Loading...
HomeMy WebLinkAboutResolution - 3629 - Accept Paving Improvements-Jarnagin Construction-Cemetary&Lou Stubbs Parking Lot - 06_13_1991Resolution No. 3629 June 13, 1991 Item #11 JWF:dw RESOLUTION A RESOLUTION ACCEPTING PAVING IMPROVEMENTS AS LISTED BELOW: WHEREAS, the City of Lubbock heretofore entered into Contract with Jarnagin Construction Company for the making of paving improvements in said City including among others the following: Cemetery Road & Lou Stubbs Parking Lot Construction WHEREAS, the construction of the above improvements was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with terms of said Contract, Project Nos. 9602 & 9665. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: SECTION 1. THAT the improvements BE and the same are hereby accepted and the City Engineer BE and he is hereby authorized to direct the final payment to the contractor in the amount of $6,003.25. SECTION 2. THAT this Resolution shall take effect and be in force from and after its passage. Passed by the City Council this 13th day of Is e boya, city secretary APPROVED S TO C NTENT: ltgrry erte , i y EngAneer APPROMED AS TO FO M. J.,-Wo/rth Fullingim, Assistant qyty At o ney June , 1991. a . C. McMI N, MAYOR MONTHLY ESTIMATE CITY. OF* LUBBOCK Resolution No. 3629 June 13, 1991 Item #0 Project: CEMETERY ROAD & LOU STUBBS PARKING LOT CONSTRUCTION Contractor: Jarnagin Construction Co. Address: P.O. Box 98128 Lubbock, Texas 79499 Estimate Period From May 20, , 19 91 to June 13, On First estimate and final estimate use actual work dates Project No. 9602 & 9665 Estimate No. 3 & FINAL Contract $ 116,,915.00 1991 ITEM UNIT OF MEASURE PROJECT EST. QUANTITIES WORK DONE ON CONTRACT CONTRACT PRICE AMOUNT CEMETER ROAD CO STRUCTION 1. 1-1/2" T.H.D. Type "C" A.C. S.Y. 6 40 6,4001n nn $ 64 000.00 paving on 3" of asphalt stabilized gravel base. 57-3-07r Curb and Gutter L.F. 420 $ 3.150.00 LOUSTUBBS ARKING LOT C NSTRUCTION 2. 1-1/2" T.H.D. Type "C" A.C. S.Y. 2,600 2,600 7,75 $ 20 150.00 paving on 6" of caliche base. 3. 30" Curb and Gutter L.F. 750 750 7,90 $ 5,625.00 . Reinforced concrete valley gutters and driveway entrance S.Y. 190 190 27.00 $ 5,130.00 5. Curb and Gutter Removal L.F. 100 100 550.00 6. Concrete Wheelchair Ramps Ea. 2 2 $ 100.00 7. 4" thick Sidewalk Construction S.Y. 600 600 $ 17,00 $ 10-,200.00 8. Prefabricated Concrete Ea. 28 28 20.00 $ 560.00 Wheelsto s installed 9. Fill with native soil.behind um Sum 140 140 $ 1 100.00 curb. 10. Fill under parkin lot um"•;um 280 280 c�.lst} 00 $ 9,150.00 11. Parking Lot Striping for Lump Sum 68 68 $ 350.00 $ 350.00 68 parking spaces APPROVED: 5 a / For En is Office Total Amount of Work Done :.:.... $ 120, 065�00 Less 5 % Retained .. $ Difference ............... _.$ $ 120, 065.00 ---------- Less Special Deduction............ $ - Less Liquidated Damage ......... $ Less Previous P ments_ .....:: ,., . $ 114, 061.75 aY Amount Due this Estimate......... $_ 6,003.25 Calculations by: C OCR Engineer oa e 2 _ Checked by. Dent. Head Date 4 pj;" C J e .13,' 1991 Director Date