Loading...
HomeMy WebLinkAboutResolution - 2002-R0037 - Change Order To Contract - Allen Butler Construction, Inc. - 01_23_2002Resolution No. 2002-R0037 January 23, 2002 Item No. 44 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Change Order No. 1 to the contract between the City of Lubbock and Allen Butler Construction, Inc. for the extension of the Westport Access Road at Lubbock International Airport, and all related documents. Said Change Order No. 1 is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council this 23rd day of January , 2002. A, 4U` , W� WINDY SITT AYOR ATTEST: Rebecca Garza City Secretary APPROVED AS TO CONTENT: Av/ation Manager APPROVED AS TO FORM: William de Haas Contract Manager/Attorney Dh/Ccdocs/Allen Butler Construction.Change Order l res January 15, 2002 Resolution No. 2002-R0037 CITY OF LUBBOCK CHANGE ORDER CHANGE ORDER #: 1 CONTRACTOR: Allen Butler Construction, Inc. DATE: January 14, 2002 CITY OF LUBBOCK BID#: 215-01/RS PROJECT NAME: LUBBOCK INTERNATIONAL AIRPORT - EXTENSION OF THE WESTPORT ACCESS ROAD DESCRIPTION OF WORK: On November 21, 2001 the project drawings were re -issued to reflect a change in alignment for the roadway constructed in this project. The original alignment depicted the connection of Westport Access Road from its existing limits. The revised alignment now runs east of the Radio Transmitting and Receiving Tower (RTR), instead of west, and the northern limit has been extended to intersect with Interstate Highway 27. The changes in alignment require the addition of a temporary bypass road and construction of two gates at the RTR. In addition, a revision has been made in the specifications for the phasing of the project. This change order is issued to accompany the 11/21/01 re -issued drawings. You are directed to make the following changes to the Bid Submittal — Unit Price Bid Contract (Exhibit A) in the Contract Documents: ADD or MODIFY the following items to accommodate the alignment changes made: An additional sixty (60) calendar days are required to accommodate the increase in scope. In the original contract, one hundred eighty (180) consecutive calendar days were provided for full completion. The sixty additional construction days increase the time for final completion to two hundred forty (240) days. Any additional work required beyond the two hundred forty days will be subject to the same liquidated damages imposed in the previous contract. PUR-045 (Rev 03199) Item No. Approx. Quantity Unit Description of Item and Unit Price Total Amount 6. 1 LS Decrease in quantities of items included in lump sum of (CO-1) Item 6- Temporary Soil Erosion and Siltation Control. (This quantity is represents the difference in the additional control measures and deletion of the Construction Staging Area.) $ (4,194.77) 22. 2 EA Twelve -foot (12') gate, seven feet (T) height. Six feet (CO-1) (6') of wire fabric and one foot (1') of barb wire. Master-Halco, Inc. Part No. 248473. $3,090.50 each. $ 6,181.00 23. 1 LS Construct a thirty-foot (30') wide temporary bypass (CO-1) road to access cargo facilities. $ 28,570.00 24. 54 EA Change Fixture Type "A" on fixture schedule to include (CO-1) 480 V fusing: Hubbell RGL D40S38062125F5M53. $72.25 each. $ 3,901.50 25. 1 LS Relocate 5 trees from in front of Airborne Express to (CO-1) the north side of the property $ 2,062.50 26. 7 EA Remove and replace 7 curb stops from south edge of (CO-1) Airborne Express parking lot. $80.00 each. $ 560.00 27. 1 LS Miscellaneous signage for Federal Express and (CO-1) Airborne Express at 1-27 and traffic control. $ 1,250.00 28. 1 LS Remove existing fence and install a twelve foot (12') (CO-1) (minimum) cantilever slide gate to provide access to Federal Express during Phase II. After construction is complete, replace the fence. $ 1,958.00 29. 1 LS Contractor retains salvaged fencing material. (CO-1) $ (2,125.00) 30. 1 LS Additional Demolition of fly ash stabilized base course (CO-1) from the existing drive at Federal Express. $ 8,452.89 31. 1 LS Provide for the complete installation of twelve (14) (CO-1) MCGRAW-EDISON *GMA401252DBKMA1005 roadway fixtures along the entrance road to the old terminal building. $62,266.60 TOTAL $108,882.72 Attachments: Change in Contract Specifications Section 01010, Part 1.3. Change in Contract Specifications Section 02200, Part 1.1, C Summary of Contract Items showing the projected project cost at completion. PUR-045 (Rev 03199) ITEM DESCRIPTION AMOUNT A. ORIGINAL CONTRACT VALUE: $861,804.10 B. AMOUNT OF THIS CHANGE ORDER: council approval required if over $25,000 C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A): - "m _2 D. AMOUNT OF PREVIOUS CHANGE ORDERS: $0 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): $108,882.72 F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 25%Max. 1, � � ,F G. NEW CONTRACT AMOUNT (A+E): $970,686.82 SIGNATURES AND DATE: R'S REPRESENTATIVE VL1,w6 // / (40Z.- PURCHASING DEPARTMENT CITY MANAGER q6all <0("/,-�1/23/02 MAYOR (Ckdnge Orders over $25, 000) WINDY SITTON ATTEST: 4�JAO Rebecca Garza, City Secret SIGNATURE /6/Od. `_/zZ/_2 RPORT PUR-045 (Rev 03/99) 1.3 SCHEDULING OF WORK In order to minimize the risk associated with unauthorized entry into the Air Operations Area (AOA) and to minimize the impact of the new construction on existing airport tenants, the construction activities shall be phased. Refer to Special Provisions Paragraph SP-5 for requirements when working within the AOA. An emphasis should be placed on minimizing impacts to Federal Express and Airborne Express over the holiday during December. Phase I — Includes work associated with preparing the site and enhancing airport security. This phase includes installation of the SWPPP measures, construction of the contractors entrance gate, staging area and access road to the site. After the staging area is prepared, the Engineer's Field Office should be delivered to the site and its utilities connected. Also included in this phase is construction of the new chain link perimeter fencing from the existing fence near north/south station 11+67 to the existing fence on the south end of the project, and the fence and gate around the RTR. Prior to construction of the these improvements, the area should be graded as shown in the roadway sections of the plans. Gate number 25 should be relocated and chain link fencing should be installed across the opening created in the existing fence during the phase. After the new perimeter fence is installed and accepted, the existing perimeter fence may be removed. Phase II — Includes all. work from east/west station 0+00 to the existing perimeter fence near north - south station 1 ]+67. The work in this phase may be performed concurrently with the work included in Phase I or the later in the project if the Contractor desires. A new fence should be constructed from the southern driveway into the Federal Express facility, north to the existing fence. After the new fence is installed and accepted, the existing fence may be removed. A portion of the existing fencing materials should be reinstalled at the limits of construction for the southern driveway into the Federal Express facility. When the area is secure, the automated cantilever slide gate can be removed and demolition of the existing driveway can begin. If the perimeter fencing has not already been removed, the Contractor may elect to install another gate in the existing airport perimeter fence near north/south station 11+67 to make movement between the staging area and work included in this phase more convenient. Two-way traffic from Interstate Highway 27 to Federal Express and Airborne Express must be maintained at all times during Phase II. Traffic control will be the responsibility of the contractor. Construction of the temporary' road must be completely finished before traffic is diverted from the existing road. In addition, the temporary crossover to Federal Express must be completed and vehicular access must be provided to the Federal Express and Airborne Express Buildings as shown in the plans. Once temporary access is provided, construction may begin on Westport Access Road between east/west station 0+00 and north/south station 11+67. The existing Federal Express drop box will need to be temporarily relocated by the contractor to a location provided by LIA. The Contractor will be allowed 45 days to complete all work associated with this phase. SECTION 02200 1.1 GENERAL C. It is anticipated that no borrow material will be required for the construction of this project. However, if the volume of excavation removed from the construction site is not sufficient for constructing the project fill to the grades indicated; the deficiency shall be supplied from borrow sites approved by the Owner's Representative at the Contractor's expense. area exeeeds that required te- P.e-nst-naet Uhe pr--ejeet to the grades indipated, the exeess arm off the site at the Cen#ae4er-'s expense, Replace strikethrouah area with the following If the volume of excavation material removed from the project construction area exceeds that required to construct the project to the grades indicated, the excess material shall be delivered to a stockpile area on airport property at the Contractor's expense. The haul route and location of the stockpile area is shown in the plans. 01272301 EXCAVATION, SUBGRADE PREPARATION, GRADING, 02200 - 1 08/01 EMBANKMENT AND TOPSOILING Resolution No. 2002-R0037 ESTIMATE AT COMPLETION City of Lubbock Bid No. 216-01/RS Extension of the Westport Access Road SUMMARY OF CONTRACT ITEMS Item Description of Item ORIGINAL BID INFORMATION CONSTRUCTED QUANTITIES &CHANGE ORDERS WORK PERFORMED TO DATE PROJECT COMPLETION No. Quantit Unit Unit Price Amount Total Quantit Unit Price Total Amount Qua nti Amount % Quantity Amount % BASE BID units same 1 Contractor Mobilization 1 LS $72,046.50 $72,046.50 1 $72,046.50 $72,046.50 1 $72,046.50 100% 1 $72,046.50 100% 2 Remove and Dispose of Existi Bituminous Surface and Granular Base Course Material 1,935 Sy $2.33 $4,508.65 7,232 $2.33 $16,850.56 768 $1 789.44 40% 7 232 $16.850.56 374% 3 Miscellaneous Site Modifications 1 LS $14,716.25 $14,716.25 1 $14,716.25 $14 716.25 0 $0.00 0% 1 $14,716.25 100% 4 Remove and Install Gate Number 25 1 LS $2,750.00 $2,750.00 1 $2,760.00 $2,750.00 0.50 $1,375.00 50% 1 $2,750.00 1007. 5 Remove Existing 6-foot Chain Link Fence 4,250 IF $1.101 $4,675.00 3,945 $1.10 $4 339.50 3,704 $4,074.40 87% 3,945 $4,339.50 93% 6 (CO-1) Temporary Soil Erosion and Siltation Control 1 LS $17,507.OD $17,507.00 1 $13,312.23 $13.312.23 0.50 $6,6W.12 38% 1 $13,312.23 76% 7 Excavation, Grading and Subgrade Preparation 19105 Sy $3.62 $67,24%60 23,064 $3.52 $81,185.28 15,249 $53,676.48 80% 23,064 $81,185.28 121 % 8 Excavation and Grading in Unpaved Areas 22,845 BY $1.86 $37,922.70 17.634 $1.66 $29,272.44 9,878 $16,397.48 43% 17,634 $29,272.44 77% 9 Concrete Curb and Gutter, 24-inch wide section 7,130 LF $6.88 $49,054.40 9,342 $6.88 $64 272.96 6,300 $43 344.00 88% 9,342 $64,272.96 131% 10 Portland Cement Concrete Paving, 8-inch thickness $80 Sy $35.03 $30,826.40 1,261 $35,03 $43,822.53 67 $2,347.01 8% 1,261 $43,822.53 142% 11 Portland Cement Concrete Paving, 44nch thickness (behind curb) 155 SY $34.10 $5,285.60 242 $34,10 $8,252.20 0 $0.00 0% 242 $8,252.20 166% 12 Remove Existing and Construct New Dumpster Pad 1 LS $648.00 $648.00 1 $648.00 $648.00 0 $0.00 0% 1 $648.00 100% 13 Flexible Base Course, 10-inch thickness 17,520 Sy $5.75 $100,740.00 19,495 $5.75 $112 096.25 9.728 $55,936.00 56% 19,495 $112,098.25 111% 14 Flexible Base Course, 6-inch thickness 1,135 SY $4.501 $5,107.501 1,493 $4.50 $8,718.501 888 $3,9%.00 781% 1,4931 $6,718.60 132% 15 Hot Mix Asphaltic Concrete Pavement, Type C, 3-inch thickness 2,565 Ton $54.81 $140,587.65 3,290 $54.81 $180,324.90 0 $0.00 09/. 3.2901 $180,324.90 128% 16 Bituminous Prime Coat 0.3 al/S 4,560 Gallon $1.92 $8,755.20 4,484 $1.92 $8,809.28 0 $0.00 0% 4.484 $8,609.28 98% 17 Bituminous Tack Coat 0.1 al/SY) 1,520 Gallon $1.15 $1,748.00 400 $1.15 $460.00 0 $0.00 01% 400 $460.00 25% 18 Traffic Markin , 4-inch wide 1,860 LF $2.44 $4,538.40 3,6W $2.44 $8,798.64 0 $0.00 0% 3,6W $8,798.64 194% 19 Seeding and Fertilizing 4.50 Acre $3,593.70 $16,171.65 3.44 $3,593.70 $12,362.33 0 $0.00 0% 3.44 $12,362.33 76% 20 Construct New Chain Link Perimeter Fencing 3,630 LF $12.31 $44,685.30 3,726 $12.31 $46.867.06 3,698 $44,291.38 99%1 3.725 $45,867.06 103% 21 Roadway Illumination, as per plans and specifications 1 LS $84,901.40 $84,901.40 1 $84,901.40 $84,901.40 0.06 $5,094.08 6% 1 $84,901.40 100% Twelve (12' cantilever ate, seven feet T hei ht. Six feet6' of wire fabric and one foot 1' of barb wire E4 2 $3,090.50 $6181.00 1 $3,090.50 50% 2 $6,181.00 100 %Construct tern ore b ss road to access car o facilities LS 1 $28,670.00 $28 570.00 0.90 $25,713.00 90% 1 $28.570.00 100% F Chan a Fixture T e "A" on fixture schedule to include 480 V fusin : Hubbell RGL D40S38062125F5M53 EA 54 $72.25 $3,901.50 0 $0.00 0%54 $3,901.50 100% Relocate five 5) trees from in from of Airborne Express to north side of property LS 1 $2,062.50 $2,062.50 0 $0.00 0% 1 $2,062.50 100% 26 CO-1 Remove and replace curb stops from south edge of Airborne Express p rking lot EA 7 $80.00 $560.00 0 $0.00 0% 7 $560.00 100% 27 (CO-1) Miscellaneous si na a and Traffic Control LS 1 $1,250.00 $1,250.00 0 $0.00 0% 1 $1,2%D0 100% 28 (CO-1) Remove existing fence and install twelve foot 121, minimum, cantilever slide gate access to Fed. Express during Phase II LS 1 $1,958.00 $1 958.00 0 $0.00 0% 1 $1,958.00 100% 29 (CO-1) Contractor retains salvaged fencing materials LS 1 -$2,125.00 -$2,125.00 0 $0.00 0% 1 $2,125.00) 100% 30 (CO-1) Additional Demolition from Existing Drive at Federal Express LS 1 $8,452.89 $8,452,89 0 $0,00 0% 1 $8,452.89 100% 31 (CO-1) Provide for the complete installation of fourteen 14) MCGRAW EDISON #GMA401252DBKMA1005 roadway fixtures along the _ entrance road to the old terminal building. 1 $62,268.60 $62.266.60 0 $0.00 0% 1 $62,266.60 100% Subtotal BASE BID ......................................... $714,425.00 Adjusted Subtotal BASE BID........... $924,684.30 $339,827.39 48% $924,684.30 129% dditive Alternate Al RoadwayIllumination, as per plans and specifications 1 LS $54,034.20 $54,034.20 1 $54,034.20 $54,0$4.20 0 $0.00 0% 1 $54,034.20 100% dditive Alternate B B1 Roadway Illumination, as per plans and specifications 1 LS $46,873.30 $45,873.301 1 $45,873.30 $45,873.30 0 $0.00 0% 1 $45,873.30 100% Additive Alternate C Cl Roadway Illumination, as per plans and specifications 1 LS $47,471.60 $47,471.60 1 $47,471.60 $47,471.60 0 $0.00 0% 1 $47.471.60 100% Total ADDITIVE ALTERNATE A+B+C ........ $147,379.10 Ad'. Total ADD. ALT. A+B+C ......... $147 379.10 $0.00 $147,379.10 Total BA E BID+ ADDITIVE ALTERNATE ..... 861,804.10 Ad'. Total BA +ADD. ALT............ 1, 72, .40 339,B 32% 1, 2, .4