HomeMy WebLinkAboutResolution - 2867 - Amendment #2 To Agreement - Parkhill Smith & Cooper Inc - Improvements, LIA - 06_23_1988Resolution #2867
June 23, 1988
Item 19
HW:dw
DP4Znl HTTAKI
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock an Amendment
No. 2 to an Agreement for Engineering Services between the City of Lubbock,
Texas, and Parkhill, Smith & Cooper, Inc., attached herewith, which shall be
spread upon the minutes of.the Council and as spread upon the minutes of
this Council shall constitute and be a part of this Resolution as if fully
copied herein in detail.
Passed by the City Council this 23rd day of June , 1988.
. r . � cA 0- , W
B. C. MCMINN, MAYOR
!;SATTES
anele Soyd, City Secretar
APPROVED AS TO CONTENT:
Marvin Coffee, Dir or of
Aviation
APPROVED AS TO FORM:
arold Wil ard, Assistant City
Attorney
Res. 02867
AMENDMENT NO. 2
TO AGREEMENT
CITY OF LUBBOCK, TEXAS
AND
PARKHILL, SMITH & COOPER, INC.
WHEREAS, the City Of Lubbock, Texas and Parkhill, Smith & Cooper, Inc.,
have entered into an agreement for engineering services, dated March 25, 1982,
as amended by Amendment No. 1, dated March 22, 1984.
WHEREAS, The City of Lubbock, Texas desires to proceed with the design
and construction of additional improvements of Lubbock International Airport
in accordance with Item 5 in the RECITALS of the Agreeement.
THIS AMENDMENT WITNESSETH:
A. In the RECITALS, as amended, the following shall be inserted
after Item 12:
13. To rehabilitate and upgrade portions of the airfield lighting
system. This includes the following:
a. Lighting for Taxiways M, S, N and portion of F.
b. Lighting for Taxiways J, K, G and portion of R.
c. Lighting for Taxiways A, B, C, D and portion of F.
d. Lighting for portions of Taxiways R and F and terminal
apron perimeter taxiway.
e. Modifications for lighting vault.
f. Runway distance remaining signs for Runways 17R-35L and
8-26.
g. Manholes and partial cable replacement for lighting on
Runways 17R-35L and 8-26.
h. Runway pavement sensor system.
j. Rehabilitation of airport rotating beacon.
AMENDMENT NO. 2
Page 1 of 9
14. To reconstruct west cargo apron.
15. To construct new runway end connector taxiways as follows:
a. Connector taxiway between Taxiway M and Runway 17R.
b. Connector taxiway between Taxiway M and Runway 35L.
16. To construct new taxiways and extend and widen existing
taxiways as follows:
a. New angled connector taxiway between Taxiway A and Runway
17R.
b. Extend Taxiway •J to Runway 17R-35L and through to
Taxiway C.
c. Widen Taxiway F west of Runway 17R-35L.
17. To construct an angled exit taxiway between Runway 17R-35L
and Taxiway M.
18. To construct new taxiways as follows:
a. Extend Taxiway L north to Taxiway A.
b. New connector taxiway between Runway 17R-35L and Taxiway
A and between Taxiway A and Taxiway L extension.
Work in Items 13 through 18, as above listed, is presented in the
PREAPPLICATION FOR FEDERAL ASSISTANCE AT LUBBOCK INTERNATIONAL AIRPORT, as
updated April 15, 1988.
B. The Engineer shall, upon authorization, proceed with the DESIGN
PHASE, as specified in Section II-C of the Agreement, for Items 13
and 14 as described in the RECITALS. Construction work for Item 13,
airfield lighting system rehabilitation, is to be included in a
single set of bidding and contract documents. Construction work for
Item 14, Reconstruction of West Cargo Apron, is to be included in a
single set of bidding and contract documents.
AMENDMENT NO. 2
Page 2 of 9
C. The Engineer shall, upon authorization for each item, proceed with
the BIDDING PHASE and CONSTRUCTION PHASE, as specified in Section
II-D and Section II-E of the Agreement, for Items 13 and 14 as
described in the RECITALS.
D. In Section III, AUTHORIZATION OF SERVICES, the following shall be
inserted following the last paragraph of Section III, page III-1,
as amended:
"The Engineer shall be authorized to proceed with the Design
Phase services for Items 13 and 14 as described in the RECITALS upon
execution of Amendment No. 2 to this Agreement. The Owner's written
authorization shall be obtained prior to proceeding with each sub-
sequent phase of services."
E. In Section IV, PERIOD OF SERVICE the following shall be inserted
after.the sixth paragraph of Section IV, page IV-1, as amended:
"It is agreed the authorization to proceed with the Design
Phase for Item 13 and Item 14 in the RECITALS will be given upon
execution of Amendment No. 2 to this Agreement. The Design Phase
for Item 13 will be completed within 180 calendar days from the
date of execution and the Design Phase for Item 14 will be completed
within 120 calendar days from the date of execution."
F. In Section VI-C, DESIGN PHASES, the following shall be inserted
after the sixth paragraph of Section VI-C, page VI-2, as amended:
"Payment for services in the Design Phases shall be made to the
Engineer in the lump sum amount of Fifty -Eight Thousand Three
Hundred Forty -Four Dollars ($58,344.00) for the Design Phase for
Item 13 in the RECITALS.
AMENDMENT NO. 2
Page 3 of 9
Payment for services in the Design Phase shall be made to the
Engineer in the lump sum amount of Sixty -One Thousand Three
Hundred Twenty -One Dollars ($61,321.00) for the Design Phase for
Item 14 in the RECITALS.
Payment for services in the Design Phases shall be made to the
Engineer in a lump sum amount of (to be negotiated whenever the
Owner desires to proceed with the Design Phase)for the Design Phase
for Items 8, 11 and 15 through 18 in the RECITALS."
G. In Section VI-D, BIDDING PHASES, the following shall be inserted
after the fourth paragraph of Section VI-D, page VI-3, as amended:
"Payment for services in the Bidding Phases shall be made to the
Engineer in a lump sum amount of Three Thousand Eight Hundred
Thirty -One Dollars ($3,831.00) for the Bidding Phase for Item 13
in the RECITALS.
Payment for services in the Bidding Phases shall be made to the
Engineer in a lump sum amount of Three Thousand Eight Hundred
Eighty -One Dollars ($3,881.00) for the Bidding Phase for Item 14
in the RECITALS.
Payment for services in the Bidding Phases shall be made to the
Engineer in a lump sum amount of (to be negotiated whenever the
Owner desires to proceed with the Bidding Phase) for the Bidding
Phase for Items 8, 11 and 15 through 18 in the RECITALS."
H. In Section VI-E, CONSTRUCTION PHASES, the following shall be
inserted after the fourth paragraph of Section VI-E, page VI-3, as
amended:
"Payment for services in the Construction Phases shall be made
to the Engineer in a lump sum amount of Seventeen Thousand Six
Hundred Forty -Three Dollars ($17,643.00) for the Construction Phase
for Item 13 in the RECITALS.
AMENDMENT NO. 2
Page 4 of 9
Payment for services in the Construction Phases shall be made
to the Engineer in a lump sum amount of Twenty -Two Thousand Three
Hundred Ninety -Eight Dollars ($22,398.00) for the Construction Phase
for Item 14 in the RECITALS.
Payment for services in the Construction Phases shall be made
to the Engineer in a lump sum amount of (to be negotiated whenever
the Owner desires to proceed with the Bidding Phase) for the
Construction Phase for Item 8, 11 and 15 through 18 in the
RECITALS."
I. In Section VII, page VII-3, the following shall be inserted after
paragraph VII (24):
"(25) Preparation of application, reimbursement and other forms
for the Federal Aviation Administration for grants or for payment of
grants for the various phases of the Project or Projects.
(26) Attendance at or presentations for City Council or
Airport Board meetings."
J. In Section VII, pages VII-3 and -4, the following shall be inserted
in place of the rate schedule shown in the agreement:
"For Special Services rendered under paragraphs VII(1) through
VII(26), the Owner shall pay the Engineer in accordance with the
following schedule:
Principal Engineer
Project Engineer
Design Engineer
Electrical Engineer
$78.00 per hour
56.00 per hour
51.00 per hour
60.00 per hour
AMENDMENT NO. 2
Page 5 of 9
Engineer -in -Training
40.00
per
hour
Chief Drafter
40.00
per
hour
Drafter III & IV
29.00
per
hour
Drafter I & II
24.00
per
hour
Grants Coordinator
44.00
per
hour
Typist
24.00
per
hour
Resident Project Representative
39.00
per
hour
Engineer or RPR Travel
0.31
per
mile
Engineer or RPR per diem
55.00
per
day
Reimbursable Expense
At Cost
K. In Section VII, page VII-4, as amended, under "Subcontract Expense"
the following shall be inserted after Item g:
h. Testing and Surveying for At cost plus $0.00 for
Design Phase of Item 13 processing expenses
in the RECITALS
i. Testing and Surveying for
Construction Phase of
Item 13 in the RECITALS
j. Testing and Surveying for
Design Phase of Item 14
in the the RECITALS
k. Testing and Surveying for
Construction Phase of
Item 14 in the RECITALS
At cost plus $200.00
for processing expenses
At cost plus $710.00
for processing expenses
At cost plus $2,590.00
for processing expenses
1. Testing and Surveying for At cost plus $
Design Phase of Items 15 for processing expenses
through 18 in the RECITALS
AMENDMENT NO. 2
Page 6-of 9
m. Testing and Surveying for
Construction Phase of
Items 15 through 18 in the
RECITALS
n. Testing and Surveying for
Design Phase of Items 8
and 11 in the RECITALS
o. Testing and Surveying for
Design Phase of Items 8
and 11 in the RECITALS
At cost plus $
for processing expenses
At cost plus $
for processing expenses
At cost plus $
for processing expenses
*To be negotiated after the scope of services are established."
L. In Section VII, page VII-4, the paragraph setting forth the adjust-
ments for changes in the Consumer Price Index shall be revised to
read as follows:
"The above rates of compensation for Special Services are based
on salaries, salary overhead, administrative overhead and direct
cost estimated to be in effect until December 31, 1988. For any
Special Services authorized after December 31, 1988, the above rates
of compensation shall be adjusted in accordance with the following
formula:
c
ARC -.IRC x 347.8**
Where
ARC - Adjusted Rate of Compensation
IRC - Initial Rate of Compensation
c - Consumer Price Index on which salaries are based at the
time Special Services are furnished after December 31,
1988.
AMENDMENT NO. 2
Page 7 of 9
**Above schedule of rates are based on Consumer price Index of
347.8
Payments to the Engineer for authorized services not included
in Basic Charges will be made monthly, by the Owner, upon presen-
tation of monthly statements by the Engineer of such services."
M. Section IX, page IX-1, shall be revised to read as follows:
1VCrPTTAU TV
REUSE OF DOCUMENTS
All documents including Drawings and Specifications prepared by
Engineer pursuant to this Agreement are instruments of service in
respect of the Project. They are not intended or represented to be
suitable for reuse by Owner or others on extensions of the Project
or on_any other project. Any reuse without written verification or
adaptation by Engineer for the specific purpose intended will be at
Owner's sole risk and without liability or legal exposure to
Engineer; and Owner shall indemnify and hold harmless Engineer from
all claims, damages, losses and expenses including attorney's fees
arising out of or resulting therefrom."
AMENDMENT NO. 2
Page 8 of 9
IN WITNESS WHEREOF, the City of Lubbock, Texas, and Parkhill, Smith
Cooper, Inc., have set their hands this 013 'r day of fttt%E , 1988.
OWNER:
CITY OF LUBBOCK, TEXAS
By__J.
` &
Mayor
ATTEST:
City Secre ry
APPROVED AS TO FORM:
i
APPROVED AS TO CONTENT:
Director Aviation
ENGINEER:
PARKHILL, SMITH & COOPER, INC.
By Cam'
Chester A. Green, P.E.
Secretary -Treasurer
AMENDMENT NO. 2
Page 9 of 9
CALCULATIONS OF BASIC COMPENSATION
FOR ENGINEERING SERVICES
LUBBOCK INTERNATIONAL AIRPORT
C. DESIGN PHASE
Design Phase for rehabilitation and upgrading of the airfield lighting
system (Item 13 in RECITALS).
Direct Salary Costs
Project Manager 121 Hrs. @ $25.11 = $ 3,038
Project Engineer 175 Hrs. @ $17.49 = $ 3,061
Design Engineer 339 Hrs. @ $13.43 = $- 4,553
Drafter 757 Hrs. @ $10.13 = $ 7,667
Typist 143 Hrs. @ $ 8.25 = $ 1,180
Estimated Salary Costs $ 19,499
Overhead (143.14%) $ 27,910
Subtotal $ 47,409
Direct Costs
Reproduction $ 750
Travel 87
Telephone & Postage 150
Electrical Consultant 2,000
CPT 338
Direct Costs $ 3,325
Estimated Costs $ 50,734
Profit $ 7,610
TOTAL FEE $ 58,344
D. BIDDING PHASE
Bidding Phase for rehabilitation and upgrading of the airfield lighting
system (Item 13 in RECITALS).
Direct Salary Costs
Project Manager 18 Hrs. @ $25.11 = $ 452
Project Engineer 32 Hrs. @ $17.49 = $ 560
Drafter 2 Hrs. @ $10.13 = $ 20
Typist 11 Hrs. @ $ 8.25 m $ 91
Estimated Salary Costs $ 1,123
Overhead (143.14%) $ 1,608
Subtotal
Direct Costs
Reproduction
Travel
Telephone & Postage
Electrical Consultant
CPT
Direct Costs
Estimated Costs
Profit
TOTAL FEE
$ 50
25
100
400
25
$ 2,731
$ 600
$ 3,331
$ 500
$ 3,831
E. CONSTRUCTION PHASE
Construction Phase for rehabilitation and upgrading of the airfield
lighting system (Item 13 in RECITALS).
Direct Salary Costs
Project Manager 83 Hrs. @ $25.11 = $ 2,084
Project Engineer 144 Hrs. @ $17.49 = $ 2,519
Design Engineer 61 Hrs. @ $13.43 - $ 820
Typist 32 Hrs. @ $ 8.25 - $ 264
Estimated Salary Costs $ 5,687
Overhead (143.14%) $ 8,140
Subtotal $ 13,827
Direct Costs
Reproduction $ 120
Travel 155
Telephone & Postage 240
Electrical Consultant 1,000
Direct Costs
Estimated Costs
Profit
TOTAL FEE
$ 1,515
$ 15,342
$ 2,301
$ 17,643
=oax=xas
C. DESIGN PHASE
Design Phase for reconstruction of
the west
cargo apron (Item 14 in
RECITALS).
Direct Salary Costs
Project Manager
136
Hrs.
@ $25.11 =
$
3,415
Project Engineer
278
Hrs.
@ $17.49 =
$
4,862
Design Engineer
544
Hrs.
@ $13.43 =
$
7,306
Drafter
448
Hrs.
@ $10.13 =
$
4,538
Typist
159
Hrs.
@ $ 8.25 =
$
1,312
Estimated Salary Costs $ 21,433
Overhead (143.14%) $ 30,678
Subtotal $ 52,111
Direct Costs
Reproduction $ 600
Travel 87
Telephone & Postage 1.50
CPT 375
Direct Costs $ 1.212
Estimated Costs $ 53,323
Profit $ 7,998
TOTAL FEE $ 61,321
=ssx=asx
D. BIDDING PHASE
Bidding Phase for reconstruction of the west cargo apron (Item 14 in
RECITALS).
Direct Salary Costs
Project Manager
Project Engineer
Design Engineer
Drafter
Typist
19
Hrs.
@
$25.11
- $
477
38
Hrs.
@
$17.49
= $
665
4
Hrs.
@
$13.43
- $
54
2
Hrs.
@
$10.13
s $
20
11
Hrs.
@
$ 8.25
- $
91
Estimated Salary Costs $ 1,307
Overhead (143.14%) $ 1,871
Subtotal $ 3,178
Direct Costs
Reproduction
Travel
Telephone & Postage
CPT
Direct Costs
Estimated Costs
Profit
TOTAL FEE
$ 50
22
100
25
$ 197
$ 3,375
$ 506
$ 3,881
scacss=a
E. CONSTRUCTION PHASE
Construction Phase for reconstruction of the west cargo apron (Item 14
in RECITALS).
Direct Salary Costs
Project Manager 119 Hrs. @ $25.11 - $ 2,988
Project Engineer 206 Hrs. @ $17.49 = $ 3,602
Design Engineer 66 Hrs. @ $13.43 - $' 886
Typist 39 Hrs. @ $ 8.25 - $ 322
Estimated Salary Costs $ 7,798
Overhead (143.14x) $ 11,163
Subtotal $ 18,961
Direct Costs
Reproduction $ 120
Travel 155
Telephone & Postage 240
Direct Costs $ 515
Estimated Costs $ 19,476
Profit $ 2,922
TOTAL FEE $ 22,398