Loading...
HomeMy WebLinkAboutResolution - 2019-R0239 - 1 Priority Environmental Services - 07/09/2019Resolution No. 2019-RO239 Item No. 6.10 July 9, 2019 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Service Contract No. 14614 for Asbestos Abatement Services as per RFP 19-14614-JM, by and between the City of Lubbock and 1 Priority Environmental Services, LLC, of Lubbock, Texas, and related documents. Said Contract is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on _ __July % 2019 ATTEST: Re cca Garza, City *'ecrary APPROVED AS TO CONTENT: Mark arw d, Assistant City Manager APPROVED AS TO FORM: - Ke Ili Leisure, Assistant City Attorney ccdocs/RES.ServiceContract 14614 Asbestos Abatement Services June 3, 2019 Resolution No. 2019-RO239 City of Lubbock, TX Asbestos Abatement Services Agreement Contract 14614 This Service Agreement (this "Agreement") is entered into as of the 94hday of 14114, 2019 ("Effective Date") by and between 1 Priority Environmental Services, LLC, (the Contractor), and the City of Lubbock (the "City"). RECITALS WHEREAS, the City has issued a Request for Proposals 19-14614-JM, Asbestos Abatement Services. WHEREAS, the proposal submitted by the Contractor has been selected as the proposal which best meets the needs of the City for this service; and WHEREAS, Contractor desires to perform as an independent contractor to provide Asbestos Abatement Services, upon terms and conditions maintained in this Agreement; and NOW THEREFORE, for and in consideration of the mutual promises contained herein, the City and Contractor agree as follows: City and Contractor acknowledge the Agreement consists of the following exhibits which are attached hereto and incorporated herein by reference, listed in their order of priority in the event of inconsistent or contradictory provisions: 1. This Agreement 2. Exhibit A — General Requirements 3. Exhibit B Best and Final Offer 4. Exhibit C Insurance Scope of Work Contractor shall provide the services that are specified in Exhibit A. The Contractor shall comply with all the applicable requirements set forth in Exhibit B, and C attached hereto. Article 1 1.1 The contract shall be for a term of one year, with the option of four, one-year extensions, said date of term beginning upon formal approval. The initial term of this Contract shall be from August 28, 2019 through August 27, 2020. The subsequent periods covered by the optional, one-year renewals shall be August 28 of the current year to August 27 of the next year. All stated annual quantities are approximations of usage during the time period to be covered by pricing established by this bid. Actual usage may be more or less. Order quantities will be determined by actual need. The City of Lubbock does not guarantee any specific amount of compensation, volume, minimum, or maximum amount of services under this bid and resulting contract. The Contractor must maintain the insurance coverage required during the term of this contract including any extensions. It is the responsibility of the Contractor to ensure that valid insurance is on file with the Purchasing and Contract Management Department as required by contract or contract may be terminated for non-compliance. The rates may be adjusted upward or downward at this time at a percentage not to exceed the effective change in the Consumer Price Index (CPI) or Product Price Index (PPI), whichever is most appropriate for the specific contract for the previous 12-months. At the City's discretion, the effective change rate shall be based on either the local or national index average rate for all items. If agreement cannot be reached, the contract is terminated at the end of the current contract period. 1.2 The Contractor shall not assign any interest in this Agreement and shall not transfer any interest in the Agreement, whatsoever, without prior consent of the City. 1.3 All funds for payment by the City under this Agreement are subject to the availability of an annual appropriation for this purpose by the City. In the event of non -appropriation of funds by the City Council of the City of Lubbock for the goods or services provided under the Agreement, the City will terminate the Agreement, without termination charge or other liability, on the last day of the then -current fiscal year or when the appropriation made for the then -current year for the goods or services covered by this Agreement is spent, whichever event occurs first. If at any time funds are not appropriated for the continuance of this Agreement, cancellation shall be accepted by the contractor on 30 days prior written notice, but failure to give such notice shall be of no effect and the City shall not be obligated under this Agreement beyond the date of termination. 1.4 This contract shall remain in effect until the first of the following occurs: (1) the expiration date, (2) performance of services ordered, or (3) termination of by either party with a 30 day written notice. The City of Lubbock reserves the right to award the canceled contract to the next lowest and best bidder as it deems to be in the best interest of the city. Article 2 Miscellaneous. 2.1 This Agreement is made in the State of Texas and shall for all purposes be construed in accordance with the laws of said State, without reference to choice of law provisions. 2.2 This Agreement is performable in, and venue of any action related or pertaining to this Agreement shall lie in, Lubbock, Texas. 2.3 This Agreement and its Exhibits contains the entire agreement between the City and Contractor and supersedes any and all previous agreements, written or oral, between the parties relating to the subject matter hereof. No amendment or modification of the terms of this Agreement shall be binding upon the parties unless reduced to writing and signed by both parties. 2.4 This Agreement may be executed in counterparts, each of which shall be deemed an original. 2.5 In the event any provision of this Agreement is held illegal or invalid, the remaining provisions of this Agreement shall not be affected thereby. 2.6 The waiver of a breach of any provision of this Agreement by any parties or the failure of any parties otherwise to insist upon strict performance of any provision hereof shall not constitute a waiver of any subsequent breach or of any subsequent failure to perform. 2.7 This Agreement shall be binding upon and inure to the benefit of the parties and their respective heirs, representatives and successors and may be assigned by Contractor or the City to any successor only on the written approval of the other party. 2.8 All claims, disputes, and other matters in question between the Parties arising out of or relating to this Agreement or the breach thereof, shall be formally discussed and negotiated between the Parties for resolution. In the event that the Parties are unable to resolve the claims, disputes, or other matters in question within 30 days of written notification from the aggrieved Party to the other Party, the aggrieved Party shall be free to pursue all remedies available at law or in equity. 2.9 At any time during the term of the contract, or thereafter, the City, or a duly authorized audit representative of the City or the State of Texas, at its expense and at reasonable times, reserves the right to audit Contractor's records and books relevant to all services provided to the City under this Contract. In the event such an audit by the City reveals any errors or overpayments by the City, Contractor shall refund the City the full amount of such overpayments within 30 days of such audit findings, or the City, at its option, reserves the right to deduct such amounts owing the City from any payments due Contractor. 2.10 The City reserves the right to exercise any right or remedy to it by law, contract, equity, or otherwise, including without limitation, the right to seek any and all forms of relief in a court of competent jurisdiction. Further, the City shall not be subject to any arbitration process prior to exercising its unrestricted right to seek judicial remedy. The remedies set forth herein are cumulative and not exclusive, and may be exercised concurrently. To the extent of any conflict between this provision and another provision in, or related to, this do. 2.11 The contractor shall not assign or sublet the contract, or any portion of the contract, without written consent from the Director of Purchasing and Contract Management. Should consent be given, the Contractor shall insure the Subcontractor or shall provide proof of insurance from the Subcontractor that complies with all contract Insurance requirements document, this provision shall control. 2.12 Contractor acknowledges by supplying any Goods or Services that the Contractor has read, fully understands, and will be in full compliance with all terms and conditions and the descriptive material contained herein and any additional associated documents and Amendments. The City disclaims any terms and conditions provided by the Contractor unless agreed upon in writing by the parties. In the event of conflict between these terms and conditions and any terms and conditions provided by the Contractor, the terms and conditions provided herein shall prevail. The terms and conditions provided herein are the final terms agreed upon by the parties, and any prior conflicting terms shall be of no force or effect. 2.13 The Vendor warrants that it complies with Chapter 2270, Subtitle F, Title 10 of the Texas Government Code by verifying that: (1) The Vendor does not boycott Israel; and (2) The Vendor will not boycott Israel during the term of the Agreement. 2.14 Pursuant to Section 2270.002 of the Texas Government Code, Respondent certifies that either (i) it meets an exemption criteria under Section 2270.002; or (ii) it does not boycott Israel and will not boycott Israel during the term of the contract resulting from this solicitation. Respondent shall state any facts that make it exempt from the boycott certification in its Response. INTENTIONALLY LEFT BLANK----- IN WITNESS WHEREOF, the parties hereto have caused this Contract to be executed the day and year first above written. Executed in triplicate. f ATTEST: Reb kca Garza, City Secret, APPROVED A TQ CONTENT: k)�� & k1c. — Wesley Everett, Director of Facilities Management APPROVED AS TO FORM Ylj-lihljz�c elli Leisure, Assistant City Attorney C TRACTOR BY: Authorized Representative Print Name 'PC;' Z Address c1L7K ,493 City, State, Zip Code City of Lubbock, TX RFP 19-14614-JM Asbestos Abatement Services Exhibit A GENERAL REQUIREMENTS 1. PERSONNEL PROTECTION A. Prior to commencement of work, all workers shall be instructed by the Contractor, and shall be knowledgeable in the appropriate procedures for personnel protection and asbestos removal. B. Contractor acknowledges and agrees that he is solely responsible for enforcing worker protection requirements at least equal to those specified in this Section. C. Contractor shall provide workers with respiratory equipment approved by NIOSH and OSHA for the type of work being performed. Each worker shall be able to show, upon request, dated proof of fit testing performed by qualified personnel for the respirator being used. D. Where respirators with disposable filters are used, provide sufficient filters for replacement as necessary by the workers, or as required by applicable regulations- E. Provide respiratory protection as needed from the time of the first operation involving contact with asbestos - containing materials. Provide respiratory protection until the acceptance of final air test results by Consultant and the completion of containment removal: 1. Provide a minimum of half -face dual cartridge respirators for workers during preparation phases of the work, providing no disturbance of the asbestos -containing material occurs. 2. Provide a minimum of half -face dual cartridge respirators for workers during preparation phases of glove bag -type pipe insulation removal, windowflouver unit removal, floor tile and mastic removal, fire door removal, fan -coil unit removal, and exterior caulking�sealant removal, except where these operations are performed in work areas concurrently with abatement activities requiring higher levels of respiratory protection as noted below. 3. Provide a minimum of half -face dual cartridge respirators for workers during all phases of handling and disposal of containerized asbestos -containing waste materials. 4. Provide workers applying spray -applied plastic sheeting with stackable HEPA/ammonia cartridges as applicable. 5. Provide workers using solvents with stackable HEPA.`organic vapor cartridges as applicable. 6. Provide a minimum of half -face dual cartridge respirators for workers during all phases of containment removal. F. Contractor shall be solely responsible for scheduling necessary air sampling by an independent testing laboratory for compliance of his respiratory protection with OSHA regulations. Contractor shall pay for all costs associated with such testing. S. Purchasc Bid Oocs RFP 19•14614 Al City of Lubbock, TX RFP 19-14614-JM Asbestos Abatement Services 1. Personnel exposure samples collected by or for the Contractor shall be analyzed in accordance with the OSHA reference method (ORM) as detailed in 29 CFR 1926.1101, Appendix A. 2. Ensure that personnel monitoring strategy employed will result in suitable samples for analysis. 3. Arrange for analysis of personnel monitoring samples such that results of analysis are received no later than forty-eight hours following sample collection. 4. Post the results of personnel exposure monitoring at job -site, upon receipt from laboratory. G. Permit no visitors, except for governmental inspectors having jurisdiction, in the work areas after commencement of asbestos disturbance or removal. Provide authorized visitors with suitable respirators and protective equipment. H. Provide workers with sufficient sets of protective disposable clothing, consisting of full body coveralls, head covers, gloves, and foot covers, of sizes to properly fit individual workers. I. Provide workers with rubber boots, hard hats, eye protection, hearing protection, and other protective equipment as needed. Leave reusable equipment, apparel and protection devices (excluding respirators) in the contaminated equipment room until the end of the asbestos abatement work, at which time such items shall be disposed of as contaminated waste or decontaminated for reuse. K. Provide authorized visitors with suitable protective disposable clothing, respiratory protection (including suitable replacement filters), headgear, eye protection, footwear and other protective equipment of sizes to properly fit visitors whenever they enter the work area. 2. SIGN-IN/OUT LOG A. Contractor shall maintain a sign-in/out log in the immediate vicinity of the clean room of the personnel decontamination units. Maintain sign-in/out logs from the time the first activity is performed until acceptance of the final air test results by the Consultant or Project Manager. Require each individual entering the work areas, including the Contractor's workers, Consultant, Project Manager, and City officials to sign in and out each time upon entering and leaving the work areas. B. Sign-in/out log shall indicate date, printed or typed name, signature, social security number, company or agency represented, and time entering and leaving the work areas. 3. ASBESTOS WASTE LOG A. Contractor shall maintain an asbestos waste log to be completed as asbestos -containing waste is removed from the work areas for transport and disposal. B. Asbestos waste log shall indicate date; description of waste included; number, size and type of waste containers, as applicable, removed from work areas; time of day; and signature of recorder. S Purchase 8 d Does RFP N-146 t4.1Rf City of Lubbock, TX RFP 19-14614-JM Asbestos Abatement Services 4. TRAINING PROGRAM A. Provide a training program to instruct personnel on proper respirator use, hazards of asbestos exposure and OSHA asbestos regulations in accordance with the requirements of the model accreditation program (MAP) established by the EPA in Appendix C to 40 CFR 763 (E). B. The Contractor shall provide a training program as often as necessary to train all employees to be utilized on the project. No worker shall be utilized on any portion of the Work until training documentation has been reviewed and accepted by the Consultant or Project Manager. 5. GENERAL — ALL JOBS A. Do not unreasonably encumber the site with materials or equipment. Confine stockpiling of materials to the areas indicated. If additional storage is necessary obtain and pay for such storage off site. B. Contractor's Asbestos Abatement Supervisors shall remain on the job site and in immediate contact with those under their supervision during all periods of asbestos abatement activity. C. During any period of actual abatement of asbestos, an abatement supervisor shall be stationed within the containment area at least 2516 of the time for the purpose of supervising the progress of the abatement work. D. All licensed supervisors are responsible for respirator fit testing, personal protection of the workers, safety, security and control of access at the job site- E. Supervisors shall also require that operations at the asbestos job site cease whenever hazardous or unlawful situations are detected, so as to effect a remedy. F. Contractor's employees shall be fully clothed at all times (shirt, pants and shoes). Sandals or other open toe shoes shall not be allowed. G. The Owner will specify locations for water and electrical hook up at the time of mobilization. H. Contractor's employees shall be restricted to the immediate work area at all times. 1. Contractors dumpster for disposal of asbestos waste must be kept locked. Location of the dumpster must be coordinated with the Owner. J. Fire Safety. At least one fire extinguisher with a minimum National Fire Protection Association rating of 10BC (dry chemical) shall be placed for every 1,000 square feet, or fraction, of containment area. K. Electrical Safety. Ground -fault circuit interrupter (GFCI) units shall be installed on all electrical circuits used within the regulated and containment areas. L. Air Monitoring. Air monitoring shall include personal samples according to 40 CFR Part 763, Subpart G or 29 CFR § 1926.1101, baseline sampling, area sampling, and clearance sampling according to §295.58(i). In a public building, a minimum of three baseline sample (minimum volume of 1250 liters) for analysis by PCM must be collected under normal building conditions prior to the disturbance of ACM as part of any abatement activity. Ambient air samples during the project must also be collected for analysis by PCM. All project activities shall be cleared by using aggressive air sampling. For all projects, samples may be collected and S Purchase Bid Doc% RFP 19-1-461441.1 City of Lubbock, TX RFP 19-14614-JM Asbestos Abatement Services analyzed by NIOSH 7400 protocol, counting rules A, Phase -contrast Microscopy (PCM) as amended. Clearance samples shall be collected at a rate of at least 0.5 less than 16 liters per minute on 0.8 micron NICE filters in conducting cassettes with extension cowls. Minimum sample volume will be 1,250 liters. Clearance will be achieved if no sample is reported greater than 0.01 f/cc by the analysis report from the licensed laboratory. Asbestos Hazard Emergency Response Act (AHERA) protocol will be used in schools. M. Contractor shall also meet the specific safety requirements mentioned in the pre -construction meeting. N. Contractor, transporter and disposal site shall meet the licensing and registration requirements of the Texas Department of State Heath Service's, Texas Asbestos Health Protection Rules. O. A licensed asbestos abatement contractor shall perform all work at night or times when tenants are not present in the work area. P. The contractor shall provide the Owner with a work plan including location of decontamination facilities, work location of negative air machines and other equipment, and a schedule of the work. Q. The contractor is responsible for meeting all federal, state, and local laws and regulation, including but not limited to OSHA, EPA, and DSHS requirements. The contractor is responsible for his own OSHA air monitoring. A third party consultant hired by the Owner will provide on -site and clearance monitoring. 6. DOCUMENTS A. The following documents shall be posted in a conspicuous spot at the entrance to the regulated area and must not be covered by any other documents: I . The asbestos information poster issued by the DSHS; and 2. Copies of any violations issued by the federal or state asbestos -regulating authorities within the preceding 12 months from any asbestos project. B. Documents required to be on -site are as follows: EPA "Green Book" for O&M work; 2. 40 CFR Part 61, Subpart M, titles "National Emissions Standards for Hazardous Air Pollutants (NESHAP), November 20, 1990; 3. 29 CFR 1926.1101, titles, "Occupational Exposure to Asbestos, Tremolite, Anthophyllite, October 11, 1994; 4. 29 CFR 1910.134, titled, "Occupational Health Standards for A Respiratory Protection Program", October 11, 1994; and 5. Texas Department of State Heath Service's, Division of Occupational Health, Texas Asbestos Health Protection Rules, September 22, 1994. 5 Purchase Bid Oocs RFP 19-14614-Al City of Lubbock, TX RFP 19-14614-JM Asbestos Abatement Services C. Tape - Shall be glass fiber or other type capable ofsealing joints of adjacent sheets of plastic and for attachment of plastic sheet to finished or unfinished surfaces under both dry and wet conditions. D. Surfactant (wetting agent)- shall consist of a mixture of "Dust -Set Amended Water Base" (Matheson Chemical Corporation), or approved equivalent, and water, mixed to manufacture's specifications. E. Sealant (encapsulant) Shall be manufactured by reputable, established manufacturer of encapsulant/sealant materials and be approved specifically for use in asbestos contaminated environments. It is the responsibility of the Contractor to determine compatibility of the sealant with the materials and existing conditions. F. Impermeable Containers Shall be suitable to receive and retain any asbestos -containing or contaminated materials until disposal at an approved site and shall be labeled in accordance with applicable regulations. Containers shall be both air and watertight. Two types of impermeable containers: 1. Metal, rigid plastic or fiber barrels with independent tightly fitting lids, lined with six -mil plastic sheeting or bags. 2. Appropriately labeled six -mil plastic bags sized to fit within the lined barrels. G. Warning Labels and Signs -Shall be as required by the Texas Department of State Heath Service's and OSHA 29 CFR 1926.1 101 and posted in both English and Spanish. H. Solvents If used for flooring or other mastic removal, shall demonstrate a flash point of at least 140 degrees F., as appropriately determined, and must be approved by the Consultant or Project Manager prior to bringing it on -site. I. Other Materials Provide all other materials, such as lumber, nails and hardware, which may be required to construct and dismantle the decontamination systems and the barriers that isolate the work areas. 7. TOOLS AND EQUIPMENT A. Provide suitable tools for asbestos -containing material removal. 1. Water sprayers Utilize airless or other low-pressure sprayers for amended water application. Pressure washers or sprayers may not be used. 2. Airless sprayer Use airless sprayer of sufficient capacity to apply spray -applied plastic sheeting or encapsulant in accordance with manufacturer's recommendations. 3. Air purifying equipment (for internal recirculation in the work area) - Shall include HEPA filtration systems and insure that no internal air movement system or purification equipment exhausts contaminated air from inside the work area into uncontaminated areas. 4. Scaffolding and ladders shall be as required to accomplish the specified work and shall meet applicable safety regulations. 5. Temporary lighting - Shall be suitable for use in wet environments. 5 Purchase Bid Docs RFP 19-14614-Al City of Lubbock, TX RFP 19-14614-JM Asbestos Abatement Services 6. Transportation As required for loading, temporary storage, transit and unloading of contaminated waste without exposure to persons or property. Use only enclosed dumpsters, trailers or other transports to haul waste containers to prevent loss or damage of containers in route to landfill. REMOVAL OF ASBESTOS -CONTAINING MATERIAL AND DEBRIS A. Remove and properly dispose of all asbestos -containing materials indicated to be removed by the Contract Documents in accordance with federal, state, and local laws and regulations or as more stringently specified herein. B. During any period of actual abatement of asbestos, an abatement supervisor shall be stationed within the containment area at least 25% of the time for the purpose of supervising the progress of the abatement work. 1. Maintain a sign in/out log, as specified previously in this section, in the immediate area of the change room to be signed by every person each time upon entering and leaving work areas. C. Place in work areas at least one fire extinguisher with a minimum NFPA rating of IOBC (dry chemical) for every 1000 square feet, or fraction, of work area for the duration of abatement and subsequent cleaning activities. Place at least one similar fire extinguisher in vicinity of change room. 1. Exterior Preparation. 2. Restrict access to exterior grounds immediately adjacent to work areas by barrier tape or similar means. 3. Place appropriate warning signs, in English and Spanish, on at least every other windowidoor opening. 4. Thoroughly wet asbestos -containing materials and debris to be removed prior to stripping or tooling to reduce fiber dispersal into the air. Saturate material sufficiently to wet to the substrate without causing excess dripping. Allow time for water to penetrate material thoroughly. Spray material repeatedly during the work process to maintain a continuously wet condition. 5. Remove the saturated asbestos -containing materials and debris in small sections. Do not allow materials to dry out. As removed, place in barrels, double wrap or bag the materials in sealable plastic bags, six -mil minimum thickness, and place in containers for transport, labeled with the appropriate wording. 6. Provide general clean up of work areas concurrent with the removal of all asbestos -containing materials and debris. Do not permit accumulation of debris. 7. After removal of asbestos -containing materials and debris, all surfaces in the work area shall be wet -cleaned to remove residual accumulated material. Continue wet cleaning until all surfaces are free of visible dust, dirt and debris. 8. CLEAN UP AND CLEARANCE TESTING A- Provide general clean up of work areas concurrent with the removal activities. Do not permit accumulation of debris on work area. B. Standard of cleaning for Final Clearance- Consider contained work areas and all other decontaminated and cleaned areas clean when: 5 PurchastBodDocsRFP19-146tadW City of Lubbock, TX RFP 19-14614-JM Asbestos Abatement Services 1. Surfaces are free from dust, dirt, residue, and debris from abatement operations or other activities subordinate to these operations. 2. Consultant has approved level of cleanliness. 3. Air testing performed by Consultant indicates that the air in the contained/enclosed work areas is acceptable, as specified in this section. DISPOSAL OF ASBESTOS -CONTAMINATED WASTE A. All asbestos abatement waste shall be transported to and disposed of at approved landfills. B. Asbestos -containing waste and debris shall be transported to the landfill double wrapped, double bagged, or in properly lined barrels. Removed debris, pipe insulation, used cleaning tools, towels, protective suits, used plastic sheeting and spray -applied plastic sheeting shall be treated as asbestos -containing waste materials. C. Temporary storage of asbestos wastes outside the work areas may be utilized only if the proposed area(s) are lined with at least two layers of six -mil plastic sheeting, individually applied, and appropriate warnings are posted. Submit proposed location and procedures for temporary waste storage to the Owner prior to initiating use. D. Remove sealed and labeled containers of asbestos -containing material and waste and transport them for disposal to the specified landfill as follows. 1. Line dumpster, trailer or other waste transport with at least two layers of six -mil plastic sheeting, individually applied. Plastic sheeting used to line waste transport containers need not be flame retardant. 2. Notify the Consultant or Project Manager prior to removing each trailer or other waste transport from the project site. 3. Asbestos -containing waste material shall be treated, packaged, labeled, transported, and disposed of in accordance with 29 CFR 1926.1 101 (OSHA), 40 CFR 61.150 (EPA) and 49 CFR 107 et al., (DOT). 4. Asbestos waste transport shall be limited to approved routes for transport of hazardous materials. Ensure that there are no visible emissions to the outside air from site where materials and waste are deposited. 5. Notify the Consultant or Project Manager immediately of any spill or similar incident involving the transport and disposal of asbestos wastes. E. Alternative methods of transporting asbestos -containing debris will be considered by the Consultant. Do not use alternative methods until reviewed and accepted by the Consultant. 9. FIELD QUALITY CONTROL A. The Consultant or Project Manager shall conduct area air monitoring prior to, throughout, and following preparation, removal and cleaning operations. 5 Purcha Bid bocs RFP 14-14614 M City of Lubbock, TX RFP 19-14614-JM Asbestos Abatement Services 1. All phase contrast microscopy (PCM) area air samples collected by the Consultant or Project Manager will be analyzed in general accordance with the procedures outlined in the National Institute for Occupational Safety and Health (NIOSH) 7400 Method and also will follow guidelines issued by EPA regarding detection limits. Owner and Consultant reserve the right to analyze air samples by transmission electron microscopy (TEM). 2. Background prevalent level air samples, collected on media for analysis by phase contrast microscopy, will be obtained from representative areas immediately prior to the start of the project and will be analyzed. 3. Background prevalent level air samples, collected on media for analysis by transmission electron microscopy, will, when deemed necessary by the Consultant, be obtained from representative areas immediately prior to the start of the project and will be held for future analysis at the discretion of the Consultant. 4. Area air samples will be collected both inside and outside of work areas. The Contractor is cautioned, however, that should interpretations be made, opinions be formed and conclusions be drawn as a result of examining the test results, these interpretations, opinions and conclusions will be those made, formed and drawn solely by the Contractor. 5. All samples must meet specified clearance levels for the area being tested to be considered clean. Results of PCM air sample analysis shall be reported as the 95 percent upper confidence limit (UCL). A. Final clearance air samples will be of at least 1250 Iiters of air, collected at a flow rate of at least 0.5 to less than 16 liters per minute on 0.8 micron MCE filters in conducting cassettes with extension cowls. B. Contractor shall wet -clean and HEPA-vacuum areas outside the contained work areas in which elevated airborne fiber concentrations are detected. Indicated airborne fiber concentrations above 0.01 Fcc, or ambient prevalent levels, will be considered elevated airborne fiber concentrations. C. Visual observations will be made by the Consultant or Project Manager after final clean-up and de- mobilization to determine the presence of visible dust, dirt, debris and abatement refuse indicative of improper cleaning and decontamination proceed. D. Written and electronic copies of final documentation on all projects S Purchase Rid Oocs RFP 10-14614-Al Exhibit B ASBESTOS ABATEMENT SERVICES RFP 19-1461"M Best and Final Offer All prices shall include any and all delivery fees, including but not limited to rrelgbtt Fuel sarebarge, environmental fees, materials & supplies, and transportation and disposal of asbestos and non -asbestos wasle UNIT PRICE ITEM DESCRIPTION QTY UOM 1 Mobilization and Project Set U job $800,00 Remove asbestos -containing fireproofing on the building's interior structural members (including overspray an both structural and non-structural butldmg components) per Plan Square Foot *11CU 2 $22.00 3 00 per Plan Square Foot $6.00 4 >2500 per Plan Square Foot $6.00 5 Remove asbestos -containing fireproofing on the building's exterior structural members (including overspray on both structural and non-structural building component) I • l000 per Plan Square Foot $1 B.00 6 1001-25Wxa per Plan Square Foot $4.00 7 >2500 per Plan Square Foot S4.00 g Remove asbestos -containing acoustic ccd ing the 1-1000 1001-2500 per Square Foot per Square Foot $10 00 $3.00 9 10 " ' Remove asbestos -containing or asbestos -contaminated gypsum board ceiling system, no hieer than 15' AFF >2500 1-1000 per Square Foot per Square Plan Foot $3.00 1 l $22.00 12 1001-2500 >25t;:} per Square Plan Foot per Square Plan Foot $6.00 $8.00 13 Remove asbestos -containing or asbestos-contammated gypsum board ceiling system, greater than 15' AFF but less than 31]' AFF 1-Iwo tool-2W, >2500 per Square Plan Foot per Square Plan Foot per Square Plan Foot !4 $22.00 $6.00 $6.00 15 16 w Remove asbestos -containing gypsum board waif system, up to I in height AFF 17 1-1060 per Square Foot $15.00 is 1001-2500 per Square Foot $4.00 19 r2500 per Square Foot IV ; 20 Remove asbestos-contatmng gypsum board wall system, greater than 15' AFF but less than 31,' AFF 1-1000 per Square Foot 15.00 21 I001-2500 per Square Foot $4,00 22 >2500 per Square Foot Remove asbestos -containing or asbestos-contam_nated interior plaster ceiling or soffit plastevstucco system, up to ITAFF 1-1000 per Square Plan Foot 23 t20.00 24 1001-2500 per Square Plan Foot 25 >2500 per Square Plan Foot $7.00 Vendor Name: 1 Priority Environmental Services ASBESTOS ABATEMENT SERVICES RFP 19-146144M Best and Final Offer All prices shall include any and all delivery fees, including but not limited to freight, fuel surcharge, environmental fees, materials & supplies, and transportation and disposal of asbestos and non -asbestos waste UNIT PRICE ITEM DESCRIPTION (STY UOM asbestu-:-containing or asbestos -contaminated interior INRemove plaster ceiling or soft plaster.+stucco system, greater than 15' AFF but less than 30' AFF 1-1000 per Square Plan Foot 26 $20.00 27 1001-25iYJ per Square Plan Foot $7.00 28 >25W per Square Plan Foot $7.00 k" Remove asbestos -containing or asbestos -contaminated exterior 4� plaster ce.hng or soffit plaster -'stucco system, up to 15' AFF $18.00 29 1-1000 per Square Plan Foot 30 1001-2500 per Square Plan Foot $5.00 31 1 >2500 per Square Plan Foot 55.00 h . ` A- Rem,kvc asbestos -containing or asbestos -contaminated exterior p'.asler ceding or Montt plaster.,stucco system, greater than 15' AFF but Icss than Y" AFF 1-1000 per Square Plan Foot 32 $18.00 33 1001-2500 per Square Plan Foot $5.00 34 >2500 per Square Plan Foot $5.00 s , 4 , Remove asbestos -containing interior call plaster/stucco, up to IF in het a AFF 35 1-1000 per Square Foot $20.00 36 1001-2500 per Square Fool $7.00 27 >2500 per Square Foot MOO Remove asbestos -containing interior call plaster/stucco, greater than I $' AFF but less than 30' AFF 38 1-1000 per Square Foot $20.00 39 1001-2500 per Square Foot 57.00 40 >2500 per Square Foot Remove asbestos -containing exterior wall plasterlstucco, up to : 5' in height AFF 41 1-1000 per Square Foot r$5'.00 42 1001-2500 per Square Foot5.00 43 >2500 per Square Foot Remove asbestos -containing exterior wall plastertstucco, greater than 15' AFF but less than 30' AFF 1-1000 per Square Foot 44 $18.00 45 1001-2500 per Square Foot 5.00 46 12500 per Square Foot $5.00 Remove asbestos -containing spray -applied ceding texture, up to IS' AFF .1? 1-11000 per Square Plan Foot a 8 1001-2500 per Square Plan Foot 16-00 a y 1 1 >2500 1 per Square Plan Foot 1$6.00 Vendor Name: 1 Priority Environmental Services ASBESTOS ABATEMENT SERVICES RFP 19-14614-iM Best and Final Offer All prices sball include any and all delivery fees, including but not limited to freigbt, fuel surcharge, environmental fees, materials & supplies, and transportation mad disposal or asbestos and non -asbestos waste UNIT' PRICE ITEM DESCRIPTION QTY UOM Remove asbestos -containing spray -applied ceiling texture, eater than IS' AFF but less than 30' AFF 50 1-tout per Square Plan Foot $22.00 51 1001-2500 per Square Plan Foot $6.00 52 >2500 per Square Plan Foot $6.00 ME Remove interior ceramic wall Life with asbestos -containing mortar, bedding or mastic up to I S' in height AFF 1-1000 per Square Foat 53 22 00 24 1001-2500 per Square Foot $6.00 55 r2500 per Square Foot $6,00 Remove interior ceramic wall the with asbestos -containing mortar, bedding or mastic greater than 15' to height AFF but less than 39 AFF 1-1000 per Square Foot 56 $24.00 57 1001-257C per Square Foot 7.00 Sg >2500 per Square Foot Remove exterior ceramic wall rife with asbestos -containing mortar, bedding or mastic. up to 15' in height AFF 1-1000 per Square Foot 59 $20.00 60 1001-2500 per Square Foot s5.00 61 >2%0 per Square Foot $5.00 -0Remove -.30' exterior ceramic wall tile with asbestos-contatnirg mortar, bedding or mastic, greater than IS' AFF but less than AFF 1-1000 per Square Foot 22.00 62 63 1001-2500 per Square Foot $6.00 64 >2500 per Square Foot $6.00 65 Remove interior ceramic floor tile with asbestos-tontaining mortar, bedding and mastic 1.1000 per Square Foot $9.00 66 1001-2500 per Square Foot $4.00 67 >2500 per Square Foot $4.00 Remove exterior ceramic Floor tile with asbestos -containing mortar, bedding and mastic 68 I-i Otx1 per Square Foot 67.00 69 1001-2500 per Square Foot 70 >2500 per Square Foot $3.00 Remove interior asbestos -containing CWU "block filler', up to IS' in hei.IitAFF 1-1000 per Square Foot 23.170 71 72 1001-2500 per Square Foot $15.00 73 >2500 per Square Foot $15.00 Remove interior asbestos -containing CMU "block filler", greater in height than I Y AFF but less than 39 AFF 1-1000 per Square Foot $26.00 74 75 1 I OOI-2500 per Square Foot $17.00 76 1 >2500 per Square Foot Vendor Name: 1 Priority Environmental Services ASBESTOS ABATEMENT SERVICES RFP 19-14614-JM Best and Final Offer All prices shall include any and all delivery fees, including but not limited to freight, fuel surcharge, environmental fees, materials & supplies, and transportation and disposal of asbestos and noo-asbestos waste UNff PRICE ITEM DESCRIPTION QTY UOM IN Remove exterior asbestos-contatning CMU "block filler, up to l5' in henht AFF 77 1-1000 per Square Foot $20.00 78 1001-2500 per Square Foot $12.00 79 >2500 per Square Foot $12.00 Remove exterior asbestos -containing CM "block filler' greater in height than IS AFF but less than 30' AFF -- - ---- - - ------ - -- -- 80 1-1000 per Square Foot 81 1001-2500 per Square Foot $15.00 82 >2500 per Square Foot $15.00 Inmastic, Remove acoustic ceiling lile adhered with asbestos -containing up to 15' AFF 1-1000 per Square Foot 83 _ 1 84 11;01-2500 >2500 per Square Foot per Square Foot $4.00 $4.00 85 > Remove acoustic ceiling the adhered with asbestos containing mastic, greater than 15 AFF but less than 3u' AFF 1-1000 per Square Foot 86 $15.00 87 t 0G 1-2500 per Square Foot $4.00 88 >2500 per Square Foot Q0 Remove interior asbestos -containing insulation cn exposed pipe, up to 15 AFF I-Ifm per Linear Foot 89 $20.00 90 [001-2500 per Linear Foot $10.00 91 >2500 per Linear Foot 1 00 Remove interior asbestos -containing insulation on exposed pipe, higher than I Sr AFF but _ess than 30' AFF 1-1000 per Linear Foot 92 $20.00 93 1001-2500 per Linear Foot $10.00 94 >251Y, per Linear Foot $10.00 Remove ssbeslo>-containing insulation on p pe in Ceilings, restroom chases, building chases and other interior locations, up to IS' AFF 1-1000 per Linear Foot 95 $20.00 96 160—I 500 per Linear Foot $10.00 97 >2500 per Linear Foot $10.00 Remove asbestos -containing insulation on pipe in ceilings, restroom chases, building chases and other interior locations, higher than I T AFF but less than 30' AFF R1001-2500 perLmearFoot 98 $20.00 99 per Linear Foot $10.00 too >2500 per Linear Foot R() kbl Remove asbestos -containing insulation on piping on the roof or otherwise outside the building I-1000 per Linear Foot $17.00 702 1001-2500 per Linear Foot $7,00 103 >2500 per Linear Foot $7.00 Vendor Warne: 1 Priority Environmental Services ASBESTOS ABATEMENT SERVICES RFP 19-1"14.JM Best and Final Offer All prices shall include any and all delivery fees, including but not limited to freight, fuel surcharge, environmental fees, materials & supplies, and transportation and disposal of asbestos and non-ashestas ,waste UNIT PRICE 1'I DESCRIPTION QTY UOM sidual asbestos -containing sealanton interior rfaces, saddles, hangers, and other structural and ral items, up to 15' AFF I-1000per Square Plan Foot 10.00 105 FG,'d 1001-2500 per Square Plan Foot $4,00 IlXi >2500 per Square Plan Foot $4.00 sidual asbestos -containing sealant on interior rfaces, saddles, hangers, and other structural and ral items, greater than 15' AFF but less than 11 AFF 1-1000 per Square Plan Foot 107 12. 00 log cool-25-,rr per Square Plan Foot Whangcrs. >2500per Square Plan Foot $6.00 Remove interior asbestos -containing sealant on non-asbesto%- containing duct insulation (including removal of sealant from saddles, supports, etc), up to 15' AFF 11 [to 1-1000 per Linear Foot of Sealant $20.00 l l i 1001-2500 per Linear Foot of Sealant �12.00 112 >2500 per Linear Foot ofSealant $12.00 Remove interior asbestos -containing sealant on non -asbestos - containing duct insulation (including removal of sealant from hangers, saddles, supports etc ), greater than 15' AFF but less than 30' AFF Ili I 1 1-1000 per Linear Fool of Sealant $20.00 114 1001-2500 per Linear Foot of Sealant $12.00 115 >2500 per Linear Foot of Sealant S12.00 Remove asbestos -containing sealant on interior sheet metal ductwork or other sheet metal, equipment, and accessories (AHUs, VAV boxes. escalators, etc.) includingremo4al of sealant from hangers, saddles, supports, etc , up to 15' AFF 116 1-1000 per Square Foot of Sealant 25 .00 117 1001-2500 per Square Foot of Sealant $14.00 118 >2500 1 ter 5atrare Foot of Sealant I i4e M Remove asbestos -containing sealant on interior sheet metal ductwork or other sheet metal, equipment and accessories (AHUs, VAV boxes, escalators, etc ) including removal of sealant from hangers, saddles, supports, etc , higher than 15' AFF but less than 30' AFF 1-1000 per 1001-2500 per >2500 1 per Remove asbestos -containing sealant on exterior metal ductwork or other sheet metal, equipment, and accessories (AHUs, VAV boxes, escalators, etc ) including removal of sealant from hangers, saddles, supports, etc, on the roof or otherwise outside the building 122 i-1000 per Square Foot of Sealant 14.00 123 1001-2500 per Square Foot of Sealant $8.00 124 >2500 per Square Foot of Sealant to art 5 4' enclOC Name' 1 Priority Environmental Services ASBESTOS ABATEMENT SERVICES RFP 19-14614-JM Best and Final Offer All prices shall include any and all delivery fees, including but not limited to freight, fuel sorcbarge, environmental fees, materials & supplies, sad transportation and disposal of asbestos and non -asbestos waste UNf[' PRICE ITEM DESCRIPTION OTY VOM Remove asbestos containing insulation on tanks and equipment inside the building US 1-1000 per Square Foot $40.00 l26 1001-2500 per Square Foot $20.00 l27 >2500 per Square Foot $20.00 1ARemove asbestos -containing insulation on tanks and equipment on the roof or otherwise outside the budding 1-1000 per Square Foot $40.00 128 129 1001-2500 per Square Foot 20-130 130 >2500 per Square Foot $20.00 Remove asbestos -containing sealant on non -asbestos - containing tank or equipment insulation inside the building 1-1000 per Square Foot 131 W.00 132 V-31-2500 per Square Foot S20.100 133 >2500 per Square Foot $20.00 134 Remove asbestos -containing sealant on non-asbesw- containing tank or equipment insulation on the roof or otherwise outside the building 1-1000 per Square Foot $40.00 135 1001-2500 per Square Foot $20.00 136 >2500 per Square Foot $20.00 137 Remove ceiling- and wall -mounted light fixtures with asbestos - containing insulation liners 1.10 Each $10.00 138 11-25 Each $8.00 139 >25 Each Remove wall paneling with asbestos -containing mastic (including removal of mastic from substrate) I a0 1-1000 per Square Foot $6.00 141 1001-2500 per Square Foot $4.00 I42 >2500 per Square Foot $2.00 Remove mirrors with asbestos-cwntaming mastic (mcluding removal of mastic from substtatel 143 1-25 per Square Foot $100.00 144 26-100 per Square Foot $25.00 145 > 100 per Square Fool $10.00 Remove asbestos-c,mtaming and non-asbestos-contatmng floor the and asbestos -containing mastic 146 1-1000 per Square Foot S4.50 147 1001-2500 per Square Foot $2.00 148 >2500 per Square Fool $2.00 149 Remove asbestos -containing and non -asbestos -containing floor file and asbestos -containing mastic using RFCI procedures I per Square Foot $4.50 150 Remove asbestos -containing ontaining floor tile with non -asbestos containing mastic using RFCI Medures 1 per Sque Foot Vendor- Name: 1 Priority Environmental Services ASBESTOS ABATEMENT SERVICES RFP 19-146144NI Best and Final Offer All prices shall include any and all delivery fees, including but not limited to freight, fuel surcharge, environmental fees, materials & supplies, and transportation and disposal or asbestos and nonasbestes waste UNIT PRICE ITEM DESCRIPTION QTY UOM Remove asbestos -containing and non -asbestos -containing cave f1mastic base with asbestos -containing mastic (including removal of from substrate) 1-1000 per Lutear Foot $6.00 152 i0p1-2500 per Linear Foot $4.00 153 >2500 per Linear Foot ;2.00 Remove asbestos-coniamtng and non -asbestos -containing 5lair tread material with asbestos -containing mastic tincluding removal of mastic from substrate) 1-1000 per Linear Foot 154 6.170 155 1001-2500 per Linear Foot 156 }250� per Linear RNit $2.00 157 Remove window frame with interior asbestos -containing I Each window glazing compound and caulk/sealant (including removal of asbestos -containing residue from Substrate) $400.00 158 Remove window frame with exterior asbestos -containing I F.aca window glazing compound and caulk/sealant (including removal ofasbestos-containing residue from substrate) $300.00 '"'9 Remove window frame with interior and exterior asbestos- 1 Each containing window glazing compound and caulk;sestant ;400.00 (including removal of asbestos -containing residue from substrate) 160 Remove door frame with asbestos -containing interior frame I caulk1sealant (including removal of asbestos -containing residue from substrate) �400 00 161 Remove door frame with asbestos -containing exterior frame I Fuch caulk/sealant (including removal ofasbesios-containing residue from substrate) $300.00 Remove asbestos -containing concrete floor sealant 1-1000 per Square Foot 162 50 163 1001-2500 per Square Foot $7.00 164 >2500 per Square Foot 7- } Remove asbestos -containing terrazzo flooring 165 1-1000 per Square Foot $6.00 166 1001-2500 per Square Foot $3.50 167 12500 per Square Foot $3.50 168 Remove asbestos -containing fire door I Each AW�00 169 Remove asbestos -containing elevator doors I Each Remove exterior cement asbestos board building panels 1-1000 per Square Foot 170 171 1001-2500 per Square Foot 172 >2500 per Square Foot $3.00 Vendor Name: I Priority Environmental Services ASBESTOS ABATEMENT SERVICES RFP 19-14614-JM Best and Final Offer All prices shall include any and all delivery fees, including but not limited to frei;ht, fuel surcharge, environmental fees, materials & supplies, and transportation and disposal of asbestos and nou-asbestos waste UNIT ITEM DESCRIPTION QTY UOM PRICE diMikernove interior cement asbestos board building panels l73 I-1000 per Square Foot $9.00 174 1001-2500 per Square Foot 6.00 l75 >2500 per Square Foot $4.00 Remove asbestos -containing roof flashing 116 MMil 1-1000 per Square Foot $7.00 177 1001-2500 per Square Foot 6.00 178 >2500 per Square Foot $5.00 Remove asbestos -containing roofing felts 179 L- l o0o Foot E7.00 180 1001 2500 Foot $6.00 k 8 k >2500 ;Squam Fool $5.00 Remove asbestos -containing roof mastic/cement182 1-1000 Foot $7.00 183 1001-2500 per Square Foot $6.00 184 >2500 per Square Foot 0 Remove interior asbestos -containing expansion joint sealant 185 1-100 per Square Foot $24.00 186 I0l -250 per Square Foot W.00 187 >250 per Square Foot $10.00 Remove exterior asbestos -containing expansion joint sealant 188 I-100 per Square Foot $20.00 189 ]01-250 per Square Foot 610. 00 190 >250 per Square Foot $5.00 Remove exterior buildingwaterprong/sealant ofi 191 i-100 per Square Foot $50.00 192 10l-250 per Square Foot ;40.00 193 >250 per Square Foot $30.00 Remove conci-cm encased asbestos 1-100 101-250 per Square Foot per Square Foot $100.00 76. >250 per Square Foot $50.00 194 Demolition required to access asbestos per Square Foot $50.00 Furniture moving per Hour $50.00 r19 Emervenk-y fiber release cleanu per Square Foot Other abatement activity not noted in any above catakones per Hour Q TOTAL Name of Company: 1 Priority Environmental Services Prepared By: Dan Oldham Title- Regional Manager Date: 06114/2019 Exhibit C City of Lubbock, TX Bid 19-14614-JM Asbestos Abatement Services III — INSURANCE COVERAGE REQUIRED SECTION A. Prior to the approval of this contract by the City, the Contractor shall furnish a completed Insurance Certificate to the City, which shall be completed by an agent authorized to bind the named underwriter(s) to the coverages, limits, and termination provisions shown thereon, and which shall furnish and contain all required information referenced or indicated thereon. THE CITY SHALL HAVE NO DUTY TO PAY OR PERFORM UNDER THIS CONTRACT UNTIL SUCH CERTIFICATE SHALL HAVE BEEN DELIVERED TO THE CITY. SECTION B. The City reserves the right to review the insurance requirements of this section during the effective period of the contract and to require adjustment of insurance coverages and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decisions, or the claims history of the industry as well as the Contractor. SECTION C. Subject to the Contractors right to maintain reasonable deductibles in such amounts as are approved by the City, the Contractor shall obtain and maintain in full force and effect for the duration of this contract, and any extension hereof, at Contractor's sole expense, insurance coverage written oy companies approves oy the state or t exas ana acceptance to the tatty, to the tottowtng type(s) ana amount(s): TYPE OF INSURANCE COMBINED SINGLE LIMIT GENERAL LIABILITY ® Commercial General Liability General Aggregate 1,000,000 ❑ Claims Made ® Occurrence Products-Comp/Op AGG X ❑ WlHeavy Equipment Personal & Adv. Injury X ❑ To Include Products of Complete Operation Endorsements Contractual Liability X Fire Damage (Any one Fire) Med Exp (Any one Person) POLLUTION LIABILITY ® General Aggregate 1,000,000 AUTOMOTIVE LIABILITY ® Any Auto ❑ All Owned Autos ❑ Scheduled Autos ❑ Hired Autos ❑ Non -Owned Autos Aggregate I,000,000 ® WORKERS COMPENSATION STATUTORY AMOUNTS OR OCCUPATIONAL MEDICAL AND DISABILITY 500,000 ® EMPLOYERS' LIABILITY OTHER. COPIES OF ENDOSEMENTS ARE REQUIRED ® City of Lubbock named as additional insured on AtttolGenerol Liability on a primary and non-rontributory bases. ® To include products ofcompleted operations endorsement. ® Waiver of subrogation in favor of the City of Lubbock on all coverages, except IMPORTANT: POLICY ENDORSEMENTS The Contractor will provide copies of the policies without expense, to the City and all endorsements thereto and may make any reasonable request for deletion, revision, or modification of particular policy terms, conditions, limitations, or exclusions (except where policy provisions are established by law or regulation binding upon either of the parties hereto or the underwriter of any of such policies). Upon such request by the City, the Contractor shall exercise reasonable efforts to accomplish such changes in policy coverages, and shall pay the cost thereof. Any costs will be paid by the Contractor. REQUIRED PROVISIONS The Contractor agrees that with respect to the above required insurance, all insurance contracts and certificate(s) of insurance will contain and state, in writing, on the certificate or its attachment, the following required provisions: The City of Lubbock shall be named as an additional insured on a primary and non-contributory basis and shall include waivers of subrogation in favor of the City on all coverage's. Copies of the Certificates of Insurance and all applicable endorsements are required. ADDITIONAL POLICY ENDORSEMENTS The City shall be entitled, upon request, and without expense, to receive copies of the policies and all endorsements thereto and may make any reasonable request for deletion, revision, or modification of particular policy terms, conditions, limitations, or exclusions (except where policy provisions are established by law or regulation binding upon either of the parties hereto or the underwriter of any of such policies). Upon such request by the City, the Contractor shall exercise reasonable efforts to accomplish such changes in policy coverages, and shall pay the cost thereof. REQUIRED PROVISIONS The Contractor agrees that with respect to the above required insurance, all insurance contracts and certificate(s) of insurance will contain and state, in writing, on the certificate or its attachment, the following required provisions: a. Name the City of Lubbock and its officers, employees, and elected representatives as additional insureds, (as the interest of each insured may appear) as to all applicable coverage; b. Provide for thirty (30) days' notice to the City for cancellation, nonrenewal, or material change; c. Provide for notice to the City at the address shown below by registered mail; d. The Contractor agrees to waive subrogation against the City of Lubbock, its officers, employees, and elected representatives for injuries, including death, property damage, or any other loss to the extent same may be covered by the proceeds of insurance; e. Provide that all provisions of this contract concerning liability, duty, and standard of care together with the indemnification provision, shall be underwritten by contractual liability coverage sufficient to include such obligations within applicable policies. NOTICES The Contractor shall notify the City in the event of any change in coverage and shall give such notices not less than 30 days prior the change, which notice must be accompanied by a replacement CERTIFICATE OF INSURANCE. All notices shall be given to the City at the following address: Marta Alvarez, Director of Purchasing and Contract Management City of Lubbock 1625 131h Street, Room 204 Lubbock, Texas 79401 SECTION D. Approval, disapproval, or failure to act by the City regarding any insurance supplied by the Contractor shall not relieve the Contractor of full responsibility or liability for damages and accidents as set forth in the contract documents. Neither shall the bankruptcy, insolvency, or denial of liability by the insurance company exonerate the Contractor from liability. CERTIFICATE OF INTERESTED PARTIES FORM 1295 1011 Complete Nos. 1- 4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos. 1. 2. 3, 5, and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form, and the city, state and country of the business entity-s place Certificate Number: of business. 2019-494339 1 Priority Environmental Services Fort Worth, TX United States Date Filed: 2 Name of governmental entry or state agency t at s a party to the contract for wMIch the forms 05122/2019 being filed. City of Lubbock ]Date Acknowledged: 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a description of the services, goods, or other property to be provided under the contract. RFP 19-14614-JM Asbestos Abatement Services 4 Name of Interested Party 1 Priority Environmental Services, LLC 5 Check only if there Is NO Interested Party. ❑ 6 UNSWORN DECLARATION My name is Gar Caldwell My address is 4028 Daley Ave. (street) Nature city, State, Country (place of business) Fort Worth, TX United States , and my date of birth is Fort Worth TX 76180 (dty) (state) (ztp code) X USA (-Untry) I declare under penalty Of perjury that the foregoing is true and correct. Executed in Tarrant _County, State of Texas on the22ndday of May Zt) 19 (month) (year) ���augnature Of auth Tetl nt of cdhtrachnubly Tess entity { rant) Texas Ethics Commission www.ethics.state.tx,us Version V1. CERTIFICATE OF INTERESTED PARTIES FORM 1295 1 of 1 Complete Nos. 1- 4 and 6 if there are interested parties, OFFICE USE ONLY Complete Nos. 1, 2, 3, 5, and 6 if there are no interested parties. CERTIFICATION OF FILING i Name of business entity filing form, and the city, state and country of the business entity's place Certificate Number: of business. 1 Priority Environmental Services 2019-494339 Fort Worth, TX United States Date Filed: 2 Name of governmental entity or state agency that is a party tot the contract for which the form is 05/22/2019 being filed. City of Lubbock Date Acknowledged: 05/22/2019 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a description of the services, goods, or other property to be provided under the contract. RFP 19-14614-JM Asbestos Abatement Services 4 Nature of interest Name of Interested Party City, State, Country (place of business) (check applicable) Controlling Intermediary 1 Priority Environmental Services, LLC Fort Worth, TX United States X 5 Check only if there is NO Interested Party. ❑ 6 UNSWORN DECLARATION My name is and my date of birth is My address is (street) (city) (state) (zip coda) (country) I declare under penalty of perjury that the foregoing is true and correct. Executed in County, State of on the day of , 20 (month) (year) Signature of authorized agent of contracting business entity (Declarant) Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.1.391`8039c