HomeMy WebLinkAboutResolution - 4801 - CO #1 To Contract-Big D Lining Systems Inc-Liner Repairs, Landfill - 04_13_1995Resolution No. 4801 April 13, 1995 Item #20 RESOLUTION WHEREAS, the City of Lubbock heretofore entered into an agreement with Big D Lining Systems, Inc., for the installation of a flexible membrane liner and leachate collection system for Cell IV(b) 1 Phase 1 at the City of Lubbock landfill facility; and WHEREAS, final installation of the liner was to be performed by City personnel, but the liner was damaged during installation; and WHEREAS, it was determined that final installation of the liner should be performed by the contractor as the City lacked proper equipment and expertise to install the liner without damage; and WHEREAS, the immediate completion of the lining was essential to the health of the citizens of the City of Lubbock due to the amount of incoming waste being received by the landfill; NOW THEREFORE: BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the City Council hereby authorizes and approves the attached Change Order No. 1 to Project No. 12913 by Big D Lining Systems, Inc., for liner repairs and completion of protective fill for Cell IV (b) 1 (Phase 1) at the City of Lubbock landfill and the Mayor of the City of Lubbock is hereby authorized and directed to execute such Change Order No. 1 in the amount of $32,810.26 on behalf of t 1 bbock. Passed by the City Council this 13 h daril AVID R. LAN09TON. MAYOR ATTEST: brtt—' a— (—L etty . Johns , City Secretary APPROVED AS TO CONTENT: Q&a- &aL� Debra Frankhouser, Assistant Solid Waste Superintendent APPROVED AS TO F Donald G. Vandiver, First Assistant City Attorney ddres/ccdocs/lanfil.res March 29, 1995 03 CHANGE ORDER No. 1 PROJECT: Flexible Membrane Liner and Leachate Collection System OWNER: City of Lubbock CONTRACTOR: Big D Lining Systems, Inc DATE OF ISSUANCE: April 28, 1994 OWNER'S PROJECT NO. 2143-541101-9977 ENGINEER: Parkhill, Smith & Cooper, Inc. CONTRACT FOR: Flexible Membrane Liner and ENGINEER'S PROJECT NO. 01-2680-94 Leachate Collection System for Cell IV (b) 1 Phase 1 You are directed to make the following changes in the Contract Documents. Description: Remove and replace protective cover soil on a portion of west slope and place protective cover soil on remaining portion of west slope and all of north slope of Cell IV (b) 1 Phase 1. Attachments: (List documents supporting change) See Attached. CHANGE IN CONTRACT PRICE Original Contract Price $ 267,488.10 CHANGE IN CONTRACT TIME: Original Contract Time 45 calendar days days or date Previous Change Orders No. to No. $ 0.00 Net change from previous Change Orders 0 days or date Contract Price prior to this Change Order $ 267,488.10 Contract Time prior to this Change Order 45 calendar days days or date Net Increase (decrease) of this /IChange Order $ 32,810.26 Net Increase (decrease) of this Change Order 0 days or date Contract Price with all approved Change Orders $ 30029836 Contract Time with all approved Change Orders 45 calendar days days or date RECOMMENDED: APPR D. by: y En"'ee` 12/m/�y DAVID R. LAXG EJCDC No. 1910-8-B (1983 Edition) ATTEST: G Prepared by the Engineers' Joint Contract Documents Committee and endo Reprinted 5195 Contractor I,rnJ Betty M. Johnson, City Sec. by The ociated General Contractors of America. APPROVED AS TO CONT NT: VED TOFORM: CHANGE ORDER Wxa vv,�� Debra Frankhouser, DbAld G. Vandiver, Asst. Solid Waste Superintendent First Asst. City Attorney CITY OF LUBBOCK MSW LANDFILL CELL IV (B) 1 PHASE 1 COVER SOIL PLACMENT COST SUMMARY DATE EQUIPMENT. HOURS RATE, DAILY EQ.'COST DOZERS & LOADER' `EXCAVATOR SUPERVISION *II 9/9/94 EXCAVATOR 8 $140.00 $1,120.00 $1,120.00 $440.00' 9/10/94 EXCAVATOR 10 $140.00 $1,400.00 D5 DOZER 10 $65.00 $650.00 966 LOADER 10 $100.00 $1,000.00 $1,650.00 $1,400.00 $440.00 9/11/94 EXCAVATOR 10 $140.00 $1,400.00 D5 DOZER 10 $65.00 $650.00 966 LOADER 10 $100.00 $1,000.00 $1,650.00 $1,400.00 $440.00 9/12/94 EXCAVATOR 10 $140.00 $1,400.00 D5 DOZER 10 $65.00 $650.00 966 LOADER 10 $100.00 $1,000.00 $1,650.00 $1,400.00 $440.00 9/13/94 EXCAVATOR 6 $140.00 $840.00 D5 DOZER 10 $65.00 $650.00 966 LOADER 10 $100.00 $1,000.00 $1,650.00 $840.00 $440.00 9/14/94 D5 DOZER 10 $65.00 $650.00 966 LOADER 10 $100.00 $1,000.00 $1,650.00 $440.00 9/19/94 D5 DOZER 10 $65.00 $650.00 $650.00 $440.00 9/20/94 D5 DOZER 10 $65.00 $650.00 D5 DOZER 10 $65.00 $650.00 $1,300.00 $440.00 9/21/94 D5 DOZER 10 $65.00 $650.00 D5 DOZER 10 $65.00 $650.00 $1,300.00 $440.00 9/22/94 D5 DOZER 10 $65.00 $650.00 D5 DOZER 6 $65.00 $390.00 $1, 040.00 $440.00 9/23/94 D5 DOZER 10 $65,00 $650.00 D5 DOZER 10 $65.00 $650.00 $1,300.00 $440.00 9/24/94 D5 DOZER 10 $65.00 $650.00 D5 DOZER 10 $65.00 $650.00 $1,300.00 $440.00 9/25/94 D5 DOZER 10 $65.00 $650.00 D5 DOZER 10 $65.00 $650.00 $1,300.00 $440.00 9/26/94 D5 DOZER 10 $65.00 $650.00 D5 DOZER 10 $65.00 $650.00 $1,300.00 $0.00 9/27/94 D5 DOZER 10 $65.00 $650.00 D5 DOZER 10 $65.00 $650.00 $1,300.00 $0.00 9/28/94 D5 DOZER 10 $65.00 $650.00 D5 DOZER 10 $65.00 $650.00 $1,300.00 $0.00 EQUIPMENT COST (D5 DOZERS(2), 966 LOADER (1)) $20,340.00 EQUIPMENT COST (EXCAVATOR) $6,160.00 TOTAL LABOR COST $5,720.00 SUBTOTAL ( EQUIPMENT + LABOR) >482,220 06 BONDS $590.26 TOTAL CHANGE ORDER COST (SUBTOTAL + BONDS) $32,810.26 1 * SUPERVISION CALCULATED AT: DAILY RATE: $350.00 PER DIEM: $ 75.00 AUTO EXPENSE: $ 15.00