Loading...
HomeMy WebLinkAboutResolution - 2633 - Accept Paving Improvements-Caprock Hwy Const-Drainage Channel Various Park Lakes - 09_10_198744 Resolution #2633 r September 10, 1987 .,-Agenda Item #21 JWF:dw r• 1 .11 mtll y .04 1 k, 0 LODe••H WHEREAS, the City of Lubbock heretofore entered into Contract with Caprock Highway Construction Company for the making of drainage channel improvements in several parks in said City including among other the following: 1985 Park Drainage Channel Improvements located in Park Lakes Nos. 19, 25, 26, 31, and 88. WHEREAS, the construction of the above improvements on the above - mentioned parks was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with terms of said Contract, G.W.O. 0115751 NOW THEREFORE: BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: SECTION 1. THAT the improvements on said portion of Park Drainage Channels BE and the same are hereby accepted and the City Engineer BE and he is hereby authorized to direct the final payment to the contractor in the amount of $15,471.46. SECTION 2. THAT this Resolution shall take effect and be in force from and after its passage. Passed by the City Council this lath day of September , 1987. B. C. McMINN, MAYOR q]Ranet Boyd, City Secretaryv � r • Mt .irectorof ..�ion APPFPVVD AS TO FORM: J rth Fullingim, Assistant i Attorney Res. #2633 MONTHLY ESTIMATE CITY. OF LUBBOCK Project: Park Drainage Channel Improvements Project No. 1421-553107-9937 Contractor: Caprock Hwy. Const. Co. Estimate No. 8 Address• 5185-B 69th Street Contract $ 149,R49 go Lubbock, TX 79424 Add Change Order #1 170,013.40 Estimate Period From November 11 19 86 to May 13 ' 1987 on First estimate and finai estimate use actuai work dates ITEM UNIT OF MEASURE PROJECT EST. QUANTITIES WORK DONE ON CONTRACT CONTRACT PRICE AMOUNT 1. Drainage slab 4" thick rein- S.F. 40 380 S.F. $1.89 79,389.64 forced concrete 3 000# Ida or extruded section including subgrade preparation, complete in place, per square foot• 2. Drainage channel, 40' wide L F 4,700 9,423.36 graded and shaped ditch section including excavation and embankment preparation includ ing temporary channel (phase 1 complete in place per linear foot• 3. Unclassified excavation and C.Y. 4,000 c.y. 606AP n $2.50 19-705-00 embankment including stripping hauling and performing of fill (embankment "ordinary compac- tion") complete in place, per cubic yard; 4. Erosion structure 4" reinforce S.F. 12 590 S.F 8,337.67 $1.79 14 924.43 concrete (3 000#/Ida includ- ing subgrade preparation, com- plete in place, per square foot• 5. Curb & utter: 12" concrete L F 442 L.F. 1,369.1 $5.35 8,009.23 curb & gutter, including site clearance and subgrade re- paration, complete in place per linear foot• 7 E W MONTHLY ESTIMATE' CITY OF LUBBOCK Project: Park Drainage Channel Improvements Project No. 1421;553107-9937 Contractor: Caprock Hwy. Const. Co. Estimate No. 8 Address: 5185-B 69th Street Contract$ 142,842.90 Lubbock, TX 79424 Add Change Order #1 170,013.40 Estimate Period From November 11 19 86 to May 13 ' 19 87 On First estimate and final estimate use actual work dates ITEM UNIT OF MEASURE . PROJECT EST. QUANTITIES WORK DONE ON CONTRACT CONTRACT. PRICE AMOUNT ._Excavation of " " S.F. 3,000 S.F 6.748.80 .75 5,061.60 logged) dry soil including removal processing as directed by the engineer, complete in place per Square foot: 6" PVC Sch. 40 water line L.F. 100 L.F. ;;' 23.50 ---------- sleeved w/ 12" PVC 100 P.S.I. pipe, at least one dresser style 40 pressure joint and installation of an approved 6" repair coupling complete in Place, er linear foot; Elmore E loDine i f of Quak r Avenue in line w will be the sum of t e .i - cost of Unit 26-11. (E Channel grading (unclass. C.Y. 1,300 C.Y. ----_ 2.89 ----------- excavation and embankment" ordinary compaction" complete in place per cubicyard; (E).Spillway Slab 6" reinforced S.Y. 4 0 S.F. 2,664.30 2.55 6,793.97 concrete 3 000# Ida upon "embankment fill" including reparation for grading slab. Complete in place, per square foot; 11 1 1: 1: b MONTHLY ESTIMATr CITY bF" LUBBOCK 1421-553107-9937 Project: Park Drainage Channel Improvements Project No. - Contractor: Caprock Hwy. Const. Co. Estimate No. R Address: 5185—B 69th Street Contract$ 142,842.90 Lubbock, Tx 79424 Add Change Order #1 170,013.40 Estimate Period From November 11, , 19 86 to May 13, ' 19 87 On First estimate and final estimate use actual work dates ITEM UNIT OF MEASURE PROJECT EST. QUANTITIES WORK DONE ON CONTRACT CONTRACT PRICE AMOUNT 10E). Soil cement excavation with S.F. 1,500,S.F.100.00 5.00 500.00* aid of saw.or pneumatic tool, thickness of mix may range from 4" to 10" a depth of 4" and a width of 4 foot is required as shown on plans, per linear foot; Drainage channel slap 4" S.F. 1,300 S.F. 7,216.31 1.89 13,638.83 reinforced concrete 3 000# 7 day) with 6"x 6" 10/10 wire mesh including grading slab, complete in place per square foot; :(E). 12" curb and gutter, includ- L.F. 150 L.F. 146.30 5.00 731.50 ing subgrade preparation complete in place per linear foot: I(E) Curb andgutter; 6" concrete L.F. 100 L.F. 4.50 curb and gutter including subgrade preparation, ,(E) Soil cement apron level -up C.Y. 30 C.Y. i.0 50.00 - improve and level up the existing soil cement apron with 3-sack caliche or A.C. paving. MONTHLY ESTIMATE' CITY OF LUBBOCK 1 1 Project: Park Drainage Channel Improvements Project No. 1421-553107-9937 Contractor: Caprock Hwy. Const. Co. Estimate No. 8 Address: 5185-B 69th Street C g 142 842 90 Lubbock, TX 79424 on tract I Add Change Order #1 170,013.40 Estimate Period From November 11 , 19 86 to May 13 , 19 87 on First estimate and final estimate use actual work dates ITEM UNIT OF MEASURE PROJECT EST. QUANTITIES WORK DONE ON CONTRACT CONTRACT PRICE AMOUNT Casey Inflow Spillway - located north side of 70th Street West of "W" (Unit 19-1) complete cost will be the sum of the items listed b low: 15 ( ), 1 5 c . In flow spillway slab. 4" F 2,800 S.F. R.C. slab - 3 000#7/da (Unit 19-1) including subgrade preparation complete in place per square foot; 6 Curb & izutter removal53.4 $6.00 320.40 disposal and paving rep -air, per linear foot: 7 c . Curb and Rutter L.F. 80 L.F. 90.2 $6,00 541.20 sawtooth section of curb and gutter. w 2' len th of #3 bars 2' o.c. com- plete in place per linear foot; 8. Concrete slab removal and S.F. 2 000 S.F. � ------ .50 ------- disposal, of sidewalks drainage slabs, etc., per square foot• 9. Curb and Rutter removal, L.F. 100 L.F. 125.8 $6.00 754.80 disposal and Paving per linear foot; MONTHLY ESTIMATC$ CITY OF LUBBOCK Project: Park Drainage Channel Improvements Contractor: Caprock Hwy. Const . Co Address: 5185-B 69th Street Project No. 1421-553107-9937 Estimate No. 8 Contract $ 142,842.90 Lubbock, TX 79424 Add Change Order #1, Estimate Period From November 11 , 1986 to May 13 ' 19 87 on First estimate and final estimate use actual work dates -- ITEM UNIT OF MEASURE PROJECT EST. QUANTITIES WORK DONE ON CONTRACT CONTRACT PRICE AMOUNT 20. Excavation-andExcavation-and embankment C.Y. 100 C.Y. $3.00 directed by the engineer and not otherwise required removal and disposal, etc. per cubic yard of cut. 21. Three (3) sack cement stabil- C.Y. 50 C.Y. 50.00 ized caliche to be used in backfill of subgrade approx- imately 6" of thickness for stabilization when requested by Engineer, lace percubi APPROVED: F"' F^ rs err":e Total Amount of Work Done ....... W 164,791 R4 Less 5 % Retained ............. $ -0- Difference Less Special Deduction ........... $ Less Liquidated Damage ......... $ ----- Less Previous Payments........... $ 149,250.38 Amount Due this Estimate......... $ 15.471 .46 Caicwatmns by: Enyine VDate Checked by. IlHlea Date J Oinctor J Date U r/