days of design survey data
3-Man Field Parry 16 Hours @ $ 110.00 Per Hour
Mileage 80 Miles @ $ 0.60 Per Mile
Office 8 Hours @ $ 65.00 Per Hour
RPLS 4 Hours @ $ 80.00 Per Hour
GP.S (2-receivers) 2 Days @ $ 200.00 Per Day
$ 1,760.00
48.00
520.00
320.00
400.00
$ 3,048.00
We anticipate starting this survey within two (2) or three (3) weeks of when written notice to proceed
is received:
It is a pleasure to provide this proposal to Delta. Airport Consultants, Inc. and if any further
information is needed or if you have any questions, please feel free to contact meat the phone
number and address below.
Respectfully Submitted,
Melissa K. Watkins, S.I.T., B.B.A.
President
TxDOT Certified Woman -Owned DBE
State of Texas Certified Historically Underutilized Business
HIGH-TECH LAND & GPS SURVEYORS, INC.
3330 70tti St., Suite 202 - Lubbock, Texas 79413
(806) 788-0020 Fax (806) 792-1646.
�r
f
l
i
7
-
♦OR
DELTA AIRPORT CONSULTANTS, INC.
3701 EXECUTIVE CENTER DRIVE, SUITE 265.
AUSTIN, TEXAS 78731
ATTN: SHERI EDWARDS-HOLLAWAY, P.E.
Dear Ms. Edwards-Hollaway,
JANUARY 8, 2002
We propose to furnish surveying parties, as listed below, equipped with all the necessary surveying
equipment and transportation at the following rates:
Two (2) Man Field Party'
@ $ 90.00 Per Hour
Three (3).Man Field Parry
@ $ 110,00 Per Hour
Four (4) Man Field Party
@ $ 120.00 Per -Hour
G.P.S. Trimble 4000 S.S.E. & S.S.i.
@ $ 200.00 Per Day
Satellite Surveyor
We propose to furnish office work, including all machines and materials at the following
rates:
Drafting
@
$
60.00 Per Hour
Computations
@
$
65.00 Per Hour
Secretarial
@ .
$
20.00 Per Hour
R.P.L.S.
@ .
$
80.00 Per Hour
Lathes
@
$
0.60 Each
Stakes
@
$
0.60 Each
Mileage
@
$
0.60 Per Mile
Monuments
@
$
200.00 Each
Travel expenses for when the crew must spend the night away from home will be as
follows:
Lodging. @ $ Actual :Cost
Meals @ $ Actual Cost
We understand that Delta Airport. Consultants, Inc. and High -Tech Land and GPS Surveyors, Inc.
will mutually determine the size party required and the office services desired.
Respectfully submitted,
Melissa K. Watkins, S.I.T., B.B.A.
President.
TxDOT Certified Woman -Owned DBE
State of Texas Certified Historically Underutilized Business
HIGH-TECH LAND & GPS SURVEYORS, INC.
3330 70th St, Suite 202 • Lubbock, Texas 7941.3
(806) 788-0020 • Fax (806) 792-1646.
� M�JWX__
AP PORT COMSULTAI is, /NC.
engineers - planners
Charlotte, NC Austin, TX Harrisburg, PA ' Richmond; VA
December 20, 2001
Mr. Lee Peterson
Dyess-Peterson Testing Laboratory, Inc.
1700 S.E. 22"' Street
P.O. Box 30699
Amarillo, Texas 79120
RE: Request for Proposal
Subsurface Investigation
Extension of Taxiway `B71"
Lubbock International Airport
Lubbock, Texas
AIP Project No. 3-48-pending
Delta Project No. 02026
Dear Mr. Peterson;
Delta Airport Consultants, Inc. is preparing a contract for the design of an extension to Taxiway "13-1" at
Lubbock International Airport in Lubbock, Texas. The proposed construction is shown on the enclosed
partial Airport Layout Plan sheet and boring layout. Please provide a -cost proposal fof the following
geotechnical services. .
SCOPE
1. Seven (7) borings will be required in the future Taxiway "13-1 " Extension area. The boring locations
may be adjusted in the field as required to avoid existing utilities, structures, etc., and a§
recommended by the on -site geotechaical engineer. The approximate boring locations and requested
depths are as follows:
Borings Bl —B5 Along the proposed length. of Taxiway `B1", roughly 200' spacing
Borings B6 — B7 Within the project site, at the discretion of the Engineer
For all borings, classification and depth of each soil. group by- the Unified Classification System
(visual method) shall be recorded The approximate depth of water table should be reported. Liquid
limit, plastic limit, in -place moisture content, and sieve analysis of the. existing soil materials shall be
obtained in accordance with normal procedure as necessary to determine suitability for structural fill.
Bag samples' shall be obtained as necessary. to run laboratory CBR`s at optimum moisture and
modified proctor for each soil type. The material shall be analyzed for suitability and for ease of
excavation. -
The depth of existing topsoil should be reported. A sample of the existing topsoil and subsoil shall.
be obtained and a basic soil fertility test completed
J.\docsl02026102026f002.RFQgeote&doc
3701 Executive Center Drive, Suite 265 Telephone (512) 349-9109
Austin, Texas 78731 Fax (512) 349-9118
Homepage: http://www.deltaairport.com E-mail: delta@deltaairport.com
2. The geotechnieal report should include all test data, recommendations . concerning the quantity and
quality of rock, if any, the stutability of the soil material for the embankment, design CBR
recommendations, as well as any other pertinent recommendations. The report should be sealed by a
registered professional engineer in the state of Texas.
3. All boring locations shall be reported with station and offset from runway centerline. This work will
be coordinated with the surveyor for the project.
GENERAL.
4. If accepted, your proposal shall serve as a basis for a not -to -exceed contract directly with Delta
Airport Consultants, Inc. The proposal should include a fee schedule, estimated work hours, .and
anticipated non -salary cost.. A copy of Delta's subconsultant contract has been attached for your
review.
5. As soon as your services are complete, your firm should invoice Delta Airport Consultants, Inc.
Your invoice will then be included with the'next Delta invoice. Payment for your services will be
forwarded within fourteen (14) days upon receipt of payment from the Owner.
6. Since this project 'is funded by the Federal Government, please confirm that your firm is in
compliance with the attached Title VI Assurances.
7. Companies whose employees perform work on the airport shall have General Liability
Insurance with a minimum coverage of $2,000,006.
8. All crews working in the active aircraft operational areas shall have aviation band radios and monitor
the airport Ground Control frequency (121.9 MHZ) at all times. All activities on the airfield shall be
coordinated with the Owner and the Engineer. It is anticipated that required work within the runway
safety areas will be accomplished without closing the runways. The work crews shall be prepared to
clear the runway and taxiway safety_ areas during aircraft operations. Please note that security
training for the field crew leader will be required. Security training requires approximately one foil
day.
9. If your firm is a disadvantaged enterprise (DBE), provide a copy(s) of current certification by a State
or Federal agency(s), preferably where the project is located
Delta is requesting your proposal on or before January. 11, 2002 . It is anticipated, that a notice -to -proceed
for your work will be given during March 2002. Upon receipt of the notice -to -proceed, it is requested that
the final geotechnical report be forwarded to our office within thirty (30) days.
J.MocA0202a02026f002MQpate&dw
If you should have any claestiGus concerning this utter, please do not hesitate to contact.our office.
Sincerely,
Sheri Edwards-Hollaway, PE
Enclosure
cc:Mark Ep* . !;ubboQk international Airport
wlencl
JAd,,\020261o2026fUQ2.RFQV,mcL dw
Sent By. DYESS PETERSON TESTING;. 806 372 5552- Jan-18-02 11:02; Page 2/2
ptim"SOHitSilG OR TOR IBC.
P.O. BOX 30699
A MARILLO, TEXAS 79120 PROFESSIONAL TESTING & iNSPEC 1ON
OFFICE: (806) 372-4911 CHEMICAL & MATERIALS TESTING.
FAX: (8U6) 372-5552
January 17, 2002
Delta Airport Consultants, inc.
% Sheri Edwards-Hollaway, PE
3701 Executive Center Drive, Suite 265
Austin, Texas 7$731
5853 49TH STREET
LUBSOCK,TEXAS 79424
OFFICE: (806) 785.8378
PAX: (806) 785.1959
Re. subsurface Soils Investigation for Proposed Extension of Taxiway B-1, Lubbock
International Airport -Lubbock, Texas Prof No. 02-02-DE
Mobilization
Staking test holes and clearing test hole locations with appropriate
personnel @ $50/hour test. 6)
7- W borings (70' total) 0 $16/ft.
Drilling Superintendent on site during drilling activity
@ $50/hour (est. 8) (monitor airport frequency 121.9)
21- Atterberg Limits @ $37.50/each
21 - Moisture contents @ S12.50/each
21 - sieve Analysis (-1200 Sieve/Decant) @ S15/each
21- Soil Classifications @ $5.00/each
7'- Remolded California Bearing Ratios (CBR) @ $500/each
7 - Mogified Proctors @ S150/each.
1 - Soil Fertility Test @ $150/each
Engineering Time
Security Training -Drilling Superintendent -1 pay
Standby @ $100/hour, if nec-
250,00
$ 300.00
$ 1120.00
$ 400.00
5 787.50
$ 26.2.50
$ 315.00
$ 105'00
$ 3500.00
$ 1050.00
$ 150.00
$ 500.00
$ 4g0.00
$ 9140.00
PRICING: The pricing Is based on the scope of work and quantities listed above. These prices
may Increase if the scope of work or actual quantitiesprovided are greater than scope of
work or quantities bid. These prices are..guaranteed for ninety days.
TERMS: Payment.is due within ten days of the date of invoice. interest will be accrued at a
rate of 18% per annum. Our price Is based on payment within 1p clays of invoice, If terms
over 10 days are requested, please notify us so we can adJust our prices accordingly.
We appreciate the opportunity to bid this project and are looking forward to hearing from
you. if you have any questions, please do not hesitate to call.
ReSpectfUlly 'tied,
Dalana Peterson,
President
Accepted By: Delta Airport Consultants, inc.
Rate:
CONCiZETE
BRICK.
BLOCK + SOILS
ASPHALT
ENGINEER'S OPINION OF PROBABLE COST
CONSTRUCT R1W 17R-35L EXIT TAXIWAY
LUBB¢CK_ NTFRNATJO_NAL.AIRP13AT
LUBBOCK, TEXAS
AIP PROJECT NO.
DELTA PROJECT NO. TX 02026
DATE: JANUARY 14, 2002
ITEM
NO.
SPEC.
NO.
I DESCRIPTION
UNITS
QUANTITY7
UNIT
PRICE
TOTAL
AMOUNT
1
P-100
MOBILIZATION
LS
1
$113,000.00
$113,000.00
2
P-140
PAVEMENT REMOVAL
SY
1,900
$4.00
$7,600.00
3
P-150
MISCELLANEOUS DEMOLITION
LS
1
$5,000.00
$5,000.00
4
P-152
UNCLASSIFIED EXCAVATION
CY
20,000
$10.00
$200,000.00
5
P-152
UNSUITABLE EXCAVATION
CY
2,000
$15.00
$30,000.00
6
P-155
12" LIME TREATED SUBGRADE
SY
12,450
$3.50
$43,575.00
7
P-155
LIME
TN
675
$95.00
$64,125.00
8
P-156
EROSION & SEDIMENT CONTROL
LS
1
$25,000.00
$25,000.00
9
P-156
SILT FENCE
LF
800
$2.50
$2,000.00
10
P-160
PAVEMENT SURFACE MILLING
SY
2,200
$5.00
$11,000.00
11
P-209
8" CRUSHED AGGREGATE BASE
TN
5,700
$21.00
$119,700.00
12
P-304
7" CEMENT TREATED BASE
SY
12,450
$14.00
$174,300.00
13
P-304
PORTLAND CEMENT
TN
300
$120.00
$36,000.00
14
P-501
14" PORTLAND CEMENT CONCRETE
SY
12,450
$55.00
$684,750.00
15
M-103
LIGHTED PORTABLE CLOSED RW MARKER
EA
2
$20,000.00
$40,000.00
16
M-103
CLOSED TAXIWAY MARKER
EA
2
$1,000.00
$2,000.00
17
M-104
TRAFFIC DRUM
EA
20
$40.00
$800.00
18
M-107
AVIATION BARRICADES
LF
500
$25.00
$12,500.00
19
P-619
PAINT REMOVAL
SF
100
$2.00
$200.00
20
P-620
RUNWAY AND TAXIWAY PAINTING
SF
5,700
$1.25
$7,125.00
21
D-701
18" RCP CLASS V
LF
192
$45.00
$8,640.00
22
D-701
18" TxDOT PIPE END TREATMENT
EA .
2
$1,500.00
$3,000.00
23
D-705
6" UNDERDRAIN
LF
200
$40.00
$8,000.00
24
D-705
6" UNDERDRAIN ENDWALL
EA
4
$250.00
$1,000.00
25
T-901
SEEDING & MULCHING
AC
10
$1,500.00
$15,000.00
26
L-108
CABLE TRENCH
LF
1,800
$3.00
$5,400.00
27
L-108
#8, 5KV TYPE C CABLE
LF
4,600
$1.00
$4,600.00
28
L-108
#6 BARE COUNTERPOISE
LF
2,300
$0.75
$1,725.00
29
L-110
2" SCH. 40 PVC CONDUIT
LF
1,800
$2.00
$3,600.00
30
L-110
4" - 4W CONC. ENCASED DUCT BANK
LF
425
$45.00
$19,125.00
31
L-125
L-850C IN -PAVEMENT HIRL
EA
4
$1,500.00
$6,000.00
32
L-125
L-861T BASE MOUNTED MITL
EA
19
$750.00
$14,250.00
33
L-125
16" L-867 PULLCAN
EA
2
$250.00
$500.00
34
L-125
TAXIWAY SIGN
EA
4
$3,500.00
$14,000.00
35
L-125
RUNWAY HOLD SIGN
EA
2
$4,500.00
$9,000.00
36
MINOR ITEMS (10%)
LS
1
$169,251.50
$169,251.50
CONSTRUCTION TOTAL: $1,861,766.50