RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute
and on behalf of the City of Lubbock, Amendment No. 1 to the Cost Sharing Agreement Conti
No. 16181 for engineering and construction services to pave the area of Ash Avenue between
South Loop 289 frontage road and US Highway 84, and the associated frontage for the intersect
of Ash Avenue and US Highway 84, by and between the City of Lubbock and Ford Developrr.
Corporation, and related documents. Said Amendment is attached hereto and incorporated in
resolution as if fully set forth herein and shall be included in the minutes of the City Council.
Passed by the City Council on January 24, 2023
ATTEST:
Rebec Garza, City Secre
APPROVED AS TO CONTENT:
Erik Rejino, Assistant City Manager
APPROVED AS TO FORM:
elli Leisure, Assistant City Attorney
ccdocs/RES.Amend # 1 to Ash Ave Cost Sharing Agrmnt
12.30.22
Resolution No. 2023-R0036
AMENDMENT NO.1 TO COST SHARING AND PAYMENT AGREEMENT
THIS FIRST AMENDMENT TO THE AGREEMENT, Contract No. 16181, is entered
into this 24th day of January 2023 by and between the City of Lubbock, Texas, a
Texas Home Rule Municipality ("City"), and Ford Development Corporation ("Ford"),
collectively ("Parties").
RECITALS
WHEREAS, the City entered into the Agreement on January 25, 2022 through Resolution
No. 2022-R0039 for the Parties to share costs associated with the engineering and construction
for paving the area of Ash Avenue between the South Loop 289 frontage road and US Highway
84, and the associated frontage for the intersection of Ash Avenue and US Highway 84 (the
"Projects") as depicted on Exhibit "A" attached hereto and incorporated herein; and
WHEREAS, the Parties found the Agreement to be beneficial as it would be a cost
savings to each of the Parties by utilizing the same engineering firm for the City's and Ford's
Projects on Ash Avenue between South Loop 289 and US Highway 84; and
WHEREAS, when the City let out the project to bid, the original estimate of the cost of
the Projects returned at a significantly higher cost than projected, the details of which are
provided in Exhibits "B1-B5", attached and incorporated herein; and
WHEREAS, the Parties agree to the following amendment terms in order to apportion the
actual bid costs between each Party for their own Project.
NOW, THEREFORE, the City and Ford agree to the terms of this FIRST AMENDMENT:
Section 2.0 of the Agreement shall be amended as follows:
2.0 P"ents
2.1 City. City shall fund the City Projects (by and through the Engineering and
Electric Utility Departments), at an amount not to exceed eight hundred eighty-nine thousand
seven hundred -two and 00/100 ($889,702.00), as apportioned and set forth in Exhibit "B-1",
attached hero and incorporated herein.
2.2 Ford. Ford shall pay the City for Ford's Project costs, as valued by the
contractor's bid that is selected in response to the City -issued request for proposals (RFP), within
fifteen (15) business days from bid opening, and prior to the approval of the bid award by the
City's governing body. Ford's remaining Project costs are estimated to be two hundred thirty-
three thousand four hundred fifty-one dollars and NO/100 ($233,451.00) as set forth in Exhibits
"B-I through B-5".
Amend. 01 Cat St of ft and Payamt Areeneet - COL and Ford ASH AVE Pap i of s
2.3. Upon project completion, Ford shall pay the City for any and all amounts incurred
for change orders on Ford's Project, and a thorough account shall be made for costs of the
Engineering, Utility, and Ford Projects. If any surplus funds designated for the Engineering
and/or Utility Projects remain, the City shall keep its surplus funds. If Ford's Project costs are
less than the amount given to the City, the City shall refund Ford any surplus funds.
2.4 In the event that all the City funds set forth herein are exhausted, and project costs
are greater than the CIP funds for the City's Projects detailed herein, Ford, and not the City, shall
pay the City for any and all overage.
2.5 In the event that project costs for Ford's Project are over the estimated amount
given herein, Ford shall pay the City for any and all overage.
All other portions of the original Agreement shall remain in place and are not altered by this
amendment.
For the C
' ubbock
TRAY Vr4 Mayor
ATTEST:
Re Garza, City Sec
APPROVED AS TO CONTENT:
For Fo evelo ent Corporation:
Rex F. Robertson, President
AAX-41UAL,11--�
Michael G. Keenum, P.E., Division Director of Engineering/City Engineer
Erik Rejino, Assistant City Manager
Joe ire r Lubbo wer & Light
Amen. 01 Cwt SMft an PayW0%AraamW - OOL and Fad ASH AVE Pap: of 3
AFTROVED AS TO FORM:
Ili Leisure, Assistant City Attorney
Jenny ith.loeml Counsel for Lubbock Power and Light
Amend. 81 Cost 9aft and Payment ftm m M -COL and Ford MH AVE P803 0 3
No Text
EXHIBIT B-1
Ash Avenue - Loop M8 to US Highway 84
Deoembw 12, 2M
Opinion of Probable Project Coals
I'� •ILLid;�ci��'�'�.TT:.L'':�"'�r-^;*.� E �
'Fond Development has Paid for all design costa to dale. Forft Cort< Wft to construction has be decreased by the project
design Costs allocated to City of Lubbock and LP&L and those parties ambibution to Construcft has been increased by the
eq&aWd amount. See quantity tabulations for detail.
IANANDrR..A IAT GO S INC.
EXHIBIT B-2
Ash Avenue - Loop 289 to US Highway 84
Total Project Cost
1%ZMI%" 1.mo
m
Quen" Una Una -- TOW
tarleo
roe f l 1 ILS Is 15.000.95 15 OW
DfMAC itemovai
1 2,157
ISY
is28.00is
53 M
r-OnembRomml
1 95
ISY
50.00
1 4,750
1310
ICY
12
15,72D
F.mbiMtiurnet
1 118
ICY
6 12.00IS
13.415
RIVISM SOON W T C 10' Fiat ease 1Y Su e
9
574 352
-� �
3 442103cwme
a
[CurMd
13110
480
Comma
142
12 070
731
WS
55 M
Corwele Flume
29
2,320
V° t30oc
4
4
VBNa Veu1t Rdfl
1S
2
n 1 ILS Is 81)(10.00 1 s8
1 ILS
IS 12.000110
1
LS 10.00O.QO
i 10 000
Co -10% o1 Consimotion Cost 1
IAIYO Atai IAT9i. INC.
EXHIBIT B-3
Ash Avenue - Loop 289 to US Nghway 84
Ford Development Share of Constivedon
134Mw22 1AoPY
Qwnft it Una Total
Price
ree®RAMOVel
1.0 LS 15 00.00
1S 000
1 0.0 Isy 25.00
Removal1
47.5 5 50.001$
2,375
[Excavagon for RoackyRys
328.0
CY
12.001S 9 936
Ennbeniannet
280.0
CY
s 12.001$ 3,360
SeCion .5• Tme C 10" Flax Bate 12'
2ANA
72.00 1 757
and Gutter
774.7
LF
f 30.00 S 41rete
rCgurbed
0.0
SY
3 80.00rete
F
71.0
SY
85.0D OAMete
FOlets and V Gunara
47.5
SY
IM 4 7b
Drains Flume
29A
SY
s 80.00 i 2,320
Valve 80rt nt
2A
SY
1 .00 2,400
r Vapre Vault Rim Ad rnt
A
SY
8 2 .00
Mason OA LS 6 .00 2400
0.4
LS
5 1 AO 4,800
rafBc Control
DA
LS
10 000.00 4000
orre -10% of Consh mft Costs
24,690
CO
AW
Snrrve sad EROW1E 1
1--FUH A:sOC,gl INC,
EXHIBIT B-4
Ash Avenue - Loop 289 to US Highway 84
My of Lubbock Share of Consbucdon
tiflyJ9 •M OY
__
and Um buret P=MAC
Ural
!Hell
Ma
irew
moval
0.0
15 000.00emoval
1 AMIA MY
13
25.00
S 4720,1-
crab Removsi
1 47.5 ISY
50.00
IS 2.375
for
841.0
CY
1100
Is7
838.0
CY
3
12.00
?Am
meet Secdon MW Two C 10' Flan Bate 1r de
5A23.0
SY
$
7100
S 390ASS
4' Curb and Gulter
2179.5
LF
30.00
' Canersft Driveway
131.0
SY
00-0015
10 4M
Comets Pivft
05.00
$ ems
' Commets FOets and Va Guam
90.00
57
6' urbed Conaele Oral
n
00.00
Box
$
1 00
400
seer valve Rim Ad
2 000 00
2
0.3
ILS
13
8 000.00
I S1
0.3
ILS
s
12 000.00
13 3 800
raft Cor*rol
0.9
ILS
10 000.00 13
3 000
ortl-1076vfC*rsftscWn Costs
60.742
Contribution to ConstmMon as offset for Professional Services Paid by Ford
3
`AND FI
EXHIBIT B-5
Ash Avenue - Loop 289 to U8 Htg my 84
LP&L Share of Construction
-'
w sna aril, - -
t�laat[iy unle
-2�Lf
una
rm
Tad
_m
-_- -- - -
me Removal
03
US
is
11000.00
PAMOVal
265.3
13Y
Is
25.00
6
PAMOVS1
I OA
lay
I
50.00
for
941A
CY
3 12.001S
4
kopmm
20D.0
CY
12.001S
2
ection .a' C. IV Flex Base 12' da
1 AS
72.00
t 111,139
d Qulaer
4 .6
LF=
30.00
14AU0.0
SY
f
a0.00
f0.0
Eve
SY
i
65.00MU
srV rs
47.3
SY
90AD
4onmo
Fkxne
OA
SY130A0
0
1 .00
V" Ift Ad ust n w
15
2=00
1 i
0
LS Is
6
1.000
tsvvppp
1
0.3 ILS
12.000.00
S 3AW
raft Conbol
1
0.9
ILS is
10,000mil
3 .000
1 Coats
1t3116
dn -
a
rror hMA to ConsUmdon as offset for Pmfeasbnal Services POW
by FcrO 1
14
WO ASSOC1AT- •; IMC,