HomeMy WebLinkAboutResolution - 2002-R0024 - Change Order To Contract For Mccalister Park Construction - 01_23_2002Resolution No. 2002-R0024 January 23, 2002 Item No. 29 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Change Order No. 1 to the Contract between the City of Lubbock and Hunter Construction for construction services at Bill McAlister Park, and all related documents. Said Change Order No. 1 is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council this 23rd day of January , 2002. 13 60111 Mum I T so ATTEST: Reb ca Garza' City Secretary APPROVED AS TO CONTENT: y Rarfdy Truesdell Parks and Recreation Manager APPROVED AS TO FORM: William de Haas Contract Manager/Attorney Dh/Ccdocs/HunterConstruction.ChangeOrderNo.l.res January 14, 2002 Resolution No. 2002—R0024 CITY OF LUBBOCK CHANGE ORDER CHANGE ORDER #: 1 CONTRACTOR: Hunter Construction DATE: January 9, 2002 CITY OF LUBBOCK BID#: 226-01/RS PROJECT NAME: Bill McAlister Park Description of change caused by conditions encountered during construction not covered by the specifications and drawings of the project: Increase concrete, increase width of entrance, change conduit, revised irrigation, increase main line, 6" water meter, additional wiring for new valves, installation of Tifton 10 Sod, lower the dirt in the right-of-way, reduce the original contract of 66 trees to 44 trees, delete hydro -mulching of playing field turf and warm-up areas, delete all turf maintenance and watering equipment. Tifton 10 Sod installed on all outfield turf areas of three baseball fields. Dormant sod installed as specified (2' x 100' rolls) and overseeded in annual rye grass . ITEM DESCRIPTION AMOUNT A. ORIGINAL CONTRACT VALUE: $1,350,787.00 B. AMOUNT OF THIS CHANGE ORDER: Council approval required if over $25,000 $ C. PERCENT OF CONTRACT VALUE THiS CHANGE ORDER (B/A):�`�nR �VIP!� 9, 3 /o D. AMOUNT OF PREVIOUS CHANGE ORDERS: $ 0.00 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): $ 130,138.00 F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A):25%Max. ywu h� ; 'f G. NEW CONTRACT AMOUNT (A+E): $1,480,925.00 This Change Order is not valid without the following signatures: yt�l / rS/o lei e2 Of Victor Kilman, irchasing Manager P OJECT RCHIT C /ENGINES k� lei oZ Bob Cass, City Manager OWNER' REPRESENTATI\(E Approved as to Form: / 141�L 4 D . William de Haas, Contract Manager/Attorney O TRACTOR Orders over $25,000 require the C OF BB CK (� ATTEST: 1/ 23 / 02.0 1 / 23 /02 Windy i ton, Rebecca Garza, City Se etary PUR-045 (Rev 11/01) jf 4, LINTER, N COMMERCIAL CON P.O. BOX 2587 LUBBOCK, TEXAS 79406 . . . . . . . . . . . . . . V, ' December 7 2001 RECE1 VF-D 0i ...... DEC 0 6 2001 Mr.'''Larry HarveY ? Chapman Harvey Architects, 'Inc. CHA INC. 12 Broad way 4, :Lubbock,-Texas"79,401. Re: BILL McALISTER PARK CONSTRUCTION Dear Sir: Asper the meeting with you, ..Craig Wuensche, Corbin * Pemberton, Jimmy Schneider" and myself,:- on'` DecemJoe;'r­6, Tye y 2001,the following changes were verballyapproved-and upon the next City Council meeting, a change order in'the amount of $88,985.00, will be issued. The changes.,are as listed. below: y. 1. For all extra concrete to enlarge the.flatwork under and around the Pavilion from 1041 x 1041 to 1151 x and to.increase the sidewalk. for. the. fir,elane from 15' wide to 201 wide and to add two concrete curb. and gutter islands in the parking lot. 2. To increase the width of the entrance to the Parking Lot and dirt work revolving around two added islands in the Parking Lot. 3. To change the 1" underground conduit to controller and Pavilion to 1 31". K F. , WIt WR: Vl- -�4 F 4� 4� 4� - -" - .; '.:- -..r. W'' '.%...i K. ? „!"{Y F,•-.,♦- J / rF' Y.^ i7f�'A, Q ♦ T' '• ! .: % =S. "! F @-i':,rvr Y-. •::YS' ='t'^,' 3- '.4J- fi' 4 .S y.} -•�: i.p _ y +t y y'i'y N: ♦ 4-'. `�' - :yS ,�} f' .,:< r _r''x y.�. •�, �t�C'�', -" r . � <.".+ if J -.� �'s � tr � y?t�'R�,ry1��+J ���., : C. J 'CS 5. Following .are.:proposed ,changes , to . the ,irrigation x , `� Y system per Revised drawings, Sheets 'I-1, I-2, .I 3, dated 11/15/01: .-, Y; .. ':' i '.° ! c iry _ ��}Y%� E ` OR— s a . Install ;6" -main 'line . as shown ' on 'revised plans Change L Water meter and -double check valve to 6 as'shown'on revised plan. b Revised irrigation.plan specifies a.6" water meter:.and Y 6"d6uble check" valve. current water "requirements J .of the sprinkler system can be met with the previously t s ecified, 4 meter and 'double checkvalve: The 4 will+; y r. supply,up to*. 600 :GPM :without any edverse''effects to. system operation due ,to' ,flow or -pressure loss.' - - - _ -•s §!ter C. My original contract included purchase of a 4" :water meter from the City of Lubbock. As per.my.conversa� tion with Craig Wuensche, the.colst,of the meter will not need to be . included in '.my contract -and -will be_ purchased by. the Parks Department`with'the '` ,s;;, installation of the main ,water service to McAlister r Park. 6. Regarding the -substitution of Irrigation'Booster-Pump: r The Chameleon Pumping Station has-a`lower'.initial cost, which'canrbe`usedKto reduce the':contract,price ; >h x as submitted. The"Cham.eleon Pump is` -available from a local supplier and can be. serviced by,this local` supplier which -will make long term maintenance more prompt and economical. 7. Substitute Hunter I-20 Stainless rotors for Toro 640 - rotors and Rain Bird 1804 pop-up sprinklers as shown on sprinkler plans revised 11/15/01. Addition of a =� " new valve to provide drip irrigation for all trees and - �y possible beds. Addition of new valve for Rain Bird 1804 pop-up sprinklers in new parking islands. ;•;_ F; Additional wiring to accommodate new valves. 8. Tifton 10 Sod installed on infield and foul areas from pressbox out past dugouts. Dormant sod installed as specified .(2' x 100' rolls) and overseeded in annual rye grass. 9. To lower`"the""dirt ' in •the' right-of-way:to*. � o `the riginal='4. elevation The dirt..is to be,moved the.West and i��.ya taper down on all sides Maximum height of the - • 't. r 'Y ,r »., F y xJ s_ } r rtv R J n"'y .' Q, t.J. rx : .. .. ... ;r,:� >r :s a. r";..it• ✓ J ,. .�.r i' t..s k '.! � ' �""„-'e-r..r �`�t` �tr`"'�'�"�'� '. :t - S' d • tom. '� L, V Y: . ... .. r T• '.,,, ly ! r,�, ••�„, . ' .4.y & � N'-0$i �3 z�j, f r,'.F J r � !'4s�.,.j ; �� S°hR+,s..-a���.< yM> sr ry r xv r r �FF1%r`�'s43e�' k `ar? F, _ 1 i " s; ;;. � d v iy v �i k F q� � �� � {, y'L�y;y�.•r'S'�' 3 s, reconfigured- dirt'pile is . 12 ft above they original= _;` +x ..:dirt elevation J. 10 Reduce the 66•treesE in the originadlar cxEonlitnr`a'cttot2e4 V �4o3" '-.-:B&B Ced be located by`owner at time of planting �4. pt .11. Delete hydro -mulching' of playing field .turf areas '`and t-s c warm-up areas These areas will be seeded in rye rt and/or 'sodded without `hydro=mulch..-All other' originally specified areas will be hydro mulched 12 YDelete all turf maintenance and watering requirements ,. - from original specifications. Maintenance will beA limited to mowing playing fields one..time We offer the, following -as an ADDITIVE ALTERNATE, if . desired: s � Install Tifton 10'Sod on infieldsand "foul areas from ' pressbox out past dugouts. Dormant sod installed as specified (2' x 100' °-rolls) -`and..overseed, in annual rye grass ' ti TOTAL PRICE FOR `ADDITIVE ALTERNATE $41153.00 . ..-:..•. ., -. � -..,do- F r y, - ,,,s � , We will look forward to -getting underway:.with'changes accepted and completing this project in a timely manner. Sincer y HUNT CO STRUCT O C AN IM D. HUNTER, PRESIDENT "�"•fie. .. r� S 'AN y ��'.' - .- .-: -• ... � � t• n ! �, •�., x, r •�'�' #'^v 7 xh"t,F '�.•a tir �.,},"�� '�i�k�"S�'£ i� ¢� t gt r`�v• �`� ;tJ,,•`3% wg :' ;.s r• _ �f is -' :� ,+ sYa., Qt � rl °ikt a5r,€'�• �'�"�-v rt � ,t,'��Sf� ?�, ��j,K�., ��.�,,r.^'y}' :Y �f� r•&� h. tv�.